How Bombardier Delivered CBTC in 22 Months
Case Study: CITYFLO 650 For Shenzhen Metro Line 3
CBTC Conference, May 5/6, 2011
©BombardierInc.oritssubsidiaries.Allrightsreserved.
2
Bombardier fully commissioned CITYFLO 650
in Shenzhen, China within 22 months
Key Project Features
25km (phase 1) + 18km (phase 2)
16 stations (phase 1) + 14 stations
(phase 2)
CBTC Moving Block
Independent CBI to secure degraded
mode operation in the rare case of CBTC
failure
22 months from award to passenger
service
Partner: INSIGMA
Customer: Shenzhen Metro Company
(SMC)
CITYFLO is a trademark of Bombardier Inc. or its subsidiaries.
©BombardierInc.oritssubsidiaries.Allrightsreserved.
3
CITYFLO 650 for Shenzhen Metro Line 3
Original contract awarded in 2008
Customer realised that signalling
supplier would not be able to
commission on time (June 30, 2011 -
before the 26th Summer Universiade
due to take place in Aug 2011)
The original supplier was replaced by
Bombardier in February 2009
Background
©BombardierInc.oritssubsidiaries.Allrightsreserved.
Technology challenges
The original plan for the system architecture had to be changed
– Contract signed based on similar system to Neihu
– Separate interlocking (independent of RATP) was desired
– It was decided to base it on the Metro Madrid architecture
The two-site project (with all components originating from one product centre)
became a five-site project with products coming from three product centres
– EBI Lock CBI from Sweden and application engineering from Bangkok
– EBI Screen ATS from Finland with application work in Pittsburgh / Bangkok
– EBI Cab (ATP and ATO) from Pittsburgh
– System design from Pittsburgh, with support from Bangkok and Stockholm
– Site testing and interface engineering in Shenzhen
Interfaces with other subsystems
– Most suppliers had already finalised their designs – being the last one, it was the
responsibility of the signalling supplier to adapt their designs to match the others
4 EBI is a trademark of Bombardier Inc. or its subsidiaries.
©BombardierInc.oritssubsidiaries.Allrightsreserved.
Redundant
Region ATP
Region1
Global Systems Displays
Operator
Workstations
High Speed Redundant Ethernet ATC Network (DTS)
Maintenance Area
Control Console
Revenue Area Control Console Redundant Central
Control Server
Redundant
Region ATO
EBI Lock
Object Controller Network
Object Controllers
(Points, Signals, Track
Occupancy)
Redundant
DTS (Data
Transmission
System)
Redundant
Region ATP
Regionn
Redundant
Region ATO
EBI Lock
Object Controller Network
Object Controllers
(To field equipment)
Redundant
DTS
Radio A
Radio B
Radio A Radio B Radio A Radio B Radio A Radio B
LOS LOS LOS LOS LOS LOS
Radiax Cable
Norming PointsSecondary Train Detection
Spread Spectrum
(Train Control Data)
OBN MDR
VATC
BRK
PROP
NPR
Signals
CITYFLO 650 Architecture
……
Region Control Rooms
Redundant TWC (Train to Wayside) Network
©BombardierInc.oritssubsidiaries.Allrightsreserved.
Key market requirements and challenges
Hot standby (seamless switchover) for both on-board and wayside systems
Independent interlocking so that if CBTC fails, basic inter-station interlocking
can be operated
Intermittent ATP required as another back up operation mode
Coded Train and Wayside Communications (TWC) (becoming mandatory)
Independent 3rd party safety certification
prior to full commissioning
Station stopping accuracy at ATO mode is
99.995% within ±±±± 0.3m and 99.9999% within
the ±±±± 0.5 m range
Other higher than normal RAMS numbers
6
©BombardierInc.oritssubsidiaries.Allrightsreserved.
Resource management challenges
System delivered from five countries
– USA, Thailand, Finland, Sweden and China
– Located in three continents and across five different time zones
– Language as well as cultural barriers
Training
– Project team members with little CBTC experience (Bangkok / China)
– Local site staff
– Partners / Customers
• Partner: INSIGMA (new entrant to the market)
• Shenzhen Metro (experienced operator, but not so familiar with CBTC)
7
©BombardierInc.oritssubsidiaries.Allrightsreserved.
Keys to success
Mature Technology
– CITYFLO 650 has been in service since 2002
– Robust TWC design – (already on the 3rd generation)
