SlideShare a Scribd company logo
1 of 11
CURRICULAM-VITAE FOR SUITABLE POST
NAME :Dharmendra Kumar Srivastava
DATE OF BIRTH :2nd October 1970
PROFESSION : Civil Engineering
NATIONALITY :Indian
EDUCATIONAL QUALIFICATION:1. M.Tech.(Civil Geo-technical Engineering)(First division with distinction)1997,
R.E.C.Kurukshetra, Kurukshetra University (INDIA)
2. B.Tech. (Civil Engineering) (First Division With Distinction)1992,H.B.T.I.Kanpur,
Kanpur University (INDIA)
ADDITIONAL QUALIFICATION:
1-Computer Training : Working knowledge of Computer (Windows, MS Office and other Regular Software).
: Computer Course on MS-Word, MS-Excel, PowerPoint, MS-Project, Primavera etc.
2- Membership of
Professional Societies: 1. Life Member of Indian Roads Congress (IRC)
2. Member of Institution of Engineers (India) {M.I.E.}
3. Life Member of Indian Geo-Technical Societies (M.I.G.S.)
4. International Society for Soil Mechanics& Geo-Technical Engg. Membership
For the Year 1998-2001 {ISSMG}
3- OTHER TRAINING : 1-Attended the workshop on design and quality control of rigid pavement and environment protection
measures during construction of highway project organized by World Bank in Maurya Hotel, Patna
on 5th April 2006.
: 2- Attended the training and awareness programme on Road safety organised by HCC with NHAI in
quality hotel sewa grand mall, Faridabad organised in 11-12 June 2010.
: 3-Attended the workshop on Road safety Audit done by IIT Delhi & other agencies (RITES) of world
bank funded four laning of LMNHP(NH-28) in IIT new Delhi on 14 June 2012.
: 4-Presented a technical paper during 5th
International Conference on Forensic Geotechnical
Engineering held in Indian Institute of Science, Bengaluru (8-10, December 2016) on Topic
‘’Geotechnical Perspectives in Failure cases and their Forensic Investigations ‘’.
4- Passport Details : No:K-3895256, Valid Up To: 14-02-2022
KEY SKILLS
1. Design and design review with field data collected from sites with the help of design software like mx road
2. Project Management
3. Review of Work program
4. Monitoring of work with specification
5. Conversant with mix design of various construction materials like DBM,BC,SDBC, VARIOUS GRADE OF
CONCRETE, WMM,GSB etc with MORT&H and AASHTO specification.
6. Monitoring of Contract Implementation as per FIDIC and Model Concession Agreement (MCA) for Four
Laning & Six Laning BOT Project (D B F O Pattern).
7. Operation & Maintenance of Project Highway as per Concession Agreement and Toll Plaza Management
Total Professional Experience: 23 Years
Experience in similar capacity for major highway projects: 21 Years, 02 months
World Bank / ADB / JBIC / NHAI funded projects: 6 Projects
KEY QUALIFICATION:
Have more than 23 years of experience in carrying out design and construction supervision at site for various Roads, Highways and Bridge
Projects in INDIA and OVERSEAS. Has carried out day-to-day supervision of work, checking of setting out of works, measurements of
completed works and monitoring the work as per the contract specification and drawings. Conversant with specifications of roads and
bridge works and material testing as per MOST, IRC&AASHTO. Assisted in the identification of quarry sites for aggregates, establishment
of standard program for various testing regarding soil, concrete, water, cement, bitumen, aggregate, steel and asphalt concrete mix
design, wet mix macadam mix design, concrete mix design, location and approval of borrow pit materials, field and laboratory testing of
various pavement layers. Also responsible for issuing of testing certificates regarding materials and layers of earthwork, base/sub-base
work and asphalt work and day-to-day supervision of works during execution, guiding technicians for testing and maintaining the records
of all testing, identification of defect/substandard work and issuing letter to the contractor for rectification of executed
defective/substandard work. Besides this, he is capable of maintaining proper coordination between Material Engineer, Bridge Engineer
and Quantity Surveyor, imparted on the job training to the Client and Contractor’s Engineers and is fully conversant with FIDIC contract
document.
RELEVANT PREVIOUS ASSIGNMENT IN INDIA :
1. Team leader Cum Senior Highway Engineer on Four laning of HISAR to DABWALI section of NH-10 from KM170.00 to KM
227.000 with paved shoulder in the state of Haryana on EPC mode , Project Cost –Rs 579.76 Crores; Employer: National
Highway Authority India, New Delhi) ---- July 2015- ongoing (INDIA)
2. Team leader Cum Senior Highway Engineer on widening and strengthening of Gohana-Lakhan Majra-Meham –Bhiwani Road
(GLMB Road) from KM 0.00 to KM 37.700 (SH -16A from KM 16.000 to KM 53.700) in Rohtak District, Haryana (under 2660-IND
National Capital Region Urban Infrastructure Financing Facility Project) funded by-ADB , Project Cost –Rs 104.20 Crores(USD 17
Million), Employer: Haryana state Road & Bridge Development Corporation Ltd (HSRDC),Bay no 13-14, sector-2, Panchkula-
134109 ,Haryana ----November 2013-March 2015
3. Project Coordinator in M/S ERA INFRA ENGG LTD (EIEL) working for:-
a) Four laning of Muzaffarnagar -Haridwarr Setion of Road Project (NH-58) from Km 131.000 to Km 211.000 on BOT (Toll)
Basis(DBFOT PATTERN) , in the state of Uttar Pradesh and Uttarakhand under NHDP, Phase-III, funded by M/S Haridwar
Highway Project Ltd(M/S HHPL) ,Project Cost: Rs. 975 Crores as per CA (USD 185 Million ) ,Employer: National Highway
Authority India, New Delhi
b) Four laning of Haridwar – Dehradun Setion of Road from Km 211.000 to Km 218.200 of NH-58 and Km 165.000 to Km
196.875 of NH-72 in state of Uttarakhand under NHDP,Phase-III as on BOT(Annuity Basis)(DBFO PATTERN) , funded by
M/S Dehradun Highway Project Ltd(M/S DHPL) ,Project Cost: Rs. 478 Crores as per CA (USD 90 Million )and As per
Concessionaire’s Financial close: Rs. 630 Cr ,Employer: National Highway Authority India, New Delhi)
c) Four laning of Bareilly –Sitapur Setion of Road on NH-24 from Km 262.000 to Km 413.200 in the state of Uttar Pradesh
under NHDP,Phase-III, on BOT Basis(DBFO PATTERN) , funded by M/S Bareilly Highway Project Ltd (M/SBHPL) ,Project
Cost: Rs. 1046 Crores as per CA (USD 195 Million ) ,Employer: National Highway Authority India, New Delhi)
4. Resident cum Highway Engineer of Independent Engineer in 6 laning of Gurgaon - Kotputli – Jaipur Section of Road Project (NH-
8) on BOT Basis(DBFO PATTERN) , in Haryana and Rajasthan, funded by Pink City Expressway Pvt Ltd ,Project Cost: Rs. 1896
Crores as per CA (USD 395 Million )and As per Concessionaire’s Financial close: Rs. 2272 Cr ,Employer: National Highway
Authority India, New Delhi)….August.2009- May 2013
a) Resident cum Highway Engineer of Independent Engineer in 6 laning of Gurgaon - Kotputli – Jaipur Section of Road Project
(NH-8) on BOT Basis(DBFO PATTERN) , in Haryana , funded by Pink City Expressway Pvt Ltd(JV of ETA Dubai and KMC
India) , package : 1&2( Km 42.700 to Km 107.100 on NH-8 in Haryana)………..August 2009 to January 2012 and June 2012
to May 2013
b) Resident cum Highway Engineer of Independent Engineer in 6 laning of Gurgaon - Kotputli – Jaipur Section of Road Project
(NH-8) on BOT Basis(DBFO PATTERN) , in Rajasthan , funded by Pink City Expressway Pvt Ltd(JV of ETA Dubai and KMC
India) , package : 5&6 ( Km 181.300 to Km 273.000 on NH-8 in Rajasthan)………..Feb 2012 to June 2012
5. Sr. Highway Engineer of Independent Engineer in Development and Four Laning of Lebad-Jaora section of Road Project (SH-31)
on BOT Basis(DBFO PATTERN) , in Ratlam, MP, funded by Western Mp Infrastructure & Toll Roads Pvt Ltd ,Project Cost:
USD147.25 Million ,Employer: Madhya Pradesh Road Development Corporation ,Bhopal, MP …Sept.2008- July 2009 (India)
6. Highway cum pavement Engineer in Construction Supervision of NH-28, LMNHP.EW-II, WB-11, LMNHP,(Kotwa to Mehansi from
KM 440.000 to KM 480.000 on NH-28) PKG-11,Motihari,Bihar,funded by World Bank, Project Cost: USD 80 Million
Employer: National Highways Authority of India ; Nov.2005- Aug 2008
7. From March 2003 to April 2005: On overseas assignment for Design and Construction of Tan’am-Hamra-Ad’Duru Road Project,
Phase-I &II (Variation Order-I&II Length of project road =54+33.65 Km on Tan’am-Hamra-Ad’Duru Road, in Sultanate of Oman
8 Inspector (Highways) in Construction Supervision of strengthening, widening and reconstruction of Rajkot –Jamnagar Road ( SH-
25) Project (Length=60 Km) in (Rajkot –Jamnagar), Gujarat,India, funded by World Bank (A joint venture with Louis Berger
International Inc ,USA), Project Cost: USD 25 Million, (Employer: P.W.D.,Gujarat, R&B Division)
……………………………………………………………………. April,2001-March, 2003(India)
1. Field Engineer (Highways) in Construction Supervision of Four Laning& Strengthening of Gurgaon to Kotputali (NH-8)
Road Project(Length=135 Km) at (Delhi –Jaipur), in Rajasthan, India, funded by ADB ,(A joint venture with
SMEC,AUSTRALIA), Project Cost: USD100 Million,(Employer: National Highways Authority of India)
…………………………………..January 1998-April,2001(India)
2. Field Engineer (Highways) in Construction Supervision of Four Laning& Strengthening of Karnal to Ambala (NH-1)
Road Project(Length=80 Km) at (Karnal –Ambala), Haryana, India, funded by World Bank , (A joint venture with
SMEC,AUSTRALIA), Project Cost: USD 80 Million,(Employer: P.W.D., Haryana, B&R Division)………………………….. March,
1995-December,1997 (India)
3. Construction Engineer in Execution of NAA-ATS Project at SantaCruzh Airport, Mumbai, INDIA, funded by National
Airport Authority, Govt of India, Project Cost: USD 2 Million,(Employer: National Airport Authority of India)
……………………………………………………….. Nov’1993 To March’1995 ,INDIA
4. Construction Engineer in Strengthening And Widening of Bhiwadi-Alwar-Karauli-Mandrial Road (BAKM Road) (Up
gradation of Rajasthan Road Project,Lenght135km) in Rajasthan ,INDIA funded by World Bank , Project Cost: USD15
Million (Employer: P.W.D.Rajasthan)
…………………………………………………………………Nov’1992 To March’1993 INDIA
RELEVANT PREVIOUS ASSIGNMENT IN OVERSEAS (SUTANATE OF OMAN):
1. Highway Engineer/Quantity Surveyor in Construction Supervision of Design and Construction of Tan’am-Hamra-Ad’Duru Road
Project, Phase-II (Variation Order-II Length of project road =33.65 Km on Tan’am-Hamra-Ad’Duru Road, Variation Order III
Length of project road =1.2 Km including service roads and Parking Area in front of Aswad School & Variation Order IV Length of
project road =4.00 Km internal road starting from Ch.44+483 of Tan’am-Hamra-Ad’Duru Road to Aswad West) in IBRI,
A’DHAHIRA (Sultanate of Oman ), funded by Directorate General of Roads, Ministry of Transport and Telecommunication,
SULTANATE OF OMAN), Project Cost: USD18 Million, (Employer: Directorate General of Roads, Ministry of Transport and
Telecommunication, SULTANATE OF OMAN) ………… October 2003-April 2005(Sultanate of Oman )
2. Highway Engineer/Quantity Surveyor in Construction Supervision of Design and Construction of Tan’am-Hamra-Ad’Duru Road
Project, Phase-I (Original Contract +Variation Order-I ,Length of project road =54.00 Km on Tan’am-Hamra-Ad’Duru Road.) in
IBRI, A’DHAHIRA (Sultanate of Oman ), funded by Directorate General of Roads, Ministry of Transport and
Telecommunication, SULTANATE OF OMAN), Project Cost: USD 30 Million (Employer: Directorate General of Roads, Ministry of
Transport and Telecommunication, SULTANATE OF OMAN) ……………… April 2003-October 2003- (Sultanate of Oman )
EMPLOYMENT RECORD:
November2013 to till date
:G- Engineering Advisory Services Private Ltd, SCO-12, HUDA Shopping Centre,Sector 55,
Gurgaon, Haryana-122002, (Associate Director / Chief General Manager)
1- From July 2015 to till date
Working as Team leader Cum Senior Highway Engineer in association with M/s Centro DE Estudios DE Mteriales Y Control
DE Obra, S.A. (C.E.M.O.S.A.) on Four laning of HISAR to DABWALI section of NH-10 from KM170.00 to KM 227.000 with
paved shoulder in the state of Haryana on EPC mode , Project Cost –Rs 579.76 Crores; Employer: National Highway
Authority India, New Delhi) ---- July 2015- ongoing (INDIA)
2- From January 2015 to July 2015
A) Worked as Team Leader in preparation of design, drawing, Quality assurance plan and methodology and sequence
of work for rehabilitation and up gradation to four lane divided carriageway with paved shoulders of Ludhiana-
Talwandi Bhai section (Existing Chainage from Km 85.980 to Km 92.000) of NH-95 (Length -6.020 km) on EPC mode
in the state of Punjab. (Employer- NHAI, Contractor- M/s Gawar Construction Ltd)
B) Worked as Team Leader in preparation of DPR including design, drawing, Quality assurance plan and methodology
and sequence of work for widening and up gradation to four lane divided carriageway with side drains of road
section SH-15A falling from Basai Chowk to start of ROB approach constructed on Delhi - Rewari –Jaipur railway
line crossing no 35/4-5 (Road length =1.020 Km ) in Gurgaon District. (Employer- Municipal Corporation of
Gurgaon)
