SlideShare a Scribd company logo
1 of 12
Reda Rezk Gomaa Abo Saad
27 EL- Emaan st. Tura El- Esment - Maadi – Cairo- Egypt
Mobile No. : 0565702904 , 0548616634
E-mail : redarezk322@yahoo.com
Objective
I am now looking to build on my extensive range of technical skills within a
suitablychallenging role. I am keen to achieve further professional development.
Personal Information
Date of Birth: 25/1/1981
Place of Birth: Cairo.
Nationality: Egyptian.
Religion:Moslem.
Marital Status: married.
Military status :. Finished ( 3 years)
Hobbies: Swimming and walking.
Languages
Arabic : Mother tongue
English : Good
Education
High education stage :
• University name: Helwan.
• Faculty name : Mattaria.
• B.SC in power mechanical engineering Degree.
• Grade of graduation : good.
• Grade of project : Excellent.
• Date of graduation : 2005
Bachelor project
• Design And Calculation Of Central Air Conditioning system (using E20-II
Carrier Software ) civil And architecture engineering building
Jop Objective
1. A designer for machine, Planning
2. Petroleum field
3. Water field
Personality Key Strength
• Ability to work under pressure.
• Excellent team worker (as both team leader or member)
• Excellent communication skills.
• Totally committed to any work requirment unconditionally.
• Self learning ability.
• Good thinkig in solving problems .
• Excellent negotiation skills .
Computer Skills
• Operating Systems (Windows 95, 98, ME, 2000, XP).
• MS Office (Word , PowerPoint , Excel ).
• CAD packages (AutoCAD).
• Having good knowledge of computer hardware .
• Internet .
• Computer Maintenance.
• Solid works
Some knowledge about:
• Vessels & piping design
i have attended courses
• Piping design & construction in ( AUC )
• Fire Fighting systems in ( syndicate of engineers)
• Plumping systems in ( syndicate of engineers)
• HVAC systems Design training course
Job Experience
• Summer training in Tura Portland cement company.
First job :
• Place : Automatic slaughter of chicken in suez
• Work : Maintenance Engineer.
Job Description
1. reading the trouble and solved it
2. contacts with Maintenance companys
3. Supervising on the erection work and production cycle
second job :
• Place : geometrical Branch of militarism centrical zone.
• Work : Project Engineer.
Job Description :.
1. Making the suitable offer
2. Making the final offer by suitable documentation and filing
3. Supervising on the erection work.
4. contacts with Maintenance companys
Third job :
• Place : Al masry office for engineering.
• Work : Project Engineer ( water & waste water ) dept.
Job Description :.
o Making the suitable offer
o Making the final offer by suitable documentation and filing
o Supervising on the erection work.
Some Of My Projects
 Project :Electromechanical works (Supply &erection) for replace and refurbish water
station
• Location: abo sultan – fayed ( EL- Esmailiya)
• Consultant: NOPWASD
• Client:. Mokhtar Ebraheem co
 Project: Electromechanical works (Supply &erection) of the sewage pumping station
• Location: Kafer EL Daghayda – Gharbia Governorate
• Consultant: SEECO Dr.Medhat Saleh .
• Client:. Arab Contractors Co
 Project: Electromechanical works (Supply &erection) of the sewage pumping station
• Location: Alsamlawin – Gharbia Governorate
• Consultant : SEECO Dr.Medhat Saleh
 Client:. Arab Contractors Co
 Project: Electromechanical works (Supply &erection) of the sewage pumping station
• Location: Khozam – Qena Governorate
