SUMMARY
I am a Civil Engineer with 10 years experience during which time I have worked on a variety of Major Highways or
Infrastructure projects in Pakistan, Afghanistan, Bangladesh, Nepal, and Qatar. In my career, I have Design experience
varies from urban roads to expressways in plains as well as in hilly terrain. Major areas of work experience includes
formulation of design standards taking into account national as well as international design practice, geometric design,
concept preparation of junction, Interchange design, widening scheme, bypass option study using GPS, utility relocation
plan, traffic control devices arrangement and diversion.
I am interested in Highway project particularly on large infrastructure projects, which will give me the opportunity to use my
abilities to the full while developing new skills. I am willing to relocate anywhere and also undertake frequent travel, if
required as part of my assignments.
EXPERIENCE
April 2014 - Present Senior Roads and Highway Engineer, WorleyParsons, Qatar
Key Project –
1-Detailed Master Planning of Qatar Economic Zone 3. ). Client: Manateq: Qatar Economic Zone 3 (QEZ3) is one of
three Economic Zones planned for development in Qatar. Qatar Economic Zone 3 (QEZ3) – 33.5 km² site adjacent to
Misaimed Industrial City (MIC) and the New Port Project (NPP). This project is focused on downstream industries. The
QEZ3 roads are mainly divided into four categories based on the functions of each road in the network. Categorizing the
roads into major arterials, major collectors, Commercial Boulevard and local roads supposed to help QEZ3 road user to
have e smooth and efficient mobility. The internal QEZ3 road network applied the principle of permeability to create a
highly connected road network which distributed traffic more evenly, improve efficiency, minimize congestion and provided
a flexible network for the management of traffic flows over the life of QEZ3 Project.
2-Pre-Contract Services of Lusail City Infrastructures and Highways for Qetaifan Island, Commercial Boulevard
and Water Front Commercial District (CP07-A, CP07-B, CP07-C, CP08; Client Lusail Real State and Development.
Activities Performed:
 Prepared the different typical cross sections for Arterial, Commercial Boulevard, Tunnel roads of different
levls,Collector and Internal Roads.
 Designed for different roads in accordance with Qatar Highway Design Manual and AASHTO Geometric
Design of Highways and Streets (2011).
 Prepared the grading plan of entire area of QEZ-3 (Qatar Economic Zone-3) and Qetaiifan Island.
 Designed of different Signalized or non-signalized junctions, interchanges, Underpasses of different stages of
road, Flyover, Roundabouts and Cul de sac for large 22.40m Interstate Semitrailer (AASHTO WB-20 industrial
Area and AAHSTO’s City Transit Bus for Lusail Project.
 Prepared the vertical profiles.
 Designed and Provided Laybys, bike track and Parallel Car and Truck Parking where it was required along the
the local, collector and arterial roads.
 Prepared design report, MTO and CRS for the QEZ-3 Project
 Designed the Flexible pavement of different above mentioned roads.
 Established working relationships and contact with client technical staff and project managers.
 Coordinate design activities and meetings between design staff, and client managers
 Participated in project decisions regarding technical approaches and scheduling performance
 Have strong written and oral communication skills and a team-oriented attitude.
 Assist project managers with other various tasks.
Jun 2012– March Senior Highway Design Engineer, Nippon Koi, Pakistan
Page 1
Muhammad Anwar
Senior Roads and Highway Engineer
Resume
2013
Key Project – Detailed Designing and Construction Supervision of Dasu Hydropower Project (4500 MW). Client:
Wapda and World Bank
M/s Nippon Koei, and Dollsar in association with Development Management Consultant, National Development consultant
and Pakistan Engineering Consultant were appointed as client representative for the Design and Construction Supervision
of Dasu Hydropower Project on Indus River at Dasu in Kohistan District of Khyber Pakhtunkhwa Province. The proposed
Dasu reservoir will extend to a length of about 74km.In the feasibility studies it was assessed that new reservoir will
submerge a 65km stretch of the existing Karakoram Highway (KKH) on left bank of river and 75 km of different access
roads on right bank will be submerged in Dasu reservoir, This will require relocation of existing road on higher levels.
In this context the under mentioned works were undertaken.
 The alignment of KKH (65km) at high altitude 975 to 1060m, finalization on topo survey maps of Survey of
Pakistan (SOP), and detailed survey in a corridor of 80 m width carried out.
 9 km access road for residential colony at an altitude of 220m higher from existing KKH was aligned.
 On right bank of Indus river, alignment of road from Komila town to Dam site(12km),Dam Site to Largani
(9km),Largani to Kandia (14km) and Kandia to Uttar Gah (17.8km), was conducted.
Activities performed:
The project encompasses different rural and urban roads, with variable width of 6m to 11m depending upon the terrain
which is flat, rolling as well as mountainous. I was responsible for pavement and geometric designing of above mentioned
road and performed the following activities:
 Prepared the typical cross section and Geometric design parameters
 Supervised the survey activities by deputing the team of junior engineers and advised on the necessary
amendments in survey.
 Conducted investigation and recorded observations, highlighted necessary discrepancies in survey and
incorporated amendments as per ground reality with the help of site surveyors.
 Prepared the typical cross section and Geometric design parameters.
 Prepared the surface models including triangulation and contouring (one meter minor contour interval and 5
meter major contour interval).
 Designed the preliminary horizontal alignment by keeping in view AASHTO design parameters (Design
Speed, Minimum radius, Minimum curve length, and Horizontal sight distance), Geological and geotechnical
information.
 Designed the preliminary vertical alignment by keeping in view AASHTO design parameters (Minimum curve
length, K value on Sag and Hog Curve, Stopping sight distance, Maximum grade and Maximum Grade Length),
Hydraulics and Hydrology data, pavement design and maximum reservoir level.
 Prepared the earthwork cross section on every 10 m intervals and to avoid high retaining structures, excessive
cut and fill, the levels and location of most feasible points were noted on every 10m interval.
 Readjusted the horizontal and vertical alignment on the basis of noted levels and locations on every 10 meter
intervals to make the design economical and viable for construction.
 Designed the super-elevation (tangent run out and runoff length) on every curve according to design speed
and maximum super-elevation limit (6.0%).
 Designed the toe line and embankment slopes on entire length of roads according to geotechnical and
geological report and then prepared earthwork cross for the cut and fill quantity.
 Marked the drainage structures on plan and profile. Height and length of retaining structures were observed