C) Worked as Team Leader in preparation of DPR including design, drawing, Quality assurance plan and methodology
and sequence of work for widening and up gradation to four lane divided carriageway with side drains of road
section SH-15A falling from Basai Chowk to start of ROB approach constructed on Delhi - Rewari –Jaipur railway
line crossing no 35/4-5 (Road length =1.020 Km ) in Gurgaon District. (Employer- Municipal Corporation of
Gurgaon)
D) Worked as Team Leader in preparation of project report and bill of quantity of balance work from Manesar to
Palwal section (From Km83.220 to Km 135.650) of 6-lane access controlled KMP Expressway on the basis of
approved Plan and Profile provided by the HSIIDC.(Client- Oriental Structural Engineers Ltd)
3- From January 2015 to November 2013
Worked as Team leader Cum Senior Highway Engineer in association with Marc Technocrats ltd,on widening and
strengthening of Gohana-Lakhan Majra-Meham –Bhiwani Road (GLMB Road) from KM 0.00 to KM 37.700 (SH -16A from
KM 16.000 to KM 53.700) in Rohtak District, Haryana (under 2660-IND National Capital Region Urban Infrastructure
Financing Facility Project) funded by-ADB , Project Cost –Rs 104.20 Crores(USD 17 Million), Employer: Haryana state Road
& Bridge Development Corporation Ltd (HSRDC),Bay no 13-14, sector-2, Panchkula-134109 ,Haryana ----November 2013-
ongoing (India)
As Team leader cum Senior Highway Engineer on this project discharging following duties:-
• Study and review available data, reports and documents.
• Review the entire project preparation and implementation activities of the contractor.
• Review the adequacy of topography survey, inventory and condition survey and pavement investigations for
design of road to be constructed.
• Review and approve the design and working drawings prepared for the construction of various components of the
highway, bridges and other structures by the contractor.
• Review analysis of rates, estimates, reports and other deliverables as per the requirement of contract agreement.
• Review quality assurance and quality control provisions during the design, construction and maintenance stages.
• Review and approve rehabilitation proposed by the contractor.
• Institute quality assurance procedure and quality control system during the design, construction and maintenance
stages.
• Assist HSRDC in handing over the site to the contractor and issue orders to commence the works.
• Coordination with Client and contractor for effective project management.
• Establish computer aided project management system.
• Review and approve contractor’s work programme.
• Review all project section contracts made by the contractor.
• Review and approve contractor’s construction methodology w.r.t. sound environmental standards.
• Verify and approve the site establishment requirements and construction plants and equipment.
• Liaise and coordinate with relevant authorities for clearing all encumbrances.
• Evolve Management Information System and provide it to HSRDC.
• Review the environmental management plan or the project highway during construction and O&M phases.
• Interpretation of terms and conditions of Contract agreement.
• Identify construction delays and recommend to the HSRDC remedial measures to expedite the progress.
• Supervision of construction of works and progress monitoring vis-a- vis approved work programme and ensure
timely completion of the project.
• Assist HSRDC in all matters related to variation orders rate fixing for non-priced works, time extensions, settlement
of claims and disputes including recourse to arbitration.
• Direct the contractor on construction safety and care of works and emergency activities.
• Review the progress and status of rehabilitation and resettlement works.
• Issue provisional and completion certificates.
• Review and certify the ‘as-built’ drawings
• Assist HSRDC in progress review meetings.
Furnish final completion report after final inspection
May 2013 to November2013 : ERA INFRA ENGINEERING PROJECTS LTD., B-24, Sector-3,NOIDA,
UP-201023,
Additional General Manager; worked as project coordinator cum contract specialist for following projects under taken
by Era group as Concessionaire (SPV) and executed by M/S Era Infra Engineering Ltd subsidiary of this Era group.
a) Four laning of Muzaffarnagar -Haridwarr Setion of Road Project (NH-58) from Km 131.000 to Km 211.000 on
BOT (Toll) Basis(DBFOT PATTERN) , in the state of Uttar Pradesh and Uttarakhand under NHDP, Phase-III,
funded by M/S Haridwar Highway Project Ltd(M/S HHPL) ,Project Cost: Rs. 975 Crores as per CA (USD 185
Million ) ,Employer: National Highway Authority India, New Delhi)….03-09-.2010-ongoing(India)
b) Four laning of Haridwar – Dehradun Setion of Road from Km 211.000 to Km 218.200 of NH-58 and Km
165.000 to Km 196.875 of NH-72 in state of Uttarakhand under NHDP,Phase-III as on BOT(Annuity Basis)
(DBFO PATTERN) , funded by M/S Dehradun Highway Project Ltd(M/S DHPL) ,Project Cost: Rs. 478 Crores as
per CA (USD 90 Million )and As per Concessionaire’s Financial close: Rs. 630 Cr ,Employer: National Highway
Authority India, New Delhi)…-; 01-11-2011-----ongoing(India)
c) Four laning of Bareilly –Sitapur Setion of Road on NH-24 from Km 262.000 to Km 413.200 in the state of Uttar
Pradesh under NHDP,Phase-III, on BOT Basis(DBFO PATTERN) , funded by M/S Bareilly Highway Project Ltd
(M/SBHPL) ,Project Cost: Rs. 1046 Crores as per CA (USD 195 Million ) ,Employer: National Highway Authority
India, New Delhi)…. 01-03-2011----ongoing(India)
Employer : National Highway Authority India, New Delhi
As Project Coordinator cum Contract specialist for above projects:-
• He has been responsible for planning, scheduling, organizing the resources for above highway projects in
beginning stage.
• Ensuring Contract administration on the project and also quality in work and workmanship.
• Implementing Operation and Maintenance of Project Highway and pavement rehabilitation and repair works if it is
required
• Procurement design / drawings as per Concession Agreement and ensure execution accordingly during
construction stage.
• Monitoring of Contract Implementation as per Model Concession Agreement (MCA) for Four Laning BOT Project
(D B F OT Pattern).
• Assisting NHAI official in respect of preparation of land acquisition plan, Liasioning with local Administrative
Authorities for getting the encumbrance free land on site.
• Toll Plaza Management
August 2009 to 30 April 2013 : Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.,
8-2-5, Ravula Residency, Srinagar Colony, Hyderabad – 500 082,
Resident cum Highway Engineer
Resident cum Highway Engineer of Independent Engineer in Development and Six Laning of Gurgaon-Kotputali-Jaipur
section of National Highway Road Project (NH-8) on BOT Basis(DBFO PATTERN) ,(Length of Project -225.600 KMS, Cost of
Project -1896 Cr of Indian Rupees, As per Concessionaire’s Financial close: Rs. 2272 Cr) in Haryana and Rajasthan, Project
Cost: USD 395 Million
CONCESSIONAIRE:- M/S Pink City Expressway Pvt Ltd (JV of M/S E T A Dubai and M/S KMC India)
Employer : National Highway Authority India, New Delhi
• Resident cum Highway Engineer of Independent Engineer in 6 laning of Gurgaon - Kotputli – Jaipur Section of Road
Project (NH-8) on BOT Basis(DBFO PATTERN) , in Haryana , package : 1&2( Km 42.700 to Km 107.100 on NH-8 in
Haryana)………..August 2009 to January 2012 ( EPC contractors in Package-1 : M/S GAWAR INFRASTRUCTURE, M/S
TOTEM Infrastructure pvt ltd, Hyderabad, M/S A S I P ,Hyderabad; In Package-2: M/S Lonzian Bridge and Road
company ,Republic of China)
• Resident cum Highway Engineer of Independent Engineer in 6 laning of Gurgaon - Kotputli – Jaipur Section of Road
Project (NH-8) on BOT Basis(DBFO PATTERN) , in Rajasthan ,package : 5&6 ( Km 181.300 to Km 273.000 on NH-8 in
Rajasthan)………..Feb 2012 to ongoing (india) ( EPC contractors in Package-5 : M/S Krishna Mohan Construction
pvt ltd, Hyderabad, Package-6: M/S N K C pvt ltd)
As Resident cum Highway Engineer:-
• He has been responsible for supervising the works of highway constructed by the Concessionaire
• Ensure quality in work and workmanship.
• Inspecting the pavement rehabilitation and repair works undertaken by the Concessionaire
• Review design / drawings and ensure execution accordingly during construction stage.
• Monitoring of Contract Implementation as per Model Concession Agreement (MCA) for Six Laning BOT Project (D
B F OT Pattern).
• Operation & Maintenance of Project Highway as per Concession Agreement and Toll Plaza Management
• Any other tasks described in TOR.
September 2008 to August 2009 : ARTEFACT PROJECTS LTD. NAGPUR, MAHARASHTRA
General Manager
Sr. Highway Engineer of Independent Engineer in Development and Four Laning of Lebad-Jaora section of Road Project
(SH-31) on BOT Basis(DBFO PATTERN) ,(Length of Project -125 KMS, Cost of Project -471 Crore of Indian Rupees) in Ratlam,
MP, Project Cost: USD147.25 Million
CONCESSIONAIRE: M/S Western M P Infrastructure & Toll Roads Pvt Ltd(Funded by-M/S ZEE Telefilm pvt ltd)
EPC Contractors: Package-1(Km 00 to km 25.00) – M/S Backbone enterprises ltd, Rajkot, Gujrat ; Package 2 and 3(Km 25.00
to Km 100.00)- M/S BSCPL , Hyderabad; Package-4 (Km 100.00 to Km 125.00)-M/S Dilip Buildcon pvt ltd,Bhopal
Employer: Madhya Pradesh Road Development Corporation ,Bhopal, MP
As Sr. Highway Engineer:-
• Review and approve/suggest modification in Contractor's work programme, design/drawings and check the
working drawing supplied by the Contractor and order for correction, if necessary.
• Prepare relevant aspect in Quality Assurance Manual and Institute Quality Assurance System
• Review of Alignment Design
• Maintain records of tests on materials and works
• Provide Survey data to the Contractor for setting out works
• Check setting out for the work and maintain records
• Assist Team Leader in liasioning and coordination with relevant authorities for clearing all encumbrances
• To monitors and checks day to day quality control and workmanship and supervise and inspect the performance of
works
• Supervise and inspect the performance of work vis-à-vis levels, contours, workman ship, specification and quality
check tests
• Inspect, examine and attend measurements for interim payment and for substantial completion
• Verify and check quality and completion of works
• Interpretation of Technical Specification and Contract Documents
• Issuance of variation orders with modified working drawings and monitor variations
• Analyze, evaluate and monitor progress of works and monitor contractor's equipment resources vis-à-vis work
program
• Inspection of Contractor's establishment including labor camp and direct the contractor on construction safety and
care of works
• Project monitoring using computer aided management techniques
• Assist Team Leader in directing contractor on emergency activities
• Attend measurement and maintain its records and check Contractor’s invoices, claims, etc.
• Assist the Team Leader in project performance monitoring and evaluation, maintenance inspection during the
Defects Liability Period
• Assist Team Leader in preparation of on the job training packages, training methodology
• Preparation of progress reports and other deliverables
• Assist Team Leader in furnishing final acceptance report after the final inspection after defect liability period
January 1998 to August 2008 : CONSULTING ENGINEERING SERVICES (INDIA) Ltd., NEW DELHI
Project Manager / Deputy Project Manager/ Sr. Engineer/Engineer
A) From April 2005 to July 2008 :-
1) Construction Supervision of Lucknow-Muzaffarpur National Highway Project(EW-II,WB-11
,LMNHP,NH-28)-Package-11(From Ch 440.00 to Ch 480.00 ,Length Project 40km), Project Cost: USD
80 Million, (Employer: National Highway Authority India, New Delhi) ; Name of Contractor: M/S
Madhucon Projects Ltd, Hyderabad
• As Highway Cum Pavement Engineer:- Review and approve/suggest modification in Contractor’s work
programme, design/drawings and check the working drawing supplied by the Contractor and order for correction if
necessary.
• Provide Survey data to the Contractor for setting out works
• Check setting out for the work and maintain records
• Assist Resident Engineer in liasioning and coordination with relevant authorities for clearing all encumbrances
• Assist Resident Engineer in review of road furniture
• To monitors and checks day to day quality control and workmanship and supervise and inspect the performance of
works
• Supervise and inspect the performance of work vis-à-vis levels, contours, workman ship, specification and quality
check tests
• Inspect, examine and attend measurements for interim payment and for substantial completion
• Verify and check quality and completion of works
• Assist the RE in interpretation of Technical Specification and Contract Documents
• Assist the RE in the issuance of variation orders with modified working drawings and monitor variations
