SlideShare a Scribd company logo
1 of 6
Jagannath Adki
E-mail: jagannath010@gmail.com
Mobile: +91 9449876847
3.1 years experience in the areas of Project Operations, Installation & Commissioning,
4.3 years experience in Operation & Maintenance with a reputed organisation.
PROFESSIONAL PROFILE
A competent professional with 07 years 04 months of industrial experience, Project Management, Service
Operations, Plant Maintenance. Presently associated as Deputy Manager (Mechanical) with Vasavadatta
Cement Sedam, Karnataka a unit of Kesoram industries Ltd. Adept in handling maintenance and up
gradation activities involving resource planning, in-process inspection and co-ordination with internal
departments for producing better accuracy in cement packing.
Skilled in managing erection and commissioning of various equipments in packing plant like Belt
conveyors, Bucket elevator, Process fans, and air slide Blowers, bag filters. Dexterous in managing
maintenance of various equipments for reducing downtime & enhancing operational effectiveness of
equipment. Expertise in implementing plans & schedules for maintenance operations and annual turn
around with focus on optimum utilisation of manpower and material.
Deft in planning & implementing the preventive, predictive & breakdown maintenance schedules for
improving the overall reliability and safety of plant equipments & machinery. Demonstrated proficiency in
managing erection, commissioning and maintenance operations of various equipments and taking various
initiatives for reducing downtime and enhancing operational effectiveness of equipment.
CORE COMPETENCIES
Project Management
Participating in overseeing project activities from conceptualization to execution including finalization of
technical specifications, tendering, and procurement/supply of raw materials, stage inspections,
scheduling, progress monitoring, site management and manpower planning.
 Participating in planning and scheduling site activities to ensure completion of the project within the
time and budgetary parameters and for optimizing resource utilization.
 Identifying project bottlenecks and undertaking corrective measures.
 Ensuring effective site management and discipline to ensure safe & timely execution of the projects.
 Coordinating material / spare parts planning related activities encompassing identification of vendors,
requirement specification & offer evaluation.
Installation & Commissioning (3.1 Years experience)
 Reading engineering drawings, alignments of major equipments like packers, fans, conveyors,
elevators, other major equipments of cement plant.
 Good knowledge on the specifications of equipments, selections of equipment and auxillaries.
 Executing projects for plant set up, expansion, modernization, installation and commissioning.
 Installing & commissioning the equipments, meeting targeted performance/ quality & quantity
parameters.
 Supervising the installation, commissioning and maintenance of machine followed by trial runs.
Plant Maintenance (4.3 Years experience)
 Implementation of weight variation in cement packing and achieved ±100 grams per standard weight
schedule in MEC packers supplied by M/s. FLSmidth ventomatic.
 Carrying out regular checks for better accuracy.
 Implementing of safety of equipment and safety of person.
 Implementing the preventive, predictive & systematic maintenance schedules for improving the overall
reliability and safety of plant, personnel and production processes.
 Preparing and submitting cost reports on spare parts, inventory, labour and machines for resources
planning, budgeting & scheduling.
 Bringing efficiency in operations to improve quality standards & achieve maximum cost savings.
 Planning and effecting predictive & preventive maintenance schedules for various machineries and
equipments to increase machine up time & equipment reliability.
 Carrying out periodic checks to ensure performance of various equipments and maintaining requisite
documents for the same.
 Identifying areas of obstruction / breakdowns and taking steps to rectify the equipments through
application of trouble shooting tools.
 Continual improvement in loading and improvement towards energy consumption of various
equipments.
Man Management
 Directing, leading and motivating workforce; imparting continuous on job training for accomplishing
greater operational effectiveness/ efficiency.
 Working on succession planning of the workforce, shift management activities, appraising the
member’s performance & providing feedback.
 Handling the grievance of the employees to maintain a healthy work environment and facilitating
employee satisfaction survey & community development activities.
 Coordinating the Inter departmental activities and developing the skills of the workforce to suit the
requirement of new technology.
EMPLOYMENT SCAN
Oct-07 to Nov-10 Trainee Engineer with Vasavadatta Cement, Sedam, Karnataka, India
