SlideShare a Scribd company logo
1 of 3
Curriculum Vitae
Brajesh Kumar Tripathi
Present Address For Correspondence:
M/s Maral Overseas Ltd.,
Maral Sarovar, A. B. Road, Khalbujurg,
Distt.- Khargone, ( M.P.) PIN - 451660
Mob. No. – +917389561266
E-mail ID. - tripathibk01@gmail.com
Permanent Address For Correspondence:
S/O SH. Ramesh Kumar Tripathi,
Village/post- Dhawa Tiwariyan
Hanumana, Rewa, (M.P.), PIN – 486335
Professional Snapshot:
• An astute and result oriented professional with over 13 years of experience in handling the complete
plant maintenance ,project operations entailing planning, resource utilization, spare part planning, TPM,
Six sigma, maintenance & operations etc. Managed a wide spectrum of equipments & utilities; while
curtailing the operational costs & expenses. Demonstrated abilities in working on initiatives, thereby
bringing down the annual cost and eliminates machine breakdown. Having good exposure in various
systems as, TPM, 5’S, KAIZEN, and WCM projects etc.
Skills and strengths:
 Good communication skills.
 Strong planning, networking and analytical skills.
 An energetic self-starter with excellent organizational and creative skills.
 Excellent leadership and managerial skills in respect to Plant & Project Mgmt.
 Flexible and Adaptive to Multiple location and varied working conditions.
 Possess exceptional relationship building skills.
 Experience in working with multiple projects and multitasking.
Qualification:
Experience Responsibility & Work Profile
Present At present working with M/S Maral Overseas Ltd as a Dy.Manager Maintenance., A company of LNJ
Bhilwara group (having interests in textiles, graphite and power sector) having total state of the art
computerized textiles machines from Switzerland, Japan,USA and Germany for process machines.
The company has ISO; 9001, 14001 and 18001 certifications and also taken up Six sigma, Kaizen,
Quality circles and performance management initiatives and now working on TPM.
Work Profile :-
 Budgetary Planning, maintaining the spares and maintain the inventory.
 Working & planning for Energy Conservation by new developments, improvements, savings,
modifications etc.
 To develop a plan along with the needs of materials, Scheduling Work-force fixation for the
overall maintenance activity.
 Good exposure in power transition equipments maintenance like Bearing, Gear boxes, Belts
Drive, Belt conveyors, Couplings, Speed variations, mechanical or hydraulic drives & chain
drives, vacuum pump, heat recovery unit, Overhead conveyor, pick and place mechanism,
robots, pneumatic and hydraulic system, pumps,etc
 Responsible for process house (Dyeing machines-Sclavos, Venus and Krishna machine.
Technical  Bachelor in Mechanical Engineering from RGPV. Bhopal with 7.3 CGPA
 Diploma in Mechanical Engineering from Govt. Polytechnic, Nowgong with 1St
Division 73.84%
 Certification in CNC machine programming and operation.
 Pursuing Exam of Energy Manager from BEE.
 Pursuing Management Development program in Project management from IIM
Rohtak
Finishing machines- Santex, Bruckner stenter, IL Sung stenter and Strahm Compactor
machines. Yarn dyeing machine Thies , RF Dryer, Hydro, EOT Crane Lab machines, Soft
winding, Rewinding) Maintenance including preventive, breakdown and predictive
maintenance activities.
 Operation and maintenance of 8 TPH coal fired Boiler, 4 TPH coal fired Boiler, 6 TPH oil fired
Boiler, 20 Kcal Thermopac pumps, EOT Crane, coal craser,etc
 Responsible For Humidification Plant, HVAC System, Air Compressor equipment
maintenance & operation
 Responsible for Effluent Treatment Plant (ETP), Sludge Treatment Plant (STP) & Water
Treatment Plant (WTP), equipment maintenance & operation of screw type sludge pumps,
effluent pumps , Air Blowers, D’Canter m/c, Diffuser , Agitator etc.
 Recording & evaluation of maintenance records of all equipment to prevent reoccurrence of
failure on a regular basis and ensured that equipments working were effectively.
 MTBF, MTTR, MTTF, monthly MIS, Root cause of breakdown, Why Why analysis, Brain
