1. Uday Sankar Maity
Personnel
information
Name:Mr. Uday Sankar Maity Date of birth: 16th
March 1973
Professional qualifications:B.E. (Civil)
Present
employment
Name of employer:GMR Infrastructure Limited
Address of employee:Udyog Vihar CGHS Ltd, Plot No-12, C-201, Dwarka, Sector-
22, New Delhi-110075, India
Mob: +91-9980137463
+91-9599220817
E-mail
usmaity@yahoo.com
Job title: General Manager (Design) Total Experience: 19+ Years
Summarize professional experience over the last 19 years, in reverse chronological order.Indicate particular
technical and managerial experience relevantto the project.
From To Company/ Project / Position /Relevant technical and management
experience
Total Experience:19 years [from year 1996 to year 2015]
2012 Till date Company : M/s GMR Infrastructure Limited
Project:
1. Design and construction of civil, structures and track works for double
line railway involving formation in embankments/cuttings, ballast on
formation, track works, bridges, structures, buildings, yards, integration
with IR existing railway system and testing & commissioning on design-
build lump sum basis for mughalsarai – new bhaupur section of eastern
dedicated freight corridor for package 201& 202.
2. Six laning of Kishangarh Udaipur Ahmedabad section of NH-79A, NH-
79, NH-76 and NH-8 including new Udaipur bypass in the states of
Rajasthan and Gujarat(Approx. length 555.50 km on DBFOT(Toll) under
NHDP phase V.
3. Development for Outer Ring Road (ORR) on Design, Build, Finance,
Operate and Transfer (DBFOT) Annuity Basis at Chennai, Tamil Nadu.
4. Design, Engineering, Construction, Development, Finance, Operation
and maintenance ofHyderabad – Vijayawada section from KM 40.000 to
Km 221.500 of National Highway No. 9 in the State of Andhra Pradesh
under NHDP Phase III A on Build Operate and Transfer (BOT) basis
5. 4 laning of hungund - hospetsection of NH – 13 from km 202.000 to km
299.000 in the state of Karnataka under NHDP phase iii on design,
build,Finance, operate and transfer (DBFOT) toll basis.(package
no.nhdp-iii/bot/knt/06)
6. Bidding for Dedicated Freight corridor corporation of India Ltd.- CPT-12,
CPT-13, CTP-3 and Kannur International Airport, Kerala.
Position: General Manager (Design)
Relevant technical and management experience:
i) Coordination with design consultant,construction team and Meeting with
2. clients as and when required for dedicated freight corridor for package
201& 202.
ii) Overall in charge for In-house Design for 90km stretch ,Coordination
with design consultant ,construction team and Meeting with clients as
and when required for 185km stretch of Six laning of Kishangarh
Udaipur Ahmedabad section of NH-79A, NH-79, NH-76 and NH-8.
iii) Coordination with design consultant,construction team and Meeting with
clients as and when required for Chennai Outer Ring Road Project,
Hyderabad-Vijayawada Project and Hundgund Hospet Project.
iv) Responsible for preparation ofBOQ, Technical documentand reviewing
of consultant’s documents for bidding project of Dedicated Freight
corridor corporation of India Ltd.- CPT-12, CPT-13, EDFC-201 & 202 ,
CTP-3 and Kannur International Airport, Kerala.
v) Design and verification of DFCC alignment with Bentley Power Rail
Track.
Apr’09 2012 Company: M/s GMR Infrastructure Limited
Project:
1. Detailed Design of 5km approach road and 10km internal road of
township and plant area for Kamalanga Thermal Power Plant.
2. Development for Outer Ring Road (ORR) on Design, Build, Finance,
Operate and Transfer (DBFOT) Annuity Basis at Chennai, Tamil Nadu.
3. Detailed design of all Internal Roads for Krishnagiri SEZ project.
4. Detailed design of Belani Coal haul road at Indonesia.
5. Bidding project - Bhilwara-ladupura,bhopal-jabalpur, Bijapur-Gulbarga-
Homanabad-NH-218
Position: Associate General Manager-Design
Relevant technical and management experience:
i) Detailed Design and coordination with construction team for Kamalanga
Thermal Power Plant.
ii) Coordination with design consultant, construction team and Meeting
with clients as and when required for Chennai Outer Ring Road Project.
iii) Detailed Design and coordination with construction team for Krishnagiri
SEZ and Belani Coal team.
iv) Responsible for preparation of BOQ, Technical document and
reviewing of consultant’s documents for bidding project of Bhilwara-
Ladupura, Bhopal-Jabalpur, Bijapur-Gulbarga-Homanabad-NH-218.