and marked on plan.
 Managed the drafting section in preparation of plan, profile and general drawings required for construction.
 Reviewed design and drafting works completed by junior colleagues for compliance with original design intent.
 Prepared the specification of different items used in road construction and then calculated the bill of quantity
for different items by using the technical specification manual.
 Advised and supported the Project Manager and the QA/QA Engineers on any technical design issues arising
from the projects.
Page 2
Muhammad Anwar
Senior Roads and Highway Engineer
Resume
Feb 2012 – May
2014
Highway Design Engineer, SMEC International, Afghanistan
Key Project – Gardendewal-Chagcharan Project Afghanistan. The project encompassed a 366km of road, with
variable width of 9m to 11m depending upon the terrain which was flat, rolling as well as mountainous. The assignment
included the detail design road network which comprised major roads and At-grade signalized junctions. The project
aimed at reduction of overall travel time and provision of comfort and high level of service to road users as well as
increase in the land value of the project area.
Activities performed:
Supervised the team of surveyors to carry out a detailed inventory survey of the road and detail topo graphic survey in
order to obtain information on alignment / width and condition of the road as well as to examine and report on the
condition of existing structures.
The assignment comprised extensive and intensive field and desk study. Major steps followed included:
 Used x,y,z coordinate data in Excel format in design software to generate 3-dimensional digital terrain (DTM)
model, on which the final design was based .Used this data to prepare the horizontal and vertical profile of the road
from which substandard horizontal and vertical locations were identified. Marked different locations where
realignment was required and additional survey works were implemented to enable sufficient data to be collected for
the detailed drawings. Designed road alignment for the Section 0 – 100km, generally following the existing
alignment and incorporating “minor” horizontal alignment corrections to eliminate poor standard curves or steep
vertical gradients and ensured that it will be across cleared agricultural land.
 At some locations, avoided an extremely steep gradient and substandard curve section (15-20% grade and
curve 15m radius. This realignment was across lightly grassed soil covered hills. The soil was weak and unsuitable
for agriculture.
 Proposed the alignment above the minimum requirements of the Afghanistan Interim Standard, Making of
significant deviations from the existing alignment in some locations. It was observed that by following the existing
alignment, it was not possible to provide the minimum radii criteria set out in the design standards
 After fixing the line of direction and design parameters, I designed the preliminary horizontal alignment by
keeping in view The Afghan Standards (Design Speed, Minimum radius, Minimum curve length, and Horizontal sight
distance) as well as Geological and Geotechnical study. After completing the preliminary design of horizontal
alignment, I designed the preliminary vertical alignment by keeping in view Afghan standards for vertical design
parameters (Minimum curve length value on Sag and Hog Curve, Stopping sight distance, Maximum grade and
Maximum Grade Length), Hydraulics and Hydrology data, pavement design.
 In order to prepare the earthwork cross section, the level and location of most feasible point was noted on
sections of every 20m interval to avoid high retaining structures and excessive cut and fill.
 I redesigned the horizontal and vertical alignment on the basis of noted levels and locations on every 10 meter
intervals to make the design economical and viable for construction then I designed the super-elevation (tangent run
out and runoff length) on every curve according to design speed and maximum super-elevation limit (6.0%).After
computing the super-elevation on every desired curve ,I provided the widening to facilitate the tracking of larger
vehicles ensuring that there was enough width for two design vehicles to pass each other on a sharp curve without
colliding.
 While applying different cut slopes on different materials as in above mentioned table, prepared earthwork
cross section for the cut and fill quantity. Subsequently introduced the drafting section in preparation of plan, profile,
general drawings, and general detailing on plan and profile drawings required for construction.
 After completing the Geometric design, I managed the plan for road marking in accordance with Afghanistan
Interim Standard. Where available information was not enough.
 Established the location of no-overtaking lines based on the MUTCD method.
Feb 2010– Jan
2012
Highway Specialist / Design Engineer, SMEC International, Bangladesh
Key Project – Padma Multipurpose Bridge Project Bangladesh. The Padma Multi-purpose Bridge is a multi-faceted
mega project, located 40km southwest of Dhaka. The project includes a 6km wide bridge on Padma River, Major River
training works, 62km of approach roads, bridge-end facilities including toll plazas, service areas and offices. The Padma
River divides the southwest of Bangladesh from the rest of the country. The Padma Bridge contributes significantly
Page 3
Muhammad Anwar
Senior Roads and Highway Engineer
Resume
towards facilitating the social, economic and industrial development of the southwest zone, which encompasses
Bangladesh’s second major port, its third main city and an important inland port.
Activities performed:
I designed the preliminary horizontal alignment of the main 7km bridge, 62km approach road by keeping in view
Bangladesh Bridge and geometric Standards. After completing the preliminary design of horizontal alignment merits and
demerits of alignment were discussed with Structure Engineer, River training, environmentalist and Social Experts
.Necessary amendments were made in the design to render it most economical, viable and safe design. Infact all
endeavors were made to render the design most practicable and perfect.
Final vertical profile of selected route was designed by keeping in view Bangladesh standards for vertical design(Minimum
curve length ,K value on Sag and Hog Curve, Stopping sight distance, Maximum grade and Maximum Grade Length),
highest flood level of river and cross drainage structures of approach road.
One of the notable challenges posed at the commencement of the project was time limitation. The entire designing
including the collection of vital data from primary/secondary sources, data analysis, field studies, and consultation with
experts of related fields, culinary to submission of final report was desired to be completed in a span of 9 month. However,
by chalking out a workable schedule, due planning of design activities, including site visits, meeting/discussion with stake
holders, geometric designing, preparation of design drawings and finalization of design report, was accomplished