An Experienced Team
– Straight from the Madrid Metro implementation (for Pittsburgh based team)
– Extensive mass transit experience for Pittsburgh and Bangkok teams
A Cooperative Customer
– Support from senior and working level for access allowance, safety review etc
Strong Project Management
– Focussed / hands-on management
– Detailed attention to schedule, including weekly updates on delivery progress
Senior Management Support
– Monthly and Quarterly reviews
– Gate reviews and audits of the system design, resource allocation, risks and
milestones
8
©BombardierInc.oritssubsidiaries.Allrightsreserved.
Additional success factors
Unified team
– Bombardier, the partner and the customer were all united
Communication
– Key project milestones were well communicated to all sites
– Product delivery (the timely communication of all changes to everyone)
– Open communication within the team (aim to have answers to all open questions)
– Communication outside of the team using a strict single channel protocol
Training
– Partner training (execution)
– Customer training (operation)
Documentation
– Detailed installation instructions created which were precise and explicit to allow for
engineers to install equipment without CBTC knowledge
– Detailed and precise test procedures detailing all parts of the test process
9
©BombardierInc.oritssubsidiaries.Allrightsreserved.
10
CITYFLO 650 signalling for Shenzhen Metro Line 3
©BombardierInc.oritssubsidiaries.Allrightsreserved.
11
CITYFLO 650 signalling for Shenzhen Metro Line 3
Elevated and underground sections of phase 1
Operation and Control Center OCC
©BombardierInc.oritssubsidiaries.Allrightsreserved.
12
Shenzhen Metro Line 3 train driving cab view
Shenzhen Metro driving cab panel
©BombardierInc.oritssubsidiaries.Allrightsreserved.
Shenzhen Metro Line 3 New Years Day 2011
around 188,000 passengers used the line shortly after opening
©BombardierInc.oritssubsidiaries.Allrightsreserved.
14
Train the trainers sessions for SMC/INSIGMA in
Pittsburgh, Bangkok and on site in Shenzhen
©BombardierInc.oritssubsidiaries.Allrightsreserved.
15
Opening ceremony of the Shenzhen Metro Line 3
Phase 1 complete: December 28, 2010
©BombardierInc.oritssubsidiaries.Allrightsreserved.
16
The CITYFLO Monitoring System (CFMS)
The CFMS can record signaling subsystems train data and play back all the
movement of the line in service
©BombardierInc.oritssubsidiaries.Allrightsreserved.
17
The Shenzhen Metro as it will be by June 30, 2011
©BombardierInc.oritssubsidiaries.Allrightsreserved.
18
Shenzhen Metro development plan up to 2020
Connecting to Hong Kong via 3 lines,
1 under the sea
Total of 16 lines
Line 3 will be extend to an additional 5
stations north and 1 station south
©BombardierInc.oritssubsidiaries.Allrightsreserved.
Key achievements
Short delivery time of 22 months from notice to proceed (NTP)
Project delivered within budget and with a minimum of unforeseen
issues, reducing any extra costs at project completion
Global cooperation through multi-site engineering and project
team (China, Thailand and US)
The project team was proud to complete the project in line with
Bombardier’s strategic goal to strive for operational excellence
especially in project execution
19
©BombardierInc.oritssubsidiaries.Allrightsreserved.
20
Seattle-Tacoma
Int’l Airport
Washington, USA
McCarran Int’l Airport
Las Vegas
Nevada, USA
Kingston Test Track
Canada
SEPTA Light Rail
Philadelphia, USA
Heathrow Int’l Airport
Gatwick Int’l Airport
United Kingdom
Shenzhen Metro
Line 3
China
San Francisco
Int’l Airport
California, USA
Tianjin Metro
Lines 2 & 3
China
Metro Madrid
Line 1, Line 6
Spain
Dallas/Forth Worth
Int’l Airport
Texas, USA
2
Projects in Revenue Operation 12
Revenue Ready (Yong-In) 1
Projects under Execution 6
Test Tracks 2
Total 21
Yong-In
Korea
Sacramento
Int’l Airport
California, USA
Neihu Mucha Line
Taiwan
2
Guangzhou Metro
Pearl River Line
China
Pittsburgh Test Track
Pennsylvania, USA
Phoenix Int’l Airport
Arizona, USA
CITYFLO 650 is in service at eleven sites and is being
implemented at six transit systems
20
King Abdullah
Financial District
Riyadh, Saudi Arabia
Tiradentes Monorail
Sao Paulo, Brazil