• Analyze, evaluate and monitor progress of works and monitor contractor’s equipment resources vis-à-vis work
program me
• Assist the RE in the inspection of Contractor’s establishment including labour camp and direct the contractor on
construction safety and care of works
• Assist the RE in project monitoring using computer aided management techniques
• Assist RE in directing contractor on emergency activities
• Attend measurement and maintain its records and check Contractor‘s invoices, claims
• Assist the RE in liasioning with NHAI in approving modified detailed construction drawings, monitoring work
progress and implementation through computer aided management techniques
• Assist the RE in project performance monitoring and evaluation, maintenance inspection during the Defects
Liability Period
• Assist RE in issuance of compilation certificate after rectification if any by the contractor
• Assist RE in preparation of on the job training packages, training the methodology
• Assist RE in preparation of progress reports and other deliverables
• Assist Team Leader in furnishing final acceptance report after the final inspection after defect liability period
2) From April 2003 to April 2005 :- (Overseas Assignment)
Construction Supervision of Design and Construction of Tan’am-Hamra-Ad’Duru Road
Project, Phase-II
a) Construction Supervision of Design and Construction of Internal Road starting from 44+483 of Tan’am-Hamra-
Ad’Duru Road to Aswad West, Variation Order-IV (Length of project-4.000km), Project Cost: USD 2 Million
b) Construction Supervision of Design and Construction of Service Road from Aswad School to proposed Deputy Wali
Office, Ibri, Parking Area in front of Aswad School, Variation Order-III (Length of project-1.200km) , Project Cost:
USD 1 Million
c) Construction Supervision of Design and Construction of Tan’ am-Hamra-Ad’Duru Road Project, Variation Order-II
(Length of project-33.65km, From Ch 55.350 to Ch 89.00)., Project Cost: USD 18 Million
(Name of Contractor: M/S Oman Gulf Contracting Company LLC, Salalah, Sultanate Of Oman;
Employer: Directorate General of Roads, Ministry of Transport and Telecommunications,
SULTANATE OF OMAN.)
• As Highway Engineer/Quantity Surveyor, responsible for checking of design submitted by contractor for execution
of works ,checking of Control Points/T.B.Ms., checking of alignments of Road and CD structures as per drawing,
checking of setting out of works vis-à-vis contract drawing &checking of horizontal/vertical curves as per highway
design manual of Sultanate of Oman. Also responsible for checking of R.L. as per approved drawings for
earthworks, sub-base works, base works and bituminous works. Responsible for measurement of approved works,
preparation of interim payment certificate and certification of quantities. Assisting in site administration and in
preparation of variation orders as per Sultanate of Oman specification/FIDIC conditions. Beside this, supervising
any further plans and drawings necessary for the carrying out of the work, making arrangement on behalf of the
Client for the inspection of works, scrutinizing the work program of the Contractor and monitoring day to day
progress of work, participating in Monthly Progress Review meeting with the Contractor and providing necessary
suggestion/advice to expedite the progress of work and assisting the Employer to determine the amount of
extension of time for completion of work, if required and on completion of works, revising and checking the
drawings in accordance with alterations agreed during the execution of works and supervising “As Built” drawings
to be submitted to the Employer by the Contractor (Original+ Three copies) along with a digital copy of the “As
Built” drawings in Auto Cad format.
Construction Supervision of Design and Construction of Tan’am-Hamra-Ad’Duru Road Project, Phase-I
(Original Contract +Variation Order-I, Length of project road =54.00 Km on Tan’am-Hamra-Ad’Duru Road,
From Ch 1.350 to Ch 55.350) Project Cost: USD 30 Million (Name of Contractor: M/S Oman Gulf
Contracting Company LLC, Salalah, Sultanate Of Oman, Employer: Directorate General of Roads,
Ministry of Transport and Telecommunication, SULTANATE OF OMAN)
• As Highway Engineer/Quantity Surveyor, responsible for checking of design submitted by contractor for execution
of works ,checking of Control Points/T.B.Ms., checking of alignments of Road and CD structures as per drawing,
checking of setting out of works vis-à-vis contract drawing &checking of horizontal/vertical curves as per highway
design manual of Sultanate of Oman. Also responsible for checking of R.L. as per approved drawings for
earthworks, sub-base works, base works and bituminous works. Responsible for measurement of approved works,
preparation of interim payment certificate and certification of quantities. Assisting in site administration and in
preparation of variation orders as per Sultanate of Oman specification/FIDIC conditions. Beside this, supervising
any further plans and drawings necessary for the carrying out of the work, making arrangement on behalf of the
Client for the inspection of works, scrutinizing the work program of the Contractor and monitoring day to day
progress of work, participating in Monthly Progress Review meeting with the Contractor and providing necessary
suggestion/advice to expedite the progress of work and assisting the Employer to determine the amount of
extension of time for completion of work, if required and on completion of works, revising and checking the
drawings in accordance with alterations agreed during the execution of works and supervising “As Built” drawings
to be submitted to the Employer by the Contractor (Original+ Three copies) along with a digital copy of the “As
Built” drawings in Auto Cad format.
B) From April 2001 to April 2003:-
3) Construction Supervision of strengthening, widening and reconstruction of Rajkot –Jamnagar
Road(SH-25)Project(Length=60Km), Project Cost: USD 25 Million (A J.V. with Louis Berger
International Inc ,USA). (Name of Contractor: Larsen & Tubro, ECC Division Chennai;
Employer: P.W.D. ,Gujarat, R&B Division)
As Inspector (Roads), responsible for construction inter-alias, check contract, setting out of works vis-à-vis contract
drawings & specifications, ensure implementation of approved works, supervision of earthwork, sub grade work,
sub-base works, base and bituminous works. Actively involved in the mix design of WMM, DBM&BC and borrow
area identification for earth & sub grade material for earthworks and quarries for GSB and WMM. Sampling and
testing intermittently from site for GSB, WMM& Bituminous materials. Participation in site measurements,
preparation of R.A.bills and certification of quantities. Assisting in site administration and in preparation of
variation orders as per FIDIC conditions. Participating in Monthly Progress Review meeting with the Contractor and
providing necessary suggestion/advice to expedite the progress of work and assisting the Employer to determine
the amount of extension of time for completion of work, if required and on completion of works, revising and
checking the drawings in accordance with alterations agreed during the execution of works and supervising “As
Built” drawings to be submitted to the Employer by the Contractor.
C) From January 1998 to March 2001 :-
4) Construction Supervision of four Laning & Strengthening of Gurgaon To Kotputali (NH-8)Road
Project, Length 135km from Ch 26.865 to Ch 162.500, Project Cost: USD 100 Million (J.V. with
SMEC-Australia). ( Name of Contractors:M/S BSC-RBM-PATI JV, Consortium of Indian and
Malaysian Companies; Employer: National Highways Authority of India)
As Field Engineer, monitoring progress of work on day-to-day basis and submitting monthly report to the
management. Responsible for construction supervision, inter-alias, check contract, setting out of works vis-à-vis
contract drawings & specifications, ensure implementation of approved works. Construction supervision of
earthwork, sub grade work, sub-base works, base works, base works and bituminous works. Responsible for
setting out of check post, typical service roads, alignments consisting of drains etc., Bus & Truck lay byes. Design
and supervision of pipe culverts, RCC slab culverts and major to minor bridges, rehabilitation of existing bridges
(major & minor), supervision of expansion joints work and finishing works of roads & bridges. Liasioning with
Client/ Contractor for the problem related to works and projects. Assisting in site administration and in
preparation of variation orders as per FIDIC conditions. Participating in Monthly Progress Review meeting with the
Contractor and providing necessary suggestion /advice to expedite the progress of work and assisting the
Employer to determene the amount of extension of time for completion of work, if required and on completion of
works, revising and checking the drawings in accordance with alterations agreed during the execution of works and
supervising “As Built” drawings to be submitted to the Employer by the Contractor.
March’1995 to Dec’1997 : STUP CONSULTANT LIMITED. NEW DELHI ; Field Engineer
Construction Supervision of four Laning & Strengthening of Karnal to Ambala (NH-1)Road
Project,Length 80 km, Project Cost: USD 80 Million( J.V. with SMEC-Australia).( Name of
Contractors: M/S Unitech Ltd & LG Construction JV, Consortium of Indian and South Korean
Companies; Employer: P.W.D., Haryana, B&R Division)
As Field Engineer, responsible for construction supervision, inter-alias, check contract, setting out of works vis-à-vis
contract drawings& specifications, ensure implementation of approved works. Planning, monitoring and
deployment of plants, equipments and man-power. Supervision of earthwork, sub grade work, sub-base works,
base works and bituminous works, checking of design of junctions, service roads, Bus& Truck lay byes. Quality
assurance of works, carry out tests on soils, GSB,WMM and Bituminous materials. Participation in site
measurements, preparation of R.A. bills and certification of quantities. Assisting in site administration and in
preparation of variation orders as per FIDIC conditions. Participating in Monthly progress Review meeting with the
Contractor and providing necessary suggestion/advice to expedite the progress of work and assisting the Employer
to determine the amount of extension of time for completion of work, if required and on completion of works,
revising and checking the drawings in accordance with alterations agreed during the execution of works and
supervising “As Built” drawings to be submitted to the Employer by the Contractor.
Nov’1993 to March’1995 : UNITECH LIMITED, (CONSTRUCTION DIVISION),NEW DELHI
Construction Engineer
Execution of NAA-ATS Project at Santa Cruz Airport site, Mumbai, Project Cost: USD 2 Million
(Employer: National Airport Authority)
As Construction Engineer, responsible for setting out building plan, construction of water pump house, electrical
sub station and internal road scheme. Also responsible for cost estimate, statement and assessment of manpower
requirements, supervision of cement concrete batching and mixing plant and setting up of laboratory for quality
assurance and quality control works.
Nov’1992 to Nov’1993 :CIMMCO LIMITED, (CONSTRUCTION DIVISION OF BIRLA
GROUP OF INDUSTRIES) ,ALWAR, (RAJASTHAN) ; Construction Engineer
Improvement and Construction of Bhiwadi-Alwar-Karauli-Mandrial Road (Length135km), Project
Cost: USD 15 Million -Up gradation of Rajasthan Road Project),World Bank Funded(Employer:
P.W.D. Rajasthan)
As Construction Engineer (Trainee for six months), responsible for field survey in construction stage including
setting out of horizontal alignments and control of levels for different layers of pavements and embankments.
Prepare details of working drawings for road works and C-D structures, identification of borrow areas for soils and
quarries of sub-base materials and its testing in laboratory. Prepare daily programme of works and planning,
monitoring the execution of works.
LANGUAGES: _
___________________________________________________________________________________
Languages Speaking Reading Writing
English Excellent Excellent Excellent
Hindi Excellent Excellent Excellent
____________________________________________________________________________________
CERTIFICATION:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes my self , my
qualifications and my experience.
Signature
(Day/Month/Year)
Address for Correspondence : Dharmendra Kumar Srivastava
: Associate Director, G- Engineering Advisory Services Private Ltd; 940, Sector-9,HIG Duplex,
Vasundhara, Ghaziabad, Uttar Pradesh-201012
Tele Fax-0124-2392006, Mobile-09456836132, 9650859797, 9650805599(H),
E-Mail Address : dksh19702006@yahoo.com, ; srivastava.dk2009@gmail.com
Passport Details : No:K-3895256, Valid Up To: 14-02-2022
Present CTC : 30 LACS
Expected CTC : Negotiable
Notice Period : 15 days- 1 months (Negotiable)

