SlideShare a Scribd company logo
1 of 4
` CITY OF NEW SMYRNA BEACH – DEVELOPMENT SERVICES
S-06-05: NSB SE Interchange (Preliminary Plat)
September 12, 2005
Summary
1. Applicant: Paul Momberger, of Zev Cohen and Associates [ZCA], 55 Seton
Trail, Ormond Beach
2. Property Owner: SE Interchange Complex, LLC, PO Box 730086, Ormond
Beach
3. Request: Preliminary plat approval for a 6-unit commercial subdivision (see
enclosed Preliminary Plat)
4. Subject Area: The subject area, zoned BPUD, Business Planned Unit
Development, and BPUD(c), Business Planned Unit Development Corridor
Overlay Zone. It consists of approximately 20.3 acres and is located at the
southeast corner of the intersection of Interstate 95 and State Road 44.
6. Recommendation: The Planning and Zoning Board deny the
application as it does not conform to the City’s Land
Development Regulations (LDR) or Activity Center design
standards.
J-1
Subject
Parcel
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
2
LPA/PLANNING AND ZONING BOARD
SEPTEMBER 12, 2005
S-13-05 NSB SE INTERCHANGE (PRELIMINARY PLAT)
5. Findings
(1) The Board approved the applicant’s sketch plat, with conditions (please see
on January 3, 2005. Following that, the Board, and then the City
Commission, reviewed and approved a developer’s agreement controlling
this development.
(2) The applicant’s request is for preliminary plat approval of a 6-unit business
planned unit development on approximately 20.3 acres. The BPUD is
bounded by SR44 on the north Glencoe Road on the east and I-95 on the
west. Preliminary plat approval allows a developer to install all required
improvements for the subdivision, including the drainage, right-of-way
improvements and utilities but does not allow the applicant to sell or develop
the lots. The applicant will need final plat approval to sell the lots.
(3) The applicant submitted the preliminary plat for review during the July
8, 2005 Plan Review Committee (PRC) meeting. During the PRC
meeting, staff provided the applicant with a list of issues to address.
(4) The Southeast Interchange Complex is the first development within the
Activity Center. It is important to be sure the Southeast Interchange is
developed correctly and provides a good example for all future development
in the Activity Center. The SE Interchange Complex is the gateway and
entry point for future development. There are areas to the east and south
that will eventually be developed. There needs to be adequate
infrastructure to support this future development.
(5) There are a host of problems associated with this preliminary plat. However,
the development Services staff was directed to include review of this
preliminary plat with the Planning & Zoning Board agenda in September.
The following findings outline the reasons why this preliminary plat cannot
be approved at this time.
(6) The Development agreement was approved conditioned upon the LDR
being amended to exclude the Activity Center from the requirements of the
Corridor Overlay Zone (COZ) regulations. This has not yet occurred and the
preliminary plat is inconsistent with the LDR as it now exists. Once the LDR
is amended to exclude the Activity Center from the COZ regulations, the
preliminary plat may come closer to meeting the requirements of the LDR.
(7) The City adopted Activity Center design standards that all developments
must adhere to when developing within the Activity Center. The proposed
subdivision construction drawings do not conform to these design standards
in several aspects as follows:
a. The design standards require a decorative roadway entrance to the
subdivision. The plans attempt to show a decorative roadway but there
are no details to allow City staff to determine what the decorative roadway
specifications are.
J-2
1
2
3
4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
5
LPA/PLANNING AND ZONING BOARD
SEPTEMBER 12, 2005
S-13-05 NSB SE INTERCHANGE (PRELIMINARY PLAT)
b. The design standards require specific landscaping in required buffers to
be sure the buffer is consistent throughout the activity center. Although
the landscaping plans show a fairly nice buffer, the specifications don’t
meet the standards.
c. The design standards require specific landscaping around retention areas
to keep retention areas consistent within the activity center. The
landscaping plans around the retention areas don’t meet the activity
center specifications.
(8) There is an overall roadway plan for the Activity Center that this subdivision
will eventually connect to. See Exhibit A. The LDR allows roads to be
stubbed out to allow for future connection and require a temporary turn-
around until the road is continued. The LDR also requires all roads to be
paved. The plans show a temporary cul-de-sac but that cul-de-sac is shown
on what is to become a lot so there is no guarantee the temporary turn-
around will be available for public use. Also, the temporary turn-around,
which will be potentially used for many years, is shown on the plans to be
shell and not a paved surface.
(9) After an analysis of the expected traffic conditions, staff found a number
of Level-Of-Service F conditions reported by the applicant’s traffic
engineer. As a result, staff will need time to work with the applicant to
address the concurrency issue. The City cannot approve a subdivision or
site plan if it does not meet the City’s concurrency management system.
(10)The City has tree preservation, protection and mitigation regulations that
must be met before a subdivision or site plan can be approved. The plans as
submitted do not adequately address tree preservation, protection and
mitigation.
(11)As of this date, the preliminary plat does not have all the signatures of the
PRC members, indicating the plans meet the technical requirements of the
City. Staff has not been able to thoroughly review the plat to confirm it
adheres to the PUD. The original plat was submitted prior to the approval of
the PUD, so staff is unsure if the plat conforms to the PUD or other relevant
City codes.
(12)The applicant provided staff with a traffic analysis in January of 2005. Staff
believes this document needs to be updated before the City grants vesting
rights. Vesting rights are established when the Planning and Zoning Board
approves the preliminary plat, which allows the applicant to obtain permits
for construction. It is important to update the traffic study because new
development may have been approved in the area that could pose Level-Of-
Service problems for roads in this area. Updating the original traffic study
will confirm the applicant is complying with the City’s concurrency standards.
6. Recommendation
Continue the applicant’s request to allow time for the applicant to adequately
meet the items above.
J-3
1
2
3
4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
5
LPA/PLANNING AND ZONING BOARD
SEPTEMBER 12, 2005
S-13-05 NSB SE INTERCHANGE (PRELIMINARY PLAT)
If the Planning and Zoning Board elects to approve the preliminary plat, it should
be conditioned upon the following:
1. The City approves a text amendment to the COZ regulations to exempt the
Activity Center from the COZ regulations.
2. The plans meet the Activity Center design standards by specifically meeting
the following requirements:
a. Details are provided for the decorative roadway into the project;
b. The landscape buffer plans meet the specifications of the design
standards;
c. The retention area landscaping plans meet the specifications of the
design standards.
3. The applicant modifies the plans to provide a paved temporary turn-around
area.
4. A legal mechanism is in place to allow the temporary turn-around to be used
by the public until the road is continued to the east.
5. The applicant addresses the Level-Of-Service problems posed by this
development as indicated in the traffic study.
6. The applicant updates the traffic study to reflect current traffic conditions and
considers all vested development at the time of Planning and Zoning Board
approval.
7. The plans conform to the City’s tree preservation, protection and mitigation
regulations.
8. All PRC comments are addressed and all members sign off the preliminary
plat drawings.
J-4
1
2
3
4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
5