• Consultant: Moharram Bakhoum.
• Client:. Mokhtar Ebraheem co
Project:: (Supply &erection) of the water hammer protection vessel
• Location: Omar abn ELkhatab ( Suez )
• Consultant: NOPWASD
• Client: Arab Contractors Company
Project:: (Supply &erection) of the water hammer protection vessel
• Location: Abo Hamad ( EL-Sharqya)
• Consultant: NOPWASD
• Client: Mokhtar Ebraheem co
 Project: Electromechanical, works (Supply) (134 –pcs) Gates of sewage from GRP
 Consultant: NOPWASD
 Client:. Mokhtar Ebraheem co
 Project: (Supply &erection)pressure reducing valves
• Location: abo aref station ( Suez )
• . Consultant: NOPWASD
• Client:. Mokhtar Ebraheem co
 Project: (Supply and installation) and purified water lifting units to the upper reservoir
• Location: Arab Contractors Branch Building, east and central Delta - Gharbia
Governorate
• Client: Arab Contractors
 Project:: penstock gates (Supply, erection)diameter ( 600 , 800 , 900 , 1000 ,1200 )mm
• Location of sanitary drainage stations :
• Abo Hamad ( EL-Sharqya)………………...( 5 penstock gates )
• Welad Saqr ( EL-Sharqya)………………..( 1 penstock gates )
• Manya ELqamh ( EL-Sharqya)……………..( 3 penstock gates )
• Mashtool EL sooq ( EL-Sharqya)…………..( 4 penstock gates )
• Kafr Saqr ( EL-Sharqya)…………………….( 1 penstock gates )
• El Qanayat ( EL-Sharqya)…………………..( 1 penstock gates )
• Client: Mokhtar Ebraheem co.
 Project:: (Supply &erection) of the Tiles filters in water stations and insulation :
 Client: Metito Co.
•Water plant Khouzam( Qena)
• Water plant Abousabl & Sriaqos
• Water plant bany Ahmed Minia
• Water plant Atfih
• Water plant Elsaf
• Water plant Imbaba
• water plant Ghzert Eldahab
•Hellwan Water Station
•Ebshadat Water Station . Elmenia
•Bany Amer Water Station . Elmenia
 Project: (Supply, erection) M-Bloks
• Location: Menia elkamh Water Station
• Location: Elmahmudea Water Station
• Location: Meetghamr Water Station
Fourth job :
• Place : Talaat Moustafa Construction ( Madinaty Project)
• Job Title: - Mechanical Engineer (sewage and water networks
)Supervision at the site and design review)
 Part time training :
Place : ( SMG) company for training in (HVAC) design
 Project
• Design of Villa AL JALLAF in dubai
• Villa badr in dubai
• Villa sharaf al hashimi in Saudi Arabia
• Villa obaid belal in dubai
• Central Air Conditioning for Hotel
• Housing workers
• Conditioning of the mosque
• Conditioning of the guard house
• current job : from 2013 to now
 working as a site engineer in ABCD @SBG (SAUDI BINLADN GROUP )
electromechanical division – JEDDA -Housing Project of the National Guard
750 Villa ,
- my responsibilities are :
• Making shop drawings according to latest modification .
• Execution of mechanical works in site .
• Coordination between electromechanical work and other works .
• Material estimation concerning mechanical works .
• Participating in suppliers selection according to technical and financial offers
 working as a site engineer in ABCD @SBG (SAUDI BINLADN GROUP )
electromechanical division – madina haram expansion project P1600,
- my responsibilities are :
• Supervising on the erection work.
• .Coordination between electromechanical work and other works .
• Material estimation concerning mechanical works .
• Follow up safety works in site
• Follow up installation of cathodic protection system
• Execution of mobilization works in site .
Reda cv en
Reda cv en
Reda cv en
Reda cv en
Reda cv en
Reda cv en