More Related Content

What's hot

CV of Yogesh Final
CV of Yogesh FinalCV of Yogesh Final
CV of Yogesh FinalYogesh V.K
 
Abhinandan K -Highway Engineer with 3 + yr Expr 2014
Abhinandan K -Highway Engineer with 3 + yr Expr 2014 Abhinandan K -Highway Engineer with 3 + yr Expr 2014
Abhinandan K -Highway Engineer with 3 + yr Expr 2014 Abhinandan K
 
Civil engineering internship report
Civil engineering internship reportCivil engineering internship report
Civil engineering internship reportMd Mohsin Mohsin
 
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_TienDuong Nguyen
 
Civil Engineer (Roads) with photo - Final
Civil Engineer (Roads) with photo - FinalCivil Engineer (Roads) with photo - Final
Civil Engineer (Roads) with photo - FinalMohamed Aboughaly
 
AECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.PAECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.PMadhava Kulal
 
Summer training @ L&T
Summer training @ L&TSummer training @ L&T
Summer training @ L&Tams_5686
 
A Meganathan - Traffic cum Pavement Expert
A Meganathan - Traffic cum Pavement ExpertA Meganathan - Traffic cum Pavement Expert
A Meganathan - Traffic cum Pavement ExpertMeganathan Andiappan
 
training report
training reporttraining report
training reportLilonheart
 
most final report of industrial training for college
most final report of industrial training for collegemost final report of industrial training for college
most final report of industrial training for collegeindrajeet kumar
 

What's hot (20)

Col SP Tomar_CV
Col SP Tomar_CVCol SP Tomar_CV
Col SP Tomar_CV
 
Curriculum Vitae-Zuber
Curriculum Vitae-ZuberCurriculum Vitae-Zuber
Curriculum Vitae-Zuber
 
CV_Bavanam Veenadhari_July_16
CV_Bavanam Veenadhari_July_16CV_Bavanam Veenadhari_July_16
CV_Bavanam Veenadhari_July_16
 
Md._Habibur_Rahman_CV
Md._Habibur_Rahman_CVMd._Habibur_Rahman_CV
Md._Habibur_Rahman_CV
 
CV of Yogesh Final
CV of Yogesh FinalCV of Yogesh Final
CV of Yogesh Final
 
Abhinandan K -Highway Engineer with 3 + yr Expr 2014
Abhinandan K -Highway Engineer with 3 + yr Expr 2014 Abhinandan K -Highway Engineer with 3 + yr Expr 2014
Abhinandan K -Highway Engineer with 3 + yr Expr 2014
 
pdf C.V RAVIKANNIAPPAN
pdf C.V RAVIKANNIAPPANpdf C.V RAVIKANNIAPPAN
pdf C.V RAVIKANNIAPPAN
 
Civil engineering internship report
Civil engineering internship reportCivil engineering internship report
Civil engineering internship report
 
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
 
Civil Engineer (Roads) with photo - Final
Civil Engineer (Roads) with photo - FinalCivil Engineer (Roads) with photo - Final
Civil Engineer (Roads) with photo - Final
 
Ravi_Shenker2014
Ravi_Shenker2014Ravi_Shenker2014
Ravi_Shenker2014
 
C.V.
C.V.C.V.
C.V.
 
Vishu resume new (1)
Vishu resume new (1)Vishu resume new (1)
Vishu resume new (1)
 
Highway Engineer
Highway EngineerHighway Engineer
Highway Engineer
 
AECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.PAECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.P
 
Summer training @ L&T
Summer training @ L&TSummer training @ L&T
Summer training @ L&T
 
A Meganathan - Traffic cum Pavement Expert
A Meganathan - Traffic cum Pavement ExpertA Meganathan - Traffic cum Pavement Expert
A Meganathan - Traffic cum Pavement Expert
 
CHVR CV
CHVR CVCHVR CV
CHVR CV
 
training report
training reporttraining report
training report
 
most final report of industrial training for college
most final report of industrial training for collegemost final report of industrial training for college
most final report of industrial training for college
 

Viewers also liked

Viewers also liked (20)

Approaches of management
Approaches of managementApproaches of management
Approaches of management
 
Spelen een ontdekkingsreis...
Spelen een ontdekkingsreis...Spelen een ontdekkingsreis...
Spelen een ontdekkingsreis...
 