Worked in the Line- 4 Erection and commissioning of the following equipments from Oct 2007 to
Nov 2010.
 Acquired training & experience in Line-4 plant erection with plant capacity of 3800 TPD.
 I Involved in the Erection & Commissioning of the following various Equipment in line-4.
o Packing plant and part of cement mill.
o Roto packer double discharge 12 spouts.
o Cement Silo flat bottom.
o Blending silo.
o Bucket elevator.
o Truck loading model 1016T.
o Wagon loaders model 2028.
o Wagon bulk loading system
o Material handling equipments like belt conveyors, bucket elevators, mass flow conveyors,
Bag filters, air slide & blowers.
Apr-09 to Oct-12 Senior Engineers (Mechanical) with Vasavadatta Cement Sedam, Karnataka
Since Nov’10 Deputy Manager (Mechanical) with Vasavadatta Cement Sedam, Karnataka
Working as mechanical in charge for maintenance and continual improvement of packing plants
from Line-1 to 4 packing plant from Nov 2010 to till the date.
 Implementing the preventive, predictive & systematic maintenance schedules for improving the overall
reliability and safety of plant, personnel and production processes.
 Responsible for the Planning & Execution of Weekly/Major maintenance of assigned section and its
auxiliary equipments. Also responsible for maintaining dust free environment in the section.
 To check and record daily the health of the equipments in given section & to take corrective action.
 Bringing efficiency in operations to improve quality standards & achieve maximum cost savings.
 Planning and effecting predictive & preventive maintenance schedules for various machineries and
equipments to increase machine up time & equipment reliability.
 Carrying out periodic checks to ensure performance of various equipments and maintaining requisite
documents for the same.
 Identifying areas for pro active approach towards breakdowns and taking steps to rectify the
equipments through application of trouble shooting tools
 To arrange for overhauling/repair of the existing one or by procurement with minimum inventory at
stores.
 To interact with other departments like Elect. Inst., Process & Mines etc., for implementation of the
above jobs.
 To work for reduction in cost for spares, reduction in power consumption.
 Responsible for safety acts and condition to avoid accidents.
 To educate & guide the subordinates for carrying out the above jobs.
 Responsible for implementation of TPM, ISO-9001:2000, ISO-14001 & OHSAS-18001, ISO-50 001:2011
in the section.
 To the superior in spares planning and procurement by maintaining min. inventory at stores stock.
Significant Highlights in Plant up Gradation
 I had worked in the following major improvements in section to sustain loading without damarage.
• Successful implementation in weight variation to achieve ±100 grams.
• Integration of silo to bucket elevator to improve loading at minimal power consumption.
• Successful modification of wagon loading machine to load BCN HL wagons to meet the
requirement of railway norms.
• Packer integration to run packer with minimal power consumption.
• In house modification of wagon loading machine to load open rakes.
• Successfully handled silo cleaning with in record time of 29 days.
• In house modification silo internal air slides.
• In house fabrication of vacuum cleaning system to reduce manpower in cleaning.
Executed operations related to project planning, manpower planning, fabrication, erection and
commissioning.
 Obtained approval of GA drawings and coordinated with other dept. like civil, electrical &
instrumentation.
 Coordinated with the equipment supplier and efficiently managed erection and commissioning of static
and rotating equipments.
 Identified the problems faced during project execution and resolved them in consultation with the
consultant.
Commercial aspects:
 Present CTC: -Rs. 10, 17, 530/- per annum /- with accommodation.
 Expected CTC: - Negotiable.
PROFESSIONAL QUALIFICATION
XII from Bhaitya vidhya bhavans, Rajashree cement malkhed.
Bachelor of Engineering from Basvakalyan engineering college, Basvakalyan,
Karnataka.
Specialisation: Mechanical Engineering.
Professional Training & Development- Production Planning and control - Process Optimisation -
Operating systems
PERSONAL DETAILS
Date of Birth : 23rd
Sep-1984
Languages : English, Hindi, Kannada & Marathi
Address : H.No: D-14/A, Laxmi narayan nagar Sedam, Tq: Sedam, Dist. Gulbarga,
Karnataka PIN 585 222
CURRENT DETAILS
Designation : Dy. Manager (Mechanical)
Present address: H.No: D-14/A, Laxmi narayan nagar Sedam, Tq: Sedam, Dist. Gulbarga,
Karnataka PIN 585 222.
DECLARATION: -
I consider myself familiar with mechanical engineering aspects.
I am also confident of my ability to work in a team.
I hereby declare that the information furnished by me, above is true to the best of my knowledge.
PLACE: Sedam
DATE: 13/02/2015 (Jagannath Adki)
PLACE: Sedam
DATE: 13/02/2015 (Jagannath Adki)