successfully before time, which earned me due appreciation from the Project Manager. It was noted by the Project
Manager that quality of work conformed to the internationally recognized quality, to the satisfaction of Bangladesh
Government and donor authority.
April 2008 – Jan
2010
Highway Design Engineer / Civil Design Engineer, EGC-SMEC International, Nepal
Key Project – West Seti Hydropower Project; funded by World Bank. 74 Km hilly areas approach road to Seti
hydropower project involved high expertise in designing. Design review of different access roads from urban areas to Dam
Axis.
Activities performed: Detailed design of the road was carried out by another local consultant and the task which was
given to me, to review the design with all respects. Though the magnitude and scope of work was not that big yet it was a
challenge that to minimize the cost by reducing cut and fill quantities as well as to check the design from safety and
economical point of view. Initially a site visit along with senior experts was undertaken and various discrepancies in design
as per site were observed for further amendments to render the design more safe and economical. Design of the alternate
route on different locations was prepared and cost worked out. It followed marking of critical points on vertical alignment
and preparation of different options to minimize the cut and fill. A comparison with previous design revealed that most of
the locations were more economical and safe within the AASHTO 2004 geometric design parameters.
Mar 2005 – Mar
2010
Assistant Civil Engineer, EGC-SMEC International, Pakistan
Key Project – Rehabilitation of Earth Quake Damaged Road from Muzaffarabad to Chakhoti Road. (Road Length
56 Km in Hilly area). Existing width of this road was 5.2 m and design width was 11.8m. Most of part of this road was
totally damaged after earth quake.
Activities performed:
Supervised the existing road survey at site and it was the first very task of my career which was taken as a challenge. I
supervised activities like establishing the control points and traversing,. Following a lesson learnt in past that traversing
plays very important role in precession of the survey, Checked the accuracy of the traverse from start to end and then
back from end to start. After successful completion of the survey, got the chance to work in design office. Assisted senior
design team in following activities.
 Prepared for the surface models including triangulation and contouring.
 Prepared of Geometric design of road on Eagle Pont Point (Road Calc) software.
 Prepared of flexible Pavement Design by using AASHTO pavement design Manual 1993 and UK Road
Note31.
 Prepared of Intersection design (Trumpet Junction and Cloverleaf junction).
 Prepared of Bill of Quantity and Engineer’s Estimate.
 Prepared of technical specification and Tender documents.
Page 4
Muhammad Anwar
Senior Roads and Highway Engineer
Resume
 Prepared design drawings using AutoCAD software;
 Assist in correspondence with client and contractor.
Other Projects:
 Baluchistan Road Development Sector Project - Debery to Roghni Road (100 Km), Pakistan. Client:
Government of Baluchistan.
 Kabul Urban Road Improvement Project (road length 75 km), Afghanistan. Client: M.P.W Afghanistan and
UNDP
 Kabul Urban Road Rehabilitation Project (Road length 50 km), Afghanistan. Client: M.P.W Afghanistan and
UNDP
 Reconstruction of Punjab Road from Midranja to Ahmad Nagar (road length 50 km), Pakistan. Client:
Communication and Works Department
 Baluchistan Road Development Sector Syed Hamid Crossing to Gulistan (30 Km hilly area), Pakistan. Client:
Government of Baluchistan.
 Rehabilitation of N5 from Sahiwal to Michanu Road (road length 106 km), Pakistan. Client: National Highway
Authority
 Design of N5 Intersections (Chechawatni, Harappa, Iqbal Nagar, Sahiwal) By Passes, Pakistan. Client:
National Highway Authority.
 Rehabilitation of Earth Quake Damaged Road from Muzaffarabad to Chakhoti Road. (Road Length 56 Km in
Hilly area).
 Design of Signalized and grade separated junctions National Highway (N5) Gujranwala, Gujrat Bypass (Khiali
Intersection, Alam Intersection k, Ali Pur Intersection,Shaheen Intersection and Haryawala Chowk ,Trumpet
Intersection on Chan da Qilla Interchange of M2 Motorway
EDUCATION
Msc Trasnportation Engineering 2012
B.SC. Civil Engineering, B.Z. University, Multan, Pakistan, 2005 (Grade-A)
REGISTRATIONS/AFFILIATIONS
2006 Pakistan Engineering Council-(Membership No.Civil /25816).
2007 Life-Member “Pakistan Engineering Congress - (Membership No Civil-4608).
2009 Life Member -Institute of Professional Engineers-(Membership No –M-17070/LHR-4611).
SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES
Computer Skills
 Mx Road V8I.
 12d 9th
version.
 Civil 3D( 2014).
 Eagle point 2009 (Road Calc).
 AutoCAD 2014
 Pavement Calc. (used for pavement design).
 MS-Office (word, excel, power point, Ms Project).
Personal Information
Mobile: + (974) 66446277,
Email:anwarchoudhry5483@hotmail.com
Official Email: Mohammad.Anwar@worleyparsons.com
Page 5
Muhammad Anwar
Senior Roads and Highway Engineer
Resume
 Prepared design drawings using AutoCAD software;
 Assist in correspondence with client and contractor.
Other Projects:
 Baluchistan Road Development Sector Project - Debery to Roghni Road (100 Km), Pakistan. Client:
Government of Baluchistan.
 Kabul Urban Road Improvement Project (road length 75 km), Afghanistan. Client: M.P.W Afghanistan and
UNDP
 Kabul Urban Road Rehabilitation Project (Road length 50 km), Afghanistan. Client: M.P.W Afghanistan and
UNDP
 Reconstruction of Punjab Road from Midranja to Ahmad Nagar (road length 50 km), Pakistan. Client:
Communication and Works Department
 Baluchistan Road Development Sector Syed Hamid Crossing to Gulistan (30 Km hilly area), Pakistan. Client:
Government of Baluchistan.
 Rehabilitation of N5 from Sahiwal to Michanu Road (road length 106 km), Pakistan. Client: National Highway
Authority
 Design of N5 Intersections (Chechawatni, Harappa, Iqbal Nagar, Sahiwal) By Passes, Pakistan. Client:
National Highway Authority.
 Rehabilitation of Earth Quake Damaged Road from Muzaffarabad to Chakhoti Road. (Road Length 56 Km in
Hilly area).
 Design of Signalized and grade separated junctions National Highway (N5) Gujranwala, Gujrat Bypass (Khiali
Intersection, Alam Intersection k, Ali Pur Intersection,Shaheen Intersection and Haryawala Chowk ,Trumpet
Intersection on Chan da Qilla Interchange of M2 Motorway
EDUCATION
Msc Trasnportation Engineering 2012
B.SC. Civil Engineering, B.Z. University, Multan, Pakistan, 2005 (Grade-A)
REGISTRATIONS/AFFILIATIONS
2006 Pakistan Engineering Council-(Membership No.Civil /25816).
2007 Life-Member “Pakistan Engineering Congress - (Membership No Civil-4608).
2009 Life Member -Institute of Professional Engineers-(Membership No –M-17070/LHR-4611).
SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES
Computer Skills
 Mx Road V8I.
 12d 9th
version.
 Civil 3D( 2014).
 Eagle point 2009 (Road Calc).
 AutoCAD 2014
 Pavement Calc. (used for pavement design).
 MS-Office (word, excel, power point, Ms Project).
Personal Information
Mobile: + (974) 66446277,
Email:anwarchoudhry5483@hotmail.com
Official Email: Mohammad.Anwar@worleyparsons.com
Page 5

