WHAT IS A
CONTRACT?
• Definitions
• “An agreement enforceable by law is a Contract.”
• “Every promise and every set of promises, forming
the consideration for each other , is an Agreement.”
• “The agreement must create legal obligations
between the parties is an Enforceable.”
• Contract: It is an undertaking by a firm or a person to
do any work under certain terms and conditions.
• Contractor: A person or a firm who undertakes any
type of contract.
Definitions ...Cont’d
• Construction contracts are the agreements
between services providers (contractors) and
the clients.
• The client is the promoter or the project
initiator. He develops a need for a structure,
establishes his requirements and provides
resources that are required for the realization
of the project
• The contractor assembles resources into the
final product
Definitions ...Cont’d
From a Legal Point of View:
 Contract is a mutual agreement between two or
more parties that something shall be done, an
agreement enforceable at law.
According to FIDIC:
 Contract means the General Conditions, the
Supplementary Conditions, the Specifications, the
Drawings, the Bill of Quantities, the Tender, the Letter
of Acceptance, the Contract Agreement.
History of construction contracts
• Formal construction contracts have been
around since 1870, J. Murdoch and W. Hughes
(2001).
• Between 1200-1600 AD construction work
was undertaken by master craftsmen
organized into guilds.
History of construction contracts
...cont’d
• By 1800 AD the contracting system emerged
and many works required designs to be
complete, including estimates for materials
and labour.
• This marked the beginning of construction
contracts as we know them today.
• Need for contract comes with many short falls
to be managed which can be termed as risks.
The following are some of the risks:-
Construction risk
• Owner’s risk is due to the following factors:
• Will the contractor be able to carry out work as per
specifications?
• Can the work be completed within quoted cost and
time?
• Will the plant/project perform at the required level?
• Will the contractor stay on job till its completion?
• Will the contractor co-operate with the owner and
rectify defects later?
• Will the relationship continue?
• Does he/she understand his/her intent fully?
Construction risk cont’d
• Contractor’s risk is due to the following
factors:
• Termination of work before its completion
• Prompt payments
• Reimbursement for extra claims
• Penalization for failures beyond his control.
• Interruptions in progress and change of scope
• Compensation for pure escalation.
Construction risk cont’d
Other construction risks include
1. The unforeseen:
• unexpected ground conditions
• unpredicted weather conditions
• a shortage of materials in the market
• a shortage of skilled labour
• accidents, whether by fire, flood or carelessness
• innovative design that does not work or proves
impossible to construct.
• The length of the contract.
Construction risk cont’d
2. Projects vary in the time needed for
completion, from days to years. During that
time the risk allocation agreed at the time of
contracting can change substantially. This is
especially so with regard to the availability of
materials and its costs. A contractor may
have ‘bought’ the job because work was
scarce at the time and the price of
components was low.
Construction risk cont’d
3.The number of participants, and parties in the
project and the corresponding length of
contractual chain cause their own problems. The
risk of insolvency increases, the longer the chain.
4.The particular relationship (often referred to as a
triangular relationship of costs, time and quality)
in which conflict is inherent. Contracting parties
have different perceptions of how these factors
of their relationship interact.
Construction risk cont’d
5.The interaction between liability for defective
workmanship and for faults in design. Lack of
coordination between design and construction
is a common source of dispute. Much of the
innovation in procurement systems of recent
years stems from creating ways of minimising
the effect of this clash.
Construction risk cont’d
• Construction contracts are drawn to ensure duties,
responsibilities and risks are shared and distributed
amongst the project participants. The use of
standard forms of agreements has been developed
and generally adopted in the construction industry to
help guide the relationships between the parties and
also to ensure construction projects are managed in
a sound and effective way. The adoption of a suitable
form of agreement, its implementation in executing
the work until project close out is the object of
construction contract administration.
Chapter 1 [compatibility mode]

More Related Content

What's hot

Vendor Contract Issues for Boards of Common Interest Developments
Vendor Contract Issues for Boards of Common Interest DevelopmentsVendor Contract Issues for Boards of Common Interest Developments
Vendor Contract Issues for Boards of Common Interest DevelopmentsConstruction Cicerone
 
Types and forms of contracts
Types and forms of contracts Types and forms of contracts
Types and forms of contracts fritzlejarso
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction ManagementShahin MB
 