More Related Content

What's hot (20)

elsayed cv last
elsayed cv lastelsayed cv last
elsayed cv last
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)
 
CIVIL ENGR.C.V
CIVIL ENGR.C.VCIVIL ENGR.C.V
CIVIL ENGR.C.V
 
ibrahim moustafa_CV_Last update dated8_2016.DOC
ibrahim moustafa_CV_Last update dated8_2016.DOCibrahim moustafa_CV_Last update dated8_2016.DOC
ibrahim moustafa_CV_Last update dated8_2016.DOC
 
ahmed cv finall ing
ahmed cv finall ingahmed cv finall ing
ahmed cv finall ing
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
Ibrahim C.V
Ibrahim C.VIbrahim C.V
Ibrahim C.V
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
 
Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015
 
Shahmeer Resume2-3
Shahmeer Resume2-3Shahmeer Resume2-3
Shahmeer Resume2-3
 
QAQC-E&I -Resume
QAQC-E&I -ResumeQAQC-E&I -Resume
QAQC-E&I -Resume
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]
 
Resume Sivakumar SKTJ
Resume Sivakumar SKTJResume Sivakumar SKTJ
Resume Sivakumar SKTJ
 
C.V
C.VC.V
C.V
 
En c.v
En c.v En c.v
En c.v
 
CV
CVCV
CV
 
Luxman -CV
Luxman -CVLuxman -CV
Luxman -CV
 
DILKASH(resume)
DILKASH(resume)DILKASH(resume)
DILKASH(resume)
 
Mohamed kamal cv2018
Mohamed kamal cv2018Mohamed kamal cv2018
Mohamed kamal cv2018
 

Viewers also liked

Viewers also liked (12)

Sample of Market Analysis
Sample of Market AnalysisSample of Market Analysis
Sample of Market Analysis
 
Remembrance of allah page 1
Remembrance of allah page 1Remembrance of allah page 1
Remembrance of allah page 1
 
Great party options
Great party optionsGreat party options
Great party options
 
TGS GPS- East Coast Canada Well Logs
TGS GPS- East Coast Canada Well Logs TGS GPS- East Coast Canada Well Logs
TGS GPS- East Coast Canada Well Logs
 
HealthCostIG
HealthCostIGHealthCostIG
HealthCostIG
 
Présentation Beeye
Présentation BeeyePrésentation Beeye
Présentation Beeye
 
ThinkPrint Press
ThinkPrint PressThinkPrint Press
ThinkPrint Press
 
Caso clínico anciano fragil
Caso clínico anciano fragilCaso clínico anciano fragil
Caso clínico anciano fragil
 
reda cv EN
reda cv ENreda cv EN
reda cv EN
 
Santhan Vutha - Resume
Santhan Vutha - ResumeSanthan Vutha - Resume
Santhan Vutha - Resume
 
ШОПЕН. ПРЕЛЮДІЇ
ШОПЕН. ПРЕЛЮДІЇШОПЕН. ПРЕЛЮДІЇ
ШОПЕН. ПРЕЛЮДІЇ
 
El sexenni democràtic
El sexenni democràticEl sexenni democràtic
El sexenni democràtic
 

Similar to Reda cv en (20)

Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
Oct. -2015-CV
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)
 
cv amr
cv amrcv amr
cv amr
 
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
 
Maintenance Supervisor.DOC
Maintenance Supervisor.DOCMaintenance Supervisor.DOC
Maintenance Supervisor.DOC
 
Hani Shaker mep
Hani Shaker mepHani Shaker mep
Hani Shaker mep
 
amr cv 222222
amr cv 222222amr cv 222222
amr cv 222222
 
cv
cvcv
cv
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
FAWZEY CV LATEST UPDATE-3
FAWZEY CV LATEST  UPDATE-3FAWZEY CV LATEST  UPDATE-3
FAWZEY CV LATEST UPDATE-3
 
Ahmad Alfahom CV
Ahmad Alfahom CVAhmad Alfahom CV
Ahmad Alfahom CV
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
Michael CV.
Michael CV.Michael CV.
Michael CV.
 
Ahmad CV
Ahmad CVAhmad CV
Ahmad CV
 
Saeed Fadl CV
Saeed Fadl CVSaeed Fadl CV
Saeed Fadl CV
 
Saeed Fadl CV
Saeed Fadl CVSaeed Fadl CV
Saeed Fadl CV
 
CV_Alaa Eldin_Mech
CV_Alaa Eldin_MechCV_Alaa Eldin_Mech
CV_Alaa Eldin_Mech
 
Mohamed Salah Ibrahim
Mohamed Salah IbrahimMohamed Salah Ibrahim
Mohamed Salah Ibrahim
 
CV-Mohamed Abulila 01- 2016
CV-Mohamed Abulila 01- 2016CV-Mohamed Abulila 01- 2016
CV-Mohamed Abulila 01- 2016
 
Ahmed zain -mechanical engineer
Ahmed zain -mechanical engineerAhmed zain -mechanical engineer
Ahmed zain -mechanical engineer
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdfKamal Acharya
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information SystemsAnge Felix NSANZIYERA
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessorAshwiniTodkar4
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Fundamentals of Internet of Things (IoT) Part-2
Fundamentals of Internet of Things (IoT) Part-2Fundamentals of Internet of Things (IoT) Part-2
Fundamentals of Internet of Things (IoT) Part-2ChandrakantDivate1
 
