(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
Â
Resume
1. RAJENDRASINH BARAD
Mobile: + 91-9879318038
E-Mail: rbarad7787@gmail.com
MECHANICAL ENGINEER With over 8 years of Experience in field of Mechanical maintenance, Aiming for challenging
opportunities in the areas of Maintenance and Project Execution with a reputed organisation.
PROFILE SUMMARY
A result-oriented professional with over 8 years of rich experience in:
Mechanical Maintenance Project Execution Static and Rotary Equipment
Spare-Parts Management Liaison / Coordination Documentation /Reporting
Cost/Energy Savings Team Management Project Planning
Presently I am associated With Reliance Industries Ltd as Manager Mechanical Maintenance at Jamnagar, Gujarat. I was
efficiently involved in pre-commissioning and commissioning activity of different equipment of petroleum coke gasification
(PCG) project. Preparing equipment maintenance plan and check list. Maintaining spares of equipment and take necessary
procurement action as per adequacy study/consumption. Solely responsible for creating/ review for all rotary and static
equipment BOM and maintaining same in the SAP.
Previously I was associated with Torrent Power Ltd. as Executive Mechanical Maintenance at Dahej, Gujarat. I was responsible
for managing maintenance activities for reducing breakdown / downtime & enhancing operational effectiveness of equipment.
Familiar with all aspects related to Mechanical maintenance of Power Plants equipments. Also having hand on experience of
various Natural Gas piping equipments, Chemical and pre treatment plant equipments.
Previously I was associated with Adani Power Ltd. as Assistant Manager Mechanical Maintenance at Mundra, Gujarat. was
responsible for managing maintenance for reducing breakdown /downtime & enhancing operational effectiveness of
equipment. I have effectively executed various operations pertaining to 660 MW supercritical unit, 330 MW unit and
mechanical maintenance of 2115 TPH HARBIN & 1020 TPH Babcock-Wilcox make Boilers.
Well versed with the working of SAP for Plant Maintenance (PM) and Material Management (MM) module. Abilities in
preparing system based documentation & analysis of different maintenance data to reduce maintenance cost. I am an effective
communicator with strong analytical, decision making & problem solving abilities.
AREAS OF EXPERTISE
Maintenance Management
īˇ Planning& implementing the preventive & predictivemaintenance schedules for improvingthe overall reliability and safety
of plant equipment& machinery
īˇ Reviewing history records of key machines for repeated breakdowns; analysing and carrying out necessary corrective
actions; involved in shutdown maintenance work & overhauling of equipment
Inspection /Material Management
īˇ Handling testing &inspection of numerous plant equipment to ensure completion of projects within stipulated time/ cost
parameters; organising activities for continual improvement & working towards cost reduction
īˇ Ensuringformulation of plans for spare-parts availability, inventory control and preparing Material Master for spare-parts
management
Resource Management
īˇ Leading a team of workmen, allocating task amongst them and providing guidance to them in maintenance work;
imparting training to the subordinate staff for increasing their effectiveness at different stages of work
īˇ Creating and sustaining a dynamic environment that fosters development opportunities and motivates high performance
amongst team members
WORK EXPERIENCE
Since Janâ17 Reliance Industries Ltd., Jamnagar, Gujarat as Manager (Mechanical Maintenance)
Growth Path
Key Result Areas
īˇ Develop, plan and implement maintenance programs like, Preventive Maintenance and Corrective Maintenance of various
equipments of J3 Gasification Sulphur Recovery Unit (SRU).
2. īˇ To carry outinspection of the plantpipingfor mechanical clearance. Rising punch points for any defects any deviation from
the drawing.
īˇ Observe, follow and implement relevant legislation and Project policies, plans and procedures to ensure safe pre-
commissioning, commissioning and start-up.
īˇ Coordinate and direct maintenance staff and contractors to ensure safe and efficient execution of maintenance activities
carried out on fixed plant throughout surface operations.
īˇ Preparing and maintaining of Equipment BOM in SAP.
īˇ Ensure timely resolution of safety issues, providing communication and consultation of safety related matters with work
teams.
īˇ Plan and coordinate in advance the resources and equipment for the Project to conduct the work in a safe, timely and cost
effective manner.