May-06 Mar-09 Company: M/s GMR Infrastructure Limited
Project:
1. Strengthening and widening ofexisting 2 lane road to 4 lane dual
carriagewayfrom km 5+735 to km 39+960 of NH 22 and km 0+000 to km
0+871 of NH 21 (Ambala Chandigarh Section)
2. Strengthening and widening ofexisting 2 lane road to 4 lane dual
carriagewayfrom km 34+140 (Farukhnagar) to km 80+050 (Jadcherla) of
NH 7 in the state of Andhra Pradesh
3. Strengthening and widening ofexisting 2 lane road to 4 lane dual
carriagewayfrom km 121+000(Tindivanam) to km 192+000 (Ulundurpet) of
NH47 in the state of Tamil Nadu.
4. Strengthening and widening ofexisting 2 lane road to 4 lane dual
carriagewayfrom km 368+255(Adloor) to km 454+332(Yallareddy) ofNH 7
3. in the state of Andhra Pradesh
Position: Manager-Design
Relevant technical and management experience:
In-house design and Review ofConsultant’s design and drawing pertaining
to Highways as per codal provisions. Close interaction with execution team
to resolve various design issues and redesign highway components as per
site requirement.
Liaison with NHAI, IC to seek early design approvals, sort out various
design related issues etc.
Applying value engineering for cost effective designs and also to enhance
construction progress.
Aug-01 May-06 Company: M/s Span Consultants Private Limited
Project:
1) 4 Lane Elevated Highway on NH-7 from km 09.00 (Silk Board Flyover) to
km 18.500(Electronic City) of Bangalore-Hosur section and 4 Lane Elevated
Highwayon NH-4 from km 10.00 to km 14.000 of Bangalore-Neelamangala
section.(Client- NHAI)
2) Consultancy Services for Preparation of Feasibility Study and Detailed
Project Reportfor 4-Laning of Salem – Coimbatore Section ofNH-47(km 1.6
to km 100.0) .(Client- NHAI)
3) 6/8 Lane of existing 4-Lane of NH-7 from km 08.000 to km 33.000 of
Bangalore – Tamil Nadu Border Section and 6/8 Lanning of existing 4-Lane
of NH-4 from km 10.000 to km 30.000 of Bangalore –Nelamangala.(Client-
NHAI)
4) 4-Lane Cable Stayed Bridge Across ZUARI River on NH-17 at CORTALIM
and Proposed GOA-VELHA Bypass,(Client-Goa Goa, PWD)
5) Widening and strengthening of existing Bilikere - Hassan -Belur (client-
KRDCL)
6) Feasibilitystudy and Detailed design of Four Laning of existing Bangalore -
Mysore Road (SH-17)
7) Design Engineer for Supervision consultancy from km.45.600 to 94.000 for
Hosur to Krishnagiri(NH-7) 4-laning project
8) Feasibility study and detailed Engineering for Mumbai City road under
MMRDA.
9) Feasibility study and detailed Engineering for Chennai City road under
TNRDC.
Position: Senior Highway Design Engineer
Relevant technical and management experience:
Carried out analysis of survey data from Total Station, , generation of DTM
(Digital Terrain Modelling) surface,contours, Design of horizontal alignment
,vertical profile, cross-section and earthwork calculation using Inroads
Select CAD and Mx Road, analysis of material and soil investigation data,
analysis of rates, computation of quantities and cost estimation.
1996 Aug-2001
Company: M/s Consulting Engineering Services (India) Limited
4. Project:
1. Project Coordination Consultancy For Kerala State Highway Project With
Inland Water Transport Pilot Project, Kerala
2. Detailed Engineering of Mumbai-Talasari Expressway, Maharashtra
3. Detailed Engineering and ProjectDevelopmentfor Chennai bypass in Tamil
Nadu
4. PCC Tamil Nadu Road Sector Project, Tamil Nadu
5. Haryana Highway Upgrading Project (HHUP)
Position: Assistant Engineer
Relevant technical and management experience:
Carried out engineering survey related to highways such as Benkelman
Beam Deflection survey, soil investigation, roughness survey, axial load
survey & road condition survey. Carried out analysis of survey data from
Total Station, generation of DTM (Digital Terrain Modeling) surface,
contours, Design of horizontal alignment, vertical profile, cross-section and
earthwork calculation using Soft desk R8, CARD-1- version-7.515
with Select CAD, Mx-Road, Bentley power rail track for different projects
as per client’s requirement, analysis of material and soil investigation data,
analysis of rates, computation of quantities and cost estimation.
Language Known (Speak, Read, Write): English,Hindi and Bengali
Passport Details: PassportNumber- J0762802,Place ofissue- Bangalore,Date of issue-14-05-2010,Date of
Expiry – 13-05-2020
CERTIFICATION:
I, the undersigned,certified that to the bestof my knowledge and belief,this Bio-data correctly describes my
qualifications myexperience and me.
Signature:
Date: 28.06.2016
(UDAY SANKAR MAITY)