More Related Content

What's hot

Fieldbus Presentation
Fieldbus PresentationFieldbus Presentation
Fieldbus PresentationSachin Rasane
 
Viết Ngôn Ngữ Lập Trình 8051 PIC AVR
Viết Ngôn Ngữ Lập Trình 8051 PIC AVRViết Ngôn Ngữ Lập Trình 8051 PIC AVR
Viết Ngôn Ngữ Lập Trình 8051 PIC AVRMr Giap
 
Giáo trình mạng máy tính
Giáo trình mạng máy tínhGiáo trình mạng máy tính
Giáo trình mạng máy tínhHoài Phạm
 
Honeywell PLC ML 200R ystem architecture &-installation
Honeywell PLC ML 200R ystem architecture &-installationHoneywell PLC ML 200R ystem architecture &-installation
Honeywell PLC ML 200R ystem architecture &-installationShivam Singh
 
2x25 KV OHE system in DFCCIL in Western corridor.ppsx
2x25 KV OHE system in DFCCIL in Western corridor.ppsx2x25 KV OHE system in DFCCIL in Western corridor.ppsx
2x25 KV OHE system in DFCCIL in Western corridor.ppsxMohd. Aslam Siddiqui
 
Honeywell PLC ML-50 (MLM-DR16S)
Honeywell PLC ML-50 (MLM-DR16S)Honeywell PLC ML-50 (MLM-DR16S)
Honeywell PLC ML-50 (MLM-DR16S)Shivam Singh
 
[Advantech] Modbus protocol training (ModbusTCP, ModbusRTU)
[Advantech] Modbus protocol training (ModbusTCP, ModbusRTU)[Advantech] Modbus protocol training (ModbusTCP, ModbusRTU)
[Advantech] Modbus protocol training (ModbusTCP, ModbusRTU)Ming-Hung Hseih
 
Airport lighting
Airport lighting Airport lighting
Airport lighting KHOLA IQBAL
 
Kiến trúc máy tính và hợp ngữ bài 04
Kiến trúc máy tính và hợp ngữ bài 04Kiến trúc máy tính và hợp ngữ bài 04
Kiến trúc máy tính và hợp ngữ bài 04Nhóc Nhóc
 
Fieldbus Tutorial Part 7 - Fieldbus Communication
Fieldbus Tutorial Part 7 - Fieldbus CommunicationFieldbus Tutorial Part 7 - Fieldbus Communication
Fieldbus Tutorial Part 7 - Fieldbus CommunicationEmerson Exchange
 
Can protocol implementation for data communication (2)
Can protocol implementation for data communication (2)Can protocol implementation for data communication (2)
Can protocol implementation for data communication (2)karuna418
 
Tìm hiểu về bluetooth
Tìm hiểu về bluetoothTìm hiểu về bluetooth
Tìm hiểu về bluetoothKim Oanh
 

What's hot (20)

Fieldbus Presentation
Fieldbus PresentationFieldbus Presentation
Fieldbus Presentation
 
Viết Ngôn Ngữ Lập Trình 8051 PIC AVR
Viết Ngôn Ngữ Lập Trình 8051 PIC AVRViết Ngôn Ngữ Lập Trình 8051 PIC AVR
Viết Ngôn Ngữ Lập Trình 8051 PIC AVR
 