īˇ Prepare purchaserequisitionsfor spareparts and consumables ensuringbudgetary constraints and arrangestrategic spares
availability to cope up with the maintenance requirements.
īˇ Preparing equipment list and documentation work for each equipment check out spares and document supplied by the
vendors and raise the necessary action before taking handover from project group.
Highlights
īˇ Successfully completed RIL J3 DTA Gasification complex Sulphur Recovery Unit (SRU)âs all equipment Bill of Material
updating in SAP against given Equipment Tag number for creating PR and Inventory Modelling.
īˇ Successfully completed RIL J3 DTA Gasification complex Sulphur Recovery Unit (SRU)âs all Items Inventory Modelling
based on criticality of equipment and parts, all items Max level, re order level, re order Quantity and Safety Stock
Value Updated with proper Justification.
WORK EXPERIENCE
From Novâ15 to Janâ17; Torrent Power Ltd., Dahej, Gujarat as Executive Mechanical Maintenance
Growth Path
Key Result Areas
īˇ Plan and implement maintenance programs likePreventive Maintenanceand Corrective Maintenanceof various mechanical
equipments in combine cycle power plant and ensure the healthiness and availability of same.
īˇ Work to achieve minimum breakdown time and equipment availability for critical equipment.
īˇ Root cause analysis for chronic faults and Predictive maintenance techniques for equipment and implement the culture of
same.
īˇ Organising and managing manpower and the delivery of materials, plant and equipment.
īˇ Equipment Handled like, BFW pump, CEP Vacuum Pump, HRSG, Different type of valve, centrifugal Compressors etc.
īˇ Prepare purchase requisitions for spare parts and consumables ensuring budgetary constraints.
īˇ Ensuring external maintenance service providerâs quality and compliance to all implemented standards of QEHS.
īˇ Prepare technical specification for purchase of new spare part and maintenance services.
īˇ Maintaining, updating & improving Quality Management Systems (ISO-9001:2000), Environmental Management System
(ISO-14001), Energy Management System 50001:2009 & OHSAS 18001
īˇ Implement, monitor and report IMS objectives, Targets and programme.
īˇ Prepare Method statements and risk analysisof non routine work, hazardous work like hot work, confined space and height
work.
Projects:
īˇ Project Title: 87 MW Solar Power Project (GENSU), Kamrej, Surat, India
o Review Design of Solar Module Mounting Structure and Inspection Of Solar Module Mounting Structure material
and checked quality of material.
o Installation of Mounting Structure Tableâs different part like Rafter, front and rear bracings, gusset plate, L-plate,
purlin.
o Installation of Module plate after Final checking Of Alignment.
o Installation and commissioning of total 14 KM length HDPE Piping system for Cleaning of total more than 5000
Solar Table, system Includes, Pumps Valves, network of piping for all table at site.
īˇ Project Title: 12M3/HR Capacity WTP plant , Torrent Power Ltd, Dahej, India
o Successfully Completed Erection & Commissioning work of 12 M3/hr Capacity Water Treatment Plant for Employee
Township water consumption.
o Selection of plant size, equipment and process requirements.
3. o Successfully erected equipments like, flocculation chambers, Tube Settler unit, chemical treatment tank, Dual
media Filter, Activated Carbon filter
o Successfully erected various pumps like, raw water pumps, chemical pumps, and filter transfer pumps.
o Successfully completed necessary pipingâs of the plants with required necessary supports.
o Prepared all equipments work plans for their periodic maintenance as recommended by vendor.
WORK EXPERIENCE
From Augâ10 to Novâ15; Adani Power Ltd., Mundra, Gujarat as AssistantManager (Operations& Maintenance)
Growth Path
Key Result Areas
īˇ Develop, Plant and Implement Maintenance program for Boiler Maintenance of 4620 MW (4X330 MW & 5X660 MW)
Thermal Power Plant ensures the healthiness of Boiler for uninterrupted power supply to the nation.
īˇ Responsible for Maintenance Planning for Annual Overhauling Work, Daily Routine Work and Condition Monitoring Based
Maintenance of Sub Critical and Super Critical Boilers,and its auxiliaries, scheduling preventive & breakdown Maintenance
of Boilers its auxiliaries.
