Result-oriented professional with understanding operational parameters and prioritizing various
tasks & deliverables as required by customers & management; seeking for assignments with an
organization of high repute to achieve Personal as well as Professional growth.
PROFILE SUMMARY
 Six Sigma (Green Belt) Certified Professional with 9.5 years of experience in Project Management (EPC) ,
Maintenance planning & Execution of Piping Systems, Rotary equipments i.e.Pumps,Blowers,Fans & Static Equipments
i.e.Tanks,Pressure tanks, Accumulators Also Servo/Proportional Valves & Related instruments i.e.Transducers,Pressure
& Temperature switches etc
 Skilled in handling the maintenance of major Hydraulics & pneumatics
 Cross functional experience in handling, monitoring & controlling the execution of project activities within the
budgeted cost, quality and time schedule on a monthly basis and review progress against the schedules
 Significant exposure in planning & implementing preventive & Predictive maintenance schedules for improving
overall reliability and safety of equipment & machinery
 Instrumental in adopting latest techniques for improving maintenance practices i.e. FMEA, RCA, CAPA, QC, etc. and
HIRAAC, AIA etc. to improve safety practices
 An effective communicator with good coordination, decision making and analytical skills
CORE COMPETENCIES
EPC Maintenance of Static & Rotary Equipments
Hydraulics & Pneumatics Modern Maintenance practices
Maintenance planning Risk Assessment& Control
Cost Control Drives Erection & Commissioning
 Monitoring the activities of sites, reviewing the project schedule and ensuring cost control within budget
of 3.5 MTPA CSP Rolling Mill.
 Anchoring erection & commissioning of Hydraulics & Pneumatics activities to ensure completion of project within the time and
cost parameters.
 Taking part in materials & manpower planning and ensuring the availability of the required material at site on time so
as to meet the pre-decided deadlines
 Preventive & Breakdown Maintenance of Static & Rotary Rolling mill equipments
 Executed various projects related to Cost Control, Energy Conservation & Environment.
 Administering the preparation of annual budget, MIS Reports and Inventory management
 Planning & implementing preventive & breakdown maintenance schedules for improving overall reliability and safety of
equipment & machinery
 Overseeing the operations of implementing Kaizen activities i.e. Six Sigma, QC, 5S, FMEA and RCA
EMPLOYMENT DETAILS
Since Jul’07: Essar Steel Limited, Hazira (Compact Strip Rolling Mill (3.5 MTPA))
Key Result Areas:
In Maintenance function:
 Area In charge of all Media systems includes Hydraulics, Lubrications, Water & Pneumatics of Rolling mill with Piping
systems.
 Maintenance of rotary equipments i.e.Fans,Blowers,Screw pumps, Submersible pumps,Piston Pumps
 Responsible for maintaining healthiness of systems as well as Media Equipments i.e. Tanks, Pumps, Pressure tanks,
Accumulators, Hydraulic & Pneumatic cylinders,Filters,strainers,Valves,Hoses,Heat Exchangers & Also instruments i.e.
Flow meters, Pressure & Temperature gauges, Flow Switches,LPT/PT,Level indicators etc.
 Developed PM plan for different equipment & streamline activities according to that plan.
 Responsible for planning & Execution of Predictive/Preventive maintenance activity to minimize breakdown time & hence
increasing equipment availability.
 Ensured Highest standards of safety for self as well as associates during execution of any job by adopting Tool box talk,
Work permit system.
 Compiled requirement of spares at work centre level by considering wear rates, change intervals, consumption etc.&
Guiding procurement of the same
 Prepared detailed shutdown job/resource/budget planning and schedules in applicable systems and optimise the
Shutdown schedule, resources and costs
 Tracking during entire SD periodically & Review Progress also documented for future improvement.
 Prepared BOQ and master data for future maintenance of the complete piping network.