Danikor Product Catalog- Screw Feeder.pdf
Danikor Product Catalog- Screw Feeder.pdfDanikor Product Catalog- Screw Feeder.pdf
Danikor Product Catalog- Screw Feeder.pdfthietkevietthinh
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 
Databricks Generative AI Fundamentals .pdf
Databricks Generative AI Fundamentals  .pdfDatabricks Generative AI Fundamentals  .pdf
Databricks Generative AI Fundamentals .pdfVinayVadlagattu
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...ppkakm
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxhublikarsn
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 

Recently uploaded (20)

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Fundamentals of Internet of Things (IoT) Part-2
Fundamentals of Internet of Things (IoT) Part-2Fundamentals of Internet of Things (IoT) Part-2
Fundamentals of Internet of Things (IoT) Part-2
 
Danikor Product Catalog- Screw Feeder.pdf
Danikor Product Catalog- Screw Feeder.pdfDanikor Product Catalog- Screw Feeder.pdf
Danikor Product Catalog- Screw Feeder.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Databricks Generative AI Fundamentals .pdf
Databricks Generative AI Fundamentals  .pdfDatabricks Generative AI Fundamentals  .pdf
Databricks Generative AI Fundamentals .pdf
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 

Reda cv en

  • 1. Reda Rezk Gomaa Abo Saad 27 EL- Emaan st. Tura El- Esment - Maadi – Cairo- Egypt Mobile No. : 0565702904 , 0548616634 E-mail : redarezk322@yahoo.com Objective I am now looking to build on my extensive range of technical skills within a suitablychallenging role. I am keen to achieve further professional development. Personal Information Date of Birth: 25/1/1981 Place of Birth: Cairo. Nationality: Egyptian. Religion:Moslem. Marital Status: married. Military status :. Finished ( 3 years) Hobbies: Swimming and walking. Languages Arabic : Mother tongue English : Good Education High education stage : • University name: Helwan. • Faculty name : Mattaria. • B.SC in power mechanical engineering Degree. • Grade of graduation : good. • Grade of project : Excellent. • Date of graduation : 2005 Bachelor project • Design And Calculation Of Central Air Conditioning system (using E20-II Carrier Software ) civil And architecture engineering building Jop Objective 1. A designer for machine, Planning 2. Petroleum field 3. Water field
  • 2. Personality Key Strength • Ability to work under pressure. • Excellent team worker (as both team leader or member) • Excellent communication skills. • Totally committed to any work requirment unconditionally. • Self learning ability. • Good thinkig in solving problems . • Excellent negotiation skills . Computer Skills • Operating Systems (Windows 95, 98, ME, 2000, XP). • MS Office (Word , PowerPoint , Excel ). • CAD packages (AutoCAD). • Having good knowledge of computer hardware . • Internet . • Computer Maintenance. • Solid works Some knowledge about: • Vessels & piping design i have attended courses • Piping design & construction in ( AUC ) • Fire Fighting systems in ( syndicate of engineers) • Plumping systems in ( syndicate of engineers) • HVAC systems Design training course Job Experience • Summer training in Tura Portland cement company. First job : • Place : Automatic slaughter of chicken in suez • Work : Maintenance Engineer. Job Description 1. reading the trouble and solved it 2. contacts with Maintenance companys 3. Supervising on the erection work and production cycle second job : • Place : geometrical Branch of militarism centrical zone. • Work : Project Engineer. Job Description :. 1. Making the suitable offer 2. Making the final offer by suitable documentation and filing 3. Supervising on the erection work. 4. contacts with Maintenance companys
