1. Adopting BIM for Construction
Fia te c h – Tec h Tues day W ebinar
2. Senior Consultant and Writing
publications and articles in
several specialized
magazines, newsletters and
books about BIM, GIS, Project
Controls
Issam El-Absi
CCT
Your Twitter Handle
HELLO!
6. • CCT has been Adopting and Implementing
BIM Methods and Tools for the last 19
years
First Success Story
Ritz Carlton Hotel - Doha - 1997
7. BIM Staff allocation in Projects and Offices (Total 200)
Building Information Modeling (BIM) CCT Group
Athens BIM Centre -> 17 Engineers
Cairo BIM Centre -> 35 Engineers
Palestine BIM Centre -> 30 Engineers
BIM Operations Backbone
CCT has established professional BIM Centers - Centers of Excellence,
where specialized engineers have been recruited and trained to be able to develop efficiently quality BIM
200
200
200
200
200
200
200
150
200
200
200
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Algeria Cairo Marocco Oman Kazahstan Qatar UAE Athens Palaestine Cairo USA
PROJECTS OFFICES
3017
50
44
10154 10
35
3
8. Current
Projects
Lusail Multi-Purpose Hall
Lusail, Qatar
C Morocco ost: $315 Million
Built up Area: 107,650 m2
Lusail Commercial Boulevard
Doha, Qatar
Cost: $350 Million
Doha’s New Port Project
Doha, Qatar
Cost: $292 Million
Sidra Hospital project
Doha, Qatar
Cost: $2.0 Billion
Built up Area: 200,000m2
Multipurpose Admin Complex
Doha, Qatar
Cost: $205 Million
Built up Area: 34,820 m2
Khlifa Bin Zayed Al Nahyan
Specialized Hospital
Casablanca, Morocco
Cost: $100 Million
Built up Area: 42,000 m2
The Nile Corniche Project
Cairo, Egypt
Cost: $450 Million
Built up Area: 70,000 m2
Abu Dhabi Plaza
Astana, Kazakstan
Cost: $1.3 Billion
Built up Area: 510,000 m2
Midfield Terminal Building
Abu Dhabi, UAE
Cost: $3.0 Billion
Built up Area: 700,000 m2
Emiral Project
Moretti, Algeria
Cost: $230 Million
Built up Area: 60,000 m2
Building Information Modeling (BIM) CCT
12. BIM Roadmap / Strategy
A n e d u c a t i o n a l p a t h f o r f u t u r e t a l e n t s
Philosophy
Mindset
Investment
Training &
Software
Endurance
Challenges
• Corporate
Vision
• Holistic
Approach
Top
Management
Embracement
Commitment
over time
Company Awareness of
advantages and outcomes
• Financial
Support
• Resources
• Create Partners/ Alliances
• Create & facilitate BIM
Needs
13. Forming BIM Entity (Department)
A n e d u c a t i o n a l p a t h f o r f u t u r e t a l e n t s
BIM Engineers
• Multi-discipline
• Multi-talent
• Multi-tasking
BIM Center
• Production Hub
• Standards
• Support Projects
• Create Resources
Project/ Site
Team
• Project
Implementation
• Serve Construction
& Project Needs
Automation &
Project Control
Engineers
• Automation
• Project Control
• Engineering point
of view
BIM
Engineers
Sr BIM
Engineers
BIM Team
Leaders/ BIM
Coordinators
BIM
Manager
14. Forming BIM Entity (Department)
S e l e c t i o n P r o c e s s
Training Period
Assessment Process
Criteria
16. Forming BIM Entity (Department)
B I M T e a m C a p a c i t y B u i l d i n g a n d K n o w l e d g e T r a n s f e r
Technical/ Engineering Knowledge &
Construction Methodology
Construction Documentation
BIM based Project Controls
concepts, methodology & Systems
BIM based Lifecycle ManagementScope Management & Quantity Surveying
BIM Standards & Procedures
Collaboration, Design
Coordination & Data/ Document
Management & Sharing
17. Standards and Procedures
S t a n d a r d , P r o c e d u r e s , W o r k f l o w s a n d C o n v e n t i o n s
SuccessfulBIM
Implementation&BIM
basedProjectControl
Capabilities
Standards /
Conventions
Procedures
Workflows
18. Systems and Automation
S y s t e m s , D e v e l o p m e n t , I n t e g r a t i o n a n d A u t o m a t i o n
• Identification of Existing Systems
• Assessment and Gap Analysis
• Systems Development and Integration Road Map
• Development of Authoring Plugins
• Manage, Monitor & Support Site Production (Lean
construction, tasks follow-up, progress)
19. 3D Based
BIM
Platform
Productivity
Tools
Data Warehouse
Finance and
Procurement
Management System
Site Inventory &
Machinery
Management System
QS Productivity Tools
Document Management
System/ Collaboration
Platform
QS Tendering
Management
Site Diary
Systems and Automation
S y s t e m s , D e v e l o p m e n t , I n t e g r a t i o n a n d A u t o m a t i o n
20. Systems and Automation
S y s t e m s , D e v e l o p m e n t , I n t e g r a t i o n a n d A u t o m a t i o n
22. • Inconsistent site productivity
• Difficulty in pin-pointing root cause of low project performance
• Scope Definition is dependent on S/C
• Data / Workflows silos
• Difficulty in matching linking sources of information
(documents, material, model)
• BIM lifespan ends at the design coordination phase
• Re – Entering same data several times
• Planning function is limited to 4D and progress presentation
• Inconsistent reporting from different stakeholders for the same scope
Before
23. • Identified reasons for low productivity and taking
prompt corrective measures
• BIM is the single source of truth for the project scope
• Full integration between ERP, BIM, Planning,
Estimation and site systems
• BIM is being used by most of the project team
,Planning, Estimation, Contracts, Construction etc…
• Proper System Integration “Data is entered once used
every where”
• Planning is the heart of construction management,
providing work fronts through workflows
After
25. Systems and Automation
M a t e r i a l M a n a g e m e n t E R P l i n k e d t o 3 D B I M M o d e l O b j e c t s
26. Systems and Automation
M a t e r i a l , B I M , D o c u m e n t N a m i n g S t a n d a r d i n A c t i o n
27. Systems and Automation
P l a n n i n g W o r k f l o w w i t h E m p h a s i s o n S i t e / O f f i c e C o l l a b o r a t i o n
Planner
• Creating 3 Weeks look-
ahead scenario based
on schedule.
Head of Planner
• Approve the look-ahead
scenario, Review and
confirmed by PM
Planner
• Merge, Issue, Set as
Issued
BIM/ Project Control
Team
• Administrate and Move
to Next Period (Week)
Planner
• Daily Foreman Report
production.
Project Engineer
• Gather progress from
site
Project Engineer
• Import progress
Planner
• Approving progress and
update progress to the
system.
28. Systems and Automation
I n s t a n t R e p o r t i n g P r o v i d i n g M a n a g e m e n t I n f o r m a t i o n f o r
C a l c u l a t e d D e c i s i o n s