Ch. Srinivas
Mob : 8019176236
Email : srinivas356@gmail.com
OBJECTIVE
To work inan esteemedorganizationwithchallengingassignmentsanddedicate my knowledge and
skillstoachieve the organization’soverall goal aswell asemerge asanexpertinthe fieldof engineering
AREAS OF EXPOSURE
 ValidationActivities
 URS PreparationforPharmaceutical ProcessEquipments
 Responsible forConductingFAT/SAT
 Preparation andExecutionof QualificationProtocols(DQ,IQ,OQ) forProcess Equipments
 Responsible forReviewof ETOPdocuments(P&ID’S,Vendordesigndocuments)
 Responsible forConductingImpactAssessmentatSystemLevel andComponentLevel
 Responsible forPreparing RiskAssessment
 ReviewandPreparationof ValidationandRevalidationProtocols
 Preparationof JobSafetyandAnalysis
 Responsible forexecutionof validationactivitiesandreview of documentsincomplaintsto
cGMP
 QMS AND DOCUMENTATION
 Filingandfollow-upof IncidentsandDeviations
 Change Control ManagementandHandling
 ReviewandPreparationof SOPs
 Performinginvestigationstofindoutrootcause for any non-conformity
 RaisingCAPA itstracking& closure
 Implementationof QualityManagementSystem inthe deliveryof QualityProducts
 ERECTION AND COMMISSIONING
 ExperiencedinErection andcommissioningof all pharmaceutical processequipments
Reactors,Centrifuges,Driers, Filters
 GENERAL AND PREVENTIVE MAINTENANCE OF EQUIPMENTS
 Maintenance of all equipments in the plant and planning of equipments for preventive
maintenance and minimizingthe breakdownsbyeffectivecheckinpreventivemaintenance
 Maintaining the proper documentation of engineering files and plant qualification as per
cGMP requirement
 Managed the operations of CAPEX management and development of budgets for
maintenance andimprovements.
 Implementationof GoodEngineeringPracticesatthe work
 Implementingstatutory andregulatorycomplianceaspertimelines
 PREDECTIVE MAINTENANCEAND THERMOGRAPHY ACTIVITIES
 Predictive maintenance of all process equipments as per the schedule by using SPM A30
instrument.
 Performing thermograph activities for electrical panels by using thermal imager instrument
fluke TI32
 WORK EXPERIENCE (8 + YEARS)
 Dr. Reddy’sLaboratories Limited,Hyderabad
 CurrentlyWorkingasa Juniormanagerinengineeringservicesdepartment
 Durationof EmploymentFromApril 2013 to present
ProjectsHandled:
 Commissioningof dry vacuumpumpwithcapacityof 267 m3
/hr
 Erectionof 1.6 kl glasslinedreactormake de dietrich includingwithutilities
 Erectionof 1.2 kl ssreactors includingwithutilities
Key Skillsand Achievements
 Maintenance and trouble shooting of glass line reactors, SS Reactors, Centrifuges, SS tray
Driers, Vacuum tray driers, water ring vacuum pumps, Centrifuges, Pumps, Brine chiller
plant, Solid fluid boilers, Air compressor, DG set, Effluent Treatment Plant & Distillation
columns.
 DesigningMaintenanceStrategies, ProceduresandMethods
 Planning&PreparationPreventivemaintenance schedule of Equipments&Utilities.
 Diagnosingbreakdownproblems.
 Directing,Instructingandsupervisingmaintenance techniciansandfitters
 MaintainingDocumentsaspercGMP Requirement.
 SafetySystemImplementation.
 Preparationof DQ,IQ& OQ of equipments
 Preparationof daily,weekly&MonthlyMaintenance relatedreports
 Monitoring& Controllingmaintenance costs.
 Writingmaintenance strategiestohelpwithinstallation&commissioning guidelines.
 Analysisof rootcause of Breakdownsandrectification.
 Preparationof Standardoperatingproceduresof operationof all utilities.
 Ensure goodhousekeepingaspersite objectives
 To meetSHE targetsfor his/herarea.