Storming and its report.
 Calculation and analysis base work on consumption of Process house steam, cold water,
hot water and maintenance of hot water recovery unit, condensate recovery unit
 To plan for timely reconditioning / periodic replacement of mechanical items for improving
their life and efficiency.
 Innovation, Modification, and system development.
 To carry out day to day WCM/ TPM activities.
 Work as TPM Projects (PM Pillar Leader), 5S, Kaizen, JM projects
 Worked as Energy coordinator of EnMS 50001:2011
Responsibility
 Plant availability: Scheduling of preventive and corrective maintenance activities. Spare
parts planning and Inventory control. Manpower planning and execution of maintenance
activities. Preparation of department MIS report. Condition monitoring activities. Job
allocation and on job training to manpower on daily basis. Co-ordination with other
department. Preparation of work orders, job execution and bill verification.
 People Development and Systems implementation: Implementation of WCM, TPM
Projects, EnMS 50001:2011, 5S etc. Preparation and record keeping as per systems.
Training the manpower for compliance to the systems. Training to workmen for skill up
gradation.
 Cost control: Preparation of budget of the section and monitoring expenditure with respect
to budget. Analysis of repetitive failure and taking preventive actions to eliminate losses.
Monitoring of contractor cost by continuous focus on overtime. Monitoring maintenance
consumption detail. To carry out small modification required in maintenance for longer life of
spares used. Avoiding idle running of the plant for power saving and better plant
performance.
 Environment and Safety: Identifying and eliminating unsafe areas, points and practices.
To ensure checking of safety tools-tackles, pressure vessels and maintain the records.
Ensuring implementation of safety procedure by providing on job training to manpower.
Creating safe working environment by analysis of near miss and fatal accidents.
 Improvement / Modification: Identification of new projects (Capex work) and proposal
making for improvement. Indenting of materials required for Capex / Modification job
execution after sanction. Checking of technical details and drawings. Work order preparation
for execution of new projects. Bill verification after completion of project / modification
work.
Previous
3
Worked with M/s Moser Bear India Ltd, Noida. as a Dy. Engineer From August 2007 till August
2011
Job Profile
 Responsible for repairing and availability of all rotary equipment like Vacuum pumps, Gear
box, Servo motor, hydraulic piston motor, hydraulic gear pump, etc.
 Spare planning, job planning, inventory control, handling of sift, training of sub-ordinate.
 Control & reduce the break down by MTTR & MTBF
 Maintenance of fully automation CDR/DVDR manufacturing machine.
 Troubleshooting of electrical panels and Hydraulic & pneumatic System.
Previous
2
Worked with M/s Hindustan Syringes & medical Devices Ltd Ballabhagarh, Faridabad. as
an Asst. Engineer, From January 2006 till August 2007
Job profile
 Operation & maintenance of Utility equipments like D.G.Set, Chiller, Air compressor ,
Cooling tower, water treatment plant, HVAC, Dryer
 Maintenance of Syringe , Needle, manufacturing and packing machine
 Repairing of all mechanical Pneumatics parts.
Previous
1
Worked with M/s Hotline CPT Ltd. Malanpur (M.P). as an Junior Engineer, From July 2002 till
January 2006
Job Profile
 Installation and commissioning of following unit in color picture tube lines,
 (i)- Over head conveyor
 (ii)-Black matrix and screen coating unit
 (iii)-New CPT sheet metal parts unit
 (iv)Miscellaneous: - pumps, blowers, heat exchanger, fast moving pick & place robots.
Professional Achievements & Trainings, Projects:
Achievem
ents
 Bring down the breakdown time from 0.30% to 0.11 % with the help of preventive &
conditional based maintenance in Maral Overseas Limited
 Lead PM Pillar Project team
 Have worked in Energy saving Project & 2- Cost saving projects.