 Minimized the maintenance & service cost and developing MIS reports for senior management
 Planned the annual spares budget requirement and executing steps to control the same
 Performed risk assessment of various internal processes i.e. procurement, maintenance, operations, etc.
 Periodically reviewed & optimize performance of planning function of plants
 Entrusted with the responsibilities of preparing PM plan for different equipment & streamline activities according to that plan
As a Project Engineer
 Accountable for validating designed drawings for total piping layout as per consultant & technology supplier’s requirement
encompassing approx. 1 Lakh IND piping for complete network of Hydraulic, Lube and Water & Gas Piping
 Involved in the erection of complete piping and systems as per DIN & IS Standards
 Collaborating with Equipment Erection Team to ensure that the equipment erection was completed with the related piping
work
 Overseeing installation & commissioning as well as conducting tests & inspections to ensure operational effectiveness
 Providing assistance for solving all type of technical and commercial issues raised by vendors as per mutually signed contract
 Generating daily progress report for erection activities and item codes for all required items to start Procurement activities
 Administering the operations of procurement which includes the following:
o Working effectively with stores & logistic departments for completing legal formalities to receive material
o Hydraulic & Lube Systems including valves & control instruments with consultation of technology supplier
o Preparation of technical specification & purchase requisition, comparative statements evaluating technical
considerations for each vendor and technical recommendation for placing orders to the vendor
o Coordinating with vendors and developing cost-effective counter offers to be given to vendors to make profitable
transaction
 Handling the floor activities during hot commissioning (rolling first coil) for ensuring smooth and safe running of equipment s
 Responsible for checking the alignment of systems like High Pressure Hydraulic Systems, Lubrication Systems & Grease
Systems including Cylinders, Tanks, Pump Stations, Heater/Filter Cooler Units, Pressure Tanks, Manifold Units, Valve Stands
and Filling Unit
 Effectively solved the problems faced during trials under supervision of SMSS & contractual personnel’s
Highlights:
 Essayed a stellar role in handling operations of commissioning of 3.5 MTPA Rolling Mill Media System/Equipments from
contract management phase
 Successfully completed Six Sigma Green Belt Project taken for continual improvement in Hydraulic Systems for reducing
the oil consumption resulting in Cost Saving of 1.15 Crores/Anum & Represents Organization at Quality council of
India
 Efficiently carried out several audits for certification i.e.IMS.5S, etc.
 Served as:
o Area In-charge of all Media Systems includes Hydraulics, Lubrications and Water & Pneumatics of Rolling Mills
o Shift In-charge and ensured smooth running of plant by managing different activities
o 5’S Zonal head for team comprising 25 engineers of one of the most challenging area of CSP Mill
 Steered efforts in handling the activities of Shutdown Planning, Oil Consumption/Recovery, In-house Modifications, Spare
Readiness, etc. for achieving more than 95% equipment availability
EDUCATIONAL DETAILS
 B.E. (Mechanical Engineering) from G.H.Patel College of Engineering & Technology, V.V.Nagar, Sardar Patel
University in 2007 with CPI 6.56/10
 12th from Bright School, Vadodara, G.H.S.E.B in 2003 with 72%
 10th from Bright School, Vadodara, G.H.S.E.B in 2001 with 92%
CERTIFICATION
 Six Sigma Green Belt course from ISL, Hyderabad
IT SKILLS
Operating System: Windows
Applications: MS Office and Internet Applications,MS Project
PERSONAL DETAILS
Date of Birth: 6th July, 1985
Current Address: # F-4/2, Nand Niketan Township, Hazira-394270, Surat
Permanent Address: 7/Avkar Society, No.2, Anand Nagar Road,Karelibaug, Vadodara-390022, Gujarat
Languages Known: English, Hindi and Gujarati