More Related Content

What's hot (20)

Vishu resume new (1)
Vishu resume new (1)Vishu resume new (1)
Vishu resume new (1)
 
CV of M Saidul Islam.os
CV of M Saidul Islam.osCV of M Saidul Islam.os
CV of M Saidul Islam.os
 
Biswajit Das_Resume
Biswajit Das_ResumeBiswajit Das_Resume
Biswajit Das_Resume
 
Curriculum Vitae-Zuber
Curriculum Vitae-ZuberCurriculum Vitae-Zuber
Curriculum Vitae-Zuber
 
Naresh Cherukuri_CV_May-2016
Naresh Cherukuri_CV_May-2016Naresh Cherukuri_CV_May-2016
Naresh Cherukuri_CV_May-2016
 
GM CV-Nov16
GM CV-Nov16 GM CV-Nov16
GM CV-Nov16
 
Fawad cv a
Fawad cv aFawad cv a
Fawad cv a
 
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
 
CV-Padmanabh
CV-PadmanabhCV-Padmanabh
CV-Padmanabh
 
Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
 
CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil Engineer
 
Senior Surveyor CV
Senior Surveyor CV Senior Surveyor CV
Senior Surveyor CV
 
Md._Habibur_Rahman_CV
Md._Habibur_Rahman_CVMd._Habibur_Rahman_CV
Md._Habibur_Rahman_CV
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
USM-28-6-16
USM-28-6-16USM-28-6-16
USM-28-6-16
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
 
PK_Thakore_New_CV
PK_Thakore_New_CVPK_Thakore_New_CV
PK_Thakore_New_CV
 
Prashant - CV simple format
Prashant - CV  simple formatPrashant - CV  simple format
Prashant - CV simple format
 
PRANESH GHOSH CV AS ON dt 01.06.2015
PRANESH GHOSH CV AS ON dt 01.06.2015PRANESH GHOSH CV AS ON dt 01.06.2015
PRANESH GHOSH CV AS ON dt 01.06.2015
 
gandham2910@yahoo.co.inCIVIL Site Manager
gandham2910@yahoo.co.inCIVIL Site Managergandham2910@yahoo.co.inCIVIL Site Manager
gandham2910@yahoo.co.inCIVIL Site Manager
 

