Club of Rome: Eco-nomics for an Ecological Civilization
Item #10 PPT AHISD 6900 Broadway
1. Case # 690F
6900 Broadway
(AH ISD – Central Plant)
Final Review
Presented By: Jason Lutz
Community Development Services Director
City Council Meeting
Agenda Item # 10
November 13, 2017
6. 6
POLICY ANALYSIS
Central Plant
Height
Total Height (approximate 44’)
Mechanical equipment will extend
above the metal screen (14’)
Brick Wall = 10’
Metal screen = 30’
7. 7
POLICY ANALYSIS
This ARB Case is for architectural
review of the building.
Location can be approved at this time as
long as no modifications to other
buildings intrude on the approved life
safety and fire lane locations.
8. 8
POLICY ANALYSIS
The goal is to provide an opportunity for
the school district to receive approval or
feedback of the plant building in order to
begin ordering parts and maintain their
construction schedule.
9. 9
POLICY ANALYSIS
In addition, an SUP is being considered
for the site to address existing non-
conforming issues.
Will come to P&Z and Council at a
later date, and after ARB
preliminary review.
11. SITE PLAN ALAMO HEIGHTS HIGH SCHOOL
ATHLETICS
COMPLEX
CENTRAL
PLANT
STEM / ROCKETRY
LABS & GENERAL
CLASSROOMS
KITCHEN /
CAFETERIA &
FINE ARTS
CLASSROOMS
E. CASTANO AVE.
E. FAIR OAKS PL.
VANDERHOEVEN
BROADWAY ST.
18. 18
ARB RECOMMENDATION
Considered the request on Nov. 7, 2017.
Approved the request with the following
conditions:
A combination of the metal wall
panel/screen be raised and the
mechanical equipment be lowered,
with the goal to screen the
mechanical equipment from view.
19. 19
PUBLIC NOTIFICATION
Postcards were mailed to property
owners within a 200-foot radius of the
property, appropriate notice was posted
on the City website and a sign was
posted on the property.
Responses received:
Support: (0)
Oppose: (0)