1. Page 1
Nareshchowdary20 @gmail.com
Mobile no: +91-9160506900 NARESH CHERUKURI
PERSONAL SUMMARY
A committed, proven and dependable Engineer, who is technically Versatile and has the ability to
understand all related aspects of an engineering project. In the current role I gained experience of
working on highways – tenders and designs. My key strengths include, but are not limited to, turning
research ideas into technical plans and understanding the functional requirements of an engineering
project.
KEY QUALIFICATIONS
I, Mr.Naresh Cherukuri is a Graduate in CIVIL Engineering with 5 years of overall
Professional experience and 4 years 6 months in Highway Design Spectrum, Involved in Design of
horizontal alignment, Vertical alignment, Preparation of plan and profile drawings and detail cross
sections, Quantities, Interchanges, intersections as well as up gradation and rehabilitation of existing
roads / highways networks. I have extensive experience of using MX ROADS Software and AutoCAD for
the design purpose and experience of applying IRC and AASHTO standards in design of roads, junctions
and roundabouts and Preparation of design reports.
This experience also includes Reconnaissance Survey for green field alignments, Monitoring
Topographical surveys, Alignment Fixing on SOI map and Google earth, Monitoring of Center line
stacking, Road Inventory, Preparation of BOQ, Preparation of strip plan, Conducting Traffic surveys, Axle
load surveys and geometric design and assisted in preparing preliminary feasibility report.
I am well conversant with Microsoft Professional, Auto CAD and MX Roads and Civil 3D and IIT-Pave.
EDUCATION DETAILS
Graduation in Civil Engineering (2007-2011) from Jawaharlal Nehru Technological University,
Hyderabad Telangana.
Intermediate in M.P.C (2005-2007) from Chaitanya Junior College, Nandigama, AP.
SSC (2004-2005) from Sri Chaitanya High School, Anigandlapadu, AP.
KEY SKILLS
Highway and Junctions Design using MXROAD software
Measuring Road Roughness using Z-250 & Bump Integrator (ROMDOS). (Road Measurement
and Data Acquisition System)
Borrow area identification and assessing the suitability of materials for highways
Traffic Surveys and Analysis, Traffic Forecasting, Diversion Analysis, Capacity Analysis,
Intersection Analysis
Axle Load Spectrum Studies and analysis to arrive VDF
Estimation and analysis of hydrological data for Drainage Design
BBD Analysis for overlay design & Pavement Design using IIT Pave. Software
CURRICULUM VITAE
2. Page 2
ACADEMIC PROJECT DETAILS
“PRINCIPLES OF FLEXIBLE PAVEMENT DESIGN.”
Design of flexible pavement from traffic studies & the data acquired from other pavement related
surveys for Poonamalee – Walajapet Section of NH 4.
EMPLOYMENT RECORD
Total Years of Working Experience : 5 Years
From To Name of the Employer Position(s) held
Nov-15 Till Date K & J Projects Pvt. Ltd. Sr. Highway Design Engineer
Sep-12 Oct-15 Samarth Infraengg Technocrats Pvt. Ltd Highway Design Engineer
May-11 Aug-12
SATRA Infrastructure Management
Services Pvt. Ltd
Dy. & Asst. Highway Engineer
Responsibilities:
As a part of a team, to carry out the field surveys – All types of pavement and Material
related.
Internal coordination with survey teams, guiding them accordingly to the project
requirements as per discussions with line manager and inline making report of day to
day activities.
Pavement layers testing and analysis for over lay and rehabilitation works.
Providing backup alignment and PIA data for design and review projects including
alignment fixation.
Preparing Plan and Profile drawings for design projects using Mx – Roads software.
Preparing typical drawings for highway features.
Estimation and analysis of hydrological data.
Preparation of reports and other documentary work for submitting to the client.
Measuring Road Roughness using Z-250 & Bump Integrator (ROMDOS).
Involved in Topographical surveys.
Involved in BBD, Axle Load, Traffic Volume counts, Origin & Destination surveys and
Analysis.
Field data analysis of pavement layers investigations/surveys.
