SlideShare a Scribd company logo
1 of 15
Quality Control Charts
Rob De Hayr
Section 5.9.2
quality control data analysed and when found
to be outside of predefined criteria, planned
action shall be taken to correct the problem
and prevent incorrect results from being
reported
ISO/IEC 17025 Requirements
Quality Control Charts
Mean and Range (x̅ and R chart)
• Monitor results for Internal Quality Control
Sample
• Criteria used to check that a method is “in
control”
• Target value (mean), upper and lower limits
• In run variation with limits
• The control chart can also show trends in results
caused by biases not large enough to put the
result out of range.
Quality Control Charts
Mean Chart
Date/Batch
Date/Batch
RangeofDuplicates
Quality Control Charts
Range Chart
Quality Control Charts
Mean and Range (x̅ and R chart)
• Initial limits are calculated using a minimum of 10
points.
• Recalculated using 20 points
• Final calculation using over ≥ 40 data points.
Systemic statistical control is required for reliable
estimates of chart limits
• indicated by the scatter of points on the control chart,
• analysis of secondary and/or certified reference materials to
confirm accuracy
Criteria for rejecting data
• Outside upper or lower warning limit: Data require
careful inspection but may be acceptable – see lab
manager
• Outside upper or lower control limit: Data are rejected
and run repeated
• Two successive results beyond the same warning limit:
Data are rejected and reason for bias is investigated
• 6 -10 successive results on the same side of the mean:
Data are rejected and reason for bias is investigated.
• Five or more points moving in the same direction
Criteria for rejecting data
If any of the rejection rules are violated the following
actions should be taken:
• Repeat the analysis, if the next point is satisfactory, continue the
analysis. If not, then
• Investigate the cause of the exceeding.
• Do not use the results of the batch, run, day or period
concerned until the cause is trailed. Only use the results if
rectification is justified (e.g. when a calculation error was made).
• If no rectification is possible, after elimination of the source of
the error, repeat the analysis of the batch(es) concerned. If this
next point is satisfactory, the analysis can be continued.
Examples of charts
Criteria for rejecting data
Trend
A trend indicates a gradual loss of reliability in the test system.
Trends are usually subtle.
Causes of trending may include:
• Gradual deterioration of calibration standards or reagents
• Deterioration of the instrument light source or light filter
• Gradual accumulation of debris in sample/reagent tubing or
electrodes
• Gradual deterioration of control materials
Criteria for rejecting data
Shift
Abrupt changes in the control mean are defined as shifts.
Shifts may be caused by:
• Inaccurate calibration/recalibration
• Sudden failure or change in the light source
• Error in standard preparation
• Change in reagent formulation or reagent lot (quality)
• Major instrument maintenance
• Change in room temperature or humidity
• Failure in the sampling system
• Failure in reagent dispense system
• Change of control materials
QC Scoring
at Chemistry Centre Laboratories, Qld, Australia
• If QC score for batch (run) is 3 or more, then
analyst/instrument operator consults with
authorised signatory re:
• Authorise batch ?
• Take remedial action ?
QC Failure Demerit Points Notes if total score exceeds 2
Single Blank > 2 X PQL 1 -
Two Blanks > 2 X PQL 3 Results may be used if blank
subtraction is a possibility.
Senior Officer to advise. QC
investigation is mandatory.
Duplicate > 1.0 X Uncertainty 1 May be accepted if only one
out of multiple duplicates fail
within a batch
Matrix Spike Recovery > ±
20% for ultra trace analytes
1 May be accepted if only one
out of multiple duplicates fail
within a batch
Matrix Spike Recovery > ±
10% for non ultra trace
analytes
1 May be accepted if only one
out of multiple duplicates fail
within a batch
Any individual QC sample >
action limit
2 Senior officer to advise
Two QC samples within the
same batch > Action limit
4 Senior officer to advise
3 consecutive QC samples
outside warning limits
3 Senior officer to advise
Thanks for your attention
https://asq.org/quality-resources/control-chart
Further Reading and resources
http://www.fao.org/3/w7295e/w7295e0a.htm#8.3.2%20co
ntrol%20chart%20of%20the%20mean%20(mean%20chart)

More Related Content

What's hot

Quality assignment(1)
Quality assignment(1)Quality assignment(1)
Quality assignment(1)
Reham Mokhtar
 