FPGA Configuration
FPGA ConfigurationFPGA Configuration
FPGA Configuration
 
FlexRay
FlexRayFlexRay
FlexRay
 
Giáo trình mạng máy tính
Giáo trình mạng máy tínhGiáo trình mạng máy tính
Giáo trình mạng máy tính
 
Honeywell PLC ML 200R ystem architecture &-installation
Honeywell PLC ML 200R ystem architecture &-installationHoneywell PLC ML 200R ystem architecture &-installation
Honeywell PLC ML 200R ystem architecture &-installation
 
29421864 cosodulieu02
29421864 cosodulieu0229421864 cosodulieu02
29421864 cosodulieu02
 
can bus theory solution
can bus theory solutioncan bus theory solution
can bus theory solution
 
Luận văn: Nghiên Cứu Công Nghệ Truyền Dẫn SDH, HAY
Luận văn: Nghiên Cứu Công Nghệ Truyền Dẫn SDH, HAYLuận văn: Nghiên Cứu Công Nghệ Truyền Dẫn SDH, HAY
Luận văn: Nghiên Cứu Công Nghệ Truyền Dẫn SDH, HAY
 
3. jar 25 weights
3. jar 25 weights3. jar 25 weights
3. jar 25 weights
 
2x25 KV OHE system in DFCCIL in Western corridor.ppsx
2x25 KV OHE system in DFCCIL in Western corridor.ppsx2x25 KV OHE system in DFCCIL in Western corridor.ppsx
2x25 KV OHE system in DFCCIL in Western corridor.ppsx
 
Honeywell PLC ML-50 (MLM-DR16S)
Honeywell PLC ML-50 (MLM-DR16S)Honeywell PLC ML-50 (MLM-DR16S)
Honeywell PLC ML-50 (MLM-DR16S)
 
[Advantech] Modbus protocol training (ModbusTCP, ModbusRTU)
[Advantech] Modbus protocol training (ModbusTCP, ModbusRTU)[Advantech] Modbus protocol training (ModbusTCP, ModbusRTU)
[Advantech] Modbus protocol training (ModbusTCP, ModbusRTU)
 
DCS an overview
DCS an overviewDCS an overview
DCS an overview
 
Airport lighting
Airport lighting Airport lighting
Airport lighting
 
Kiến trúc máy tính và hợp ngữ bài 04
Kiến trúc máy tính và hợp ngữ bài 04Kiến trúc máy tính và hợp ngữ bài 04
Kiến trúc máy tính và hợp ngữ bài 04
 
Fieldbus Tutorial Part 7 - Fieldbus Communication
Fieldbus Tutorial Part 7 - Fieldbus CommunicationFieldbus Tutorial Part 7 - Fieldbus Communication
Fieldbus Tutorial Part 7 - Fieldbus Communication
 
Profibus
ProfibusProfibus
Profibus
 
Can protocol implementation for data communication (2)
Can protocol implementation for data communication (2)Can protocol implementation for data communication (2)
Can protocol implementation for data communication (2)
 
Tìm hiểu về bluetooth
Tìm hiểu về bluetoothTìm hiểu về bluetooth
Tìm hiểu về bluetooth
 

Similar to Shen_Presentation_CBTC_Conf_2011

Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Shyam Raman
 
ERTMS Solutions general company presentation
ERTMS Solutions general company presentationERTMS Solutions general company presentation
ERTMS Solutions general company presentationERTMS Solutions
 
AIRCOM LTE Webinar 1 - Network Architecture
AIRCOM LTE Webinar 1 - Network ArchitectureAIRCOM LTE Webinar 1 - Network Architecture
AIRCOM LTE Webinar 1 - Network ArchitectureAIRCOM International
 
Roads, Infrastructure and BIM
Roads, Infrastructure and BIMRoads, Infrastructure and BIM
Roads, Infrastructure and BIMCCT International
 
Using “Big-Data” to improve roadway performance across strategic road network...
Using “Big-Data” to improve roadway performance across strategic road network...Using “Big-Data” to improve roadway performance across strategic road network...
Using “Big-Data” to improve roadway performance across strategic road network...Italo Broggini
 