More Related Content

What's hot (20)

PRADEEP TP
PRADEEP TPPRADEEP TP
PRADEEP TP
 
Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015
 
Mr.Shamim CV
Mr.Shamim CVMr.Shamim CV
Mr.Shamim CV
 
Pragnesh Gadaria resume planning
Pragnesh Gadaria resume planningPragnesh Gadaria resume planning
Pragnesh Gadaria resume planning
 
debasish 2nd cv
debasish 2nd cvdebasish 2nd cv
debasish 2nd cv
 
Satish resume
Satish  resume Satish  resume
Satish resume
 
JMK Resume 2
JMK Resume 2JMK Resume 2
JMK Resume 2
 
Resume_Balachandru
Resume_BalachandruResume_Balachandru
Resume_Balachandru
 
Karthik S - 5.5 Years of Experience
Karthik S - 5.5 Years of ExperienceKarthik S - 5.5 Years of Experience
Karthik S - 5.5 Years of Experience
 
resume new
resume newresume new
resume new
 
Chandrasekaran
ChandrasekaranChandrasekaran
Chandrasekaran
 
Abhimanyu Katoch Cv.
Abhimanyu Katoch Cv.Abhimanyu Katoch Cv.
Abhimanyu Katoch Cv.
 
CV Sen
CV SenCV Sen
CV Sen
 
vinay
vinayvinay
vinay
 
NIKET SONI RESUME UPDATED
NIKET SONI RESUME UPDATEDNIKET SONI RESUME UPDATED
NIKET SONI RESUME UPDATED
 
Resume
ResumeResume
Resume
 
CV
CVCV
CV
 
G28 dec8 ASR Resu
G28 dec8 ASR ResuG28 dec8 ASR Resu
G28 dec8 ASR Resu
 
Updated ressume arun SQAE
Updated ressume arun SQAEUpdated ressume arun SQAE
Updated ressume arun SQAE
 
Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2
 

Viewers also liked

Faq for sign shine industrial serial gprs gsm modem ip modem dtu
Faq for sign shine industrial serial gprs gsm modem ip modem dtuFaq for sign shine industrial serial gprs gsm modem ip modem dtu
Faq for sign shine industrial serial gprs gsm modem ip modem dtuSignShine Andy
 
Bступление Pоссии в BTO
Bступление Pоссии в BTOBступление Pоссии в BTO
Bступление Pоссии в BTOUNDP Eurasia
 
2 April Daily market report
2 April Daily market report2 April Daily market report
2 April Daily market reportQNB Group
 
Introduction to SOL*R
Introduction to SOL*RIntroduction to SOL*R
Introduction to SOL*RScott Leslie
 
Citysoft presentation
Citysoft presentationCitysoft presentation
Citysoft presentationAckap
 