Similar to Senior Highway Engineer Resume: 10+ Years Experience

Similar to Senior Highway Engineer Resume: 10+ Years Experience (20)

_Mohamad Bendary_Jan-2015
_Mohamad Bendary_Jan-2015_Mohamad Bendary_Jan-2015
_Mohamad Bendary_Jan-2015
 
Muhammad Asad Shaheen - CV
Muhammad Asad Shaheen - CVMuhammad Asad Shaheen - CV
Muhammad Asad Shaheen - CV
 
RESUME New
RESUME NewRESUME New
RESUME New
 
CV_Anil Malagi
CV_Anil MalagiCV_Anil Malagi
CV_Anil Malagi
 
A Meganathan - Traffic cum Pavement Expert
A Meganathan - Traffic cum Pavement ExpertA Meganathan - Traffic cum Pavement Expert
A Meganathan - Traffic cum Pavement Expert
 
Naveed Asif C.V Updated
Naveed Asif C.V UpdatedNaveed Asif C.V Updated
Naveed Asif C.V Updated
 
ToR
ToRToR
ToR
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
PROJECT-REPORT-SUBHENDU
PROJECT-REPORT-SUBHENDUPROJECT-REPORT-SUBHENDU
PROJECT-REPORT-SUBHENDU
 
[PDF]PROJECT ON HIGHWAY BY SUBHENDU SAMUI
[PDF]PROJECT ON HIGHWAY BY SUBHENDU  SAMUI[PDF]PROJECT ON HIGHWAY BY SUBHENDU  SAMUI
[PDF]PROJECT ON HIGHWAY BY SUBHENDU SAMUI
 
CHVR CV
CHVR CVCHVR CV
CHVR CV
 
CV for Nyquist rev bob 2
CV for Nyquist rev bob 2CV for Nyquist rev bob 2
CV for Nyquist rev bob 2
 
Keith Kent CV
Keith Kent CVKeith Kent CV
Keith Kent CV
 
Design of expressway
Design of expresswayDesign of expressway
Design of expressway
 
civil engineers project work .docx
civil engineers project work .docxcivil engineers project work .docx
civil engineers project work .docx
 
Maher Abuelteen Highways July 2016.
Maher Abuelteen Highways July 2016.Maher Abuelteen Highways July 2016.
Maher Abuelteen Highways July 2016.
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway Alignment
 
CV_Bavanam Veenadhari_July_16
CV_Bavanam Veenadhari_July_16CV_Bavanam Veenadhari_July_16
CV_Bavanam Veenadhari_July_16
 
Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani Portfolio
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 