Training  3 days training for an Internal Auditor imparted by SGS on ISO.
 Three days training on Job method & Job relations by Q-Spread
 One day training on job instruction by Q- Spread.
 One day training on oil and lubricants by Voltas
Projects  Expansion of processing unit at maral Overseas Limited , work as following
Installation and commissioning of Santex Compactor,Sclavos Fabric dyeing, Thies yarn
Dyeing,RF Dryer, 8 TPH Coal fired Boiler, Bruckner stenter,Inspection machine,
Bianco slitter, Reversing machine,
 Installation and commissioning of New CPT Line and Metal component unit at HOT
Line CPT Limited
Personal Data:
Father’s Name : Sh. Ramesh Tripathi
Date of Birth : Dec 1, 1982
Language known : Hindi, English
Marital Status : Married
Religion : Hindu
Nationality : Indian
Hobbies : Reading, Music, Games
Computer Skills:
Having good knowledge of computers, ERP, MS office, Internet and other uses.
Present Salary:
Rs. 56000/month + Accommodation
Expected Salary:
Negotiable
(Brajesh kumar Tripathi)

More Related Content

What's hot

What's hot (20)

Mechanical Maintenance Engineer
Mechanical Maintenance Engineer Mechanical Maintenance Engineer
Mechanical Maintenance Engineer
 
Maintenance Manager - CV
Maintenance Manager - CVMaintenance Manager - CV
Maintenance Manager - CV
 
Vipin Mishra_Oct16
Vipin Mishra_Oct16Vipin Mishra_Oct16
Vipin Mishra_Oct16
 
ZEESHAN ALI
ZEESHAN ALIZEESHAN ALI
ZEESHAN ALI
 
Maintenance Manager
Maintenance ManagerMaintenance Manager
Maintenance Manager
 
MAINTENANCE MANAGER
MAINTENANCE MANAGERMAINTENANCE MANAGER
MAINTENANCE MANAGER
 
Stewart Spence Maintenance Manager CV 2015
Stewart Spence Maintenance Manager CV 2015Stewart Spence Maintenance Manager CV 2015
Stewart Spence Maintenance Manager CV 2015
 
Resume
ResumeResume
Resume
 
Facilities maintenance _manager_resume
Facilities maintenance _manager_resumeFacilities maintenance _manager_resume
Facilities maintenance _manager_resume
 
Maintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryMaintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive Industry
 
MY RESUME
MY RESUMEMY RESUME
MY RESUME
 
CV.
CV.CV.
CV.
 
Resume
Resume Resume
Resume
 
Sushil-Resume
Sushil-ResumeSushil-Resume
Sushil-Resume
 
JAMES_Hill_CV_2015
JAMES_Hill_CV_2015JAMES_Hill_CV_2015
JAMES_Hill_CV_2015
 
s.khan.cv for Chief Engineer
s.khan.cv for Chief Engineers.khan.cv for Chief Engineer
s.khan.cv for Chief Engineer
 
Vipin mishra june 16
Vipin mishra june 16Vipin mishra june 16
Vipin mishra june 16
 
Service & O&M Engineer
Service & O&M EngineerService & O&M Engineer
Service & O&M Engineer
 
sarfaraz New
sarfaraz Newsarfaraz New
sarfaraz New
 
CURRICULAM_VITAE (1)
CURRICULAM_VITAE (1)CURRICULAM_VITAE (1)
CURRICULAM_VITAE (1)
 

Similar to Brajesh Resume (20)

sreeram cv 2016
sreeram cv 2016sreeram cv 2016
sreeram cv 2016
 
HEMANT Resume 2015
HEMANT Resume 2015HEMANT Resume 2015
HEMANT Resume 2015
 
resume of sanjay update on 01 -04-2015
resume of sanjay update on 01 -04-2015resume of sanjay update on 01 -04-2015
resume of sanjay update on 01 -04-2015
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
updated_resume_280815
updated_resume_280815updated_resume_280815
updated_resume_280815
 
Nikhil resume (1)
Nikhil resume (1)Nikhil resume (1)
Nikhil resume (1)
 
apsingh resume
apsingh resume apsingh resume
apsingh resume
 
Pawan Resume-2014(rev)
Pawan Resume-2014(rev)Pawan Resume-2014(rev)
Pawan Resume-2014(rev)
 
CV
CVCV
CV
 
SDKCV
SDKCVSDKCV
SDKCV
 
Vardhan Electrical_resume (2)
Vardhan Electrical_resume (2)Vardhan Electrical_resume (2)
Vardhan Electrical_resume (2)
 
PRADEEP BALAN
PRADEEP BALANPRADEEP BALAN
PRADEEP BALAN
 
NAIK CV(AM)
NAIK CV(AM)NAIK CV(AM)
NAIK CV(AM)
 
Pragnesh Gadaria resume planning
Pragnesh Gadaria resume planningPragnesh Gadaria resume planning
Pragnesh Gadaria resume planning
 
Resume
ResumeResume
Resume
 
BIO DATA
BIO DATABIO DATA
BIO DATA
 
Resume
ResumeResume
Resume
 
CV- chandra prakash yadav
CV- chandra prakash yadavCV- chandra prakash yadav
CV- chandra prakash yadav
 