психология21
психология21психология21
психология21deshchenkod
 
Cs nyc becomes-adigitalcity-en
Cs nyc becomes-adigitalcity-enCs nyc becomes-adigitalcity-en
Cs nyc becomes-adigitalcity-enHootsuite
 
Solution to 5 email marketing problems
Solution to 5 email marketing problemsSolution to 5 email marketing problems
Solution to 5 email marketing problemsSharath Ghosh
 
"Презентация Союза фермеров Казахстана"
"Презентация Союза фермеров Казахстана" "Презентация Союза фермеров Казахстана"
"Презентация Союза фермеров Казахстана" НЭПК "СОЮЗ "АТАМЕКЕН"
 
Content Marketing With WordPress -- Tallahassee WordPress Meetup
Content Marketing With WordPress -- Tallahassee WordPress MeetupContent Marketing With WordPress -- Tallahassee WordPress Meetup
Content Marketing With WordPress -- Tallahassee WordPress MeetupCaldera Labs
 
Authentic and In Control: Universum Webinar
Authentic and In Control: Universum WebinarAuthentic and In Control: Universum Webinar
Authentic and In Control: Universum WebinarUniversum Webinars
 
Chapter one Overview of E-Commerce
Chapter one Overview of E-CommerceChapter one Overview of E-Commerce
Chapter one Overview of E-CommerceMarya Sholevar
 

Viewers also liked (16)

Faq for sign shine industrial serial gprs gsm modem ip modem dtu
Faq for sign shine industrial serial gprs gsm modem ip modem dtuFaq for sign shine industrial serial gprs gsm modem ip modem dtu
Faq for sign shine industrial serial gprs gsm modem ip modem dtu
 
Discover as designer pressa
Discover as designer pressaDiscover as designer pressa
Discover as designer pressa
 
Bступление Pоссии в BTO
Bступление Pоссии в BTOBступление Pоссии в BTO
Bступление Pоссии в BTO
 
2 April Daily market report
2 April Daily market report2 April Daily market report
2 April Daily market report
 
Introduction to SOL*R
Introduction to SOL*RIntroduction to SOL*R
Introduction to SOL*R
 
JHB HUG
JHB HUGJHB HUG
JHB HUG
 
Citysoft presentation
Citysoft presentationCitysoft presentation
Citysoft presentation
 
репка
репкарепка
репка
 
психология21
психология21психология21
психология21
 
Cs nyc becomes-adigitalcity-en
Cs nyc becomes-adigitalcity-enCs nyc becomes-adigitalcity-en
Cs nyc becomes-adigitalcity-en
 
Solution to 5 email marketing problems
Solution to 5 email marketing problemsSolution to 5 email marketing problems
Solution to 5 email marketing problems
 
"Презентация Союза фермеров Казахстана"
"Презентация Союза фермеров Казахстана" "Презентация Союза фермеров Казахстана"
"Презентация Союза фермеров Казахстана"
 
Content Marketing With WordPress -- Tallahassee WordPress Meetup
Content Marketing With WordPress -- Tallahassee WordPress MeetupContent Marketing With WordPress -- Tallahassee WordPress Meetup
Content Marketing With WordPress -- Tallahassee WordPress Meetup
 
Authentic and In Control: Universum Webinar
Authentic and In Control: Universum WebinarAuthentic and In Control: Universum Webinar
Authentic and In Control: Universum Webinar
 
Chapter one Overview of E-Commerce
Chapter one Overview of E-CommerceChapter one Overview of E-Commerce
Chapter one Overview of E-Commerce
 
Tel oulu 27_01_2012
Tel oulu 27_01_2012Tel oulu 27_01_2012
Tel oulu 27_01_2012
 

Similar to Jagannath Adki

JITENDRA P DHOLE RESUME Updated 05042016
JITENDRA P DHOLE  RESUME Updated 05042016JITENDRA P DHOLE  RESUME Updated 05042016
JITENDRA P DHOLE RESUME Updated 05042016JITENDRA DHOLE
 
Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015wendell spencer
 
Tamas Seres Resume 2016
Tamas Seres Resume 2016Tamas Seres Resume 2016
Tamas Seres Resume 2016Tamas Seres
 
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMEngr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMMuhammad Awais
 
MANISH KUMAR- UPDATE RESUME (1) (1)
MANISH KUMAR- UPDATE RESUME (1) (1)MANISH KUMAR- UPDATE RESUME (1) (1)
MANISH KUMAR- UPDATE RESUME (1) (1)MANISH KUMAR
 
planning engineer resume of shahid akhtar siddiqui
planning engineer resume of shahid akhtar siddiquiplanning engineer resume of shahid akhtar siddiqui
planning engineer resume of shahid akhtar siddiquishahid siddiqui
 

Similar to Jagannath Adki (20)

JITENDRA P DHOLE RESUME Updated 05042016
JITENDRA P DHOLE  RESUME Updated 05042016JITENDRA P DHOLE  RESUME Updated 05042016
JITENDRA P DHOLE RESUME Updated 05042016
 
my cv
my cvmy cv
my cv
 
Maintenance Engineer having 9 years experience
Maintenance  Engineer having 9 years experienceMaintenance  Engineer having 9 years experience
Maintenance Engineer having 9 years experience
 
Linked in attach
Linked in attachLinked in attach
Linked in attach
 
ZEESHAN ALI
ZEESHAN ALIZEESHAN ALI
ZEESHAN ALI
 
Nikhil resume (1)
Nikhil resume (1)Nikhil resume (1)
Nikhil resume (1)
 
Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015
 
Tamas Seres Resume 2016
Tamas Seres Resume 2016Tamas Seres Resume 2016
Tamas Seres Resume 2016
 
Anil Kumar
Anil KumarAnil Kumar
Anil Kumar
 
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMEngr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
 
Dipak Gorade
Dipak GoradeDipak Gorade
Dipak Gorade
 
RANGANATHAN NEW RESUME
RANGANATHAN NEW RESUMERANGANATHAN NEW RESUME
RANGANATHAN NEW RESUME
 
MANISH KUMAR- UPDATE RESUME (1) (1)
MANISH KUMAR- UPDATE RESUME (1) (1)MANISH KUMAR- UPDATE RESUME (1) (1)
MANISH KUMAR- UPDATE RESUME (1) (1)
 
planning engineer resume of shahid akhtar siddiqui
planning engineer resume of shahid akhtar siddiquiplanning engineer resume of shahid akhtar siddiqui
planning engineer resume of shahid akhtar siddiqui
 
Tushar dhone new
Tushar dhone newTushar dhone new
Tushar dhone new
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
 