More Related Content

What's hot

Foxhall w street community meeting-flyer
Foxhall w street  community meeting-flyerFoxhall w street  community meeting-flyer
Foxhall w street community meeting-flyerRamaChilamkurthy
 
Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016
Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016
Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016VDOT Northern Virginia
 
Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation VDOT Northern Virginia
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingVDOT Northern Virginia
 
8th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 20158th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 2015City Brandon
 
Pardon Our Dust meeting, March 9, 2016
Pardon Our Dust meeting, March 9, 2016Pardon Our Dust meeting, March 9, 2016
Pardon Our Dust meeting, March 9, 2016VDOT Northern Virginia
 
Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020RamaChilamkurthy
 
Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15VDOT Northern Virginia
 
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14Adam Cohen
 
South Lakes Drive Sidewalk
South Lakes Drive Sidewalk South Lakes Drive Sidewalk
South Lakes Drive Sidewalk Fairfax County
 
Public Input - City Streets Maintenance Plan for 2020
Public Input - City Streets Maintenance Plan for 2020Public Input - City Streets Maintenance Plan for 2020
Public Input - City Streets Maintenance Plan for 2020CityofNewBraunfels
 
Renaissance Downtowns Depot Square Phase I Financial Proposal; Supplemental S...
Renaissance Downtowns Depot Square Phase I Financial Proposal; Supplemental S...Renaissance Downtowns Depot Square Phase I Financial Proposal; Supplemental S...
Renaissance Downtowns Depot Square Phase I Financial Proposal; Supplemental S...bristolrising
 