07_PRE_MIGRATION_ACT.ppt
07_PRE_MIGRATION_ACT.ppt07_PRE_MIGRATION_ACT.ppt
07_PRE_MIGRATION_ACT.pptnitin_009
 
AIRCOM World Telecom CTIO Summit 2012 - Keynote
AIRCOM World Telecom CTIO Summit 2012 - KeynoteAIRCOM World Telecom CTIO Summit 2012 - Keynote
AIRCOM World Telecom CTIO Summit 2012 - KeynoteSteve Bowker
 
Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...
Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...
Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...Chittaranjan Bai
 
Robotics applied to power line
Robotics applied to power line Robotics applied to power line
Robotics applied to power line RTE
 
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013CCT International
 
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...IRJET Journal
 
923 2 wheeler_public privat partnerships
923 2 wheeler_public privat partnerships923 2 wheeler_public privat partnerships
923 2 wheeler_public privat partnershipsRail~Volution
 
Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)
Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)
Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)Alberto Los Santos Aransay
 
Communications Based Train Control Conference London March 12 2014
Communications Based Train Control Conference London March 12 2014 Communications Based Train Control Conference London March 12 2014
Communications Based Train Control Conference London March 12 2014 James Nesbitt
 

Similar to Shen_Presentation_CBTC_Conf_2011 (20)

Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...
 
Divaker resume updated
Divaker resume updatedDivaker resume updated
Divaker resume updated
 
Rabi Kumar Purohita
Rabi Kumar PurohitaRabi Kumar Purohita
Rabi Kumar Purohita
 
ERTMS Solutions general company presentation
ERTMS Solutions general company presentationERTMS Solutions general company presentation
ERTMS Solutions general company presentation
 
Crossrail - Integrated Assurance, 17 May 2016,
Crossrail - Integrated Assurance, 17 May 2016, Crossrail - Integrated Assurance, 17 May 2016,
Crossrail - Integrated Assurance, 17 May 2016,
 
AIRCOM LTE Webinar 1 - Network Architecture
AIRCOM LTE Webinar 1 - Network ArchitectureAIRCOM LTE Webinar 1 - Network Architecture
AIRCOM LTE Webinar 1 - Network Architecture
 
Dubai metro paper in ASPECT Conference
Dubai metro paper in ASPECT Conference Dubai metro paper in ASPECT Conference
Dubai metro paper in ASPECT Conference
 
Roads, Infrastructure and BIM
Roads, Infrastructure and BIMRoads, Infrastructure and BIM
Roads, Infrastructure and BIM
 
Using “Big-Data” to improve roadway performance across strategic road network...
Using “Big-Data” to improve roadway performance across strategic road network...Using “Big-Data” to improve roadway performance across strategic road network...
Using “Big-Data” to improve roadway performance across strategic road network...
 
07_PRE_MIGRATION_ACT.ppt
07_PRE_MIGRATION_ACT.ppt07_PRE_MIGRATION_ACT.ppt
07_PRE_MIGRATION_ACT.ppt
 
AIRCOM World Telecom CTIO Summit 2012 - Keynote
AIRCOM World Telecom CTIO Summit 2012 - KeynoteAIRCOM World Telecom CTIO Summit 2012 - Keynote
AIRCOM World Telecom CTIO Summit 2012 - Keynote
 
Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...
Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...
Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...
 
Resume
ResumeResume
Resume
 
Robotics applied to power line
Robotics applied to power line Robotics applied to power line
Robotics applied to power line
 
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
 
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
 
Yangzhou cnc
Yangzhou cncYangzhou cnc
Yangzhou cnc
 
923 2 wheeler_public privat partnerships
923 2 wheeler_public privat partnerships923 2 wheeler_public privat partnerships
923 2 wheeler_public privat partnerships
 
Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)
Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)
Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)
 
Communications Based Train Control Conference London March 12 2014
Communications Based Train Control Conference London March 12 2014 Communications Based Train Control Conference London March 12 2014
Communications Based Train Control Conference London March 12 2014
 

