1. APPENDIX-B-5
CV of Yunus Ali
1 of 5
Proposed Position : Drafts Man
Name of Firm : Pioneer Infra Projects Pvt. Ltd.
Name of Staff : Mr. Yunus Ali
Profession : Civil Engineering
Date of Birth : 10
th
Nov 1986
Years with Firm/Entity : 9 Months Nationality: Indian
Membership of Professional Societies: Nil
Detailed Task Assigned:
As mentioned in APPENDIX B- 4 of the Proposal
Summary of Qualification & Experience vis-à-vis the requirements as per TOR
S.
No.
Name of
Employer
Post Held Project Name Period Assignment in
the project
Client of
the project
Remar
ksFrom To
1. Pioneer Infra
Projects Pvt.
Ltd.
Drafts Man
Preparation of Feasibility
Report for “two-laning
road of ;
Uniara – Dooni – Anwa
section of MDR-94 (the
“Highway-I”);
Beawar – Masuda –
Goyla section of MDR-57
(the “Highway-II”);
Sawarda – Rupangarh
– Ajmer section of MDR-
85 (the “Highway-III”);
Hurda - Banera section
of MDR-135 (the
“Highway-IV”);
Banera – Bigod section
of MDR-135 (the
“Highway-V”); totaling
384 Kms. (the “Project”)
through Public Private
Partnership (the “PPP”)
on Design, Build,
Finance, Operate and
Transfer (the "DBFOT")
basis”.
March
2015
Till
date
PWD, PPP,
Rajasthan,
MP., MH.
Gujrat.
2. APPENDIX-B-5
CV of Yunus Ali
2 of 5
S.
No.
Name of
Employer
Post Held Project Name Period Assignment in
the project
Client of
the project
Remar
ksFrom To
2. Unity infra
projects
Ltd.,
Mumbai
Cad
Operator
Six – Laning of Gurgaon –
Kotputli – Jaipur Section of
NH-8 from KM 42.70 to KM
273.00 (length 225.60 KM)
in the state of
Haryana/Rajasthan to be
Executed as BOT (TOLL) on
DBFO pattern under
NHDP Phase –V
Two Laning of section
From Chomu to Mahala Via
Renwal, Jobner, From Km:
0.00 to 81.260( Length
81.260 Km) (SH-8B, SH-
19,SH-2C,SH-8A& ODR -
02) Project Through PPP
ON
Design,Build,Finance,Ope
rate and Transfer (DBFOT-
TOLL)Basis.
Desk and field study of
topo-sheets.
Bypass optional studies
(alternative routes) for
major towns
Preparation of Detailed
Project Report documents
and Technical Schedule
documents
Interaction with clients for
approval.
Planning and supervision
of Topographical Surveys
(Traversing, Levelling and
DTM)
Preparation of Utility
Relocation maps and
Preconstruction Activities
(Land Acquisition Plans)
Sep.
2010
April
2013
NHAI
Delhi
3. APPENDIX-B-5
CV of Yunus Ali
3 of 5
S.
No.
Name of
Employer
Post Held Project Name Period Assignment in
the project
Client of
the project
Remar
ksFrom To
3. PATH INDIA
Ltd., M.P
Cad
Operator
Four Laning of Section
From Jaipur to Reengus
From Km: 0.000 to 54.000(
Length 54 km), Section of
NH-11 ,In The State Of
Rajasthan Under NHDP
PHASE-III, Programme
(PACKAGE NO.NHDP-
III/DL4/09).
Desk and field
study of topo-
sheets.
Bypass optional
studies (alternative
routes) for major
towns
Preparation of
Detailed Project
Report
documents and
Technical
Schedule
documents
Interaction with
clients for
approval.
Planning and
supervision of
Topographical
Surveys
(Traversing,
Levelling and
DTM)
Preparation of
Utility Relocation
maps and
Preconstruction
Activities (Land
Acquisition Plans)
Jan.
2008
Sep.
2009
NH-11
NHAI Dehli
Education:
Diploma in Civil Engineer in 2012
Other Training:
Nil
Key Qualifications:
Mr. Yunus Ali, is Diploma Civil Engineer and having 5 Years experience in computer related design method for
highway engineering. Having good knowledge of programming language, good command on Autocad, Auto Plotter ,Civil
3D and MS office tools. He is involving in all Design Aspects of Highway Design and construction. Responsibilities
involved preparation of L-Section & cross section for proposed alignment of new as well as existing roads. The design
software’s used were Road Estimator, AUTOPLOTTER & AUTOCADD. CD works using excel & other software. He is also
having good knowledge of setting guidelines for road inventory survey, preparation of preliminary and feasibility study
reports. the draft and final detailed project report
4. APPENDIX-B-5
CV of Yunus Ali
4 of 5
Employment Record:
April 2015 to Till date Pioneer Infra Projects Pvt. Ltd.
Drafts Man
Preparation of Feasibility Report for “two-laning road of ;
Uniara – Dooni – Anwa section of MDR-94 (the “Highway-I”);
Beawar – Masuda – Goyla section of MDR-57 (the “Highway-II”);
Sawarda – Rupangarh – Ajmer section of MDR-85 (the “Highway-III”);
Hurda - Banera section of MDR-135 (the “Highway-IV”);
Banera – Bigod section of MDR-135 (the “Highway-V”); totaling 384 Kms. (the “Project”) through Public Private
Partnership (the “PPP”) on Design, Build, Finance, Operate and Transfer (the "DBFOT") basis”.
Admirable experience in Highway drafting & design worked on, major highway & internal urban road network projects in
India .Processing of field survey data for ground modeling to generate cross sections, contour maps and topographic
sheets. Marking of alignments using design software and finally selecting the most economical and suitable route for the
alignment keeping in view the topographical conditions and General Arrangement and Typical cross sections.