AH City Council Meeting 12.14.15 - Item #10 - 6116 Broadway & 213 Henderson
AH City Council Meeting 12.14.15 - Item #10  - 6116 Broadway & 213 HendersonAH City Council Meeting 12.14.15 - Item #10  - 6116 Broadway & 213 Henderson
AH City Council Meeting 12.14.15 - Item #10 - 6116 Broadway & 213 HendersonMarian Vargas Mendoza
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Crosstown TO
 

What's hot (20)

Stamm
StammStamm
Stamm
 
Foxhall w street community meeting-flyer
Foxhall w street  community meeting-flyerFoxhall w street  community meeting-flyer
Foxhall w street community meeting-flyer
 
Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016
Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016
Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016
 
2021 Streets Survey
2021 Streets Survey2021 Streets Survey
2021 Streets Survey
 
Street Survey
Street SurveyStreet Survey
Street Survey
 
Shaggy Dog
Shaggy DogShaggy Dog
Shaggy Dog
 
Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meeting
 
8th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 20158th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 2015
 
Pardon Our Dust meeting, March 9, 2016
Pardon Our Dust meeting, March 9, 2016Pardon Our Dust meeting, March 9, 2016
Pardon Our Dust meeting, March 9, 2016
 
Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020
 
VCS Resume_May 2015
VCS Resume_May 2015VCS Resume_May 2015
VCS Resume_May 2015
 
Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15
 
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
 
South Lakes Drive Sidewalk
South Lakes Drive Sidewalk South Lakes Drive Sidewalk
South Lakes Drive Sidewalk
 
Public Input - City Streets Maintenance Plan for 2020
Public Input - City Streets Maintenance Plan for 2020Public Input - City Streets Maintenance Plan for 2020
Public Input - City Streets Maintenance Plan for 2020
 
Indigo hotel
Indigo hotelIndigo hotel
Indigo hotel
 
Renaissance Downtowns Depot Square Phase I Financial Proposal; Supplemental S...
Renaissance Downtowns Depot Square Phase I Financial Proposal; Supplemental S...Renaissance Downtowns Depot Square Phase I Financial Proposal; Supplemental S...
Renaissance Downtowns Depot Square Phase I Financial Proposal; Supplemental S...
 
AH City Council Meeting 12.14.15 - Item #10 - 6116 Broadway & 213 Henderson
AH City Council Meeting 12.14.15 - Item #10  - 6116 Broadway & 213 HendersonAH City Council Meeting 12.14.15 - Item #10  - 6116 Broadway & 213 Henderson
AH City Council Meeting 12.14.15 - Item #10 - 6116 Broadway & 213 Henderson
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017
 

Viewers also liked

Solucion guia 10
Solucion guia 10Solucion guia 10
Solucion guia 10samy254
 
Slide 05
Slide 05Slide 05
Slide 05jrblei
 
Generacion del 27 literatura
Generacion del 27 literaturaGeneracion del 27 literatura
Generacion del 27 literaturaraul garcia sanz
 
JRD-Foreign glass 2016
JRD-Foreign glass 2016JRD-Foreign glass 2016
JRD-Foreign glass 2016Kenneth Gee
 
Nî±ïîºï‰ï„î¹îºî¬
Nî±ïîºï‰ï„î¹îºî¬Nî±ïîºï‰ï„î¹îºî¬
Nî±ïîºï‰ï„î¹îºî¬4Gym Glyfadas
 
OTW Pilgrimage Brochure
OTW Pilgrimage BrochureOTW Pilgrimage Brochure
OTW Pilgrimage Brochurenoelr
 
さきラボの就業規則
さきラボの就業規則さきラボの就業規則
さきラボの就業規則Yousuke Saki
 
The UK Strategy for Outward Mobility and the Go International Programme: Incr...
The UK Strategy for Outward Mobility and the Go International Programme: Incr...The UK Strategy for Outward Mobility and the Go International Programme: Incr...
The UK Strategy for Outward Mobility and the Go International Programme: Incr...mlang-events
 
Miracles in Lourdes by group5
Miracles in Lourdes by group5Miracles in Lourdes by group5
Miracles in Lourdes by group5Erasmus+
 
Supporting Quality Teaching: a Profile of IWLP Teachers and the Role of Langu...
Supporting Quality Teaching: a Profile of IWLP Teachers and the Role of Langu...Supporting Quality Teaching: a Profile of IWLP Teachers and the Role of Langu...
Supporting Quality Teaching: a Profile of IWLP Teachers and the Role of Langu...mlang-events
 