Cyborgs
CyborgsCyborgs
Cyborgs
 
19
1919
19
 
Ush per k2
Ush per k2Ush per k2
Ush per k2
 
mafe
mafe mafe
mafe
 
Primer trabajo de e especial
Primer trabajo de e especialPrimer trabajo de e especial
Primer trabajo de e especial
 
Lean UX: Parem de criar produtos, comecem a criar experiências
Lean UX: Parem de criar produtos, comecem a criar experiênciasLean UX: Parem de criar produtos, comecem a criar experiências
Lean UX: Parem de criar produtos, comecem a criar experiências
 
Web 2.0 & Salute
Web 2.0 & SaluteWeb 2.0 & Salute
Web 2.0 & Salute
 
Transzformatív
TranszformatívTranszformatív
Transzformatív
 
行政学の構成と視点
行政学の構成と視点行政学の構成と視点
行政学の構成と視点
 
Spike jonze
Spike jonzeSpike jonze
Spike jonze
 
Case study module6_bg
Case study module6_bgCase study module6_bg
Case study module6_bg
 
Vivere la rete
Vivere la reteVivere la rete
Vivere la rete
 
Fracking
FrackingFracking
Fracking
 
Valores 903
Valores 903Valores 903
Valores 903
 
Galaxy s2 android 4.0
Galaxy s2 android 4.0Galaxy s2 android 4.0
Galaxy s2 android 4.0
 
Uritused parnu kolledzis
Uritused parnu kolledzisUritused parnu kolledzis
Uritused parnu kolledzis
 
Billitteri, narrazioni taormina
Billitteri, narrazioni taorminaBillitteri, narrazioni taormina
Billitteri, narrazioni taormina
 
содоклад о в шевченко
содоклад о в  шевченкосодоклад о в  шевченко
содоклад о в шевченко
 

Similar to CURRICULAM DKS1 (20)

CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
CV
CVCV
CV
 
CURRICULUM_VITAE__NHAI_latest
CURRICULUM_VITAE__NHAI_latestCURRICULUM_VITAE__NHAI_latest
CURRICULUM_VITAE__NHAI_latest
 
GM CV-Nov16
GM CV-Nov16 GM CV-Nov16
GM CV-Nov16
 
Manoj cv
Manoj cv Manoj cv
Manoj cv
 
Vijay banga
Vijay banga Vijay banga
Vijay banga
 
Vijay banga
Vijay banga Vijay banga
Vijay banga
 
JITENDER CV
JITENDER CVJITENDER CV
JITENDER CV
 
Chennakesavulu CV tendering format
Chennakesavulu CV tendering formatChennakesavulu CV tendering format
Chennakesavulu CV tendering format
 
PK_Thakore_New_CV
PK_Thakore_New_CVPK_Thakore_New_CV
PK_Thakore_New_CV
 
Naresh Cherukuri_CV_May-2016
Naresh Cherukuri_CV_May-2016Naresh Cherukuri_CV_May-2016
Naresh Cherukuri_CV_May-2016
 
highway main
highway mainhighway main
highway main
 
GDRPL Company Profile - .pptx
GDRPL Company Profile - .pptxGDRPL Company Profile - .pptx
GDRPL Company Profile - .pptx
 
Giri - CV
Giri - CVGiri - CV
Giri - CV
 
JYOTI THAKURIA CV
JYOTI THAKURIA CVJYOTI THAKURIA CV
JYOTI THAKURIA CV
 
Mandatory course for DPR consultants - inviting nominations.pdf
Mandatory course for DPR consultants - inviting nominations.pdfMandatory course for DPR consultants - inviting nominations.pdf
Mandatory course for DPR consultants - inviting nominations.pdf
 
ToR
ToRToR
ToR
 
CV of M Saidul Islam.os
CV of M Saidul Islam.osCV of M Saidul Islam.os
CV of M Saidul Islam.os
 
Muhammad Asad Shaheen - CV
Muhammad Asad Shaheen - CVMuhammad Asad Shaheen - CV
Muhammad Asad Shaheen - CV
 
