Introduction to Microprocesso programming and interfacing.pptx
Cv of tanvir shahrier mahmud
1. CAREER OBJECTIVE
To excel at the diversified field of civil engineering through proper
implementation of my highest earned technical skills and professional
experience as well as monitoring every aspect of construction in a dynamic
and challenging work environment where there is an opportunity of self-
assessment and self-improvement. I am capable of working independently
with minimum supervision and committed to providing high-quality service
to every project.
TANVIR SHAHRIER
MAHMUD CAREER SUMMARY
B.Sc. in Civil Engineering, KUET
PROFILE
Dynamic and Dedicated Civil Engineer with
hands-on extensive experience in Structural
Analysis and Design, Preparation of As-Built,
I started working with reputed construction firms in Bangladesh
immediately after graduation and have been associated with the
implementation and tendering works of eight (08) major Railway Projects
funded by GOB, ADB and JICA.
Construction & Shop Drawings, Preparation
of Rate Analysis and Method Statements for
Tendering Purpose, Preparation of Progress
Reports, Preparation of Inspection Reports,
PROJECT HIGHLIGHTS
Construction Supervision, Estimation of
RCC & Steel Frame Structures, Steel Girder
& PSC Girder Bridges, RCC Pipe and RCC
Box Culverts, Temporary Shoring, Staging
& Temporary Site Accommodation Facilities,
Retaining Structures, etc.
CONTACT
CELL:
+8801820236446
+8801726136304
EMAIL:
shahriermahmud14@gmail.com
shahriermahmud15@gmail.com
MAILING ADDRESS:
House: #26, Eskaton Garder Road, Ramna,
Dhaka 1000.
Construction of New Dual Gauge Single Railway Line
from Dohazari to Cox’s Bazar. (Lot-01).
26.88 (billion)
BDT approx.
Construction of New Broad-Gauge Track on Gopalganj
– Gobra Section.
2.55 (billion)
BDT approx.
Construction of Dual Gauge Double Rail Line and
Conversion of Existing Rail Line into Dual Gauge
between Akhaura and Laksam. (Lot-01 & Lot-02)
34.73 (billion)
BDT approx.
Construction of New Broad-Gauge Track on Kashiani
– Gopalganj Section.
7.23 (billion)
BDT approx.
Construction of Station Building at Kaliakoir in between
Mirzapur Mouchak Station in connection with Hi-Tech
Park Project.
4.52 (billion)
BDT approx.
TOTAL VALUE OF PROJECTS 75.91 (billion)
BDT approx.
2. EMPLOYMENT RECORD
(Sept. 2018 – continuing)
TOMA CONSTRUCTION & CO. LTD.
ASSISTANT MANAGER (ENGINEERING)
01. PROJECT
Construction of New Dual Gauge Single Railway Line from Dohazari to
Cox’s Bazar LOT-01
- Funded by Asian Development Bank
- Client: Bangladesh Railway
PROJECT OVERVIEW
- Route Length: 52.4 km
RESPONSIBILTIES
- Planning & Implementation.
- Supervision of construction work.
- Estimation of construction material requirement.
- Preparation of Method Statements and Inspection Reports.
- Supervision of Drawing Preparation.
- Keeping liaison with the Consultants and Clients.
MY ACHIEVEMENTS
- Waiting period for surcharge has been cut down by three (03) months
considering negative skin friction in pile foundations of 19 nos. steel girder
bridges.
- Design Review and Construction Drawing Preparation process has been
escalated by 1.5 times the usual pace of submission.
- Compiled three (03) Method Statements.
- Compiled TCCL Safety Handbook.
02. PROJECT
Construction of Dual Gauge Double Rail Line and Conversion of Existing
Rail Line into Dual Gauge between Akhaura and Laksam.
- Funded by Government of Bangladesh, Asian Development Bank and
European Investment Bank
- Client: Bangladesh Railway
PROJECT OVERVIEW
- Route Length: 36.00 km
RESPONSIBILTIES
- Structural analysis and Design of single cell, double cell, triple cell and
quadruple cell RCC Box Culverts as per IS.
- Structural analysis and Design of Station Buildings as per ACI.
- Structural analysis and Design of Staging, Scaffolding work.
- Structural analysis and Design of Temporary Shoring System as per
AREMA.
- Structural analysis and Design of Braced Cofferdams as per AREMA.
3. EMPLOYMENT RECORD
(Sept. 2018 – continuing)
MY ACHIEVEMENTS
- Conducted in-house Analysis and Design of Temporary Shoring, Staging,
RCC Retaining Wall (150.0 linear meter), Multibarrel RCC Box Culverts and
saved approximately 1.8 Million BDT in consultancy fees.