Internal Quality Control Lecture MD General 2014 Course, Clin Path Ain Shams ...
Internal Quality Control Lecture MD General 2014 Course, Clin Path Ain Shams ...Internal Quality Control Lecture MD General 2014 Course, Clin Path Ain Shams ...
Internal Quality Control Lecture MD General 2014 Course, Clin Path Ain Shams ...
Adel Elazab Elged
 

What's hot (20)

Haemoglobin quality control by maintaining levey jennings chart
Haemoglobin quality control by maintaining levey jennings chartHaemoglobin quality control by maintaining levey jennings chart
Haemoglobin quality control by maintaining levey jennings chart
 
Countries’ presentation on internal quality control: Sri Lanka
Countries’ presentation on internal quality control: Sri LankaCountries’ presentation on internal quality control: Sri Lanka
Countries’ presentation on internal quality control: Sri Lanka
 
Control of analytical quality using stable control materials postgrad
Control of analytical quality using stable control materials postgradControl of analytical quality using stable control materials postgrad
Control of analytical quality using stable control materials postgrad
 
Laboratory Internal Quality Control presentation master revision, 2014
Laboratory Internal Quality Control presentation master revision, 2014Laboratory Internal Quality Control presentation master revision, 2014
Laboratory Internal Quality Control presentation master revision, 2014
 
4th SEALNET meeting, item 8: Training on internal quality control - Preparing...
4th SEALNET meeting, item 8: Training on internal quality control - Preparing...4th SEALNET meeting, item 8: Training on internal quality control - Preparing...
4th SEALNET meeting, item 8: Training on internal quality control - Preparing...
 
Qaqc Course Total
Qaqc Course TotalQaqc Course Total
Qaqc Course Total
 
Troubleshooting iqc eqas 19.07.2018
Troubleshooting iqc eqas 19.07.2018Troubleshooting iqc eqas 19.07.2018
Troubleshooting iqc eqas 19.07.2018
 
WESTGARD RULES
WESTGARD RULESWESTGARD RULES
WESTGARD RULES
 
4th SEALNET meeting, item 8: Training on internal quality control - Overview ...
4th SEALNET meeting, item 8: Training on internal quality control - Overview ...4th SEALNET meeting, item 8: Training on internal quality control - Overview ...
4th SEALNET meeting, item 8: Training on internal quality control - Overview ...
 
Quality Control
Quality ControlQuality Control
Quality Control
 
Quality assignment(1)
Quality assignment(1)Quality assignment(1)
Quality assignment(1)
 
4th SEALNET meeting, item 6 - Case study: Pacific Soil Laboratory Network (AS...
4th SEALNET meeting, item 6 - Case study: Pacific Soil Laboratory Network (AS...4th SEALNET meeting, item 6 - Case study: Pacific Soil Laboratory Network (AS...
4th SEALNET meeting, item 6 - Case study: Pacific Soil Laboratory Network (AS...
 
Quality Control In Clinical Laboratory
Quality Control In Clinical LaboratoryQuality Control In Clinical Laboratory
Quality Control In Clinical Laboratory
 
Troubleshooting IQC / EQAS
Troubleshooting IQC / EQASTroubleshooting IQC / EQAS
Troubleshooting IQC / EQAS
 
Quality control lecture CPath master 2014 Ain Shams
Quality control lecture CPath master 2014 Ain ShamsQuality control lecture CPath master 2014 Ain Shams
Quality control lecture CPath master 2014 Ain Shams
 
Troubleshooting QC Problems: Your QC has failed, what do you do next?
Troubleshooting QC Problems: Your QC has failed, what do you do next?Troubleshooting QC Problems: Your QC has failed, what do you do next?
Troubleshooting QC Problems: Your QC has failed, what do you do next?
 
Quality Assurance of Laboratory Test Results based on ISO/IEC 17025
Quality Assurance of Laboratory Test Results based on ISO/IEC 17025Quality Assurance of Laboratory Test Results based on ISO/IEC 17025
Quality Assurance of Laboratory Test Results based on ISO/IEC 17025
 
Lean concepts and quality indicators final
Lean concepts and quality indicators finalLean concepts and quality indicators final
Lean concepts and quality indicators final
 
Internal Quality Control Lecture MD General 2014 Course, Clin Path Ain Shams ...
Internal Quality Control Lecture MD General 2014 Course, Clin Path Ain Shams ...Internal Quality Control Lecture MD General 2014 Course, Clin Path Ain Shams ...
Internal Quality Control Lecture MD General 2014 Course, Clin Path Ain Shams ...
 