 To coordinate andassist productionheadinimproving/addressing
complaints/troubleshootingthe processandabsorptionof new technologiesinorderto
improve the productoffering.
 NeulandLaboratories Limited,Hyderabad
 Workedas a Executive EngineerinEngineeringservices department
 Durationof EmploymentFromApril 2010 to April 2013
ProjectsHandled:
 Commissioningcentrifugalpumpswithcapacityof 5 m3
/hr
 Erectionof 630 Lts glasslinedreactormake NILE Ltd includingwithutilities
Key Skillsand Achievements
 Maintenance and trouble shooting of glass line reactors, SS Reactors, Centrifuges, SS tray
Driers,Vacuumtray driers,waterringvacuumpumps,Centrifuges,Pumps
 DesigningMaintenanceStrategies,ProceduresandMethods
 Planning&PreparationPreventivemaintenance schedule of Equipments
 Diagnosingbreakdownproblems.
 Directing,Instructingandsupervisingmaintenance techniciansand fitters
 MaintainingDocumentsaspercGMP Requirement.
 SafetySystemImplementation.
 Preparationof DQ,IQ& OQ of equipments
 Preparationof daily,weekly&MonthlyMaintenance relatedreports
 Monitoring& Controllingmaintenance costs.
 Writingmaintenance strategiestohelpwithinstallation&commissioningguidelines.
 Analysisof rootcause of Breakdownsandrectification.
 Preparationof Standardoperatingproceduresof operationof all utilities.
 Nutra specialitiesPvtLimited,Vinjamoor,SPSR Nellore Dist,A.P
 Workedas a EngineerinEngineeringservicesdepartment
 Durationof Employment From Sep2008 to Jan 2010
ProjectsHandled:
 Erectionof two no’sof 8kl steel linedreactorswithcondenserandutilityconnections.
 Erection of one 4kl & 8kl Mild Steel reactors with a connection of steam and condenser for
the evaporationof effluent.
 Erection of centrifugal blower with a capacity of 500 CFM for the ware house dispensing
room.
 Execution of Ware house extension building in a dimension of 18.75 met X 12.2 met X 6 met
heightwitharoofingof non asbestossheets.
 Erectionof 500 litcapacityRotary cone vacuum dryerwith the utilityconnections.
 Erectionof pressfilterswithutilityconnections.
 Erection of 5kl SS reactor with 25 sq met condensers and 4 sq met as sub cooler with vent
condenserandutilityconnections.
Key Skillsand Achievements
 Projectwork-Erection
 Maintenance of all equipmentsinthe plant.
 Trouble shootingof Equipment.
 Equipmentscritical sparesarrangements.
 Productionrelatedmodificationworkfallow up.
 FollowupAMC’Sand Calibrationforequipments.
 Preparationof DQ,IQ, and OQ documents.
 Unloadthe material safelyrelatedtothe Projects.
 Give AssetCode fornewEquipments.
 Raise purchase Requisition.
 Followthe preventivemaintenance schedule.
 Preventive,Periodicmaintenance of fuel pumps,multistage/centrifugal/Feedwaterpumps.
 Fallowthe SafetyPermitslike hotwork,Vessel Entry,HeightworkandExcavationwork.
EDUCATION QUALIFICATION:
Degree Institute/ Board Year Percentage
B.Tech (Mechanical ) JNTU 2004-2008 First Class (60.91%)
SOFT SKILLS, INTERESTS & ATTRIBUTES:
 ProficientinusingcomputerskillssuchasMicrosoftWindows,MicrosoftWord,Excel and
PowerPoint.
 Interests-Listeningtomusic,PublicSpeaking,Travelling.
 Target orientedandconfidentpersonality.
 Maintainingleadershipskillsinall endeavors.
LANGUAGES:
 ProficientinEnglish,Telugu.
PERSONAL INFORMATION:
FatherName : Ch.Prakash Rao
Date Of Birth : 08- June -1984
Address: Ch.Srinivas
Flat No:404, Satya devaNilayam, Padmanagarphase 2ring road
Chintal,Hyderabad.
DECLARATION :
I herebydeclare thatthe above-submittedparticularsare true tothe bestof my knowledge.