Viewers also liked (15)

Solucion guia 10
Solucion guia 10Solucion guia 10
Solucion guia 10
 
301
301301
301
 
Slide 05
Slide 05Slide 05
Slide 05
 
Generacion del 27 literatura
Generacion del 27 literaturaGeneracion del 27 literatura
Generacion del 27 literatura
 
Go Where The People Are
Go Where The People AreGo Where The People Are
Go Where The People Are
 
Comercio internacional
Comercio internacionalComercio internacional
Comercio internacional
 
Six Studio Profile
Six Studio ProfileSix Studio Profile
Six Studio Profile
 
JRD-Foreign glass 2016
JRD-Foreign glass 2016JRD-Foreign glass 2016
JRD-Foreign glass 2016
 
Nî±ïîºï‰ï„î¹îºî¬
Nî±ïîºï‰ï„î¹îºî¬Nî±ïîºï‰ï„î¹îºî¬
Nî±ïîºï‰ï„î¹îºî¬
 
OTW Pilgrimage Brochure
OTW Pilgrimage BrochureOTW Pilgrimage Brochure
OTW Pilgrimage Brochure
 
さきラボの就業規則
さきラボの就業規則さきラボの就業規則
さきラボの就業規則
 
The UK Strategy for Outward Mobility and the Go International Programme: Incr...
The UK Strategy for Outward Mobility and the Go International Programme: Incr...The UK Strategy for Outward Mobility and the Go International Programme: Incr...
The UK Strategy for Outward Mobility and the Go International Programme: Incr...
 
Miracles in Lourdes by group5
Miracles in Lourdes by group5Miracles in Lourdes by group5
Miracles in Lourdes by group5
 
Supporting Quality Teaching: a Profile of IWLP Teachers and the Role of Langu...
Supporting Quality Teaching: a Profile of IWLP Teachers and the Role of Langu...Supporting Quality Teaching: a Profile of IWLP Teachers and the Role of Langu...
Supporting Quality Teaching: a Profile of IWLP Teachers and the Role of Langu...
 
Question 3
Question 3Question 3
Question 3
 

Similar to Preliminary Plat Staff Report (S-6-05 NSB SE Interchange)

WPR_02.01.2023 W-114 - Copy (1).pptx
WPR_02.01.2023 W-114 - Copy (1).pptxWPR_02.01.2023 W-114 - Copy (1).pptx
WPR_02.01.2023 W-114 - Copy (1).pptxcyberyogi07
 
Planning Requirements for FTA Grants - Darin Allan, Community Planner, FTA Re...
Planning Requirements for FTA Grants - Darin Allan, Community Planner, FTA Re...Planning Requirements for FTA Grants - Darin Allan, Community Planner, FTA Re...
Planning Requirements for FTA Grants - Darin Allan, Community Planner, FTA Re...New York Public Transit Association
 
PMI Scheduling Conference 2016 Bruce Stephan
PMI Scheduling Conference 2016 Bruce StephanPMI Scheduling Conference 2016 Bruce Stephan
PMI Scheduling Conference 2016 Bruce StephanBruce Stephan
 
Quality Management Plan
Quality Management PlanQuality Management Plan
Quality Management PlanAnuragBhat7
 
Group proposal
Group proposalGroup proposal
Group proposalLeon Lim
 
Draft Rockdale Contributions Plan 2016 - Urban Renewal Area
Draft Rockdale Contributions Plan 2016 - Urban Renewal AreaDraft Rockdale Contributions Plan 2016 - Urban Renewal Area
Draft Rockdale Contributions Plan 2016 - Urban Renewal AreaRockdaleCityNSW
 
Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Pronob Ghosh
 
Transit District Draft Standard and Guidelines
Transit District Draft Standard and GuidelinesTransit District Draft Standard and Guidelines
Transit District Draft Standard and GuidelinesJose Carlos Ayala
 
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge GirdersCauses of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge GirdersIOSR Journals
 
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge GirdersCauses of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge GirdersIOSR Journals
 
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge GirdersCauses of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge GirdersIOSR Journals
 