Generating L-section of the ground of selected alignment and designing of profile keeping in view the ground condition
(contours). Immense ability to develop and follow drafting section in preparation of plans, profile drawings and other allied
project drawings. Skilled to prepare detailed design drawings and specifications for tender documents. Traffic signs and
Pavement marking (new construction, Re-construction, Rehabilitation, widening and maintenance. Exceptional
knowledge of highway design techniques and experience, Indian Road (IRC, MORTH) Design Standards.
Capable to handle engineering software, Civil 3D, AutoCAD.Good skills to interpret the company policies and procedures.
September 2010 to April 2011 Unity infra projects Ltd., Mumbai
Cad Operator
(EPC Contractor 800 staff)
Project Management Consultancy for Design, Engineering, Finance, Construction, Operation and Maintenance of Six –
Laning of Gurgaon – Kotputli – Jaipur Section of NH-8 from KM 42.70 to KM 273.00 (length 225.60 KM) in the state of
Haryana/Rajasthan to be Executed as BOT (TOLL) on DBFO pattern under NHDP Phase –V
Two Laning of section From Chomu to Mahala Via Renwal, Jobner, From Km: 0.00 to 81.260( Length 81.260 Km) (SH-8B,
SH-19,SH-2C,SH-8A& ODR -02) Project Through PPP ON Design, Build, Finance, Operate and Transfer (DBFOT-
TOLL)Basis. Desk and field study of topo-sheets. Bypass optional studies (alternative routes) for major towns Preparation
of Detailed Project Report documents and Technical Schedule documents
Interaction with clients for approval. Planning and supervision of Topographical Surveys (Traversing, Levelling and DTM)
Preparation of Utility Relocation maps and Preconstruction Activities (Land Acquisition Plans)
Desk and field study of topo-sheets .Bypass optional studies (alternative routes) for major towns Preparation of Detailed
Project Report documents and Technical Schedule documents Interactionwithclientsforapproval.Planning and supervision
of Topographical Surveys (Traversing, Levelling and DTM)
Preparation of Utility Relocation maps and Preconstruction Activities (Land Acquisition Plans)
Jan. 2008 to September 2009 PATH INDIA Ltd., M.P.
Cad Operator
Four Laning of Section From Jaipur to Reengus From Km: 0.000 to 54.000( Length 54 km), Section of
NH-11 ,In The State Of Rajasthan Under NHDP PHASE-III, Programme (PACKAGE NO.NHDP-III/DL4/09).
Desk and field study of topo-sheets.
5. APPENDIX-B-5
CV of Yunus Ali
5 of 5
Activities Performed :
Desk and field study of topo-sheets.
Bypass optional studies (alternative routes) for major towns
Preparation of Detailed Project Report documents and Technical Schedule documents
Interaction with clients for approval.
Planning and supervision of Topographical Surveys (Traversing, Levelling and DTM)
Preparation of Utility Relocation maps and Preconstruction Activities (Land Acquisition Plans)
Languages:
Speaking Reading Writing
English Excellent Excellent Excellent
Hindi Excellent Excellent Excellent
Summary of Qualification & Experience vis-à-vis the requirements as per ToR
Certification by the Candidate:
I, the undersigned, Mr.Yunus ALi, S/o Shri Bhanwar Ali, 124, Udhyog Nagar, In front of Royal Safari Tower,
Jhotwara, Jaipur, Mobile No. 08432228679) undertake that this CV correctly describes myself, my qualifications and
my experience and NHAI would be at liberty to debar me if any information given in the CV, in particular the Summary of
Qualification & Experience vis-à-vis the requirements as per TOR is found incorrect. I further undertake that I have neither
been debarred by NHAI nor left any assignment with the consultants engaged by NHAI / contracting firm (firm to be
supervised now) for any continuing work of NHAI without completing my assignment. If I leave this assignment in the
middle of the work, NHAI would be at liberty to debar me from taking any assignment in any of the NHAI works for an
appropriate period of time to be decided by NHAI. I have no objection if my services are extended by NHAI for this work in
future.
I further undertake that if due to my inability to work on this project due to unavoidable circumstances, due to which
consultant’s firm is forced to seek replacement. In such unavoidable circumstances, I shall not undertake any employment
in NHAI projects during the period of assignment of this project and NHAI shall consider my CV invalid till such time.
I undertake that I have no objection in uploading/hosting of my credentials by Employer in public domain.
________________________ Date: ______________
(Signature of Key Personnel) Day/Month/Year
Certification by the Firm:
The undersigned on behalf of L N Malviya Infra Projects Pvt. Ltd. in Association with Pioneer Infra Consultants Pvt.
Ltd., B-307, 10-B Scheme, Opposite Narayan Niwas, Gopalpura Bypass, Jaipur -302016 (Raj.) certify that the
qualification and experience details of Mr.Yunus ALi, S/o Shri Bhanwar Ali, 124, Udhyog Nagar, In front of Royal
Safari Tower, Jhotwara, Jaipur, Mobile No. 08432228679), as described in the CV has been checked and found to be
correct. It is also certified that Mr.Yunus ALi, S/o Shri Bhanwar Ali, 124, Udhyog Nagar, In front of Royal Safari
Tower, Jhotwara, Jaipur, Mobile No. 08432228679) (name of the proposed personnel and address) to the best of our
knowledge has neither been debarred by NHAI nor left his assignment with any other consulting firm engaged by NHAI /
Contracting firm (firm to be supervised now) for the ongoing projects. We understand that if the information about leaving
the past assignment is known to NHAI, NHAI would be at liberty to remove the personnel from the present assignment and
debar him for an appropriate period to be decided by NHAI.
_________________________________________ Date:_____________
[Signature of authorized representative of the Firm] Day/Month/Year