RESUME_31-Oct-16
RESUME_31-Oct-16RESUME_31-Oct-16
RESUME_31-Oct-16
 

CURRICULAM DKS1

  • 1. CURRICULAM-VITAE FOR SUITABLE POST NAME :Dharmendra Kumar Srivastava DATE OF BIRTH :2nd October 1970 PROFESSION : Civil Engineering NATIONALITY :Indian EDUCATIONAL QUALIFICATION:1. M.Tech.(Civil Geo-technical Engineering)(First division with distinction)1997, R.E.C.Kurukshetra, Kurukshetra University (INDIA) 2. B.Tech. (Civil Engineering) (First Division With Distinction)1992,H.B.T.I.Kanpur, Kanpur University (INDIA) ADDITIONAL QUALIFICATION: 1-Computer Training : Working knowledge of Computer (Windows, MS Office and other Regular Software). : Computer Course on MS-Word, MS-Excel, PowerPoint, MS-Project, Primavera etc. 2- Membership of Professional Societies: 1. Life Member of Indian Roads Congress (IRC) 2. Member of Institution of Engineers (India) {M.I.E.} 3. Life Member of Indian Geo-Technical Societies (M.I.G.S.) 4. International Society for Soil Mechanics& Geo-Technical Engg. Membership For the Year 1998-2001 {ISSMG} 3- OTHER TRAINING : 1-Attended the workshop on design and quality control of rigid pavement and environment protection measures during construction of highway project organized by World Bank in Maurya Hotel, Patna on 5th April 2006. : 2- Attended the training and awareness programme on Road safety organised by HCC with NHAI in quality hotel sewa grand mall, Faridabad organised in 11-12 June 2010. : 3-Attended the workshop on Road safety Audit done by IIT Delhi & other agencies (RITES) of world bank funded four laning of LMNHP(NH-28) in IIT new Delhi on 14 June 2012. : 4-Presented a technical paper during 5th International Conference on Forensic Geotechnical Engineering held in Indian Institute of Science, Bengaluru (8-10, December 2016) on Topic ‘’Geotechnical Perspectives in Failure cases and their Forensic Investigations ‘’. 4- Passport Details : No:K-3895256, Valid Up To: 14-02-2022 KEY SKILLS 1. Design and design review with field data collected from sites with the help of design software like mx road 2. Project Management 3. Review of Work program 4. Monitoring of work with specification 5. Conversant with mix design of various construction materials like DBM,BC,SDBC, VARIOUS GRADE OF CONCRETE, WMM,GSB etc with MORT&H and AASHTO specification. 6. Monitoring of Contract Implementation as per FIDIC and Model Concession Agreement (MCA) for Four Laning & Six Laning BOT Project (D B F O Pattern). 7. Operation & Maintenance of Project Highway as per Concession Agreement and Toll Plaza Management
  • 2. Total Professional Experience: 23 Years Experience in similar capacity for major highway projects: 21 Years, 02 months World Bank / ADB / JBIC / NHAI funded projects: 6 Projects KEY QUALIFICATION: Have more than 23 years of experience in carrying out design and construction supervision at site for various Roads, Highways and Bridge Projects in INDIA and OVERSEAS. Has carried out day-to-day supervision of work, checking of setting out of works, measurements of completed works and monitoring the work as per the contract specification and drawings. Conversant with specifications of roads and bridge works and material testing as per MOST, IRC&AASHTO. Assisted in the identification of quarry sites for aggregates, establishment of standard program for various testing regarding soil, concrete, water, cement, bitumen, aggregate, steel and asphalt concrete mix design, wet mix macadam mix design, concrete mix design, location and approval of borrow pit materials, field and laboratory testing of various pavement layers. Also responsible for issuing of testing certificates regarding materials and layers of earthwork, base/sub-base work and asphalt work and day-to-day supervision of works during execution, guiding technicians for testing and maintaining the records of all testing, identification of defect/substandard work and issuing letter to the contractor for rectification of executed defective/substandard work. Besides this, he is capable of maintaining proper coordination between Material Engineer, Bridge Engineer and Quantity Surveyor, imparted on the job training to the Client and Contractor’s Engineers and is fully conversant with FIDIC contract document. RELEVANT PREVIOUS ASSIGNMENT IN INDIA : 1. Team leader Cum Senior Highway Engineer on Four laning of HISAR to DABWALI section of NH-10 from KM170.00 to KM 227.000 with paved shoulder in the state of Haryana on EPC mode , Project Cost –Rs 579.76 Crores; Employer: National Highway Authority India, New Delhi) ---- July 2015- ongoing (INDIA) 2. Team leader Cum Senior Highway Engineer on widening and strengthening of Gohana-Lakhan Majra-Meham –Bhiwani Road (GLMB Road) from KM 0.00 to KM 37.700 (SH -16A from KM 16.000 to KM 53.700) in Rohtak District, Haryana (under 2660-IND National Capital Region Urban Infrastructure Financing Facility Project) funded by-ADB , Project Cost –Rs 104.20 Crores(USD 17 Million), Employer: Haryana state Road & Bridge Development Corporation Ltd (HSRDC),Bay no 13-14, sector-2, Panchkula- 134109 ,Haryana ----November 2013-March 2015 3. Project Coordinator in M/S ERA INFRA ENGG LTD (EIEL) working for:- a) Four laning of Muzaffarnagar -Haridwarr Setion of Road Project (NH-58) from Km 131.000 to Km 211.000 on BOT (Toll) Basis(DBFOT PATTERN) , in the state of Uttar Pradesh and Uttarakhand under NHDP, Phase-III, funded by M/S Haridwar Highway Project Ltd(M/S HHPL) ,Project Cost: Rs. 975 Crores as per CA (USD 185 Million ) ,Employer: National Highway Authority India, New Delhi b) Four laning of Haridwar – Dehradun Setion of Road from Km 211.000 to Km 218.200 of NH-58 and Km 165.000 to Km 196.875 of NH-72 in state of Uttarakhand under NHDP,Phase-III as on BOT(Annuity Basis)(DBFO PATTERN) , funded by M/S Dehradun Highway Project Ltd(M/S DHPL) ,Project Cost: Rs. 478 Crores as per CA (USD 90 Million )and As per Concessionaire’s Financial close: Rs. 630 Cr ,Employer: National Highway Authority India, New Delhi) c) Four laning of Bareilly –Sitapur Setion of Road on NH-24 from Km 262.000 to Km 413.200 in the state of Uttar Pradesh under NHDP,Phase-III, on BOT Basis(DBFO PATTERN) , funded by M/S Bareilly Highway Project Ltd (M/SBHPL) ,Project Cost: Rs. 1046 Crores as per CA (USD 195 Million ) ,Employer: National Highway Authority India, New Delhi) 4. Resident cum Highway Engineer of Independent Engineer in 6 laning of Gurgaon - Kotputli – Jaipur Section of Road Project (NH- 8) on BOT Basis(DBFO PATTERN) , in Haryana and Rajasthan, funded by Pink City Expressway Pvt Ltd ,Project Cost: Rs. 1896 Crores as per CA (USD 395 Million )and As per Concessionaire’s Financial close: Rs. 2272 Cr ,Employer: National Highway Authority India, New Delhi)….August.2009- May 2013 a) Resident cum Highway Engineer of Independent Engineer in 6 laning of Gurgaon - Kotputli – Jaipur Section of Road Project (NH-8) on BOT Basis(DBFO PATTERN) , in Haryana , funded by Pink City Expressway Pvt Ltd(JV of ETA Dubai and KMC
  • 3. India) , package : 1&2( Km 42.700 to Km 107.100 on NH-8 in Haryana)………..August 2009 to January 2012 and June 2012 to May 2013 b) Resident cum Highway Engineer of Independent Engineer in 6 laning of Gurgaon - Kotputli – Jaipur Section of Road Project (NH-8) on BOT Basis(DBFO PATTERN) , in Rajasthan , funded by Pink City Expressway Pvt Ltd(JV of ETA Dubai and KMC India) , package : 5&6 ( Km 181.300 to Km 273.000 on NH-8 in Rajasthan)………..Feb 2012 to June 2012 5. Sr. Highway Engineer of Independent Engineer in Development and Four Laning of Lebad-Jaora section of Road Project (SH-31) on BOT Basis(DBFO PATTERN) , in Ratlam, MP, funded by Western Mp Infrastructure & Toll Roads Pvt Ltd ,Project Cost: USD147.25 Million ,Employer: Madhya Pradesh Road Development Corporation ,Bhopal, MP …Sept.2008- July 2009 (India) 6. Highway cum pavement Engineer in Construction Supervision of NH-28, LMNHP.EW-II, WB-11, LMNHP,(Kotwa to Mehansi from KM 440.000 to KM 480.000 on NH-28) PKG-11,Motihari,Bihar,funded by World Bank, Project Cost: USD 80 Million Employer: National Highways Authority of India ; Nov.2005- Aug 2008 7. From March 2003 to April 2005: On overseas assignment for Design and Construction of Tan’am-Hamra-Ad’Duru Road Project, Phase-I &II (Variation Order-I&II Length of project road =54+33.65 Km on Tan’am-Hamra-Ad’Duru Road, in Sultanate of Oman 8 Inspector (Highways) in Construction Supervision of strengthening, widening and reconstruction of Rajkot –Jamnagar Road ( SH- 25) Project (Length=60 Km) in (Rajkot –Jamnagar), Gujarat,India, funded by World Bank (A joint venture with Louis Berger International Inc ,USA), Project Cost: USD 25 Million, (Employer: P.W.D.,Gujarat, R&B Division) ……………………………………………………………………. April,2001-March, 2003(India) 1. Field Engineer (Highways) in Construction Supervision of Four Laning& Strengthening of Gurgaon to Kotputali (NH-8) Road Project(Length=135 Km) at (Delhi –Jaipur), in Rajasthan, India, funded by ADB ,(A joint venture with SMEC,AUSTRALIA), Project Cost: USD100 Million,(Employer: National Highways Authority of India) …………………………………..January 1998-April,2001(India) 2. Field Engineer (Highways) in Construction Supervision of Four Laning& Strengthening of Karnal to Ambala (NH-1) Road Project(Length=80 Km) at (Karnal –Ambala), Haryana, India, funded by World Bank , (A joint venture with SMEC,AUSTRALIA), Project Cost: USD 80 Million,(Employer: P.W.D., Haryana, B&R Division)………………………….. March, 1995-December,1997 (India) 3. Construction Engineer in Execution of NAA-ATS Project at SantaCruzh Airport, Mumbai, INDIA, funded by National Airport Authority, Govt of India, Project Cost: USD 2 Million,(Employer: National Airport Authority of India) ……………………………………………………….. Nov’1993 To March’1995 ,INDIA 4. Construction Engineer in Strengthening And Widening of Bhiwadi-Alwar-Karauli-Mandrial Road (BAKM Road) (Up gradation of Rajasthan Road Project,Lenght135km) in Rajasthan ,INDIA funded by World Bank , Project Cost: USD15 Million (Employer: P.W.D.Rajasthan) …………………………………………………………………Nov’1992 To March’1993 INDIA RELEVANT PREVIOUS ASSIGNMENT IN OVERSEAS (SUTANATE OF OMAN): 1. Highway Engineer/Quantity Surveyor in Construction Supervision of Design and Construction of Tan’am-Hamra-Ad’Duru Road Project, Phase-II (Variation Order-II Length of project road =33.65 Km on Tan’am-Hamra-Ad’Duru Road, Variation Order III Length of project road =1.2 Km including service roads and Parking Area in front of Aswad School & Variation Order IV Length of project road =4.00 Km internal road starting from Ch.44+483 of Tan’am-Hamra-Ad’Duru Road to Aswad West) in IBRI, A’DHAHIRA (Sultanate of Oman ), funded by Directorate General of Roads, Ministry of Transport and Telecommunication, SULTANATE OF OMAN), Project Cost: USD18 Million, (Employer: Directorate General of Roads, Ministry of Transport and Telecommunication, SULTANATE OF OMAN) ………… October 2003-April 2005(Sultanate of Oman ) 2. Highway Engineer/Quantity Surveyor in Construction Supervision of Design and Construction of Tan’am-Hamra-Ad’Duru Road Project, Phase-I (Original Contract +Variation Order-I ,Length of project road =54.00 Km on Tan’am-Hamra-Ad’Duru Road.) in IBRI, A’DHAHIRA (Sultanate of Oman ), funded by Directorate General of Roads, Ministry of Transport and Telecommunication, SULTANATE OF OMAN), Project Cost: USD 30 Million (Employer: Directorate General of Roads, Ministry of Transport and Telecommunication, SULTANATE OF OMAN) ……………… April 2003-October 2003- (Sultanate of Oman )