Method validation
Method validationMethod validation
Method validation
 

Similar to 1st NENALAB Meeting_Item 32: How to interpret the results of an internal QC: QC charts and development of estimates by Rob De Hayr, GLOSOLAN Vice-Chair

Similar to 1st NENALAB Meeting_Item 32: How to interpret the results of an internal QC: QC charts and development of estimates by Rob De Hayr, GLOSOLAN Vice-Chair (20)

Item 3. Internal quality control - Quality Control Charts
Item 3. Internal quality control - Quality Control ChartsItem 3. Internal quality control - Quality Control Charts
Item 3. Internal quality control - Quality Control Charts
 
Hematology Chemistry Coagulation
Hematology Chemistry CoagulationHematology Chemistry Coagulation
Hematology Chemistry Coagulation
 
(IQC) - Internal Quality Control.pptx
(IQC) - Internal Quality Control.pptx(IQC) - Internal Quality Control.pptx
(IQC) - Internal Quality Control.pptx
 
Share_Total_Quality_Management.pptx
Share_Total_Quality_Management.pptxShare_Total_Quality_Management.pptx
Share_Total_Quality_Management.pptx
 
Asia Pesticide Residue Mitigation through the Promotion of Biopesticides and ...
Asia Pesticide Residue Mitigation through the Promotion of Biopesticides and ...Asia Pesticide Residue Mitigation through the Promotion of Biopesticides and ...
Asia Pesticide Residue Mitigation through the Promotion of Biopesticides and ...
 
Quality control
Quality controlQuality control
Quality control
 
Clinical lab qc sethu
Clinical lab qc sethuClinical lab qc sethu
Clinical lab qc sethu
 
Quality Control for Quantitative Tests by Prof Aamir Ijaz (Pakistan)
Quality Control for Quantitative Tests by Prof Aamir Ijaz (Pakistan)Quality Control for Quantitative Tests by Prof Aamir Ijaz (Pakistan)
Quality Control for Quantitative Tests by Prof Aamir Ijaz (Pakistan)
 
QC Multi rules - Improving Laboratory Performance Through Quality Control
QC Multi rules - Improving Laboratory Performance Through Quality ControlQC Multi rules - Improving Laboratory Performance Through Quality Control
QC Multi rules - Improving Laboratory Performance Through Quality Control
 
quality control in clinical laboratory
quality control in clinical laboratory quality control in clinical laboratory
quality control in clinical laboratory
 
Quality Control in Clinical Chemistry
Quality Control in Clinical ChemistryQuality Control in Clinical Chemistry
Quality Control in Clinical Chemistry
 
QA-QC-PSK.pdf
QA-QC-PSK.pdfQA-QC-PSK.pdf
QA-QC-PSK.pdf
 
Laboratory Quality Control .ppt
Laboratory Quality Control .pptLaboratory Quality Control .ppt
Laboratory Quality Control .ppt
 
Quality Assurance and Quality Control
Quality Assurance and Quality ControlQuality Assurance and Quality Control
Quality Assurance and Quality Control
 
Quality assurance and quality control
Quality assurance and quality controlQuality assurance and quality control
Quality assurance and quality control
 
Chapter 12
Chapter 12Chapter 12
Chapter 12
 
Quality control.pptx
Quality control.pptxQuality control.pptx
Quality control.pptx
 
Quality management system BY M .REJA
Quality management system BY M .REJAQuality management system BY M .REJA
Quality management system BY M .REJA
 
100018718.ppt
100018718.ppt100018718.ppt
100018718.ppt
 
Quality Control in Pathological Laboratory
Quality Control in Pathological LaboratoryQuality Control in Pathological Laboratory
Quality Control in Pathological Laboratory
 

More from Soils FAO-GSP

More from Soils FAO-GSP (20)

Global Soil Partnership efforts to promote soil governance from the global to...
Global Soil Partnership efforts to promote soil governance from the global to...Global Soil Partnership efforts to promote soil governance from the global to...
Global Soil Partnership efforts to promote soil governance from the global to...
 
Global Soil Partnership efforts to promote soil governance from the global to...
Global Soil Partnership efforts to promote soil governance from the global to...Global Soil Partnership efforts to promote soil governance from the global to...
Global Soil Partnership efforts to promote soil governance from the global to...
 