Senior Highway Engineer Resume: 10+ Years Experience

  • 1. Muhammad Anwar Senior Roads and Highway Engineer Resume SUMMARY I am a Civil Engineer with 10 years experience during which time I have worked on a variety of Major Highways or Infrastructure projects in Pakistan, Afghanistan, Bangladesh, Nepal, and Qatar. In my career, I have Design experience varies from urban roads to expressways in plains as well as in hilly terrain. Major areas of work experience includes formulation of design standards taking into account national as well as international design practice, geometric design, concept preparation of junction, Interchange design, widening scheme, bypass option study using GPS, utility relocation plan, traffic control devices arrangement and diversion. I am interested in Highway project particularly on large infrastructure projects, which will give me the opportunity to use my abilities to the full while developing new skills. I am willing to relocate anywhere and also undertake frequent travel, if required as part of my assignments. EXPERIENCE April 2014 - Present Senior Roads and Highway Engineer, WorleyParsons, Qatar Key Project – 1-Detailed Master Planning of Qatar Economic Zone 3. ). Client: Manateq: Qatar Economic Zone 3 (QEZ3) is one of three Economic Zones planned for development in Qatar. Qatar Economic Zone 3 (QEZ3) – 33.5 km² site adjacent to Misaimed Industrial City (MIC) and the New Port Project (NPP). This project is focused on downstream industries. The QEZ3 roads are mainly divided into four categories based on the functions of each road in the network. Categorizing the roads into major arterials, major collectors, Commercial Boulevard and local roads supposed to help QEZ3 road user to have e smooth and efficient mobility. The internal QEZ3 road network applied the principle of permeability to create a highly connected road network which distributed traffic more evenly, improve efficiency, minimize congestion and provided a flexible network for the management of traffic flows over the life of QEZ3 Project. 2-Pre-Contract Services of Lusail City Infrastructures and Highways for Qetaifan Island, Commercial Boulevard and Water Front Commercial District (CP07-A, CP07-B, CP07-C, CP08; Client Lusail Real State and Development. Activities Performed:  Prepared the different typical cross sections for Arterial, Commercial Boulevard, Tunnel roads of different levls,Collector and Internal Roads.  Designed for different roads in accordance with Qatar Highway Design Manual and AASHTO Geometric Design of Highways and Streets (2011).  Prepared the grading plan of entire area of QEZ-3 (Qatar Economic Zone-3) and Qetaiifan Island.  Designed of different Signalized or non-signalized junctions, interchanges, Underpasses of different stages of road, Flyover, Roundabouts and Cul de sac for large 22.40m Interstate Semitrailer (AASHTO WB-20 industrial Area and AAHSTO’s City Transit Bus for Lusail Project.  Prepared the vertical profiles.  Designed and Provided Laybys, bike track and Parallel Car and Truck Parking where it was required along the the local, collector and arterial roads.  Prepared design report, MTO and CRS for the QEZ-3 Project  Designed the Flexible pavement of different above mentioned roads.  Established working relationships and contact with client technical staff and project managers.  Coordinate design activities and meetings between design staff, and client managers  Participated in project decisions regarding technical approaches and scheduling performance  Have strong written and oral communication skills and a team-oriented attitude.  Assist project managers with other various tasks. Jun 2012– March Senior Highway Design Engineer, Nippon Koi, Pakistan Page 1
  • 2. Muhammad Anwar Senior Roads and Highway Engineer Resume 2013 Key Project – Detailed Designing and Construction Supervision of Dasu Hydropower Project (4500 MW). Client: Wapda and World Bank M/s Nippon Koei, and Dollsar in association with Development Management Consultant, National Development consultant and Pakistan Engineering Consultant were appointed as client representative for the Design and Construction Supervision of Dasu Hydropower Project on Indus River at Dasu in Kohistan District of Khyber Pakhtunkhwa Province. The proposed Dasu reservoir will extend to a length of about 74km.In the feasibility studies it was assessed that new reservoir will submerge a 65km stretch of the existing Karakoram Highway (KKH) on left bank of river and 75 km of different access roads on right bank will be submerged in Dasu reservoir, This will require relocation of existing road on higher levels. In this context the under mentioned works were undertaken.  The alignment of KKH (65km) at high altitude 975 to 1060m, finalization on topo survey maps of Survey of Pakistan (SOP), and detailed survey in a corridor of 80 m width carried out.  9 km access road for residential colony at an altitude of 220m higher from existing KKH was aligned.  On right bank of Indus river, alignment of road from Komila town to Dam site(12km),Dam Site to Largani (9km),Largani to Kandia (14km) and Kandia to Uttar Gah (17.8km), was conducted. Activities performed: The project encompasses different rural and urban roads, with variable width of 6m to 11m depending upon the terrain which is flat, rolling as well as mountainous. I was responsible for pavement and geometric designing of above mentioned road and performed the following activities:  Prepared the typical cross section and Geometric design parameters  Supervised the survey activities by deputing the team of junior engineers and advised on the necessary amendments in survey.  Conducted investigation and recorded observations, highlighted necessary discrepancies in survey and incorporated amendments as per ground reality with the help of site surveyors.  Prepared the typical cross section and Geometric design parameters.  Prepared the surface models including triangulation and contouring (one meter minor contour interval and 5 meter major contour interval).  Designed the preliminary horizontal alignment by keeping in view AASHTO design parameters (Design Speed, Minimum radius, Minimum curve length, and Horizontal sight distance), Geological and geotechnical information.  Designed the preliminary vertical alignment by keeping in view AASHTO design parameters (Minimum curve length, K value on Sag and Hog Curve, Stopping sight distance, Maximum grade and Maximum Grade Length), Hydraulics and Hydrology data, pavement design and maximum reservoir level.  Prepared the earthwork cross section on every 10 m intervals and to avoid high retaining structures, excessive cut and fill, the levels and location of most feasible points were noted on every 10m interval.  Readjusted the horizontal and vertical alignment on the basis of noted levels and locations on every 10 meter intervals to make the design economical and viable for construction.  Designed the super-elevation (tangent run out and runoff length) on every curve according to design speed and maximum super-elevation limit (6.0%).  Designed the toe line and embankment slopes on entire length of roads according to geotechnical and geological report and then prepared earthwork cross for the cut and fill quantity.  Marked the drainage structures on plan and profile. Height and length of retaining structures were observed and marked on plan.  Managed the drafting section in preparation of plan, profile and general drawings required for construction.  Reviewed design and drafting works completed by junior colleagues for compliance with original design intent.  Prepared the specification of different items used in road construction and then calculated the bill of quantity for different items by using the technical specification manual.  Advised and supported the Project Manager and the QA/QA Engineers on any technical design issues arising from the projects. Page 2