Our Future Valley - Developer Session January 28, 2021
Our Future Valley - Developer Session January 28, 2021Our Future Valley - Developer Session January 28, 2021
Our Future Valley - Developer Session January 28, 2021Allison Zinnick
 
Project Management Assignment 1
Project Management Assignment 1Project Management Assignment 1
Project Management Assignment 1DavidJPCChai
 
Design_Guidelines_and_Standard_Drawings.pdf
Design_Guidelines_and_Standard_Drawings.pdfDesign_Guidelines_and_Standard_Drawings.pdf
Design_Guidelines_and_Standard_Drawings.pdfecep nurali
 
Final DCP
Final DCPFinal DCP
Final DCPejjeff
 

Similar to Preliminary Plat Staff Report (S-6-05 NSB SE Interchange) (20)

WPR_02.01.2023 W-114 - Copy (1).pptx
WPR_02.01.2023 W-114 - Copy (1).pptxWPR_02.01.2023 W-114 - Copy (1).pptx
WPR_02.01.2023 W-114 - Copy (1).pptx
 
Planning Requirements for FTA Grants - Darin Allan, Community Planner, FTA Re...
Planning Requirements for FTA Grants - Darin Allan, Community Planner, FTA Re...Planning Requirements for FTA Grants - Darin Allan, Community Planner, FTA Re...
Planning Requirements for FTA Grants - Darin Allan, Community Planner, FTA Re...
 
PMI Scheduling Conference 2016 Bruce Stephan
PMI Scheduling Conference 2016 Bruce StephanPMI Scheduling Conference 2016 Bruce Stephan
PMI Scheduling Conference 2016 Bruce Stephan
 
Quality Management Plan
Quality Management PlanQuality Management Plan
Quality Management Plan
 
Capital Programs - O'Hare 21
Capital Programs - O'Hare 21 Capital Programs - O'Hare 21
Capital Programs - O'Hare 21
 
Group proposal
Group proposalGroup proposal
Group proposal
 
Group proposal
Group proposalGroup proposal
Group proposal
 
Draft Rockdale Contributions Plan 2016 - Urban Renewal Area
Draft Rockdale Contributions Plan 2016 - Urban Renewal AreaDraft Rockdale Contributions Plan 2016 - Urban Renewal Area
Draft Rockdale Contributions Plan 2016 - Urban Renewal Area
 
Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011
 
Transit District Draft Standard and Guidelines
Transit District Draft Standard and GuidelinesTransit District Draft Standard and Guidelines
Transit District Draft Standard and Guidelines
 
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge GirdersCauses of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge Girders
 
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge GirdersCauses of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge Girders
 
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge GirdersCauses of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge Girders
 
B012140812
B012140812B012140812
B012140812
 
QPR-1 draft.pptx
QPR-1 draft.pptxQPR-1 draft.pptx
QPR-1 draft.pptx
 
Our Future Valley - Developer Session January 28, 2021
Our Future Valley - Developer Session January 28, 2021Our Future Valley - Developer Session January 28, 2021
Our Future Valley - Developer Session January 28, 2021
 
Project Management Assignment 1
Project Management Assignment 1Project Management Assignment 1
Project Management Assignment 1
 
Design_Guidelines_and_Standard_Drawings.pdf
Design_Guidelines_and_Standard_Drawings.pdfDesign_Guidelines_and_Standard_Drawings.pdf
Design_Guidelines_and_Standard_Drawings.pdf
 
Final DCP
Final DCPFinal DCP
Final DCP
 
01. general design
01. general design01. general design
01. general design
 

More from Seann Smith, AICP

PA-06-07-52 The Loop Staff Report to BCC - Plan Amendment
PA-06-07-52 The Loop Staff Report to BCC - Plan AmendmentPA-06-07-52 The Loop Staff Report to BCC - Plan Amendment
PA-06-07-52 The Loop Staff Report to BCC - Plan AmendmentSeann Smith, AICP
 
Carbon Tax V Trade - When Forests Burn
Carbon Tax V Trade - When Forests BurnCarbon Tax V Trade - When Forests Burn
Carbon Tax V Trade - When Forests BurnSeann Smith, AICP
 
A-7-05 Gardens 207 LLC-Pioneer Trails - staff report
A-7-05 Gardens 207 LLC-Pioneer Trails - staff reportA-7-05 Gardens 207 LLC-Pioneer Trails - staff report
A-7-05 Gardens 207 LLC-Pioneer Trails - staff reportSeann Smith, AICP
 