More Related Content

What's hot

Episode 30 : Project Execution ( Part 1 )
Episode 30 :  Project Execution ( Part 1 ) Episode 30 :  Project Execution ( Part 1 )
Episode 30 : Project Execution ( Part 1 ) SAJJAD KHUDHUR ABBAS
 
HumphriesFarinStandardResume
HumphriesFarinStandardResumeHumphriesFarinStandardResume
HumphriesFarinStandardResumefarin humphries
 
Maintenance module 1 ppt number 1
Maintenance module 1 ppt number 1Maintenance module 1 ppt number 1
Maintenance module 1 ppt number 1Dhanesh S
 
Aircraft maintenance package methods
Aircraft maintenance package methodsAircraft maintenance package methods
Aircraft maintenance package methodsSuhartono Raharjo
 
Experienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor ManagementExperienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor ManagementLakshminarasimman S
 
Mostafa Dawood Ali (National)
Mostafa Dawood Ali (National)Mostafa Dawood Ali (National)
Mostafa Dawood Ali (National)Mostafa Dawood
 
Planned maintenance system pry20210105
Planned maintenance system   pry20210105Planned maintenance system   pry20210105
Planned maintenance system pry20210105Padmini Ramasamy
 
main resume milind naukri
main resume milind naukrimain resume milind naukri
main resume milind naukrimilind phadke
 
Michael Carlin's Resume for the internet
Michael Carlin's Resume for the internetMichael Carlin's Resume for the internet
Michael Carlin's Resume for the internetMichael Carlin
 

What's hot (20)

Episode 30 : Project Execution ( Part 1 )
Episode 30 :  Project Execution ( Part 1 ) Episode 30 :  Project Execution ( Part 1 )
Episode 30 : Project Execution ( Part 1 )
 
HumphriesFarinStandardResume
HumphriesFarinStandardResumeHumphriesFarinStandardResume
HumphriesFarinStandardResume
 
David Lawrence11
David Lawrence11David Lawrence11
David Lawrence11
 
Maintenance module 1 ppt number 1
Maintenance module 1 ppt number 1Maintenance module 1 ppt number 1
Maintenance module 1 ppt number 1
 
Aircraft maintenance package methods
Aircraft maintenance package methodsAircraft maintenance package methods
Aircraft maintenance package methods
 
Experienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor ManagementExperienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor Management
 
Mostafa Dawood Ali (National)
Mostafa Dawood Ali (National)Mostafa Dawood Ali (National)
Mostafa Dawood Ali (National)
 
Maintenace management and TPM
Maintenace management and TPMMaintenace management and TPM
Maintenace management and TPM
 
Planned maintenance system pry20210105
Planned maintenance system   pry20210105Planned maintenance system   pry20210105
Planned maintenance system pry20210105
 
Venkat_Resume
Venkat_ResumeVenkat_Resume
Venkat_Resume
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
 
Planned Maintenance
Planned MaintenancePlanned Maintenance
Planned Maintenance
 
Maintenance
MaintenanceMaintenance
Maintenance
 
SOP ENGINEERING
SOP ENGINEERINGSOP ENGINEERING
SOP ENGINEERING
 
A.Resume
A.ResumeA.Resume
A.Resume
 
Bs bab 3
Bs bab 3Bs bab 3
Bs bab 3
 
ASIF CV - HVAC O & M
ASIF CV - HVAC O & MASIF CV - HVAC O & M
ASIF CV - HVAC O & M
 
main resume milind naukri
main resume milind naukrimain resume milind naukri
main resume milind naukri
 
CV D. Maimbolwa
CV D. MaimbolwaCV D. Maimbolwa
CV D. Maimbolwa
 
Michael Carlin's Resume for the internet
Michael Carlin's Resume for the internetMichael Carlin's Resume for the internet
Michael Carlin's Resume for the internet
 

Viewers also liked

Motorola WB2521
Motorola WB2521Motorola WB2521
Motorola WB2521savomir
 
Final Written Paper
Final Written Paper Final Written Paper
Final Written Paper Suhina Nath
 
Photographic terms
Photographic termsPhotographic terms
Photographic termsMuad Suleman
 
Demo proofisinthepressure
Demo proofisinthepressureDemo proofisinthepressure
Demo proofisinthepressureDon Neubauer
 