Roles and Responsibilities of a Civil Engineer
Roles and Responsibilities of a Civil EngineerRoles and Responsibilities of a Civil Engineer
Roles and Responsibilities of a Civil Engineerflood37tray
 
Types of contracts
Types of contracts   Types of contracts
Types of contracts MANNU KUMAR
 
types of contracts
 types of contracts types of contracts
types of contractsKEVINMISTRY8
 
Classification of contracts
Classification of contractsClassification of contracts
Classification of contractsAnil Kumar(6)
 
Legal issues associated with project management and consulting
Legal issues associated with project management and consultingLegal issues associated with project management and consulting
Legal issues associated with project management and consultingThis account is closed
 
What is NEC3? by Dr Jon Broome, with industry examples by John Rayner, 21st A...
What is NEC3? by Dr Jon Broome, with industry examples by John Rayner, 21st A...What is NEC3? by Dr Jon Broome, with industry examples by John Rayner, 21st A...
What is NEC3? by Dr Jon Broome, with industry examples by John Rayner, 21st A...Association for Project Management
 
Government Contracts 101 - Understanding the Basics of Contract Types
Government Contracts 101 - Understanding the Basics of Contract Types Government Contracts 101 - Understanding the Basics of Contract Types
Government Contracts 101 - Understanding the Basics of Contract Types Unanet
 

What's hot (20)

Types of contracts
Types of contractsTypes of contracts
Types of contracts
 
Gcc vs scc
Gcc vs sccGcc vs scc
Gcc vs scc
 
Pp1 group assignment
Pp1 group assignmentPp1 group assignment
Pp1 group assignment
 
Vendor Contract Issues for Boards of Common Interest Developments
Vendor Contract Issues for Boards of Common Interest DevelopmentsVendor Contract Issues for Boards of Common Interest Developments
Vendor Contract Issues for Boards of Common Interest Developments
 
Types and forms of contracts
Types and forms of contracts Types and forms of contracts
Types and forms of contracts
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
Roles and Responsibilities of a Civil Engineer
Roles and Responsibilities of a Civil EngineerRoles and Responsibilities of a Civil Engineer
Roles and Responsibilities of a Civil Engineer
 
Contract
Contract Contract
Contract
 
Types of contracts
Types of contracts   Types of contracts
Types of contracts
 
types of contracts
 types of contracts types of contracts
types of contracts
 
Tenders
TendersTenders
Tenders
 
Classification of contracts
Classification of contractsClassification of contracts
Classification of contracts
 
Chapter 2- Construction Law
Chapter 2- Construction Law Chapter 2- Construction Law
Chapter 2- Construction Law
 
Fidic law1
Fidic law1Fidic law1
Fidic law1
 
Completion
CompletionCompletion
Completion
 
Legal issues associated with project management and consulting
Legal issues associated with project management and consultingLegal issues associated with project management and consulting
Legal issues associated with project management and consulting
 
Type of Contracts.
Type of Contracts.Type of Contracts.
Type of Contracts.
 
Project contracts
Project contractsProject contracts
Project contracts
 
What is NEC3? by Dr Jon Broome, with industry examples by John Rayner, 21st A...
What is NEC3? by Dr Jon Broome, with industry examples by John Rayner, 21st A...What is NEC3? by Dr Jon Broome, with industry examples by John Rayner, 21st A...
What is NEC3? by Dr Jon Broome, with industry examples by John Rayner, 21st A...
 
Government Contracts 101 - Understanding the Basics of Contract Types
Government Contracts 101 - Understanding the Basics of Contract Types Government Contracts 101 - Understanding the Basics of Contract Types
Government Contracts 101 - Understanding the Basics of Contract Types
 

Similar to Chapter 1 [compatibility mode]

05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITION05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITIONByishimoBTCChef
 
Construction contract
Construction contract Construction contract
Construction contract Rakshith Reddy
 
Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureHASMANIRA
 
Pp 1-report-complete
Pp 1-report-completePp 1-report-complete
Pp 1-report-completeYong Sy
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...Praveen Premkumar
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in MalaysiaDayat Mohamad
 
2.12 procurement management 1
2.12  procurement management 12.12  procurement management 1
2.12 procurement management 1reddvise
 
Professional Practice
Professional PracticeProfessional Practice
Professional Practiceseenyeeyong
 