3. Page 3
DETAILS OF EXPERIANCE
List of Detailed Design Projects (DPR) on which I have worked:
Sl.No Name of the Project
Duration
Employer Client
From To
1
Consultancy Services for preparation of
Feasibility Study and Detailed Project Report
for 2 laning / 2 Lane with paved shoulder of
Champai – Seling section of NH-6 in Mizoram
under SARDP Phase-B on EPC mode
Length 150.000 km
Mar-16 Till date
K&J Projects
Pvt. Ltd
NHAI
2
Consultancy Serives Detaild Project Rerport
Survey Preparation land schedules for
widening to two/foru lane with paved shlulder
for 00/00 to 125/0 NH-563 Jaityal Karimangar
-Warangal Road ) Length 125.000 km
Jan-16 Till date
K&J Projects
Pvt. Ltd
NHAI
3
Consultancy services for Preparation of
Detailed project report for widening to
Two/Four lane with paved shoulder from km
0.000 to Km 74.000 of NH-365A on Kodad –
Khammam - Kurvi Road in the State of
Telangana on EPC Mode.
Length 80.570 km
Nov-15 Apr-16
K&J Projects
Pvt. Ltd
NHAI
Position: Sr Highway Design Engineer
Work Performed: Overall coordination of the project, liaising with the NHAI/MORTH, Bypass
identification and Geometric design of highways using MX-Roads. Alignment fixation, Detailed geometric
design (Plan and Profile), Preparation of Detailed Drawing Cross Sections and Quantities and Support to
BOQ team for estimation of road works and Major junction design using MX Road, Preparation of GFC
Drawings and As built drawings, Preliminary and Detail design reports and highway presentations
Alignment fixing on SOI map & Google Earth, Responsible for Conducting Road inventory and condition
survey, BBD Survey and monitoring of Topographical Survey teams and DGPS teams at site and review
and processed the data for design and coordinated all the activities with client by staying in the site.
4
Rehabilitation and Up gradation of NH-221
(New NH-30) from Km 71.200 to Km 121.000
(Andhra Pradesh/Telangana Border to
Rudrampur Section) in the State of Telangana
Two Lane with Paved Shoulder under NHDP-
IV Phase on EPC Basis Length 49.800 km
Dec-14 Aug-15
Samarth
Infraengg
Technocrats
Pvt. Ltd
Ragha
va
Constr
uctions
5
Detailed Engineering Design Consultancy
Services of "Improvement and Augmentation
of Thanjavur to Pudukottai section of NH-226
to 2-lane with paved shoulders from km
00.000 to km 55.228 (Existing Chainage from
Km 00.000 to Km 56.460) (Total Design
Length 55.228 km) under NHDP Phase IV on
EPC mode.Length 55.228 km
Sep-14 May-15
Samarth
Infraengg
Technocrats
Pvt. Ltd
SPL &
Gayatri
joint
venture
s
4. Page 4
Sl.No Name of the Project
Duration
Employer Client
From To
6
Widening from 2-lane to 4-lane of Raigiri-
Yadgirigutta road (km. 0/0 to km. 6/3)
Including construction of 2nd rob at km. 1/4-6
in Nalgondadistrict.Length 6.3 km
May
2015
JULY
2015
Samarth
Infraengg
Technocrats
Pvt. Ltd
Telang
ana
R&B
7
Construction of 2nd Ghat road to Sri
Laxminarsimha Swamy vari
Devasthanam,Yadagiri gutta (village &
mandal) in Nalgonda district km 0/0 to 1/062.
Length 1.062 km
June
2014
Aug-
2014
Samarth
Infraengg
Technocrats
Pvt. Ltd
Telang
ana
R&B
8
Construction of 2nd ghat road to Sri
Laxminarsimha swamy vari
Devasthanam,Yadagiri gutta (village &
mandal) in Nalgonda district sub work:
construction of link road /goshala road.
Length 1.477 km
June
2014
Aug-
2014
Samarth
Infraengg
Technocrats
Pvt. Ltd
Telang
ana
R&B
9
Four - Laning (Rigid pavement) divided with
cycle track Investigation,Surveying Design,
Preparation of Detailed Estimates and
execution of widening of Road from
Nandanavanam i.e., from Moghal ka nala to
Puranapul under Greater Hyderabad
Development Project – EPC System.
Length 3.47 km
Sept-
2013
Oct-
2013
Samarth
Infraengg
Technocrats
Pvt. Ltd
Ragha
va
Constr
uctions
10
Six laning divided with cycle track from
Botanical Gardens to Old Bombay road via
Masjeed Banda village under Greater
Hyderabad Development Project– EPC
System. Length 3.80 km
Sept-
2013
Oct-
2013
Samarth
Infraengg
Technocrats
Pvt. Ltd
Ragha
va
Constr
uctions
11
Rehabilitation and Upgradation of NH-163
from km 159/0 to km 165/350 & km 194/4 to
km 215/0 to Two lane with Paved Shoulders
in the State of Telangana under NHDP –IV
through an Engineering, Procurement &
Construction (EPC) Basis Contract.