Nexus 7000 Series Innovations: M3 Module, DCI, Scale
Nexus 7000 Series Innovations: M3 Module, DCI, ScaleNexus 7000 Series Innovations: M3 Module, DCI, Scale
Nexus 7000 Series Innovations: M3 Module, DCI, ScaleTony Antony
 
Shakeer_Electrical Engineer
Shakeer_Electrical EngineerShakeer_Electrical Engineer
Shakeer_Electrical EngineerShakeer K
 
Konsumerisaatio presentaatio joulukuu 2016
Konsumerisaatio   presentaatio joulukuu 2016Konsumerisaatio   presentaatio joulukuu 2016
Konsumerisaatio presentaatio joulukuu 2016Jussi Järvinen
 
Importing caravans from the uk to south korea
Importing caravans from the uk to south koreaImporting caravans from the uk to south korea
Importing caravans from the uk to south koreaClaudia FEVRY
 
Amalan terbaik di bandar europian dan bandar kuala
Amalan terbaik di bandar europian dan bandar kualaAmalan terbaik di bandar europian dan bandar kuala
Amalan terbaik di bandar europian dan bandar kualaeffaraihani
 
DCP & Oil immersion cooling
DCP & Oil immersion coolingDCP & Oil immersion cooling
DCP & Oil immersion coolingParth Soni
 
#FlipMyFunnel Atlanta 2016 - Julia Stead - ABM Success: Invoca's Journey from...
#FlipMyFunnel Atlanta 2016 - Julia Stead - ABM Success: Invoca's Journey from...#FlipMyFunnel Atlanta 2016 - Julia Stead - ABM Success: Invoca's Journey from...
#FlipMyFunnel Atlanta 2016 - Julia Stead - ABM Success: Invoca's Journey from...#FlipMyFunnel
 
A criança na casa espírita
A criança na casa espíritaA criança na casa espírita
A criança na casa espíritaBernadete Costa
 
Qu'est-ce qu'un miracle ?
Qu'est-ce qu'un miracle ?Qu'est-ce qu'un miracle ?
Qu'est-ce qu'un miracle ?Pierrot Caron
 

Viewers also liked (20)

Motorola WB2521
Motorola WB2521Motorola WB2521
Motorola WB2521
 
Childhood forecasting
Childhood forecastingChildhood forecasting
Childhood forecasting
 
SB Advogados
SB Advogados SB Advogados
SB Advogados
 
Final Written Paper
Final Written Paper Final Written Paper
Final Written Paper
 
Photographic terms
Photographic termsPhotographic terms
Photographic terms
 
Demo proofisinthepressure
Demo proofisinthepressureDemo proofisinthepressure
Demo proofisinthepressure
 
Tarea 6 c.i
Tarea 6 c.iTarea 6 c.i
Tarea 6 c.i
 
Nexus 7000 Series Innovations: M3 Module, DCI, Scale
Nexus 7000 Series Innovations: M3 Module, DCI, ScaleNexus 7000 Series Innovations: M3 Module, DCI, Scale
Nexus 7000 Series Innovations: M3 Module, DCI, Scale
 
Shakeer_Electrical Engineer
Shakeer_Electrical EngineerShakeer_Electrical Engineer
Shakeer_Electrical Engineer
 
Konsumerisaatio presentaatio joulukuu 2016
Konsumerisaatio   presentaatio joulukuu 2016Konsumerisaatio   presentaatio joulukuu 2016
Konsumerisaatio presentaatio joulukuu 2016
 
Importing caravans from the uk to south korea
Importing caravans from the uk to south koreaImporting caravans from the uk to south korea
Importing caravans from the uk to south korea
 
Amalan terbaik di bandar europian dan bandar kuala
Amalan terbaik di bandar europian dan bandar kualaAmalan terbaik di bandar europian dan bandar kuala
Amalan terbaik di bandar europian dan bandar kuala
 
Memoria Halloween
Memoria HalloweenMemoria Halloween
Memoria Halloween
 
DCP & Oil immersion cooling
DCP & Oil immersion coolingDCP & Oil immersion cooling
DCP & Oil immersion cooling
 
Integridade na comunicação científica - responsabilidade partilhada entre aut...
Integridade na comunicação científica - responsabilidade partilhada entre aut...Integridade na comunicação científica - responsabilidade partilhada entre aut...
Integridade na comunicação científica - responsabilidade partilhada entre aut...
 