MY RESUME
MY RESUMEMY RESUME
MY RESUME
 
Shoyeb resume 30.7
Shoyeb resume 30.7Shoyeb resume 30.7
Shoyeb resume 30.7
 
Shoyeb resume 30.7
Shoyeb resume 30.7Shoyeb resume 30.7
Shoyeb resume 30.7
 
shoyeb resume 30.7
shoyeb resume 30.7shoyeb resume 30.7
shoyeb resume 30.7
 

Jagannath Adki

  • 1. Jagannath Adki E-mail: jagannath010@gmail.com Mobile: +91 9449876847 3.1 years experience in the areas of Project Operations, Installation & Commissioning, 4.3 years experience in Operation & Maintenance with a reputed organisation. PROFESSIONAL PROFILE A competent professional with 07 years 04 months of industrial experience, Project Management, Service Operations, Plant Maintenance. Presently associated as Deputy Manager (Mechanical) with Vasavadatta Cement Sedam, Karnataka a unit of Kesoram industries Ltd. Adept in handling maintenance and up gradation activities involving resource planning, in-process inspection and co-ordination with internal departments for producing better accuracy in cement packing. Skilled in managing erection and commissioning of various equipments in packing plant like Belt conveyors, Bucket elevator, Process fans, and air slide Blowers, bag filters. Dexterous in managing maintenance of various equipments for reducing downtime & enhancing operational effectiveness of equipment. Expertise in implementing plans & schedules for maintenance operations and annual turn around with focus on optimum utilisation of manpower and material. Deft in planning & implementing the preventive, predictive & breakdown maintenance schedules for improving the overall reliability and safety of plant equipments & machinery. Demonstrated proficiency in managing erection, commissioning and maintenance operations of various equipments and taking various initiatives for reducing downtime and enhancing operational effectiveness of equipment. CORE COMPETENCIES Project Management Participating in overseeing project activities from conceptualization to execution including finalization of technical specifications, tendering, and procurement/supply of raw materials, stage inspections, scheduling, progress monitoring, site management and manpower planning.  Participating in planning and scheduling site activities to ensure completion of the project within the time and budgetary parameters and for optimizing resource utilization.  Identifying project bottlenecks and undertaking corrective measures.  Ensuring effective site management and discipline to ensure safe & timely execution of the projects.  Coordinating material / spare parts planning related activities encompassing identification of vendors, requirement specification & offer evaluation. Installation & Commissioning (3.1 Years experience)  Reading engineering drawings, alignments of major equipments like packers, fans, conveyors, elevators, other major equipments of cement plant.  Good knowledge on the specifications of equipments, selections of equipment and auxillaries.  Executing projects for plant set up, expansion, modernization, installation and commissioning.  Installing & commissioning the equipments, meeting targeted performance/ quality & quantity parameters.  Supervising the installation, commissioning and maintenance of machine followed by trial runs.
  • 2. Plant Maintenance (4.3 Years experience)  Implementation of weight variation in cement packing and achieved ±100 grams per standard weight schedule in MEC packers supplied by M/s. FLSmidth ventomatic.  Carrying out regular checks for better accuracy.  Implementing of safety of equipment and safety of person.  Implementing the preventive, predictive & systematic maintenance schedules for improving the overall reliability and safety of plant, personnel and production processes.  Preparing and submitting cost reports on spare parts, inventory, labour and machines for resources planning, budgeting & scheduling.  Bringing efficiency in operations to improve quality standards & achieve maximum cost savings.  Planning and effecting predictive & preventive maintenance schedules for various machineries and equipments to increase machine up time & equipment reliability.  Carrying out periodic checks to ensure performance of various equipments and maintaining requisite documents for the same.  Identifying areas of obstruction / breakdowns and taking steps to rectify the equipments through application of trouble shooting tools.  Continual improvement in loading and improvement towards energy consumption of various equipments. Man Management  Directing, leading and motivating workforce; imparting continuous on job training for accomplishing greater operational effectiveness/ efficiency.  Working on succession planning of the workforce, shift management activities, appraising the member’s performance & providing feedback.  Handling the grievance of the employees to maintain a healthy work environment and facilitating employee satisfaction survey & community development activities.  