īˇ Analysing Boiler Tube leakage and appointing IBR Welder to fix the job in least possible time and Root Cause Analysis of
Boiler Tube Failure and Predictive Maintenance done by carrying out Baroscopic Inspection.
īˇ Ensure timely resolution of safety issues, providing communication and consultati on of safety related matters with work
teams.
īˇ Ensuringformulation of plans for spare-parts availability, inventory control and preparing Material Master for spare-parts
management.
īˇ Leading a team of workmen, allocating task amongst them and providing guidance to them in maintenance work; imparting
training to the subordinate staff for increasing their effectiveness at different stages of work.
īˇ Prepare purchaserequisitionsfor spareparts and consumables ensuringbudgetary constraints and arrangestrategic spares
availability to cope up with the maintenance requirements.
īˇ Reviewing history records of key machines for repeated breakdowns; analysing and carrying out necessary corrective
actions; involved in shutdown maintenance work & overhauling of equipment.
īˇ Root Cause Analysis of Boiler Tube Failure and Predictive Maintenance done by carrying out Baroscopic Inspection of
Superheater, reheater and Water wall Header.
Highlights
īˇ Served as a Boiler Maintenance Engineer to reduce breakdown and defects by preventive and proactive maintenance
activity to maximize Boiler availability
īˇ Functioned as a DCS Engineer to operate plant as per SOPs and avoid any interruption
īˇ Deftly observed & monitored consumption of oil to reduce specific oil consumption
īˇ Successfully executed the job of supercritical boiler air pre heater heating element replacement.
EDUCATION
īˇ B.Tech (Mechanical Engineering)from Nirma University, Ahmedabad in 2010; secured 72.00 %
īˇ Diploma in Mechanical Engineering from N.G. Patel Polytechnic, Bardoli in 2006; secured 81.15 %
PERSONAL DETAILS
Date of Birth: 7th July 1987
Address: Patel Street, AT & PO - Antroli, Taluka- Palsana, Surat-394325, Gujarat, India
Languages Known: English, Gujarati & Hindi
LinkedIn Profile: Rajendra Barad
Please refer Annexure for Academic Accolades, IT Skills, Academic Projects, Industrial Visits and Trainings Attended
ANNEXURE
ACADEMIC ACCOLADES
īˇ Merit of securing First Rank at Institute Level in N.G. Patel Polytechnic, Bardoli
īˇ Distinction of being awarded with a Gold Medal from N.G. Patel Polytechnic, Bardoli
4. IT SKILLS
īˇ Well versed with:
o MS Office, AutoCAD, SAP â PM & MM Modules, Pro-E Wildfire 4.0& Internet Applications
TRAININGS ATTENDED
īˇ Attended Training on 660 MW Simulator at Adani Power Ltd., Mundra
o It involved Simulator Room training of supercritical unit of 660 MW, its start-up and shutdown, equipment line- up,
emergency handling and CCS mode operations
īˇ Completed 330 MW Simulator Training at Adani Power Ltd., Mundra
o It entailed Simulator Room training of 3300 MW, its start-up and shutdown, equipment line-up, and emergency
handling
īˇ Industrial Training of Steel Plant at Essar Steel Ltd., Hazira
o It was 2 months industrial training on Steel Making Process, Hot Rolling and Cold Rolling as academic credit while
studying in Nirma University.
ACADEMIC PROJECTS
Title: Design and Fabrication of Bending Machine
Institute: Nirma University, Ahmedabad
Scope: The project involved design and fabrication of a 3-roll Bending machine in Nirma University for future use and
application in workshop.
Title: Design and Fabrication of Gear Pump
Institute: N.G. Patel Polytechnic, Bardoli
Scope: The project entailed design and fabrication of Gear Pump in N. G. Patel Polytechnic and to set-up a model in
Fluid Mechanics Laboratory for studying and experimenting on Positive Displacement Pump.
INDUSTRIAL VISITS
īˇ Visited:
o Thermal Power Plant, Gas Based Power Plant & Casting Plant
o Manufacturing Unit of Bearing, Solar Plates, Pipes, Hydraulic Valves, Crane and CNC Machines