  • 3. Muhammad Anwar Senior Roads and Highway Engineer Resume Feb 2012 – May 2014 Highway Design Engineer, SMEC International, Afghanistan Key Project – Gardendewal-Chagcharan Project Afghanistan. The project encompassed a 366km of road, with variable width of 9m to 11m depending upon the terrain which was flat, rolling as well as mountainous. The assignment included the detail design road network which comprised major roads and At-grade signalized junctions. The project aimed at reduction of overall travel time and provision of comfort and high level of service to road users as well as increase in the land value of the project area. Activities performed: Supervised the team of surveyors to carry out a detailed inventory survey of the road and detail topo graphic survey in order to obtain information on alignment / width and condition of the road as well as to examine and report on the condition of existing structures. The assignment comprised extensive and intensive field and desk study. Major steps followed included:  Used x,y,z coordinate data in Excel format in design software to generate 3-dimensional digital terrain (DTM) model, on which the final design was based .Used this data to prepare the horizontal and vertical profile of the road from which substandard horizontal and vertical locations were identified. Marked different locations where realignment was required and additional survey works were implemented to enable sufficient data to be collected for the detailed drawings. Designed road alignment for the Section 0 – 100km, generally following the existing alignment and incorporating “minor” horizontal alignment corrections to eliminate poor standard curves or steep vertical gradients and ensured that it will be across cleared agricultural land.  At some locations, avoided an extremely steep gradient and substandard curve section (15-20% grade and curve 15m radius. This realignment was across lightly grassed soil covered hills. The soil was weak and unsuitable for agriculture.  Proposed the alignment above the minimum requirements of the Afghanistan Interim Standard, Making of significant deviations from the existing alignment in some locations. It was observed that by following the existing alignment, it was not possible to provide the minimum radii criteria set out in the design standards  After fixing the line of direction and design parameters, I designed the preliminary horizontal alignment by keeping in view The Afghan Standards (Design Speed, Minimum radius, Minimum curve length, and Horizontal sight distance) as well as Geological and Geotechnical study. After completing the preliminary design of horizontal alignment, I designed the preliminary vertical alignment by keeping in view Afghan standards for vertical design parameters (Minimum curve length value on Sag and Hog Curve, Stopping sight distance, Maximum grade and Maximum Grade Length), Hydraulics and Hydrology data, pavement design.  In order to prepare the earthwork cross section, the level and location of most feasible point was noted on sections of every 20m interval to avoid high retaining structures and excessive cut and fill.  I redesigned the horizontal and vertical alignment on the basis of noted levels and locations on every 10 meter intervals to make the design economical and viable for construction then I designed the super-elevation (tangent run out and runoff length) on every curve according to design speed and maximum super-elevation limit (6.0%).After computing the super-elevation on every desired curve ,I provided the widening to facilitate the tracking of larger vehicles ensuring that there was enough width for two design vehicles to pass each other on a sharp curve without colliding.  While applying different cut slopes on different materials as in above mentioned table, prepared earthwork cross section for the cut and fill quantity. Subsequently introduced the drafting section in preparation of plan, profile, general drawings, and general detailing on plan and profile drawings required for construction.  After completing the Geometric design, I managed the plan for road marking in accordance with Afghanistan Interim Standard. Where available information was not enough.  Established the location of no-overtaking lines based on the MUTCD method. Feb 2010– Jan 2012 Highway Specialist / Design Engineer, SMEC International, Bangladesh Key Project – Padma Multipurpose Bridge Project Bangladesh. The Padma Multi-purpose Bridge is a multi-faceted mega project, located 40km southwest of Dhaka. The project includes a 6km wide bridge on Padma River, Major River training works, 62km of approach roads, bridge-end facilities including toll plazas, service areas and offices. The Padma River divides the southwest of Bangladesh from the rest of the country. The Padma Bridge contributes significantly Page 3
  • 4. Muhammad Anwar Senior Roads and Highway Engineer Resume towards facilitating the social, economic and industrial development of the southwest zone, which encompasses Bangladesh’s second major port, its third main city and an important inland port. Activities performed: I designed the preliminary horizontal alignment of the main 7km bridge, 62km approach road by keeping in view Bangladesh Bridge and geometric Standards. After completing the preliminary design of horizontal alignment merits and demerits of alignment were discussed with Structure Engineer, River training, environmentalist and Social Experts .Necessary amendments were made in the design to render it most economical, viable and safe design. Infact all endeavors were made to render the design most practicable and perfect. Final vertical profile of selected route was designed by keeping in view Bangladesh standards for vertical design(Minimum curve length ,K value on Sag and Hog Curve, Stopping sight distance, Maximum grade and Maximum Grade Length), highest flood level of river and cross drainage structures of approach road. One of the notable challenges posed at the commencement of the project was time limitation. The entire designing including the collection of vital data from primary/secondary sources, data analysis, field studies, and consultation with experts of related fields, culinary to submission of final report was desired to be completed in a span of 9 month. However, by chalking out a workable schedule, due planning of design activities, including site visits, meeting/discussion with stake holders, geometric designing, preparation of design drawings and finalization of design report, was accomplished successfully