The importance of Soil Awareness for developing Soil Protection Law
The importance of Soil Awareness for developing Soil Protection LawThe importance of Soil Awareness for developing Soil Protection Law
The importance of Soil Awareness for developing Soil Protection Law
 
Good Governance for sustainable soil management: How to do it?
Good Governance for sustainable soil management: How to do it? Good Governance for sustainable soil management: How to do it?
Good Governance for sustainable soil management: How to do it?
 
The status of salt-affected soils in Eurasia with a focus on Uzbekistan
The status of salt-affected soils in Eurasia with a focus on UzbekistanThe status of salt-affected soils in Eurasia with a focus on Uzbekistan
The status of salt-affected soils in Eurasia with a focus on Uzbekistan
 
The status of salt-affected soils in NENA with a focus on Iraq
The status of salt-affected soils in NENA with a focus on IraqThe status of salt-affected soils in NENA with a focus on Iraq
The status of salt-affected soils in NENA with a focus on Iraq
 
Introduction to the International Network of Salt-Affected Soils and update o...
Introduction to the International Network of Salt-Affected Soils and update o...Introduction to the International Network of Salt-Affected Soils and update o...
Introduction to the International Network of Salt-Affected Soils and update o...
 
The role and importance of INSAS for natural resource management
The role and importance of INSAS for natural resource managementThe role and importance of INSAS for natural resource management
The role and importance of INSAS for natural resource management
 
The status of salt-affected soils in Africa with a focus on Djibouti
The status of salt-affected soils in Africa with a focus on DjiboutiThe status of salt-affected soils in Africa with a focus on Djibouti
The status of salt-affected soils in Africa with a focus on Djibouti
 
The status of salt-affected soils and spatial modelling of the soil salinity ...
The status of salt-affected soils and spatial modelling of the soil salinity ...The status of salt-affected soils and spatial modelling of the soil salinity ...
The status of salt-affected soils and spatial modelling of the soil salinity ...
 
Avances de LATSOLAN. Rol de laboratorios de referencia y laboratorios inscrit...
Avances de LATSOLAN. Rol de laboratorios de referencia y laboratorios inscrit...Avances de LATSOLAN. Rol de laboratorios de referencia y laboratorios inscrit...
Avances de LATSOLAN. Rol de laboratorios de referencia y laboratorios inscrit...
 
Presentación del piloto de implementación del programa RECSOIL en Costa Rica ...
Presentación del piloto de implementación del programa RECSOIL en Costa Rica ...Presentación del piloto de implementación del programa RECSOIL en Costa Rica ...
Presentación del piloto de implementación del programa RECSOIL en Costa Rica ...
 
Implementación del Código Internacional de conducta para el Uso y Manejo Sost...
Implementación del Código Internacional de conducta para el Uso y Manejo Sost...Implementación del Código Internacional de conducta para el Uso y Manejo Sost...
Implementación del Código Internacional de conducta para el Uso y Manejo Sost...
 
Implementación del Programa de Doctores de los Suelos - Laura Bertha Reyes
Implementación del Programa de Doctores de los Suelos - Laura Bertha ReyesImplementación del Programa de Doctores de los Suelos - Laura Bertha Reyes
Implementación del Programa de Doctores de los Suelos - Laura Bertha Reyes
 
Propuestas, para el trabajo conjunto alrededor del tema de RECSOIL y del TCP ...
Propuestas, para el trabajo conjunto alrededor del tema de RECSOIL y del TCP ...Propuestas, para el trabajo conjunto alrededor del tema de RECSOIL y del TCP ...
Propuestas, para el trabajo conjunto alrededor del tema de RECSOIL y del TCP ...
 
Ejemplo de formulación de un proyecto sobre re carbonización de suelos, para ...
Ejemplo de formulación de un proyecto sobre re carbonización de suelos, para ...Ejemplo de formulación de un proyecto sobre re carbonización de suelos, para ...
Ejemplo de formulación de un proyecto sobre re carbonización de suelos, para ...
 