ZON2006-00040 Princeton-Smith
ZON2006-00040 Princeton-SmithZON2006-00040 Princeton-Smith
ZON2006-00040 Princeton-SmithSeann Smith, AICP
 

More from Seann Smith, AICP (8)

Babcock work-samplev5
Babcock work-samplev5Babcock work-samplev5
Babcock work-samplev5
 
PA-06-07-52 The Loop Staff Report to BCC - Plan Amendment
PA-06-07-52 The Loop Staff Report to BCC - Plan AmendmentPA-06-07-52 The Loop Staff Report to BCC - Plan Amendment
PA-06-07-52 The Loop Staff Report to BCC - Plan Amendment
 
Carbon Tax V Trade - When Forests Burn
Carbon Tax V Trade - When Forests BurnCarbon Tax V Trade - When Forests Burn
Carbon Tax V Trade - When Forests Burn
 
A-7-05 Gardens 207 LLC-Pioneer Trails - staff report
A-7-05 Gardens 207 LLC-Pioneer Trails - staff reportA-7-05 Gardens 207 LLC-Pioneer Trails - staff report
A-7-05 Gardens 207 LLC-Pioneer Trails - staff report
 
CPA-2-03 West Canal
CPA-2-03 West CanalCPA-2-03 West Canal
CPA-2-03 West Canal
 
Renderings
RenderingsRenderings
Renderings
 
ZON2006-00040 Princeton-Smith
ZON2006-00040 Princeton-SmithZON2006-00040 Princeton-Smith
ZON2006-00040 Princeton-Smith
 
Babcock Work Sample.v3
Babcock Work Sample.v3Babcock Work Sample.v3
Babcock Work Sample.v3
 

Preliminary Plat Staff Report (S-6-05 NSB SE Interchange)