  • 3. Third job : • Place : Al masry office for engineering. • Work : Project Engineer ( water & waste water ) dept. Job Description :. o Making the suitable offer o Making the final offer by suitable documentation and filing o Supervising on the erection work. Some Of My Projects  Project :Electromechanical works (Supply &erection) for replace and refurbish water station • Location: abo sultan – fayed ( EL- Esmailiya) • Consultant: NOPWASD • Client:. Mokhtar Ebraheem co  Project: Electromechanical works (Supply &erection) of the sewage pumping station • Location: Kafer EL Daghayda – Gharbia Governorate • Consultant: SEECO Dr.Medhat Saleh . • Client:. Arab Contractors Co  Project: Electromechanical works (Supply &erection) of the sewage pumping station • Location: Alsamlawin – Gharbia Governorate • Consultant : SEECO Dr.Medhat Saleh  Client:. Arab Contractors Co  Project: Electromechanical works (Supply &erection) of the sewage pumping station • Location: Khozam – Qena Governorate • Consultant: Moharram Bakhoum. • Client:. Mokhtar Ebraheem co Project:: (Supply &erection) of the water hammer protection vessel • Location: Omar abn ELkhatab ( Suez ) • Consultant: NOPWASD • Client: Arab Contractors Company Project:: (Supply &erection) of the water hammer protection vessel • Location: Abo Hamad ( EL-Sharqya)
  • 4. • Consultant: NOPWASD • Client: Mokhtar Ebraheem co  Project: Electromechanical, works (Supply) (134 –pcs) Gates of sewage from GRP  Consultant: NOPWASD  Client:. Mokhtar Ebraheem co  Project: (Supply &erection)pressure reducing valves • Location: abo aref station ( Suez ) • . Consultant: NOPWASD • Client:. Mokhtar Ebraheem co  Project: (Supply and installation) and purified water lifting units to the upper reservoir • Location: Arab Contractors Branch Building, east and central Delta - Gharbia Governorate • Client: Arab Contractors  Project:: penstock gates (Supply, erection)diameter ( 600 , 800 , 900 , 1000 ,1200 )mm • Location of sanitary drainage stations : • Abo Hamad ( EL-Sharqya)………………...( 5 penstock gates ) • Welad Saqr ( EL-Sharqya)………………..( 1 penstock gates ) • Manya ELqamh ( EL-Sharqya)……………..( 3 penstock gates ) • Mashtool EL sooq ( EL-Sharqya)…………..( 4 penstock gates ) • Kafr Saqr ( EL-Sharqya)…………………….( 1 penstock gates ) • El Qanayat ( EL-Sharqya)…………………..( 1 penstock gates ) • Client: Mokhtar Ebraheem co.  Project:: (Supply &erection) of the Tiles filters in water stations and insulation :  Client: Metito Co. •Water plant Khouzam( Qena) • Water plant Abousabl & Sriaqos • Water plant bany Ahmed Minia • Water plant Atfih • Water plant Elsaf
  • 5. • Water plant Imbaba • water plant Ghzert Eldahab •Hellwan Water Station •Ebshadat Water Station . Elmenia •Bany Amer Water Station . Elmenia  Project: (Supply, erection) M-Bloks • Location: Menia elkamh Water Station • Location: Elmahmudea Water Station • Location: Meetghamr Water Station Fourth job : • Place : Talaat Moustafa Construction ( Madinaty Project) • Job Title: - Mechanical Engineer (sewage and water networks )Supervision at the site and design review)  Part time training : Place : ( SMG) company for training in (HVAC) design  Project • Design of Villa AL JALLAF in dubai • Villa badr in dubai • Villa sharaf al hashimi in Saudi Arabia • Villa obaid belal in dubai • Central Air Conditioning for Hotel • Housing workers • Conditioning of the mosque • Conditioning of the guard house • current job : from 2013 to now  working as a site engineer in ABCD @SBG (SAUDI BINLADN GROUP ) electromechanical division – JEDDA -Housing Project of the National Guard 750 Villa , - my responsibilities are : • Making shop drawings according to latest modification . • Execution of mechanical works in site . • Coordination between electromechanical work and other works . • Material estimation concerning mechanical works . • Participating in suppliers selection according to technical and financial offers  working as a site engineer in ABCD @SBG (SAUDI BINLADN GROUP )
  • 6. electromechanical division – madina haram expansion project P1600, - my responsibilities are : • Supervising on the erection work. • .Coordination between electromechanical work and other works . • Material estimation concerning mechanical works . • Follow up safety works in site • Follow up installation of cathodic protection system • Execution of mobilization works in site .