ASLAC: Pilar 1
ASLAC: Pilar 1ASLAC: Pilar 1
ASLAC: Pilar 1
 
Placa
PlacaPlaca
Placa
 
El compromiso de la fao
El compromiso de la faoEl compromiso de la fao
El compromiso de la fao
 
Pilar 4
Pilar 4Pilar 4
Pilar 4
 

Recently uploaded

Recently uploaded (20)

OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17
 
Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Observing-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptxObserving-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.ppt
 
Michaelis Menten Equation and Estimation Of Vmax and Tmax.pptx
Michaelis Menten Equation and Estimation Of Vmax and Tmax.pptxMichaelis Menten Equation and Estimation Of Vmax and Tmax.pptx
Michaelis Menten Equation and Estimation Of Vmax and Tmax.pptx
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx
 
Simple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfSimple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdf
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
What is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptxWhat is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptx
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
 
Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
UGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdf
UGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdfUGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdf
UGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdf
 

1st NENALAB Meeting_Item 32: How to interpret the results of an internal QC: QC charts and development of estimates by Rob De Hayr, GLOSOLAN Vice-Chair

  • 2. Section 5.9.2 quality control data analysed and when found to be outside of predefined criteria, planned action shall be taken to correct the problem and prevent incorrect results from being reported ISO/IEC 17025 Requirements
  • 3. Quality Control Charts Mean and Range (x̅ and R chart) • Monitor results for Internal Quality Control Sample • Criteria used to check that a method is “in control” • Target value (mean), upper and lower limits • In run variation with limits • The control chart can also show trends in results caused by biases not large enough to put the result out of range.
  • 4. Quality Control Charts Mean Chart Date/Batch
  • 6. Quality Control Charts Mean and Range (x̅ and R chart) • Initial limits are calculated using a minimum of 10 points. • Recalculated using 20 points • Final calculation using over ≥ 40 data points. Systemic statistical control is required for reliable estimates of chart limits • indicated by the scatter of points on the control chart, • analysis of secondary and/or certified reference materials to confirm accuracy
  • 7. Criteria for rejecting data • Outside upper or lower warning limit: Data require careful inspection but may be acceptable – see lab manager • Outside upper or lower control limit: Data are rejected and run repeated • Two successive results beyond the same warning limit: Data are rejected and reason for bias is investigated • 6 -10 successive results on the same side of the mean: Data are rejected and reason for bias is investigated. • Five or more points moving in the same direction
  • 8. Criteria for rejecting data If any of the rejection rules are violated the following actions should be taken: • Repeat the analysis, if the next point is satisfactory, continue the analysis. If not, then • Investigate the cause of the exceeding. • Do not use the results of the batch, run, day or period concerned until the cause is trailed. Only use the results if rectification is justified (e.g. when a calculation error was made). • If no rectification is possible, after elimination of the source of the error, repeat the analysis of the batch(es) concerned. If this next point is satisfactory, the analysis can be continued.
  • 10. Criteria for rejecting data Trend A trend indicates a gradual loss of reliability in the test system. Trends are usually subtle. Causes of trending may include: • Gradual deterioration of calibration standards or reagents • Deterioration of the instrument light source or light filter • Gradual accumulation of debris in sample/reagent tubing or electrodes • Gradual deterioration of control materials
  • 11. Criteria for rejecting data Shift Abrupt changes in the control mean are defined as shifts. Shifts may be caused by: • Inaccurate calibration/recalibration • Sudden failure or change in the light source • Error in standard preparation • Change in reagent formulation or reagent lot (quality) • Major instrument maintenance • Change in room temperature or humidity • Failure in the sampling system • Failure in reagent dispense system • Change of control materials
  • 12.
  • 13. QC Scoring at Chemistry Centre Laboratories, Qld, Australia • If QC score for batch (run) is 3 or more, then analyst/instrument operator consults with authorised signatory re: • Authorise batch ? • Take remedial action ?
  • 14. QC Failure Demerit Points Notes if total score exceeds 2 Single Blank > 2 X PQL 1 - Two Blanks > 2 X PQL 3 Results may be used if blank subtraction is a possibility. Senior Officer to advise. QC investigation is mandatory. Duplicate > 1.0 X Uncertainty 1 May be accepted if only one out of multiple duplicates fail within a batch Matrix Spike Recovery > ± 20% for ultra trace analytes 1 May be accepted if only one out of multiple duplicates fail within a batch Matrix Spike Recovery > ± 10% for non ultra trace analytes 1 May be accepted if only one out of multiple duplicates fail within a batch Any individual QC sample > action limit 2 Senior officer to advise Two QC samples within the same batch > Action limit 4 Senior officer to advise 3 consecutive QC samples outside warning limits 3 Senior officer to advise
  • 15. Thanks for your attention https://asq.org/quality-resources/control-chart Further Reading and resources http://www.fao.org/3/w7295e/w7295e0a.htm#8.3.2%20co ntrol%20chart%20of%20the%20mean%20(mean%20chart)

Editor's Notes

  1. 3
  2. 6
  3. 7
  4. 8
  5. 10
  6. 11