before time, which earned me due appreciation from the Project Manager. It was noted by the Project Manager that quality of work conformed to the internationally recognized quality, to the satisfaction of Bangladesh Government and donor authority. April 2008 – Jan 2010 Highway Design Engineer / Civil Design Engineer, EGC-SMEC International, Nepal Key Project – West Seti Hydropower Project; funded by World Bank. 74 Km hilly areas approach road to Seti hydropower project involved high expertise in designing. Design review of different access roads from urban areas to Dam Axis. Activities performed: Detailed design of the road was carried out by another local consultant and the task which was given to me, to review the design with all respects. Though the magnitude and scope of work was not that big yet it was a challenge that to minimize the cost by reducing cut and fill quantities as well as to check the design from safety and economical point of view. Initially a site visit along with senior experts was undertaken and various discrepancies in design as per site were observed for further amendments to render the design more safe and economical. Design of the alternate route on different locations was prepared and cost worked out. It followed marking of critical points on vertical alignment and preparation of different options to minimize the cut and fill. A comparison with previous design revealed that most of the locations were more economical and safe within the AASHTO 2004 geometric design parameters. Mar 2005 – Mar 2010 Assistant Civil Engineer, EGC-SMEC International, Pakistan Key Project – Rehabilitation of Earth Quake Damaged Road from Muzaffarabad to Chakhoti Road. (Road Length 56 Km in Hilly area). Existing width of this road was 5.2 m and design width was 11.8m. Most of part of this road was totally damaged after earth quake. Activities performed: Supervised the existing road survey at site and it was the first very task of my career which was taken as a challenge. I supervised activities like establishing the control points and traversing,. Following a lesson learnt in past that traversing plays very important role in precession of the survey, Checked the accuracy of the traverse from start to end and then back from end to start. After successful completion of the survey, got the chance to work in design office. Assisted senior design team in following activities.  Prepared for the surface models including triangulation and contouring.  Prepared of Geometric design of road on Eagle Pont Point (Road Calc) software.  Prepared of flexible Pavement Design by using AASHTO pavement design Manual 1993 and UK Road Note31.  Prepared of Intersection design (Trumpet Junction and Cloverleaf junction).  Prepared of Bill of Quantity and Engineer’s Estimate.  Prepared of technical specification and Tender documents. Page 4
  • 5. Muhammad Anwar Senior Roads and Highway Engineer Resume  Prepared design drawings using AutoCAD software;  Assist in correspondence with client and contractor. Other Projects:  Baluchistan Road Development Sector Project - Debery to Roghni Road (100 Km), Pakistan. Client: Government of Baluchistan.  Kabul Urban Road Improvement Project (road length 75 km), Afghanistan. Client: M.P.W Afghanistan and UNDP  Kabul Urban Road Rehabilitation Project (Road length 50 km), Afghanistan. Client: M.P.W Afghanistan and UNDP  Reconstruction of Punjab Road from Midranja to Ahmad Nagar (road length 50 km), Pakistan. Client: Communication and Works Department  Baluchistan Road Development Sector Syed Hamid Crossing to Gulistan (30 Km hilly area), Pakistan. Client: Government of Baluchistan.  Rehabilitation of N5 from Sahiwal to Michanu Road (road length 106 km), Pakistan. Client: National Highway Authority  Design of N5 Intersections (Chechawatni, Harappa, Iqbal Nagar, Sahiwal) By Passes, Pakistan. Client: National Highway Authority.  Rehabilitation of Earth Quake Damaged Road from Muzaffarabad to Chakhoti Road. (Road Length 56 Km in Hilly area).  Design of Signalized and grade separated junctions National Highway (N5) Gujranwala, Gujrat Bypass (Khiali Intersection, Alam Intersection k, Ali Pur Intersection,Shaheen Intersection and Haryawala Chowk ,Trumpet Intersection on Chan da Qilla Interchange of M2 Motorway EDUCATION Msc Trasnportation Engineering 2012 B.SC. Civil Engineering, B.Z. University, Multan, Pakistan, 2005 (Grade-A) REGISTRATIONS/AFFILIATIONS 2006 Pakistan Engineering Council-(Membership No.Civil /25816). 2007 Life-Member “Pakistan Engineering Congress - (Membership No Civil-4608). 2009 Life Member -Institute of Professional Engineers-(Membership No –M-17070/LHR-4611). SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES Computer Skills  Mx Road V8I.  12d 9th version.  Civil 3D( 2014).  Eagle point 2009 (Road Calc).  AutoCAD 2014  Pavement Calc. (used for pavement design).  MS-Office (word, excel, power point, Ms Project). Personal Information Mobile: + (974) 66446277, Email:anwarchoudhry5483@hotmail.com Official Email: Mohammad.Anwar@worleyparsons.com Page 5
  • 6. Muhammad Anwar Senior Roads and Highway Engineer Resume  Prepared design drawings using AutoCAD software;  Assist in correspondence with client and contractor. Other Projects:  Baluchistan Road Development Sector Project - Debery to Roghni Road (100 Km), Pakistan. Client: Government of Baluchistan.  Kabul Urban Road Improvement Project (road length 75 km), Afghanistan. Client: M.P.W Afghanistan and UNDP  Kabul Urban Road Rehabilitation Project (Road length 50 km), Afghanistan. Client: M.P.W Afghanistan and UNDP  Reconstruction of Punjab Road from Midranja to Ahmad Nagar (road length 50 km), Pakistan. Client: Communication and Works Department  Baluchistan Road Development Sector Syed Hamid Crossing to Gulistan (30 Km hilly area), Pakistan. Client: Government of Baluchistan.  Rehabilitation of N5 from Sahiwal to Michanu Road (road length 106 km), Pakistan. Client: National Highway Authority  Design of N5 Intersections (Chechawatni, Harappa, Iqbal Nagar, Sahiwal) By Passes, Pakistan. Client: National Highway Authority.  Rehabilitation of Earth Quake Damaged Road from Muzaffarabad to Chakhoti Road. (Road Length 56 Km in Hilly area).  Design of Signalized and grade separated junctions National Highway (N5) Gujranwala, Gujrat Bypass (Khiali Intersection, Alam Intersection k, Ali Pur Intersection,Shaheen Intersection and Haryawala Chowk ,Trumpet Intersection on Chan da Qilla Interchange of M2 Motorway EDUCATION Msc Trasnportation Engineering 2012 B.SC. Civil Engineering, B.Z. University, Multan, Pakistan, 2005 (Grade-A) REGISTRATIONS/AFFILIATIONS 2006 Pakistan Engineering Council-(Membership No.Civil /25816). 2007 Life-Member “Pakistan Engineering Congress - (Membership No Civil-4608). 2009 Life Member -Institute of Professional Engineers-(Membership No –M-17070/LHR-4611). SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES Computer Skills  Mx Road V8I.  12d 9th version.  Civil 3D( 2014).  Eagle point 2009 (Road Calc).  AutoCAD 2014  Pavement Calc. (used for pavement design).  MS-Office (word, excel, power point, Ms Project). Personal Information Mobile: + (974) 66446277, Email:anwarchoudhry5483@hotmail.com Official Email: Mohammad.Anwar@worleyparsons.com Page 5