Length 26.95 km
July
2014
Sep.
2014
Samarth
Infraengg
Technocrats
Pvt. Ltd
Telang
ana
R&B
5. Page 5
Sl.No Name of the Project
Duration
Employer Client
From To
Position: Highway Design Engineer
Work Performed: Overall coordination of the project, Geometric design of highways using MX-Roads.
Alignment fixation, Detailed geometric design (Plan and Profile), Preparation of Detailed Drawing Cross
Sections and Quantities and Major junction design using MX Road, Preparation of GFC Drawings and As
built drawings, Preliminary and Detail design reports and highway presentations and Drainage design.
Preparing schedules for traffic signs, Road furniture, Responsible for Conducting Road inventory and
condition survey, BBD Survey and monitoring of Topographical Survey teams and DGPS teams at site
and review and processed the data for design and coordinated all the activities with client by staying in
the site execution time.
List of Prebid Projects on which I have worked:
Sl.
No
Name of the Project
Duration
Employer Client
From To
12
Technical Feasibility and Value Engineering
services for the improvement/augmentation of four
laning of Km 5.000 to Km 79.340 (existing
chainage) and two laning with paved shoulders
from Km 79.340 to Km 118.795 of Madurai –
Ramnathpuram Section of NH49
Aug-14
Dec-
14
Samarth
Infraengg
Technocr
ats Pvt.
Ltd
L&T ECC
Length 113.795 km
13
Preparation of Feasibility Report forfour
laning of Warangal to Karimnagar Section of SH-
7 from Km:63.20 to Km:125.00 and Karimnagar to
Jagitial Section of SH-
10 from Km:4.60 to Km:48.40 in
the State of Telangana.Length 105.600 km
Jul-14
Aug-
14
Samarth
Infraengg
Technocr
ats Pvt.
Ltd
R & B
Telangana
14
Widening & Strengthening of Phalodi – Jaisalmer
Section of NH 15 to two/four lane with paved
Shoulder (km163.400 to km323.857) in the state of
Rajasthan on EPC mode.
Feb-14 Apr-14
Samarth
Infraengg
Technocr
ats Pvt.
Ltd
L & T ECC
Length 160.457 km
15
Consultancy Services for Technical Feasibility and
Value Engineering of “Four laning of Yedeshi –
Aurangabad section of nh-211 from km 100.000 to
km 290.200 in the state of Maharashtra to be
executed as BOT (Toll) on DBFOT pattern under
NHDP Phase – IVB”Length 190.200 km
Jan-14
Mar-
14
Samarth
Infraengg
Technocr
ats Pvt.
Ltd
L&T IDPL
16
“Widening of existing NH – 4B, NH 348 (Previous
SH 54 & Amra Marg ) to Six/Eight lanes on the
boundaries of proposed Navi Mumbai international
Airport and JNPT on DBFOT Pattern.
Length 43.910 km
Aug-13 Oct-13
Samarth
Infraengg
Technocr
ats Pvt.
Ltd
Sadbhav
6. Page 6
Sl. No Name of the Project
Duration
Employer Client
From To
17
Technical Feasibility for “Rehabilitation of
State Highways and Major District Roads
- Package II (Northern Region) Total
length 150.50 Km (12 roads) in the state
of Kerala under DBMT on Annuity basis”.
Length 150.500 km
Jul-13 Aug-13
Samarth
Infraengg
Technocrats
Pvt. Ltd
L&T IDPL
18
Four laning with paved shoulders of
Sambalpur - Rourkela Section of SH - 10
from Km. 4.900 to Km. 167.900 in the
state of Odisa to be executed as BOT
(Toll) project on DBFOT Pattern
Feb-13 Apr-13
Samarth
Infraengg
Technocrats
Pvt. Ltd
sL&T IDPL
Length 163.000 km
19
Consultancy Services for Evaluating the
Pavement Strength using Benkelman
Beam Deflection Test for Routine
Maintenance of 4-Lane Road Project
from Km: 278+000 (Kadthal) to Km:
308+000 (Armur) of Nagpur – Hyderabad
Section of NH-7 in the state of Andra
Pradesh Length 30.000 km
Nov-12 Dec-12
Samarth
Infraengg
Technocrats
Pvt. Ltd
Nirmal BOT
Limited &
HCC
Infrastructure
Company
20
Technical Feasibility and Value
Engineering Services for Two Laning
with paved shoulders of Bijapur-
Gulbarga-Homnabad Section of NH 218
from km 195.000 to km 418.000 in the
State of Karnataka under NHDP Phase-
IV on BOT basis of DBFOT pattern.