Shen_Presentation_CBTC_Conf_2011

  • 1. How Bombardier Delivered CBTC in 22 Months Case Study: CITYFLO 650 For Shenzhen Metro Line 3 CBTC Conference, May 5/6, 2011
  • 2. ©BombardierInc.oritssubsidiaries.Allrightsreserved. 2 Bombardier fully commissioned CITYFLO 650 in Shenzhen, China within 22 months Key Project Features 25km (phase 1) + 18km (phase 2) 16 stations (phase 1) + 14 stations (phase 2) CBTC Moving Block Independent CBI to secure degraded mode operation in the rare case of CBTC failure 22 months from award to passenger service Partner: INSIGMA Customer: Shenzhen Metro Company (SMC) CITYFLO is a trademark of Bombardier Inc. or its subsidiaries.
  • 3. ©BombardierInc.oritssubsidiaries.Allrightsreserved. 3 CITYFLO 650 for Shenzhen Metro Line 3 Original contract awarded in 2008 Customer realised that signalling supplier would not be able to commission on time (June 30, 2011 - before the 26th Summer Universiade due to take place in Aug 2011) The original supplier was replaced by Bombardier in February 2009 Background
  • 4. ©BombardierInc.oritssubsidiaries.Allrightsreserved. Technology challenges The original plan for the system architecture had to be changed – Contract signed based on similar system to Neihu – Separate interlocking (independent of RATP) was desired – It was decided to base it on the Metro Madrid architecture The two-site project (with all components originating from one product centre) became a five-site project with products coming from three product centres – EBI Lock CBI from Sweden and application engineering from Bangkok – EBI Screen ATS from Finland with application work in Pittsburgh / Bangkok – EBI Cab (ATP and ATO) from Pittsburgh – System design from Pittsburgh, with support from Bangkok and Stockholm – Site testing and interface engineering in Shenzhen Interfaces with other subsystems – Most suppliers had already finalised their designs – being the last one, it was the responsibility of the signalling supplier to adapt their designs to match the others 4 EBI is a trademark of Bombardier Inc. or its subsidiaries.
  • 5. ©BombardierInc.oritssubsidiaries.Allrightsreserved. Redundant Region ATP Region1 Global Systems Displays Operator Workstations High Speed Redundant Ethernet ATC Network (DTS) Maintenance Area Control Console Revenue Area Control Console Redundant Central Control Server Redundant Region ATO EBI Lock Object Controller Network Object Controllers (Points, Signals, Track Occupancy) Redundant DTS (Data Transmission System) Redundant Region ATP Regionn Redundant Region ATO EBI Lock Object Controller Network Object Controllers (To field equipment) Redundant DTS Radio A Radio B Radio A Radio B Radio A Radio B Radio A Radio B LOS LOS LOS LOS LOS LOS Radiax Cable Norming PointsSecondary Train Detection Spread Spectrum (Train Control Data) OBN MDR VATC BRK PROP NPR Signals CITYFLO 650 Architecture …… Region Control Rooms Redundant TWC (Train to Wayside) Network
  • 6. ©BombardierInc.oritssubsidiaries.Allrightsreserved. Key market requirements and challenges Hot standby (seamless switchover) for both on-board and wayside systems Independent interlocking so that if CBTC fails, basic inter-station interlocking can be operated Intermittent ATP required as another back up operation mode Coded Train and Wayside Communications (TWC) (becoming mandatory) Independent 3rd party safety certification prior to full commissioning Station stopping accuracy at ATO mode is 99.995% within ±±±± 0.3m and 99.9999% within the ±±±± 0.5 m range Other higher than normal RAMS numbers 6
  • 7. ©BombardierInc.oritssubsidiaries.Allrightsreserved. Resource management challenges System delivered from five countries – USA, Thailand, Finland, Sweden and China – Located in three continents and across five different time zones – Language as well as cultural barriers Training – Project team members with little CBTC experience (Bangkok / China) – Local site staff – Partners / Customers • Partner: INSIGMA (new entrant to the market) • Shenzhen Metro (experienced operator, but not so familiar with CBTC) 7