Coordinating the Inter departmental activities and developing the skills of the workforce to suit the requirement of new technology. EMPLOYMENT SCAN Oct-07 to Nov-10 Trainee Engineer with Vasavadatta Cement, Sedam, Karnataka, India Worked in the Line- 4 Erection and commissioning of the following equipments from Oct 2007 to Nov 2010.  Acquired training & experience in Line-4 plant erection with plant capacity of 3800 TPD.  I Involved in the Erection & Commissioning of the following various Equipment in line-4. o Packing plant and part of cement mill. o Roto packer double discharge 12 spouts. o Cement Silo flat bottom. o Blending silo. o Bucket elevator. o Truck loading model 1016T. o Wagon loaders model 2028. o Wagon bulk loading system o Material handling equipments like belt conveyors, bucket elevators, mass flow conveyors, Bag filters, air slide & blowers. Apr-09 to Oct-12 Senior Engineers (Mechanical) with Vasavadatta Cement Sedam, Karnataka
  • 3. Since Nov’10 Deputy Manager (Mechanical) with Vasavadatta Cement Sedam, Karnataka Working as mechanical in charge for maintenance and continual improvement of packing plants from Line-1 to 4 packing plant from Nov 2010 to till the date.  Implementing the preventive, predictive & systematic maintenance schedules for improving the overall reliability and safety of plant, personnel and production processes.  Responsible for the Planning & Execution of Weekly/Major maintenance of assigned section and its auxiliary equipments. Also responsible for maintaining dust free environment in the section.  To check and record daily the health of the equipments in given section & to take corrective action.  Bringing efficiency in operations to improve quality standards & achieve maximum cost savings.  Planning and effecting predictive & preventive maintenance schedules for various machineries and equipments to increase machine up time & equipment reliability.  Carrying out periodic checks to ensure performance of various equipments and maintaining requisite documents for the same.  Identifying areas for pro active approach towards breakdowns and taking steps to rectify the equipments through application of trouble shooting tools  To arrange for overhauling/repair of the existing one or by procurement with minimum inventory at stores.  To interact with other departments like Elect. Inst., Process & Mines etc., for implementation of the above jobs.  To work for reduction in cost for spares, reduction in power consumption.  Responsible for safety acts and condition to avoid accidents.  To educate & guide the subordinates for carrying out the above jobs.  Responsible for implementation of TPM, ISO-9001:2000, ISO-14001 & OHSAS-18001, ISO-50 001:2011 in the section.  To the superior in spares planning and procurement by maintaining min. inventory at stores stock. Significant Highlights in Plant up Gradation  I had worked in the following major improvements in section to sustain loading without damarage. • Successful implementation in weight variation to achieve ±100 grams. • Integration of silo to bucket elevator to improve loading at minimal power consumption. • Successful modification of wagon loading machine to load BCN HL wagons to meet the requirement of railway norms. • Packer integration to run packer with minimal power consumption. • In house modification of wagon loading machine to load open rakes. • Successfully handled silo cleaning with in record time of 29 days. • In house modification silo internal air slides. • In house fabrication of vacuum cleaning system to reduce manpower in cleaning. Executed operations related to project planning, manpower planning, fabrication, erection and commissioning.  Obtained approval of GA drawings and coordinated with other dept. like civil, electrical & instrumentation.  Coordinated with the equipment supplier and efficiently managed erection and commissioning of static and rotating equipments.
  • 4.  Identified the problems faced during project execution and resolved them in consultation with the consultant. Commercial aspects:  Present CTC: -Rs. 10, 17, 530/- per annum /- with accommodation.  Expected CTC: - Negotiable. PROFESSIONAL QUALIFICATION XII from Bhaitya vidhya bhavans, Rajashree cement malkhed. Bachelor of Engineering from Basvakalyan engineering college, Basvakalyan, Karnataka. Specialisation: Mechanical Engineering. Professional Training & Development- Production Planning and control - Process Optimisation - Operating systems PERSONAL DETAILS Date of Birth : 23rd Sep-1984 Languages : English, Hindi, Kannada & Marathi Address : H.No: D-14/A, Laxmi narayan nagar Sedam, Tq: Sedam, Dist. Gulbarga, Karnataka PIN 585 222 CURRENT DETAILS Designation : Dy. Manager (Mechanical) Present address: H.No: D-14/A, Laxmi narayan nagar Sedam, Tq: Sedam, Dist. Gulbarga, Karnataka PIN 585 222. DECLARATION: - I consider myself familiar with mechanical engineering aspects. I am also confident of my ability to work in a team. I hereby declare that the information furnished by me, above is true to the best of my knowledge.
  • 5. PLACE: Sedam DATE: 13/02/2015 (Jagannath Adki)
  • 6. PLACE: Sedam DATE: 13/02/2015 (Jagannath Adki)