"Types and Causes of Construction Claims"
"Types and Causes of Construction Claims""Types and Causes of Construction Claims"
"Types and Causes of Construction Claims"Abhishek Shah
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignmentLwj Welson
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignmentLwj Welson
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014SHKLaw
 
contract management, stages of contract management
 contract management, stages of contract management contract management, stages of contract management
contract management, stages of contract managementVISHAKA BOTHRA
 
Group 1 presentation intro to cpm
Group 1 presentation intro to cpmGroup 1 presentation intro to cpm
Group 1 presentation intro to cpmKaila Turla
 
Literature review on_ extension of time
Literature review on_ extension of timeLiterature review on_ extension of time
Literature review on_ extension of timeJoseph Sangpang
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentationTimun Loh
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.pptssuser32da691
 

Similar to Chapter 1 [compatibility mode] (20)

05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITION05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITION
 
Construction contract
Construction contract Construction contract
Construction contract
 
TOPIC2.pdf
TOPIC2.pdfTOPIC2.pdf
TOPIC2.pdf
 
Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment Structure
 
Pp 1-report-complete
Pp 1-report-completePp 1-report-complete
Pp 1-report-complete
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
2.12 procurement management 1
2.12  procurement management 12.12  procurement management 1
2.12 procurement management 1
 
Professional Practice
Professional PracticeProfessional Practice
Professional Practice
 
"Types and Causes of Construction Claims"
"Types and Causes of Construction Claims""Types and Causes of Construction Claims"
"Types and Causes of Construction Claims"
 
Preparation of boq
Preparation of boqPreparation of boq
Preparation of boq
 
contract procedure
contract procedurecontract procedure
contract procedure
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014
 
contract management, stages of contract management
 contract management, stages of contract management contract management, stages of contract management
contract management, stages of contract management
 
Group 1 presentation intro to cpm
Group 1 presentation intro to cpmGroup 1 presentation intro to cpm
Group 1 presentation intro to cpm
 
Literature review on_ extension of time
Literature review on_ extension of timeLiterature review on_ extension of time
Literature review on_ extension of time
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentation
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.ppt
 

More from Delhi Technological University

More from Delhi Technological University (20)

Chapter 6- Contract Management
Chapter 6- Contract ManagementChapter 6- Contract Management
Chapter 6- Contract Management
 
Chapter 5- Contract Management
Chapter 5- Contract ManagementChapter 5- Contract Management
Chapter 5- Contract Management
 
Chapter 4- Contract Management
Chapter 4- Contract ManagementChapter 4- Contract Management
Chapter 4- Contract Management
 
Chapter 3- Contract Management
Chapter 3- Contract ManagementChapter 3- Contract Management
Chapter 3- Contract Management
 
Chapter 2- Contract Management
Chapter 2- Contract ManagementChapter 2- Contract Management
Chapter 2- Contract Management
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 
Chapter 3- Construction Law
Chapter 3- Construction Law Chapter 3- Construction Law
Chapter 3- Construction Law
 
Chapter 1-Construction Law
Chapter 1-Construction Law Chapter 1-Construction Law
Chapter 1-Construction Law
 
Chapter 5- Lecture
Chapter 5- LectureChapter 5- Lecture
Chapter 5- Lecture
 
Chapter 4- Lecture
Chapter 4- LectureChapter 4- Lecture
Chapter 4- Lecture
 
Chapter 3- Lecture
Chapter 3- LectureChapter 3- Lecture
Chapter 3- Lecture
 
Chapter 2- Lecture
Chapter 2- LectureChapter 2- Lecture
Chapter 2- Lecture
 
Chapter 1- Lecture
Chapter 1- LectureChapter 1- Lecture
Chapter 1- Lecture
 
Construction equipment management chapter 5
Construction equipment management chapter 5Construction equipment management chapter 5
Construction equipment management chapter 5
 
Construction equipment management chapter 4
Construction equipment management chapter 4Construction equipment management chapter 4
Construction equipment management chapter 4
 
Construction equipment management chapter 3
Construction equipment management chapter 3Construction equipment management chapter 3
Construction equipment management chapter 3
 
Construction equipment management chapter 2
Construction equipment management chapter 2Construction equipment management chapter 2
Construction equipment management chapter 2
 
Construction equipment management chapter 1pdf
Construction equipment management chapter 1pdfConstruction equipment management chapter 1pdf
Construction equipment management chapter 1pdf
 