- Adapted alternative analysis approach towards foundation design for RCC
Buildings to yield an additional profit of 10.0 Million BDT.
03. PROJECT
Construction of New Broad-Gauge Track on Gopalganj – Gobra Section.
- Funded by Government of Bangladesh
- Client: Bangladesh Railway
PROJECT OVERVIEW
- Route Length: 11.315 km
RESPONSIBILTIES
- Structural analysis and Design of single cell, double cell and triple cell RCC
Box Culverts as per IS.
- Structural analysis and Design of Steel Plate Girder Bridges as per IS.
- Structural analysis and Design of Underpass and Overpass for local access
roads as per IS.
- Structural analysis and Design of Station Buildings and Industrial Sheds as
per ACI and AISC.
- Preparation of construction drawings of buildings, bridges and culverts.
- Supervision of construction work (i.e. concreting work, shuttering work,
rebar binding work, excavation work etc.).
- Preparation of As-built drawings.
- Preparation of Bar Bending Schedule.
- Estimation of civil works.
- Preparation of budget.
- Inspection of trial assembly of steel girder bridges.
- Keeping liaison with the Consultants and Clients.
MY ACHIEVEMENTS
- Conducted in-house Analysis and Design of eight (08) nos. Multibarrel Skew
RCC Box Culverts and saved approximately 1.2 Million BDT in consultancy
fees.
- Rectified an error in As-Built drawings of River Training Works saving 30.0
Million BDT.
- Compiled four (04) Inspection Reports.
04. PROJECT
Tendering for Bangabandhu Sheikh Mujib Railway Bridge Construction
Project.
- Funded by Japan International Cooperation Agency
- Client: Bangladesh Railway
4. EMPLOYMENT RECORD
(Sept. 2018 – continuing)
MY ACHIEVEMENTS
- Compiled Unit Rate Analysis for 400+ items of work.
- Compiled five (05) Method Statements.
05. PROJECT
Tendering for Expansion of Osmani Int’l Airport, Sylhet (1st Phase).
- Funded by Government of Bangladesh
- Client: Civil Aviation Authority of Bangladesh
MY ACHIEVEMENTS
- Compiled Unit Rate Analysis for 300+ items of work.
- Compiled two (02) Method Statements.
06. PROJECT
Tendering for Construction of Padma Bridge Rail Link Project.
- Funded by Government of Bangladesh and Export-Import Bank of
China
- Client: Bangladesh Railway
MY ACHIEVEMENTS
- Compiled Unit Rate Analysis for 100+ items of work.
- Compiled three (03) Method Statements.
(Dec. 2015 – Sept. 2018)
MAX INFRASTRUCTURE LTD.
JUNIOR STRUCTURAL ENGINEER
01. PROJECT
Construction of New Broad-Gauge Track on Kashiani – Gopalganj Section.
- Funded by Government of Bangladesh
- Client: Bangladesh Railway
PROJECT OVERVIEW
- Route Length: 32.365 km
RESPONSIBILITIES
- Structural analysis and Design of single cell, double cell and triple cell RCC
Box Culverts as per IS.
- Structural analysis and Design of Steel Plate Girder Bridges as per IS.
- Structural analysis and Design of Underpass and Overpass for local access
roads as per IS.
- Structural analysis and Design of 40.0-meter-long PSC Girder as per
AASHTO LRFD and IRC.
- Structural analysis and Design of Station Buildings and Industrial Sheds as
per ACI and AISC.
5. EMPLOYMENT RECORD
(Dec. 2015 – Sept. 2018)
- Preparation of construction drawings of bridges and culverts.
- Supervision of construction work (i.e. concreting work, shuttering work,
rebar binding work, excavation work etc.).
- Preparation of Bar Bending Schedule.
- Preparation of Method Statements and Inspection Reports.
- Estimation of civil works.
- Inspection of trial assembly of steel girder bridges.
- Keeping liaison with the Consultants and Clients.
MY ACHIEVEMENTS
- Man month for Design Review was cut down from fourteen (14) months to
eight (08) months.
- Adapted alternative analysis approach towards foundation design for RCC
Buildings, Bridges and Culverts to increase contractor’s profit margin by
8.0% (480 Million BDT).
- Implemented local fabrication of steel girders and reduced incidental costs
related to production by 10.0% (1.5 Million BDT).
- Conducted in-house Analysis and Design of various civil infrastructures and
saved approximately 3.0 Million BDT in consultancy fees.
- Reviewed Revised Development Project Proposal (RDPP) and rectified an
error in estimation saving 20.0 Million BDT.
- Compiled two (02) Method Statements.
- Compiled two (02) Inspection Reports.