TAU: SYNOPSIS 4
TAU: SYNOPSIS 4TAU: SYNOPSIS 4
TAU: SYNOPSIS 4
 
#FlipMyFunnel Atlanta 2016 - Julia Stead - ABM Success: Invoca's Journey from...
#FlipMyFunnel Atlanta 2016 - Julia Stead - ABM Success: Invoca's Journey from...#FlipMyFunnel Atlanta 2016 - Julia Stead - ABM Success: Invoca's Journey from...
#FlipMyFunnel Atlanta 2016 - Julia Stead - ABM Success: Invoca's Journey from...
 
Google home
Google homeGoogle home
Google home
 
A criança na casa espírita
A criança na casa espíritaA criança na casa espírita
A criança na casa espírita
 
Qu'est-ce qu'un miracle ?
Qu'est-ce qu'un miracle ?Qu'est-ce qu'un miracle ?
Qu'est-ce qu'un miracle ?
 

Similar to CV-Shreyas Shah 9.5

Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CVvaithiya nathan
 
Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar
 
DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016D Venkatesh
 
SumitGaur_Resume
SumitGaur_ResumeSumitGaur_Resume
SumitGaur_ResumeSumit Gaur
 
Amiit Resume
Amiit ResumeAmiit Resume
Amiit ResumeAmit Mane
 
Scott hammond planning scheduling #2
Scott hammond planning scheduling   #2Scott hammond planning scheduling   #2
Scott hammond planning scheduling #2Scott Hammond
 
Scott Hammond Planning Scheduling - #2
Scott Hammond Planning Scheduling - #2Scott Hammond Planning Scheduling - #2
Scott Hammond Planning Scheduling - #2Scott Hammond
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateMohamed Zawam
 
Allen Schmitgen Resume' #12
Allen Schmitgen Resume' #12Allen Schmitgen Resume' #12
Allen Schmitgen Resume' #12Allen Schmitgen
 
Senior management professional technical
Senior management professional  technicalSenior management professional  technical
Senior management professional technicalShashi Kant Gupta
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceDHRUVA MISHRA
 
CV - Ashokan (Operation)
CV - Ashokan (Operation)CV - Ashokan (Operation)
CV - Ashokan (Operation)ashokan pandian
 
Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015Mohamed Ali
 

Similar to CV-Shreyas Shah 9.5 (20)

Yusuff- CV
Yusuff- CVYusuff- CV
Yusuff- CV
 
Linked in attach
Linked in attachLinked in attach
Linked in attach
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CV
 
Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar (Resume)
Praveen Kumar (Resume)
 
DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016
 
MS Suresh -Jun-16
MS Suresh -Jun-16MS Suresh -Jun-16
MS Suresh -Jun-16
 
SumitGaur_Resume
SumitGaur_ResumeSumitGaur_Resume
SumitGaur_Resume
 
Amiit Resume
Amiit ResumeAmiit Resume
Amiit Resume
 
Scott hammond planning scheduling #2
Scott hammond planning scheduling   #2Scott hammond planning scheduling   #2
Scott hammond planning scheduling #2
 
Scott Hammond Planning Scheduling - #2
Scott Hammond Planning Scheduling - #2Scott Hammond Planning Scheduling - #2
Scott Hammond Planning Scheduling - #2
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last update
 
Allen Schmitgen Resume' #12
Allen Schmitgen Resume' #12Allen Schmitgen Resume' #12
Allen Schmitgen Resume' #12
 
Senior management professional technical
Senior management professional  technicalSenior management professional  technical
Senior management professional technical
 