 Place : Hyderabad.
 Date: (CH.SRINIVAS)

Maintenance Manager - CV

  • 1.
    Ch. Srinivas Mob :8019176236 Email : srinivas356@gmail.com OBJECTIVE To work inan esteemedorganizationwithchallengingassignmentsanddedicate my knowledge and skillstoachieve the organization’soverall goal aswell asemerge asanexpertinthe fieldof engineering AREAS OF EXPOSURE  ValidationActivities  URS PreparationforPharmaceutical ProcessEquipments  Responsible forConductingFAT/SAT  Preparation andExecutionof QualificationProtocols(DQ,IQ,OQ) forProcess Equipments  Responsible forReviewof ETOPdocuments(P&ID’S,Vendordesigndocuments)  Responsible forConductingImpactAssessmentatSystemLevel andComponentLevel  Responsible forPreparing RiskAssessment  ReviewandPreparationof ValidationandRevalidationProtocols  Preparationof JobSafetyandAnalysis  Responsible forexecutionof validationactivitiesandreview of documentsincomplaintsto cGMP  QMS AND DOCUMENTATION  Filingandfollow-upof IncidentsandDeviations  Change Control ManagementandHandling  ReviewandPreparationof SOPs  Performinginvestigationstofindoutrootcause for any non-conformity  RaisingCAPA itstracking& closure  Implementationof QualityManagementSystem inthe deliveryof QualityProducts  ERECTION AND COMMISSIONING  ExperiencedinErection andcommissioningof all pharmaceutical processequipments Reactors,Centrifuges,Driers, Filters
  • 2.
     GENERAL ANDPREVENTIVE MAINTENANCE OF EQUIPMENTS  Maintenance of all equipments in the plant and planning of equipments for preventive maintenance and minimizingthe breakdownsbyeffectivecheckinpreventivemaintenance  Maintaining the proper documentation of engineering files and plant qualification as per cGMP requirement  Managed the operations of CAPEX management and development of budgets for maintenance andimprovements.  Implementationof GoodEngineeringPracticesatthe work  Implementingstatutory andregulatorycomplianceaspertimelines  PREDECTIVE MAINTENANCEAND THERMOGRAPHY ACTIVITIES  Predictive maintenance of all process equipments as per the schedule by using SPM A30 instrument.  Performing thermograph activities for electrical panels by using thermal imager instrument fluke TI32  WORK EXPERIENCE (8 + YEARS)  Dr. Reddy’sLaboratories Limited,Hyderabad  CurrentlyWorkingasa Juniormanagerinengineeringservicesdepartment  Durationof EmploymentFromApril 2013 to present ProjectsHandled:  Commissioningof dry vacuumpumpwithcapacityof 267 m3 /hr  Erectionof 1.6 kl glasslinedreactormake de dietrich includingwithutilities  Erectionof 1.2 kl ssreactors includingwithutilities Key Skillsand Achievements  Maintenance and trouble shooting of glass line reactors, SS Reactors, Centrifuges, SS tray Driers, Vacuum tray driers, water ring vacuum pumps, Centrifuges, Pumps, Brine chiller plant, Solid fluid boilers, Air compressor, DG set, Effluent Treatment Plant & Distillation columns.  DesigningMaintenanceStrategies, ProceduresandMethods  Planning&PreparationPreventivemaintenance schedule of Equipments&Utilities.  Diagnosingbreakdownproblems.  Directing,Instructingandsupervisingmaintenance techniciansandfitters  MaintainingDocumentsaspercGMP Requirement.
  • 3.