  • 8. ©BombardierInc.oritssubsidiaries.Allrightsreserved. Keys to success Mature Technology – CITYFLO 650 has been in service since 2002 – Robust TWC design – (already on the 3rd generation) An Experienced Team – Straight from the Madrid Metro implementation (for Pittsburgh based team) – Extensive mass transit experience for Pittsburgh and Bangkok teams A Cooperative Customer – Support from senior and working level for access allowance, safety review etc Strong Project Management – Focussed / hands-on management – Detailed attention to schedule, including weekly updates on delivery progress Senior Management Support – Monthly and Quarterly reviews – Gate reviews and audits of the system design, resource allocation, risks and milestones 8
  • 9. ©BombardierInc.oritssubsidiaries.Allrightsreserved. Additional success factors Unified team – Bombardier, the partner and the customer were all united Communication – Key project milestones were well communicated to all sites – Product delivery (the timely communication of all changes to everyone) – Open communication within the team (aim to have answers to all open questions) – Communication outside of the team using a strict single channel protocol Training – Partner training (execution) – Customer training (operation) Documentation – Detailed installation instructions created which were precise and explicit to allow for engineers to install equipment without CBTC knowledge – Detailed and precise test procedures detailing all parts of the test process 9
  • 11. ©BombardierInc.oritssubsidiaries.Allrightsreserved. 11 CITYFLO 650 signalling for Shenzhen Metro Line 3 Elevated and underground sections of phase 1 Operation and Control Center OCC
  • 12. ©BombardierInc.oritssubsidiaries.Allrightsreserved. 12 Shenzhen Metro Line 3 train driving cab view Shenzhen Metro driving cab panel
  • 13. ©BombardierInc.oritssubsidiaries.Allrightsreserved. Shenzhen Metro Line 3 New Years Day 2011 around 188,000 passengers used the line shortly after opening
  • 14. ©BombardierInc.oritssubsidiaries.Allrightsreserved. 14 Train the trainers sessions for SMC/INSIGMA in Pittsburgh, Bangkok and on site in Shenzhen
  • 15. ©BombardierInc.oritssubsidiaries.Allrightsreserved. 15 Opening ceremony of the Shenzhen Metro Line 3 Phase 1 complete: December 28, 2010
  • 16. ©BombardierInc.oritssubsidiaries.Allrightsreserved. 16 The CITYFLO Monitoring System (CFMS) The CFMS can record signaling subsystems train data and play back all the movement of the line in service
  • 18. ©BombardierInc.oritssubsidiaries.Allrightsreserved. 18 Shenzhen Metro development plan up to 2020 Connecting to Hong Kong via 3 lines, 1 under the sea Total of 16 lines Line 3 will be extend to an additional 5 stations north and 1 station south
  • 19. ©BombardierInc.oritssubsidiaries.Allrightsreserved. Key achievements Short delivery time of 22 months from notice to proceed (NTP) Project delivered within budget and with a minimum of unforeseen issues, reducing any extra costs at project completion Global cooperation through multi-site engineering and project team (China, Thailand and US) The project team was proud to complete the project in line with Bombardier’s strategic goal to strive for operational excellence especially in project execution 19
  • 20. ©BombardierInc.oritssubsidiaries.Allrightsreserved. 20 Seattle-Tacoma Int’l Airport Washington, USA McCarran Int’l Airport Las Vegas Nevada, USA Kingston Test Track Canada SEPTA Light Rail Philadelphia, USA Heathrow Int’l Airport Gatwick Int’l Airport United Kingdom Shenzhen Metro Line 3 China San Francisco Int’l Airport California, USA Tianjin Metro Lines 2 & 3 China Metro Madrid Line 1, Line 6 Spain Dallas/Forth Worth Int’l Airport Texas, USA 2 Projects in Revenue Operation 12 Revenue Ready (Yong-In) 1 Projects under Execution 6 Test Tracks 2 Total 21 Yong-In Korea Sacramento Int’l Airport California, USA Neihu Mucha Line Taiwan 2 Guangzhou Metro Pearl River Line China Pittsburgh Test Track Pennsylvania, USA Phoenix Int’l Airport Arizona, USA CITYFLO 650 is in service at eleven sites and is being implemented at six transit systems 20 King Abdullah Financial District Riyadh, Saudi Arabia Tiradentes Monorail Sao Paulo, Brazil