  • 4. EMPLOYMENT RECORD: November2013 to till date :G- Engineering Advisory Services Private Ltd, SCO-12, HUDA Shopping Centre,Sector 55, Gurgaon, Haryana-122002, (Associate Director / Chief General Manager) 1- From July 2015 to till date Working as Team leader Cum Senior Highway Engineer in association with M/s Centro DE Estudios DE Mteriales Y Control DE Obra, S.A. (C.E.M.O.S.A.) on Four laning of HISAR to DABWALI section of NH-10 from KM170.00 to KM 227.000 with paved shoulder in the state of Haryana on EPC mode , Project Cost –Rs 579.76 Crores; Employer: National Highway Authority India, New Delhi) ---- July 2015- ongoing (INDIA) 2- From January 2015 to July 2015 A) Worked as Team Leader in preparation of design, drawing, Quality assurance plan and methodology and sequence of work for rehabilitation and up gradation to four lane divided carriageway with paved shoulders of Ludhiana- Talwandi Bhai section (Existing Chainage from Km 85.980 to Km 92.000) of NH-95 (Length -6.020 km) on EPC mode in the state of Punjab. (Employer- NHAI, Contractor- M/s Gawar Construction Ltd) B) Worked as Team Leader in preparation of DPR including design, drawing, Quality assurance plan and methodology and sequence of work for widening and up gradation to four lane divided carriageway with side drains of road section SH-15A falling from Basai Chowk to start of ROB approach constructed on Delhi - Rewari –Jaipur railway line crossing no 35/4-5 (Road length =1.020 Km ) in Gurgaon District. (Employer- Municipal Corporation of Gurgaon) C) Worked as Team Leader in preparation of DPR including design, drawing, Quality assurance plan and methodology and sequence of work for widening and up gradation to four lane divided carriageway with side drains of road section SH-15A falling from Basai Chowk to start of ROB approach constructed on Delhi - Rewari –Jaipur railway line crossing no 35/4-5 (Road length =1.020 Km ) in Gurgaon District. (Employer- Municipal Corporation of Gurgaon) D) Worked as Team Leader in preparation of project report and bill of quantity of balance work from Manesar to Palwal section (From Km83.220 to Km 135.650) of 6-lane access controlled KMP Expressway on the basis of approved Plan and Profile provided by the HSIIDC.(Client- Oriental Structural Engineers Ltd) 3- From January 2015 to November 2013 Worked as Team leader Cum Senior Highway Engineer in association with Marc Technocrats ltd,on widening and strengthening of Gohana-Lakhan Majra-Meham –Bhiwani Road (GLMB Road) from KM 0.00 to KM 37.700 (SH -16A from KM 16.000 to KM 53.700) in Rohtak District, Haryana (under 2660-IND National Capital Region Urban Infrastructure Financing Facility Project) funded by-ADB , Project Cost –Rs 104.20 Crores(USD 17 Million), Employer: Haryana state Road & Bridge Development Corporation Ltd (HSRDC),Bay no 13-14, sector-2, Panchkula-134109 ,Haryana ----November 2013- ongoing (India) As Team leader cum Senior Highway Engineer on this project discharging following duties:- • Study and review available data, reports and documents. • Review the entire project preparation and implementation activities of the contractor. • Review the adequacy of topography survey, inventory and condition survey and pavement investigations for design of road to be constructed.
  • 5. • Review and approve the design and working drawings prepared for the construction of various components of the highway, bridges and other structures by the contractor. • Review analysis of rates, estimates, reports and other deliverables as per the requirement of contract agreement. • Review quality assurance and quality control provisions during the design, construction and maintenance stages. • Review and approve rehabilitation proposed by the contractor. • Institute quality assurance procedure and quality control system during the design, construction and maintenance stages. • Assist HSRDC in handing over the site to the contractor and issue orders to commence the works. • Coordination with Client and contractor for effective project management. • Establish computer aided project management system. • Review and approve contractor’s work programme. • Review all project section contracts made by the contractor. • Review and approve contractor’s construction methodology w.r.t. sound environmental standards. • Verify and approve the site establishment requirements and construction plants and equipment. • Liaise and coordinate with relevant authorities for clearing all encumbrances. • Evolve Management Information System and provide it to HSRDC. • Review the environmental management plan or the project highway during construction and O&M phases. • Interpretation of terms and conditions of Contract agreement. • Identify construction delays and recommend to the HSRDC remedial measures to expedite the progress. • Supervision of construction of works and progress monitoring vis-a- vis approved work programme and ensure timely completion of the project. • Assist HSRDC in all matters related to variation orders rate fixing for non-priced works, time extensions, settlement of claims and disputes including recourse to arbitration. • Direct the contractor on construction safety and care of works and emergency activities. • Review the progress and status of rehabilitation and resettlement works. • Issue provisional and completion certificates. • Review and certify the ‘as-built’ drawings • Assist HSRDC in progress review meetings. Furnish final completion report after final inspection May 2013 to November2013 : ERA INFRA ENGINEERING PROJECTS LTD., B-24, Sector-3,NOIDA, UP-201023, Additional General Manager; worked as project coordinator cum contract specialist for following projects under taken by Era group as Concessionaire (SPV) and executed by M/S Era Infra Engineering Ltd subsidiary of this Era group. a) Four laning of Muzaffarnagar -Haridwarr Setion of Road Project (NH-58) from Km 131.000 to Km 211.000 on BOT (Toll) Basis(DBFOT PATTERN) , in the state of Uttar Pradesh and Uttarakhand under NHDP, Phase-III, funded by M/S Haridwar Highway Project Ltd(M/S HHPL) ,Project Cost: Rs. 975 Crores as per CA (USD 185 Million ) ,Employer: National Highway Authority India, New Delhi)….03-09-.2010-ongoing(India) b) Four laning of Haridwar – Dehradun Setion of Road from Km 211.000 to Km 218.200 of NH-58 and Km 165.000 to Km 196.875 of NH-72 in state of Uttarakhand under NHDP,Phase-III as on BOT(Annuity Basis) (DBFO PATTERN) , funded by M/S Dehradun Highway Project Ltd(M/S DHPL) ,Project Cost: Rs. 478 Crores as per CA (USD 90 Million )and As per Concessionaire’s Financial close: Rs. 630 Cr ,Employer: National Highway Authority India, New Delhi)…-; 01-11-2011-----ongoing(India) c) Four laning of Bareilly –Sitapur Setion of Road on NH-24 from Km 262.000 to Km 413.200 in the state of Uttar Pradesh under NHDP,Phase-III, on BOT Basis(DBFO PATTERN) , funded by M/S Bareilly Highway Project Ltd (M/SBHPL) ,Project Cost: Rs. 1046 Crores as per CA (USD 195 Million ) ,Employer: National Highway Authority India, New Delhi)…. 01-03-2011----ongoing(India) Employer : National Highway Authority India, New Delhi
  • 6. As Project Coordinator cum Contract specialist for above projects:- • He has been responsible for planning, scheduling, organizing the resources for above highway projects in beginning stage. • Ensuring Contract administration on the project and also quality in work and workmanship. • Implementing Operation and Maintenance of Project Highway and pavement rehabilitation and repair works if it is required • Procurement design / drawings as per Concession Agreement and ensure execution accordingly during construction stage. • Monitoring of Contract Implementation as per Model Concession Agreement (MCA) for Four Laning BOT Project (D B F OT Pattern). • Assisting NHAI official in respect of preparation of land acquisition plan, Liasioning with local Administrative Authorities for getting the encumbrance free land on site. • Toll Plaza Management August 2009 to 30 April 2013 : Aarvee Associates Architects Engineers & Consultants Pvt. Ltd., 8-2-5, Ravula Residency, Srinagar Colony, Hyderabad – 500 082, Resident cum Highway Engineer Resident cum Highway Engineer of Independent Engineer in Development and Six Laning of Gurgaon-Kotputali-Jaipur section of National Highway Road Project (NH-8) on BOT Basis(DBFO PATTERN) ,(Length of Project -225.600 KMS, Cost of Project -1896 Cr of Indian Rupees, As per Concessionaire’s Financial close: Rs. 2272 Cr) in Haryana and Rajasthan, Project Cost: USD 395 Million CONCESSIONAIRE:- M/S Pink City Expressway Pvt Ltd (JV of M/S E T A Dubai and M/S KMC India) Employer : National Highway Authority India, New Delhi • Resident cum Highway Engineer of Independent Engineer in 6 laning of Gurgaon - Kotputli – Jaipur Section of Road Project (NH-8) on BOT Basis(DBFO PATTERN) , in Haryana , package : 1&2( Km 42.700 to Km 107.100 on NH-8 in Haryana)………..August 2009 to January 2012 ( EPC contractors in Package-1 : M/S GAWAR INFRASTRUCTURE, M/S TOTEM Infrastructure pvt ltd, Hyderabad, M/S A S I P ,Hyderabad; In Package-2: M/S Lonzian Bridge and Road company ,Republic of China) • Resident cum Highway Engineer of Independent Engineer in 6 laning of Gurgaon - Kotputli – Jaipur Section of Road Project (NH-8) on BOT Basis(DBFO PATTERN) , in Rajasthan ,package : 5&6 ( Km 181.300 to Km 273.000 on NH-8 in Rajasthan)………..Feb 2012 to ongoing (india) ( EPC contractors in Package-5 : M/S Krishna Mohan Construction pvt ltd, Hyderabad, Package-6: M/S N K C pvt ltd) As Resident cum Highway Engineer:- • He has been responsible for supervising the works of highway constructed by the Concessionaire • Ensure quality in work and workmanship. • Inspecting the pavement rehabilitation and repair works undertaken by the Concessionaire • Review design / drawings and ensure execution accordingly during construction stage. • Monitoring of Contract Implementation as per Model Concession Agreement (MCA) for Six Laning BOT Project (D B F OT Pattern). • Operation & Maintenance of Project Highway as per Concession Agreement and Toll Plaza Management • Any other tasks described in TOR.
  • 7. September 2008 to August 2009 : ARTEFACT PROJECTS LTD. NAGPUR, MAHARASHTRA General Manager Sr. Highway Engineer of Independent Engineer in Development and Four Laning of Lebad-Jaora section of Road Project (SH-31) on BOT Basis(DBFO PATTERN) ,(Length of Project -125 KMS, Cost of Project -471 Crore of Indian Rupees) in Ratlam, MP, Project Cost: USD147.25 Million CONCESSIONAIRE: M/S Western M P Infrastructure & Toll Roads Pvt Ltd(Funded by-M/S ZEE Telefilm pvt ltd) EPC Contractors: Package-1(Km 00 to km 25.00) – M/S Backbone enterprises ltd, Rajkot, Gujrat ; Package 2 and 3(Km 25.00 to Km 100.00)- M/S BSCPL , Hyderabad; Package-4 (Km 100.00 to Km 125.00)-M/S Dilip Buildcon pvt ltd,Bhopal Employer: Madhya Pradesh Road Development Corporation ,Bhopal, MP As Sr. Highway Engineer:- • Review and approve/suggest modification in Contractor's work programme, design/drawings and check the working drawing supplied by the Contractor and order for correction, if necessary. • Prepare relevant aspect in Quality Assurance Manual and Institute Quality Assurance System • Review of Alignment Design • Maintain records of tests on materials and works • Provide Survey data to the Contractor for setting out works • Check setting out for the work and maintain records • Assist Team Leader in liasioning and coordination with relevant authorities for clearing all encumbrances • To monitors and checks day to day quality control and workmanship and supervise and inspect the performance of works • Supervise and inspect the performance of work vis-à-vis levels, contours, workman ship, specification and quality check tests • Inspect, examine and attend measurements for interim payment and for substantial completion • Verify and check quality and completion of works • Interpretation of Technical Specification and Contract Documents • Issuance of variation orders with modified working drawings and monitor variations • Analyze, evaluate and monitor progress of works and monitor contractor's equipment resources vis-à-vis work program • Inspection of Contractor's establishment including labor camp and direct the contractor on construction safety and care of works • Project monitoring using computer aided management techniques • Assist Team Leader in directing contractor on emergency activities • Attend measurement and maintain its records and check Contractor’s invoices, claims, etc. • Assist the Team Leader in project performance monitoring and evaluation, maintenance inspection during the Defects Liability Period • Assist Team Leader in preparation of on the job training packages, training methodology • Preparation of progress reports and other deliverables • Assist Team Leader in furnishing final acceptance report after the final inspection after defect liability period January 1998 to August 2008 : CONSULTING ENGINEERING SERVICES (INDIA) Ltd., NEW DELHI Project Manager / Deputy Project Manager/ Sr. Engineer/Engineer A) From April 2005 to July 2008 :- 1) Construction Supervision of Lucknow-Muzaffarpur National Highway Project(EW-II,WB-11 ,LMNHP,NH-28)-Package-11(From Ch 440.00 to Ch 480.00 ,Length Project 40km), Project Cost: USD