  • 1. ` CITY OF NEW SMYRNA BEACH – DEVELOPMENT SERVICES S-06-05: NSB SE Interchange (Preliminary Plat) September 12, 2005 Summary 1. Applicant: Paul Momberger, of Zev Cohen and Associates [ZCA], 55 Seton Trail, Ormond Beach 2. Property Owner: SE Interchange Complex, LLC, PO Box 730086, Ormond Beach 3. Request: Preliminary plat approval for a 6-unit commercial subdivision (see enclosed Preliminary Plat) 4. Subject Area: The subject area, zoned BPUD, Business Planned Unit Development, and BPUD(c), Business Planned Unit Development Corridor Overlay Zone. It consists of approximately 20.3 acres and is located at the southeast corner of the intersection of Interstate 95 and State Road 44. 6. Recommendation: The Planning and Zoning Board deny the application as it does not conform to the City’s Land Development Regulations (LDR) or Activity Center design standards. J-1 Subject Parcel 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 2
  • 2. LPA/PLANNING AND ZONING BOARD SEPTEMBER 12, 2005 S-13-05 NSB SE INTERCHANGE (PRELIMINARY PLAT) 5. Findings (1) The Board approved the applicant’s sketch plat, with conditions (please see on January 3, 2005. Following that, the Board, and then the City Commission, reviewed and approved a developer’s agreement controlling this development. (2) The applicant’s request is for preliminary plat approval of a 6-unit business planned unit development on approximately 20.3 acres. The BPUD is bounded by SR44 on the north Glencoe Road on the east and I-95 on the west. Preliminary plat approval allows a developer to install all required improvements for the subdivision, including the drainage, right-of-way improvements and utilities but does not allow the applicant to sell or develop the lots. The applicant will need final plat approval to sell the lots. (3) The applicant submitted the preliminary plat for review during the July 8, 2005 Plan Review Committee (PRC) meeting. During the PRC meeting, staff provided the applicant with a list of issues to address. (4) The Southeast Interchange Complex is the first development within the Activity Center. It is important to be sure the Southeast Interchange is developed correctly and provides a good example for all future development in the Activity Center. The SE Interchange Complex is the gateway and entry point for future development. There are areas to the east and south that will eventually be developed. There needs to be adequate infrastructure to support this future development. (5) There are a host of problems associated with this preliminary plat. However, the development Services staff was directed to include review of this preliminary plat with the Planning & Zoning Board agenda in September. The following findings outline the reasons why this preliminary plat cannot be approved at this time. (6) The Development agreement was approved conditioned upon the LDR being amended to exclude the Activity Center from the requirements of the Corridor Overlay Zone (COZ) regulations. This has not yet occurred and the preliminary plat is inconsistent with the LDR as it now exists. Once the LDR is amended to exclude the Activity Center from the COZ regulations, the preliminary plat may come closer to meeting the requirements of the LDR. (7) The City adopted Activity Center design standards that all developments must adhere to when developing within the Activity Center. The proposed subdivision construction drawings do not conform to these design standards in several aspects as follows: a. The design standards require a decorative roadway entrance to the subdivision. The plans attempt to show a decorative roadway but there are no details to allow City staff to determine what the decorative roadway specifications are. J-2 1 2 3 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 5
  • 3. LPA/PLANNING AND ZONING BOARD SEPTEMBER 12, 2005 S-13-05 NSB SE INTERCHANGE (PRELIMINARY PLAT) b. The design standards require specific landscaping in required buffers to be sure the buffer is consistent throughout the activity center. Although the landscaping plans show a fairly nice buffer, the specifications don’t meet the standards. c. The design standards require specific landscaping around retention areas to keep retention areas consistent within the activity center. The landscaping plans around the retention areas don’t meet the activity center specifications. (8) There is an overall roadway plan for the Activity Center that this subdivision will eventually connect to. See Exhibit A. The LDR allows roads to be stubbed out to allow for future connection and require a temporary turn- around until the road is continued. The LDR also requires all roads to be paved. The plans show a temporary cul-de-sac but that cul-de-sac is shown on what is to become a lot so there is no guarantee the temporary turn- around will be available for public use. Also, the temporary turn-around, which will be potentially used for many years, is shown on the plans to be shell and not a paved surface. (9) After an analysis of the expected traffic conditions, staff found a number of Level-Of-Service F conditions reported by the applicant’s traffic engineer. As a result, staff will need time to work with the applicant to address the concurrency issue. The City cannot approve a subdivision or site plan if it does not meet the City’s concurrency management system. (10)The City has tree preservation, protection and mitigation regulations that must be met before a subdivision or site plan can be approved. The plans as submitted do not adequately address tree preservation, protection and mitigation. (11)As of this date, the preliminary plat does not have all the signatures of the PRC members, indicating the plans meet the technical requirements of the City. Staff has not been able to thoroughly review the plat to confirm it adheres to the PUD. The original plat was submitted prior to the approval of the PUD, so staff is unsure if the plat conforms to the PUD or other relevant City codes. (12)The applicant provided staff with a traffic analysis in January of 2005. Staff believes this document needs to be updated before the City grants vesting rights. Vesting rights are established when the Planning and Zoning Board approves the preliminary plat, which allows the applicant to obtain permits for construction. It is important to update the traffic study because new development may have been approved in the area that could pose Level-Of- Service problems for roads in this area. Updating the original traffic study will confirm the applicant is complying with the City’s concurrency standards. 6. Recommendation Continue the applicant’s request to allow time for the applicant to adequately meet the items above. J-3 1 2 3 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 5
  • 4. LPA/PLANNING AND ZONING BOARD SEPTEMBER 12, 2005 S-13-05 NSB SE INTERCHANGE (PRELIMINARY PLAT) If the Planning and Zoning Board elects to approve the preliminary plat, it should be conditioned upon the following: 1. The City approves a text amendment to the COZ regulations to exempt the Activity Center from the COZ regulations. 2. The plans meet the Activity Center design standards by specifically meeting the following requirements: a. Details are provided for the decorative roadway into the project; b. The landscape buffer plans meet the specifications of the design standards; c. The retention area landscaping plans meet the specifications of the design standards. 3. The applicant modifies the plans to provide a paved temporary turn-around area. 4. A legal mechanism is in place to allow the temporary turn-around to be used by the public until the road is continued to the east. 5. The applicant addresses the Level-Of-Service problems posed by this development as indicated in the traffic study. 6. The applicant updates the traffic study to reflect current traffic conditions and considers all vested development at the time of Planning and Zoning Board approval. 7. The plans conform to the City’s tree preservation, protection and mitigation regulations. 8. All PRC comments are addressed and all members sign off the preliminary plat drawings. J-4 1 2 3 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 5