Chapter 5 [compatibility mode]
Chapter 5 [compatibility mode]Chapter 5 [compatibility mode]
Chapter 5 [compatibility mode]
 
Chapter 4 [compatibility mode]
Chapter 4 [compatibility mode]Chapter 4 [compatibility mode]
Chapter 4 [compatibility mode]
 

Recently uploaded

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 

Recently uploaded (20)

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 

Chapter 1 [compatibility mode]

  • 1. Introduction Chapter One University Madawalabu Procurement Management and Contract Administration CoTM 4242 Instructor: Andualem Endris (M.Sc) andu0117@yahoo.com College of Engineering, Construction Technology and Management Department
  • 2. WHAT IS A CONTRACT? • Definitions • “An agreement enforceable by law is a Contract.” • “Every promise and every set of promises, forming the consideration for each other , is an Agreement.” • “The agreement must create legal obligations between the parties is an Enforceable.” • Contract: It is an undertaking by a firm or a person to do any work under certain terms and conditions. • Contractor: A person or a firm who undertakes any type of contract.
  • 3. Definitions ...Cont’d • Construction contracts are the agreements between services providers (contractors) and the clients. • The client is the promoter or the project initiator. He develops a need for a structure, establishes his requirements and provides resources that are required for the realization of the project • The contractor assembles resources into the final product
  • 4. Definitions ...Cont’d From a Legal Point of View:  Contract is a mutual agreement between two or more parties that something shall be done, an agreement enforceable at law. According to FIDIC:  Contract means the General Conditions, the Supplementary Conditions, the Specifications, the Drawings, the Bill of Quantities, the Tender, the Letter of Acceptance, the Contract Agreement.
  • 5. History of construction contracts • Formal construction contracts have been around since 1870, J. Murdoch and W. Hughes (2001). • Between 1200-1600 AD construction work was undertaken by master craftsmen organized into guilds.
  • 6. History of construction contracts ...cont’d • By 1800 AD the contracting system emerged and many works required designs to be complete, including estimates for materials and labour. • This marked the beginning of construction contracts as we know them today. • Need for contract comes with many short falls to be managed which can be termed as risks. The following are some of the risks:-
  • 7. Construction risk • Owner’s risk is due to the following factors: • Will the contractor be able to carry out work as per specifications? • Can the work be completed within quoted cost and time? • Will the plant/project perform at the required level? • Will the contractor stay on job till its completion? • Will the contractor co-operate with the owner and rectify defects later? • Will the relationship continue? • Does he/she understand his/her intent fully?
  • 8. Construction risk cont’d • Contractor’s risk is due to the following factors: • Termination of work before its completion • Prompt payments • Reimbursement for extra claims • Penalization for failures beyond his control. • Interruptions in progress and change of scope • Compensation for pure escalation.
  • 9. Construction risk cont’d Other construction risks include 1. The unforeseen: • unexpected ground conditions • unpredicted weather conditions • a shortage of materials in the market • a shortage of skilled labour • accidents, whether by fire, flood or carelessness • innovative design that does not work or proves impossible to construct. • The length of the contract.
  • 10. Construction risk cont’d 2. Projects vary in the time needed for completion, from days to years. During that time the risk allocation agreed at the time of contracting can change substantially. This is especially so with regard to the availability of materials and its costs. A contractor may have ‘bought’ the job because work was scarce at the time and the price of components was low.
  • 11. Construction risk cont’d 3.The number of participants, and parties in the project and the corresponding length of contractual chain cause their own problems. The risk of insolvency increases, the longer the chain. 4.The particular relationship (often referred to as a triangular relationship of costs, time and quality) in which conflict is inherent. Contracting parties have different perceptions of how these factors of their relationship interact.
  • 12. Construction risk cont’d 5.The interaction between liability for defective workmanship and for faults in design. Lack of coordination between design and construction is a common source of dispute. Much of the innovation in procurement systems of recent years stems from creating ways of minimising the effect of this clash.
  • 13. Construction risk cont’d • Construction contracts are drawn to ensure duties, responsibilities and risks are shared and distributed amongst the project participants. The use of standard forms of agreements has been developed and generally adopted in the construction industry to help guide the relationships between the parties and also to ensure construction projects are managed in a sound and effective way. The adoption of a suitable form of agreement, its implementation in executing the work until project close out is the object of construction contract administration.