02. PROJECT
Construction of Dual Gauge Double Rail Line and Conversion of Existing
Rail Line into Dual Gauge between Akhaura and Laksam.
- Funded by Government of Bangladesh, Asian Development Bank and
European Investment Bank
- Client: Bangladesh Railway
PROJECT OVERVIEW
- Route Length: 36.00 km
RESPONSIBILITIES
- Structural analysis and Design of single cell and double cell RCC Box
Culverts as per IS.
- Structural analysis and Design of Temporary Shoring System as per
AREMA.
- Structural analysis and Design of Braced Cofferdams as per AREMA.
- Structural analysis and Design of Steel Trestle Bridges as per IS.
MY ACHIEVEMENTS
- Conducted in-house Analysis and Design of Temporary Shoring, Staging
and Track Lifting Arrangement and saved approximately 1.2 Million BDT in
consultancy fees.
6. EMPLOYMENT RECORD
(Dec. 2015 – Sept. 2018)
- Adapted alternative analysis approach towards foundation design for RCC
Buildings to yield an additional profit of 12.8 Million BDT.
- Conducted in-house simulation to assess bearing capacity of founding soil
strata and reduced waiting period for surcharge by three (03) months for five
(05) nos. RCC Box Culverts.
03. PROJECT
Construction of Station Building at Kaliakoir in between Mirzapur-
Mouchak Station in connection with Hi-Tech Park Project.
- Funded by Government of Bangladesh
- Client: Bangladesh Railway
PROJECT OVERVIEW
- Route Length: 1.07 km
RESPONSIBILITIES
- Structural analysis and Design of Earth Retention System.
- Structural analysis and Design of Pile Foundation for RCC Buildings.
MY ACHIEVEMENTS
- Conducted in-house Analysis and Design of RCC Retaining Wall (100 linear
meter) and pile foundation for RCC Buildings and saved approximately 0.6
Million BDT in consultancy fees.
ACADEMIC QUALIFICATION
Bachelor of Science in Civil Engineering
Khulna University of Engineering & Technology (KUET)
Undergraduate Thesis: Determination of Shear Strength Characteristics and Load-Settlement Behavior of Fiber
Reinforced Soil using Finite Element Method and Experimental Models.
LANGUAGE PROFICIENCY
1. ENGLISH (Professional Working Proficiency)
2. BENGALI (Native Proficiency) Listening: 8.5
Reading: 9.0
Writing: 7.0
Overall: 8.0
3. HINDI (Verbal Proficiency) Speaking: 7.0
7. COMPUTER SKILLS
ENGINEERING SOFTWARE
- Midas Civil
- STAAD.Pro
- Bentley LEAP Bridge
- Bentley RAM Connection
- ASDIP Foundation
- ASDIP Concrete
- All Pile
- Lpile
- GeoStudio
- Dlubal Crane Way
- AutoCAD
- PLAXIS
- GS AFES
- RCM ACI Builder
- PROKON
- Shoring Suite
- CSI Etabs
- CSI Bridge
MICROSOFT OFFICE PACKAGE
- Microsoft Word
- Microsoft Excel
- Microsoft PowerPoint
- Microsoft Project
TRAINING SUMMARY
Training Title: Training Workshop on Midas Civil Software – Intermediate Level.
Training Contents: Modelling and Design of PSC Box, PSC I, Steel Composite, Culverts,
Sub Structure, Railway Loadings and Rail Structure Interaction.
Venue: MIDAS-IT, Navi Mumbai, India.
Training Title: Workshop on ETABS & Arc-GIS
Training Contents: Development and Analysis of Structural Models and
Preparation of Hydrological Models.
Venue: Khulna University of Engineering & Technology (KUET), Khulna,
Bangladesh.
8. PERSONAL DETAIL
Marital Status Married
Nationality Bangladeshi
National Identification Number 19921594314000554
Passport Number BQ0114994
REFERENCE (S)
Name Engr. Udayan Chakraborty Dr. Muhammad Harunur Rashid
Organization TOMA Construction & Co. Ltd. Khulna University of Engineering & Technology
(KUET)
Designation General Manager (Bridge) Professor
Address Toma Tower, 77/1 Kakrail Ramna, Dhaka,
Bangladesh.
Dept. of Civil Engineering,
Khulna University of Engineering & Technology
Cell +8801718265032 +8801711933230
Email udayan.chakraborty.br@gmail.com hafin02@gmail.com
I do hereby declare that the particulars provided in the curriculum vitae are true to the best of my knowledge and belief. I
authorize your organization to verify the information provided above.
Any necessary documentation related to institutional verification & authorization will be provided upon request.
Sincerely,
Tanvir Shahrier Mahmud