Brajesh Resume

  • 1. Curriculum Vitae Brajesh Kumar Tripathi Present Address For Correspondence: M/s Maral Overseas Ltd., Maral Sarovar, A. B. Road, Khalbujurg, Distt.- Khargone, ( M.P.) PIN - 451660 Mob. No. – +917389561266 E-mail ID. - tripathibk01@gmail.com Permanent Address For Correspondence: S/O SH. Ramesh Kumar Tripathi, Village/post- Dhawa Tiwariyan Hanumana, Rewa, (M.P.), PIN – 486335 Professional Snapshot: • An astute and result oriented professional with over 13 years of experience in handling the complete plant maintenance ,project operations entailing planning, resource utilization, spare part planning, TPM, Six sigma, maintenance & operations etc. Managed a wide spectrum of equipments & utilities; while curtailing the operational costs & expenses. Demonstrated abilities in working on initiatives, thereby bringing down the annual cost and eliminates machine breakdown. Having good exposure in various systems as, TPM, 5’S, KAIZEN, and WCM projects etc. Skills and strengths:  Good communication skills.  Strong planning, networking and analytical skills.  An energetic self-starter with excellent organizational and creative skills.  Excellent leadership and managerial skills in respect to Plant & Project Mgmt.  Flexible and Adaptive to Multiple location and varied working conditions.  Possess exceptional relationship building skills.  Experience in working with multiple projects and multitasking. Qualification: Experience Responsibility & Work Profile Present At present working with M/S Maral Overseas Ltd as a Dy.Manager Maintenance., A company of LNJ Bhilwara group (having interests in textiles, graphite and power sector) having total state of the art computerized textiles machines from Switzerland, Japan,USA and Germany for process machines. The company has ISO; 9001, 14001 and 18001 certifications and also taken up Six sigma, Kaizen, Quality circles and performance management initiatives and now working on TPM. Work Profile :-  Budgetary Planning, maintaining the spares and maintain the inventory.  Working & planning for Energy Conservation by new developments, improvements, savings, modifications etc.  To develop a plan along with the needs of materials, Scheduling Work-force fixation for the overall maintenance activity.  Good exposure in power transition equipments maintenance like Bearing, Gear boxes, Belts Drive, Belt conveyors, Couplings, Speed variations, mechanical or hydraulic drives & chain drives, vacuum pump, heat recovery unit, Overhead conveyor, pick and place mechanism, robots, pneumatic and hydraulic system, pumps,etc  Responsible for process house (Dyeing machines-Sclavos, Venus and Krishna machine. Technical  Bachelor in Mechanical Engineering from RGPV. Bhopal with 7.3 CGPA  Diploma in Mechanical Engineering from Govt. Polytechnic, Nowgong with 1St Division 73.84%  Certification in CNC machine programming and operation.  Pursuing Exam of Energy Manager from BEE.  Pursuing Management Development program in Project management from IIM Rohtak
  • 2. Finishing machines- Santex, Bruckner stenter, IL Sung stenter and Strahm Compactor machines. Yarn dyeing machine Thies , RF Dryer, Hydro, EOT Crane Lab machines, Soft winding, Rewinding) Maintenance including preventive, breakdown and predictive maintenance activities.  Operation and maintenance of 8 TPH coal fired Boiler, 4 TPH coal fired Boiler, 6 TPH oil fired Boiler, 20 Kcal Thermopac pumps, EOT Crane, coal craser,etc  Responsible For Humidification Plant, HVAC System, Air Compressor equipment maintenance & operation  Responsible for Effluent Treatment Plant (ETP), Sludge Treatment Plant (STP) & Water Treatment Plant (WTP), equipment maintenance & operation of screw type sludge pumps, effluent pumps , Air Blowers, D’Canter m/c, Diffuser , Agitator etc.  Recording & evaluation of maintenance records of all equipment to prevent reoccurrence of failure on a regular basis and ensured that equipments working were effectively.  MTBF, MTTR, MTTF, monthly MIS, Root cause of breakdown, Why Why analysis, Brain Storming and its report.  Calculation and analysis base work on consumption of Process house steam, cold water, hot water and maintenance of hot water recovery unit, condensate recovery unit  To plan for timely reconditioning / periodic replacement of mechanical items for improving their life and efficiency.  Innovation, Modification, and system development.  To carry out day to day WCM/ TPM activities.  