Updated resume
Updated resumeUpdated resume
Updated resume
 
Akshay Updated CV
Akshay Updated CVAkshay Updated CV
Akshay Updated CV
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experience
 
my cv
my cvmy cv
my cv
 
Cv (2). kh
Cv (2). kh Cv (2). kh
Cv (2). kh
 
CV - Ashokan (Operation)
CV - Ashokan (Operation)CV - Ashokan (Operation)
CV - Ashokan (Operation)
 
Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015
 

CV-Shreyas Shah 9.5

  • 1. SHREYAS SHAH Contact: +91 9909902428, (0265)6684542 E-Mail: smech_303@yahoo.co.in,shreyasshah67@hotmail.com Result-oriented professional with understanding operational parameters and prioritizing various tasks & deliverables as required by customers & management; seeking for assignments with an organization of high repute to achieve Personal as well as Professional growth. PROFILE SUMMARY  Six Sigma (Green Belt) Certified Professional with 9.5 years of experience in Project Management (EPC) , Maintenance planning & Execution of Piping Systems, Rotary equipments i.e.Pumps,Blowers,Fans & Static Equipments i.e.Tanks,Pressure tanks, Accumulators Also Servo/Proportional Valves & Related instruments i.e.Transducers,Pressure & Temperature switches etc  Skilled in handling the maintenance of major Hydraulics & pneumatics  Cross functional experience in handling, monitoring & controlling the execution of project activities within the budgeted cost, quality and time schedule on a monthly basis and review progress against the schedules  Significant exposure in planning & implementing preventive & Predictive maintenance schedules for improving overall reliability and safety of equipment & machinery  Instrumental in adopting latest techniques for improving maintenance practices i.e. FMEA, RCA, CAPA, QC, etc. and HIRAAC, AIA etc. to improve safety practices  An effective communicator with good coordination, decision making and analytical skills CORE COMPETENCIES EPC Maintenance of Static & Rotary Equipments Hydraulics & Pneumatics Modern Maintenance practices Maintenance planning Risk Assessment& Control Cost Control Drives Erection & Commissioning  Monitoring the activities of sites, reviewing the project schedule and ensuring cost control within budget of 3.5 MTPA CSP Rolling Mill.  Anchoring erection & commissioning of Hydraulics & Pneumatics activities to ensure completion of project within the time and cost parameters.  Taking part in materials & manpower planning and ensuring the availability of the required material at site on time so as to meet the pre-decided deadlines  Preventive & Breakdown Maintenance of Static & Rotary Rolling mill equipments  Executed various projects related to Cost Control, Energy Conservation & Environment.  Administering the preparation of annual budget, MIS Reports and Inventory management  Planning & implementing preventive & breakdown maintenance schedules for improving overall reliability and safety of equipment & machinery  Overseeing the operations of implementing Kaizen activities i.e. Six Sigma, QC, 5S, FMEA and RCA EMPLOYMENT DETAILS Since Jul’07: Essar Steel Limited, Hazira (Compact Strip Rolling Mill (3.5 MTPA)) Key Result Areas: In Maintenance function:  Area In charge of all Media systems includes Hydraulics, Lubrications, Water & Pneumatics of Rolling mill with Piping systems.  Maintenance of rotary equipments i.e.Fans,Blowers,Screw pumps, Submersible pumps,Piston Pumps  Responsible for maintaining healthiness of systems as well as Media Equipments i.e. Tanks, Pumps, Pressure tanks, Accumulators, Hydraulic & Pneumatic cylinders,Filters,strainers,Valves,Hoses,Heat Exchangers & Also instruments i.e. Flow meters, Pressure & Temperature gauges, Flow Switches,LPT/PT,Level indicators etc.  Developed PM plan for different equipment & streamline activities according to that plan.  Responsible for planning & Execution of Predictive/Preventive maintenance activity to minimize breakdown time & hence increasing equipment availability.  Ensured Highest standards of safety for self as well as associates during execution of any job by adopting Tool box talk, Work permit system.