  • 8. 80 Million, (Employer: National Highway Authority India, New Delhi) ; Name of Contractor: M/S Madhucon Projects Ltd, Hyderabad • As Highway Cum Pavement Engineer:- Review and approve/suggest modification in Contractor’s work programme, design/drawings and check the working drawing supplied by the Contractor and order for correction if necessary. • Provide Survey data to the Contractor for setting out works • Check setting out for the work and maintain records • Assist Resident Engineer in liasioning and coordination with relevant authorities for clearing all encumbrances • Assist Resident Engineer in review of road furniture • To monitors and checks day to day quality control and workmanship and supervise and inspect the performance of works • Supervise and inspect the performance of work vis-à-vis levels, contours, workman ship, specification and quality check tests • Inspect, examine and attend measurements for interim payment and for substantial completion • Verify and check quality and completion of works • Assist the RE in interpretation of Technical Specification and Contract Documents • Assist the RE in the issuance of variation orders with modified working drawings and monitor variations • Analyze, evaluate and monitor progress of works and monitor contractor’s equipment resources vis-à-vis work program me • Assist the RE in the inspection of Contractor’s establishment including labour camp and direct the contractor on construction safety and care of works • Assist the RE in project monitoring using computer aided management techniques • Assist RE in directing contractor on emergency activities • Attend measurement and maintain its records and check Contractor‘s invoices, claims • Assist the RE in liasioning with NHAI in approving modified detailed construction drawings, monitoring work progress and implementation through computer aided management techniques • Assist the RE in project performance monitoring and evaluation, maintenance inspection during the Defects Liability Period • Assist RE in issuance of compilation certificate after rectification if any by the contractor • Assist RE in preparation of on the job training packages, training the methodology • Assist RE in preparation of progress reports and other deliverables • Assist Team Leader in furnishing final acceptance report after the final inspection after defect liability period 2) From April 2003 to April 2005 :- (Overseas Assignment) Construction Supervision of Design and Construction of Tan’am-Hamra-Ad’Duru Road Project, Phase-II a) Construction Supervision of Design and Construction of Internal Road starting from 44+483 of Tan’am-Hamra- Ad’Duru Road to Aswad West, Variation Order-IV (Length of project-4.000km), Project Cost: USD 2 Million b) Construction Supervision of Design and Construction of Service Road from Aswad School to proposed Deputy Wali Office, Ibri, Parking Area in front of Aswad School, Variation Order-III (Length of project-1.200km) , Project Cost: USD 1 Million c) Construction Supervision of Design and Construction of Tan’ am-Hamra-Ad’Duru Road Project, Variation Order-II (Length of project-33.65km, From Ch 55.350 to Ch 89.00)., Project Cost: USD 18 Million (Name of Contractor: M/S Oman Gulf Contracting Company LLC, Salalah, Sultanate Of Oman; Employer: Directorate General of Roads, Ministry of Transport and Telecommunications, SULTANATE OF OMAN.) • As Highway Engineer/Quantity Surveyor, responsible for checking of design submitted by contractor for execution of works ,checking of Control Points/T.B.Ms., checking of alignments of Road and CD structures as per drawing, checking of setting out of works vis-à-vis contract drawing &checking of horizontal/vertical curves as per highway design manual of Sultanate of Oman. Also responsible for checking of R.L. as per approved drawings for earthworks, sub-base works, base works and bituminous works. Responsible for measurement of approved works,
  • 9. preparation of interim payment certificate and certification of quantities. Assisting in site administration and in preparation of variation orders as per Sultanate of Oman specification/FIDIC conditions. Beside this, supervising any further plans and drawings necessary for the carrying out of the work, making arrangement on behalf of the Client for the inspection of works, scrutinizing the work program of the Contractor and monitoring day to day progress of work, participating in Monthly Progress Review meeting with the Contractor and providing necessary suggestion/advice to expedite the progress of work and assisting the Employer to determine the amount of extension of time for completion of work, if required and on completion of works, revising and checking the drawings in accordance with alterations agreed during the execution of works and supervising “As Built” drawings to be submitted to the Employer by the Contractor (Original+ Three copies) along with a digital copy of the “As Built” drawings in Auto Cad format. Construction Supervision of Design and Construction of Tan’am-Hamra-Ad’Duru Road Project, Phase-I (Original Contract +Variation Order-I, Length of project road =54.00 Km on Tan’am-Hamra-Ad’Duru Road, From Ch 1.350 to Ch 55.350) Project Cost: USD 30 Million (Name of Contractor: M/S Oman Gulf Contracting Company LLC, Salalah, Sultanate Of Oman, Employer: Directorate General of Roads, Ministry of Transport and Telecommunication, SULTANATE OF OMAN) • As Highway Engineer/Quantity Surveyor, responsible for checking of design submitted by contractor for execution of works ,checking of Control Points/T.B.Ms., checking of alignments of Road and CD structures as per drawing, checking of setting out of works vis-à-vis contract drawing &checking of horizontal/vertical curves as per highway design manual of Sultanate of Oman. Also responsible for checking of R.L. as per approved drawings for earthworks, sub-base works, base works and bituminous works. Responsible for measurement of approved works, preparation of interim payment certificate and certification of quantities. Assisting in site administration and in preparation of variation orders as per Sultanate of Oman specification/FIDIC conditions. Beside this, supervising any further plans and drawings necessary for the carrying out of the work, making arrangement on behalf of the Client for the inspection of works, scrutinizing the work program of the Contractor and monitoring day to day progress of work, participating in Monthly Progress Review meeting with the Contractor and providing necessary suggestion/advice to expedite the progress of work and assisting the Employer to determine the amount of extension of time for completion of work, if required and on completion of works, revising and checking the drawings in accordance with alterations agreed during the execution of works and supervising “As Built” drawings to be submitted to the Employer by the Contractor (Original+ Three copies) along with a digital copy of the “As Built” drawings in Auto Cad format. B) From April 2001 to April 2003:- 3) Construction Supervision of strengthening, widening and reconstruction of Rajkot –Jamnagar Road(SH-25)Project(Length=60Km), Project Cost: USD 25 Million (A J.V. with Louis Berger International Inc ,USA). (Name of Contractor: Larsen & Tubro, ECC Division Chennai; Employer: P.W.D. ,Gujarat, R&B Division) As Inspector (Roads), responsible for construction inter-alias, check contract, setting out of works vis-à-vis contract drawings & specifications, ensure implementation of approved works, supervision of earthwork, sub grade work, sub-base works, base and bituminous works. Actively involved in the mix design of WMM, DBM&BC and borrow area identification for earth & sub grade material for earthworks and quarries for GSB and WMM. Sampling and testing intermittently from site for GSB, WMM& Bituminous materials. Participation in site measurements, preparation of R.A.bills and certification of quantities. Assisting in site administration and in preparation of variation orders as per FIDIC conditions. Participating in Monthly Progress Review meeting with the Contractor and providing necessary suggestion/advice to expedite the progress of work and assisting the Employer to determine the amount of extension of time for completion of work, if required and on completion of works, revising and checking the drawings in accordance with alterations agreed during the execution of works and supervising “As Built” drawings to be submitted to the Employer by the Contractor. C) From January 1998 to March 2001 :- 4) Construction Supervision of four Laning & Strengthening of Gurgaon To Kotputali (NH-8)Road Project, Length 135km from Ch 26.865 to Ch 162.500, Project Cost: USD 100 Million (J.V. with
  • 10. SMEC-Australia). ( Name of Contractors:M/S BSC-RBM-PATI JV, Consortium of Indian and Malaysian Companies; Employer: National Highways Authority of India) As Field Engineer, monitoring progress of work on day-to-day basis and submitting monthly report to the management. Responsible for construction supervision, inter-alias, check contract, setting out of works vis-à-vis contract drawings & specifications, ensure implementation of approved works. Construction supervision of earthwork, sub grade work, sub-base works, base works, base works and bituminous works. Responsible for setting out of check post, typical service roads, alignments consisting of drains etc., Bus & Truck lay byes. Design and supervision of pipe culverts, RCC slab culverts and major to minor bridges, rehabilitation of existing bridges (major & minor), supervision of expansion joints work and finishing works of roads & bridges. Liasioning with Client/ Contractor for the problem related to works and projects. Assisting in site administration and in preparation of variation orders as per FIDIC conditions. Participating in Monthly Progress Review meeting with the Contractor and providing necessary suggestion /advice to expedite the progress of work and assisting the Employer to determene the amount of extension of time for completion of work, if required and on completion of works, revising and checking the drawings in accordance with alterations agreed during the execution of works and supervising “As Built” drawings to be submitted to the Employer by the Contractor. March’1995 to Dec’1997 : STUP CONSULTANT LIMITED. NEW DELHI ; Field Engineer Construction Supervision of four Laning & Strengthening of Karnal to Ambala (NH-1)Road Project,Length 80 km, Project Cost: USD 80 Million( J.V. with SMEC-Australia).( Name of Contractors: M/S Unitech Ltd & LG Construction JV, Consortium of Indian and South Korean Companies; Employer: P.W.D., Haryana, B&R Division) As Field Engineer, responsible for construction supervision, inter-alias, check contract, setting out of works vis-à-vis contract drawings& specifications, ensure implementation of approved works. Planning, monitoring and deployment of plants, equipments and man-power. Supervision of earthwork, sub grade work, sub-base works, base works and bituminous works, checking of design of junctions, service roads, Bus& Truck lay byes. Quality assurance of works, carry out tests on soils, GSB,WMM and Bituminous materials. Participation in site measurements, preparation of R.A. bills and certification of quantities. Assisting in site administration and in preparation of variation orders as per FIDIC conditions. Participating in Monthly progress Review meeting with the Contractor and providing necessary suggestion/advice to expedite the progress of work and assisting the Employer to determine the amount of extension of time for completion of work, if required and on completion of works, revising and checking the drawings in accordance with alterations agreed during the execution of works and supervising “As Built” drawings to be submitted to the Employer by the Contractor. Nov’1993 to March’1995 : UNITECH LIMITED, (CONSTRUCTION DIVISION),NEW DELHI Construction Engineer Execution of NAA-ATS Project at Santa Cruz Airport site, Mumbai, Project Cost: USD 2 Million (Employer: National Airport Authority) As Construction Engineer, responsible for setting out building plan, construction of water pump house, electrical sub station and internal road scheme. Also responsible for cost estimate, statement and assessment of manpower requirements, supervision of cement concrete batching and mixing plant and setting up of laboratory for quality assurance and quality control works. Nov’1992 to Nov’1993 :CIMMCO LIMITED, (CONSTRUCTION DIVISION OF BIRLA GROUP OF INDUSTRIES) ,ALWAR, (RAJASTHAN) ; Construction Engineer Improvement and Construction of Bhiwadi-Alwar-Karauli-Mandrial Road (Length135km), Project Cost: USD 15 Million -Up gradation of Rajasthan Road Project),World Bank Funded(Employer: P.W.D. Rajasthan) As Construction Engineer (Trainee for six months), responsible for field survey in construction stage including setting out of horizontal alignments and control of levels for different layers of pavements and embankments. Prepare details of working drawings for road works and C-D structures, identification of borrow areas for soils and
  • 11. quarries of sub-base materials and its testing in laboratory. Prepare daily programme of works and planning, monitoring the execution of works. LANGUAGES: _ ___________________________________________________________________________________ Languages Speaking Reading Writing English Excellent Excellent Excellent Hindi Excellent Excellent Excellent ____________________________________________________________________________________ CERTIFICATION: I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes my self , my qualifications and my experience. Signature (Day/Month/Year) Address for Correspondence : Dharmendra Kumar Srivastava : Associate Director, G- Engineering Advisory Services Private Ltd; 940, Sector-9,HIG Duplex, Vasundhara, Ghaziabad, Uttar Pradesh-201012 Tele Fax-0124-2392006, Mobile-09456836132, 9650859797, 9650805599(H), E-Mail Address : dksh19702006@yahoo.com, ; srivastava.dk2009@gmail.com Passport Details : No:K-3895256, Valid Up To: 14-02-2022 Present CTC : 30 LACS Expected CTC : Negotiable Notice Period : 15 days- 1 months (Negotiable)