Length 223.000 km
Oct-12 Nov-12
Samarth
Infraengg
Technocrats
Pvt. Ltd
Sadbhav
21
Consultancy Services for Technical
Feasibility and Value Engineering
Services for tendering WAP-3: Shimoga-
Hangal & Shikaripur-Anandapur Section
in Karnataka.Length 153.665 km
Aug-12 Sep-12
SATRA
Infrastructure
Management
Services Pvt.
Ltd
COASTAL
22
Design, Engineering, Finance,
Construction, Operation and
Maintenance of 6-laning of existing 4-
lane/2-lane NH from km 0.000 to km
555.480 (Appr. 555.500 km) on the
Kishangarh-Udaipur- Ahmadabad
section including new Udaipur Bypass,
which comprises segments of NH No.
NH-79A, NH-79, NH-76 and NH-8 in the
states of Rajasthan and Gujarat-
Pavement Design Engineering
Consultancy (from KM 0 to Km
185)Length 185.000 km
Feb-12 Jul-12
SATRA
Infrastructure
Management
Services Pvt.
Ltd
M/s GMR
Infrastructure
Limited EPC
Division.,
7. Page 7
Sl. No Name of the Project
Duration
Employer Client
From To
23
Consultancy Services for Technical
Feasibility for "Four laning of Gwalior
Shivpuri Section of NH-3 (from
km.15.600 of NH-75 to km 236.000 of
NH-3) in the State of Madhya Pradesh
to be executed as BOT (Toll) project on
DBFOT pattern under NHDP Phase IV
Project".Length 220.400 km
Jul-11 Aug-11
SATRA
Infrastructure
Management
Services Pvt.
Ltd
GVK Power &
Infrastructure
24
Consultancy Services for Technical
Feasibility for "Four laning of Shivpuri
Dewas Section of NH-3 (from
km.236.000 to km 566.450) in the State
of Madhya Pradesh to be executed as
BOT (Toll) project on DBFOT pattern
under NHDP Phase IV Project".
Length 330.000 km
Jul-11 Sep-11
SATRA
Infrastructure
Management
Services Pvt.
Ltd
GVK Power &
Infrastructure
25
Consultancy Services for Review of
Detailed Project Reports of works
proposed under Upgradation
component of A.P. Road Sector
Project. Length 143.000 km
May-11 July
SATRA
Infrastructure
Management
Services Pvt.
Ltd
AP -
Government
Work Performed:
Organizing Traffic Surveys, Axle load surveys and Analysis, Evaluation of existing pavement
characteristics by conducting BBD studies, Roughness studies, and subgrade soil studies. Identification
of the borrow areas for soils, aggregates and suitability for road construction through various laboratory
studies. Pavement condition surveys. Preparation of Traffic Report and pavement design reports.
Assisting the Senior Engineer in preparing the Detailed Project Report.
SOFTWARE PROFICIENCY:
Desktop applications : MS Office.
Drafting Software : Auto Cad.
Highway Design : MX Road Suit V8i & Civil 3D & Soft desk.
Surveying : Total Station – Leica and Sokkia.
Pavement Analysis Software : IIT-Pave
8. Page 8
HOBBIES &STRENGTHS:
Playing Cricket and Chess.
Reading books and Listening to music.
Hard work, Sincerity and Punctuality.
Commitment to work and quick learner.
Ability to lead team efficiently.
PERSONAL DETAILS
Name : Naresh Cherukuri
Date of Birth : 3rd April 1990
Email : nareshchowdary20@gmail.com
Permanent Address : 10-44,2 Ward, Sivapuram
Krishna District, AP
India. PIN - 521190.
Languages Known : Telugu, Hindi, and English.
Nationality : Indian
Gender : Male
Marital Status : Single.
Declaration:
The above information is true to the best of my knowledge and belief.
Place:
Date: (CH.NARESH)