  • 2.  Compiled requirement of spares at work centre level by considering wear rates, change intervals, consumption etc.& Guiding procurement of the same  Prepared detailed shutdown job/resource/budget planning and schedules in applicable systems and optimise the Shutdown schedule, resources and costs  Tracking during entire SD periodically & Review Progress also documented for future improvement.  Prepared BOQ and master data for future maintenance of the complete piping network.  Minimized the maintenance & service cost and developing MIS reports for senior management  Planned the annual spares budget requirement and executing steps to control the same  Performed risk assessment of various internal processes i.e. procurement, maintenance, operations, etc.  Periodically reviewed & optimize performance of planning function of plants  Entrusted with the responsibilities of preparing PM plan for different equipment & streamline activities according to that plan As a Project Engineer  Accountable for validating designed drawings for total piping layout as per consultant & technology supplier’s requirement encompassing approx. 1 Lakh IND piping for complete network of Hydraulic, Lube and Water & Gas Piping  Involved in the erection of complete piping and systems as per DIN & IS Standards  Collaborating with Equipment Erection Team to ensure that the equipment erection was completed with the related piping work  Overseeing installation & commissioning as well as conducting tests & inspections to ensure operational effectiveness  Providing assistance for solving all type of technical and commercial issues raised by vendors as per mutually signed contract  Generating daily progress report for erection activities and item codes for all required items to start Procurement activities  Administering the operations of procurement which includes the following: o Working effectively with stores & logistic departments for completing legal formalities to receive material o Hydraulic & Lube Systems including valves & control instruments with consultation of technology supplier o Preparation of technical specification & purchase requisition, comparative statements evaluating technical considerations for each vendor and technical recommendation for placing orders to the vendor o Coordinating with vendors and developing cost-effective counter offers to be given to vendors to make profitable transaction  Handling the floor activities during hot commissioning (rolling first coil) for ensuring smooth and safe running of equipment s  Responsible for checking the alignment of systems like High Pressure Hydraulic Systems, Lubrication Systems & Grease Systems including Cylinders, Tanks, Pump Stations, Heater/Filter Cooler Units, Pressure Tanks, Manifold Units, Valve Stands and Filling Unit  Effectively solved the problems faced during trials under supervision of SMSS & contractual personnel’s Highlights:  Essayed a stellar role in handling operations of commissioning of 3.5 MTPA Rolling Mill Media System/Equipments from contract management phase  Successfully completed Six Sigma Green Belt Project taken for continual improvement in Hydraulic Systems for reducing the oil consumption resulting in Cost Saving of 1.15 Crores/Anum & Represents Organization at Quality council of India  Efficiently carried out several audits for certification i.e.IMS.5S, etc.  Served as: o Area In-charge of all Media Systems includes Hydraulics, Lubrications and Water & Pneumatics of Rolling Mills o Shift In-charge and ensured smooth running of plant by managing different activities o 5’S Zonal head for team comprising 25 engineers of one of the most challenging area of CSP Mill  Steered efforts in handling the activities of Shutdown Planning, Oil Consumption/Recovery, In-house Modifications, Spare Readiness, etc. for achieving more than 95% equipment availability EDUCATIONAL DETAILS  B.E. (Mechanical Engineering) from G.H.Patel College of Engineering & Technology, V.V.Nagar, Sardar Patel University in 2007 with CPI 6.56/10  12th from Bright School, Vadodara, G.H.S.E.B in 2003 with 72%  10th from Bright School, Vadodara, G.H.S.E.B in 2001 with 92% CERTIFICATION  Six Sigma Green Belt course from ISL, Hyderabad
  • 3. IT SKILLS Operating System: Windows Applications: MS Office and Internet Applications,MS Project PERSONAL DETAILS Date of Birth: 6th July, 1985 Current Address: # F-4/2, Nand Niketan Township, Hazira-394270, Surat Permanent Address: 7/Avkar Society, No.2, Anand Nagar Road,Karelibaug, Vadodara-390022, Gujarat Languages Known: English, Hindi and Gujarati