     SafetySystemImplementation.  PreparationofDQ,IQ& OQ of equipments  Preparationof daily,weekly&MonthlyMaintenance relatedreports  Monitoring& Controllingmaintenance costs.  Writingmaintenance strategiestohelpwithinstallation&commissioning guidelines.  Analysisof rootcause of Breakdownsandrectification.  Preparationof Standardoperatingproceduresof operationof all utilities.  Ensure goodhousekeepingaspersite objectives  To meetSHE targetsfor his/herarea.  To coordinate andassist productionheadinimproving/addressing complaints/troubleshootingthe processandabsorptionof new technologiesinorderto improve the productoffering.  NeulandLaboratories Limited,Hyderabad  Workedas a Executive EngineerinEngineeringservices department  Durationof EmploymentFromApril 2010 to April 2013 ProjectsHandled:  Commissioningcentrifugalpumpswithcapacityof 5 m3 /hr  Erectionof 630 Lts glasslinedreactormake NILE Ltd includingwithutilities Key Skillsand Achievements  Maintenance and trouble shooting of glass line reactors, SS Reactors, Centrifuges, SS tray Driers,Vacuumtray driers,waterringvacuumpumps,Centrifuges,Pumps  DesigningMaintenanceStrategies,ProceduresandMethods  Planning&PreparationPreventivemaintenance schedule of Equipments  Diagnosingbreakdownproblems.  Directing,Instructingandsupervisingmaintenance techniciansand fitters  MaintainingDocumentsaspercGMP Requirement.  SafetySystemImplementation.  Preparationof DQ,IQ& OQ of equipments  Preparationof daily,weekly&MonthlyMaintenance relatedreports  Monitoring& Controllingmaintenance costs.  Writingmaintenance strategiestohelpwithinstallation&commissioningguidelines.  Analysisof rootcause of Breakdownsandrectification.  Preparationof Standardoperatingproceduresof operationof all utilities.
  • 4.
     Nutra specialitiesPvtLimited,Vinjamoor,SPSRNellore Dist,A.P  Workedas a EngineerinEngineeringservicesdepartment  Durationof Employment From Sep2008 to Jan 2010 ProjectsHandled:  Erectionof two no’sof 8kl steel linedreactorswithcondenserandutilityconnections.  Erection of one 4kl & 8kl Mild Steel reactors with a connection of steam and condenser for the evaporationof effluent.  Erection of centrifugal blower with a capacity of 500 CFM for the ware house dispensing room.  Execution of Ware house extension building in a dimension of 18.75 met X 12.2 met X 6 met heightwitharoofingof non asbestossheets.  Erectionof 500 litcapacityRotary cone vacuum dryerwith the utilityconnections.  Erectionof pressfilterswithutilityconnections.  Erection of 5kl SS reactor with 25 sq met condensers and 4 sq met as sub cooler with vent condenserandutilityconnections. Key Skillsand Achievements  Projectwork-Erection  Maintenance of all equipmentsinthe plant.  Trouble shootingof Equipment.  Equipmentscritical sparesarrangements.  Productionrelatedmodificationworkfallow up.  FollowupAMC’Sand Calibrationforequipments.  Preparationof DQ,IQ, and OQ documents.  Unloadthe material safelyrelatedtothe Projects.  Give AssetCode fornewEquipments.  Raise purchase Requisition.  Followthe preventivemaintenance schedule.  Preventive,Periodicmaintenance of fuel pumps,multistage/centrifugal/Feedwaterpumps.  Fallowthe SafetyPermitslike hotwork,Vessel Entry,HeightworkandExcavationwork.
  • 5.
    EDUCATION QUALIFICATION: Degree Institute/Board Year Percentage B.Tech (Mechanical ) JNTU 2004-2008 First Class (60.91%) SOFT SKILLS, INTERESTS & ATTRIBUTES:  ProficientinusingcomputerskillssuchasMicrosoftWindows,MicrosoftWord,Excel and PowerPoint.  Interests-Listeningtomusic,PublicSpeaking,Travelling.  Target orientedandconfidentpersonality.  Maintainingleadershipskillsinall endeavors. LANGUAGES:  ProficientinEnglish,Telugu. PERSONAL INFORMATION: FatherName : Ch.Prakash Rao Date Of Birth : 08- June -1984 Address: Ch.Srinivas Flat No:404, Satya devaNilayam, Padmanagarphase 2ring road Chintal,Hyderabad. DECLARATION : I herebydeclare thatthe above-submittedparticularsare true tothe bestof my knowledge.  Place : Hyderabad.  Date: (CH.SRINIVAS)