Work as TPM Projects (PM Pillar Leader), 5S, Kaizen, JM projects  Worked as Energy coordinator of EnMS 50001:2011 Responsibility  Plant availability: Scheduling of preventive and corrective maintenance activities. Spare parts planning and Inventory control. Manpower planning and execution of maintenance activities. Preparation of department MIS report. Condition monitoring activities. Job allocation and on job training to manpower on daily basis. Co-ordination with other department. Preparation of work orders, job execution and bill verification.  People Development and Systems implementation: Implementation of WCM, TPM Projects, EnMS 50001:2011, 5S etc. Preparation and record keeping as per systems. Training the manpower for compliance to the systems. Training to workmen for skill up gradation.  Cost control: Preparation of budget of the section and monitoring expenditure with respect to budget. Analysis of repetitive failure and taking preventive actions to eliminate losses. Monitoring of contractor cost by continuous focus on overtime. Monitoring maintenance consumption detail. To carry out small modification required in maintenance for longer life of spares used. Avoiding idle running of the plant for power saving and better plant performance.  Environment and Safety: Identifying and eliminating unsafe areas, points and practices. To ensure checking of safety tools-tackles, pressure vessels and maintain the records. Ensuring implementation of safety procedure by providing on job training to manpower. Creating safe working environment by analysis of near miss and fatal accidents.  Improvement / Modification: Identification of new projects (Capex work) and proposal making for improvement. Indenting of materials required for Capex / Modification job execution after sanction. Checking of technical details and drawings. Work order preparation for execution of new projects. Bill verification after completion of project / modification work. Previous 3 Worked with M/s Moser Bear India Ltd, Noida. as a Dy. Engineer From August 2007 till August 2011 Job Profile  Responsible for repairing and availability of all rotary equipment like Vacuum pumps, Gear box, Servo motor, hydraulic piston motor, hydraulic gear pump, etc.  Spare planning, job planning, inventory control, handling of sift, training of sub-ordinate.  Control & reduce the break down by MTTR & MTBF  Maintenance of fully automation CDR/DVDR manufacturing machine.  Troubleshooting of electrical panels and Hydraulic & pneumatic System. Previous 2 Worked with M/s Hindustan Syringes & medical Devices Ltd Ballabhagarh, Faridabad. as an Asst. Engineer, From January 2006 till August 2007
  • 3. Job profile  Operation & maintenance of Utility equipments like D.G.Set, Chiller, Air compressor , Cooling tower, water treatment plant, HVAC, Dryer  Maintenance of Syringe , Needle, manufacturing and packing machine  Repairing of all mechanical Pneumatics parts. Previous 1 Worked with M/s Hotline CPT Ltd. Malanpur (M.P). as an Junior Engineer, From July 2002 till January 2006 Job Profile  Installation and commissioning of following unit in color picture tube lines,  (i)- Over head conveyor  (ii)-Black matrix and screen coating unit  (iii)-New CPT sheet metal parts unit  (iv)Miscellaneous: - pumps, blowers, heat exchanger, fast moving pick & place robots. Professional Achievements & Trainings, Projects: Achievem ents  Bring down the breakdown time from 0.30% to 0.11 % with the help of preventive & conditional based maintenance in Maral Overseas Limited  Lead PM Pillar Project team  Have worked in Energy saving Project & 2- Cost saving projects.  Training  3 days training for an Internal Auditor imparted by SGS on ISO.  Three days training on Job method & Job relations by Q-Spread  One day training on job instruction by Q- Spread.  One day training on oil and lubricants by Voltas Projects  Expansion of processing unit at maral Overseas Limited , work as following Installation and commissioning of Santex Compactor,Sclavos Fabric dyeing, Thies yarn Dyeing,RF Dryer, 8 TPH Coal fired Boiler, Bruckner stenter,Inspection machine, Bianco slitter, Reversing machine,  Installation and commissioning of New CPT Line and Metal component unit at HOT Line CPT Limited Personal Data: Father’s Name : Sh. Ramesh Tripathi Date of Birth : Dec 1, 1982 Language known : Hindi, English Marital Status : Married Religion : Hindu Nationality : Indian Hobbies : Reading, Music, Games Computer Skills: Having good knowledge of computers, ERP, MS office, Internet and other uses. Present Salary: Rs. 56000/month + Accommodation Expected Salary: Negotiable (Brajesh kumar Tripathi)