Vivencio D. Atienza is an electrical supervisor with over 19 years of experience in oil and gas construction projects around the world. He is currently working as an electrical supervisor in Saudi Arabia and seeks new opportunities to further develop his skills. Atienza has extensive experience managing electrical installations for power plants, refineries, and other industrial facilities.
1. VIVENCIO D. ATIENZA
Address: Barangay San Antonio I
San Pablo City, Laguna 4000 Philippines
Mobile Nos. +63 928 6061187 (Roaming)
in Phils. +63 921 6853403 (Saudi Arabia +966501527087)
+63 939 9387164
Email Add: bhenatienza13@yahoo.com
POSITION DESIRED: ELECTRICAL SUPERVISOR
SUMMARY OF EXPERIENCES:
Professional experience over 19 years in Oil & Gas Plant & Refineries (EPC) Construction
Projects. Working Overseas in Different Countries; Such as Saudi Arabia, Taiwan Republic of
China, Qatar, Russia and United Arab Emirates Seeking career in an organization, which
enhance my knowledge, abilities and professional skills in a challenging environment as well as
provides a chance to improve my career based on my ability and performance
I. Presently working as Electrical Supervisor at GS Neotek Co. Ltd. Since March 17.2014,
for the Construction of KEMYA SEP HALOBUTYL PROJECT
Technip Main Contractor
II. 4months as Electrical Supervisor at DAEMYUNG COMPANY,
For the Construction of Petron Bataan Refinery, Philippines.
DAELIM ENGINEERING AND CONSTRUCTION COMPANY, Main Contractor
III. 1year as Electrical Supervisor at SENDAN GULF CONTRACTING COMPANY,
For the Construction of RUWAIS REFINERY EXPANSION PROJECT.
SK E&C, Main Contractor
IV. Two years working as Electrical Supervisor at Binjarallah Group of Company’’
For the Construction of Hail University Hospital and Jizan University 200 Bed
Hospital, Kingdom Of Saudi Arabia, with the supervision of EBENSALEH
CONSULTANTS FOR ARCHITECTURE &PLANNING.
V. 9months as Electrical Supervisor at Al Hasoun Sejong Electromechanical Est.
For the Construction of (IWPP) Hyundai Rapo, STATE OF QATAR’’
HYUNDAI ENGINEERING AND CONSTRUCTION COMPANY LTD.
General Contractor.
VI. Almost 1year at Al Hasoun Sejong Electromechanical Est.For the Construction
1
2. Of AL TAWEELA’ A-10 PROJECT, DOOSAN General Contractor
ABU DHABI UNITED ARAB EMIRATES
VII. 1year at Kentech Sakhalin Technical Services’ ‘For the Construction Of
SAKHALIN PHASE 2 LNG PLANT and OIL EXPORTING TERMINAL
CHIODA TOYO SAKHALIN DEVELOPMENT(CTSD)LTD.
General Contractor SAKHALIN RUSSIA
VIII. 10months at Dong Yeong Engineering and Construction Company’’
For the Construction of QP LAB PROJECT
LG ENGINEERING and CONSTRUCTION CORP.
General Contractor
MESAIEED INDUSTRIAL CITY ,STATE OF QATAR
IX. 1Year at Daesun Engineering and Construction Company Ltd’’
For the Construction of SPC/PDH POLY PROPYLENE PROJECT
SAMSUNG ENGINEERING and CONSTRUCTION COMPANY LTD.
General Contractor, JUBAIL K S A,
X. 7Months at (CCIC) CONSOLIDATED CONTRUCROR INTN’L.CO.
For the Construction of ONSHORE GAS DEVELOPMENT PROJECT
PHASE—2’BECHTEL and TECHNIP,General Contractor
HABSHAN ABU DHABI UNITED ARAB EMIRATES
XI. 9Months at SAMSUNG ENGINEERING and CONSTRUCTION CO.
For the Construction of FORMOSA PETROCHEMICAL COMPANY
MAILIAO,YUAN LIN PROVINCE,TAIWAN,REPUBLIC OF CHINA
XII. 1year and 4months at DONG YEONG ENGINEERING and CONSTRUCTION
COMPANY LTD. For the Construction of; ARAMCO GAS and OIL REFINERY,
AL KHOBAR AK3 POWER and DESALINATION PLANT PROJECT.
SAUDI SHINWHA COMPANY LTD. General Contractor
AL KHOBAR,SAUDI ARABIA.
XIII. 11Months at TAELIM ENGINEERING and CONSTRUCTION CO.LTD.
For the Construction Of QATAR GAS UPSTREAM DEVELOPMENT PROJECT
SHINWHA ENGINEERING and CONSTRUCTION COMPANY LTD.
General Contractor, RAS LAFFAN,STATE OF QATAR
XIV. 1year and 10months at SAUDI BINLADIN GROUP SPECIAL BUILDING
DIVISION’For the Construction Of SABIC RESIDENSIAL COMPLEXES
JUBAIL KINGDOM OF SAUDI ARABIA
2
3. XVI. 5years at HADI HAIDER and BROTHERS COMPANY
For the Construction of:
SCECO TRANSMISSION LINE and SUB STATION
AINDAR, K S A
QURAYYAH POWER PLANT PHASE 1 and PHASE 2
MITSUBISHI HEAVY INDUTRIES LTD. General Contractor
SCECO CONSTRUCTION
QURAYYAH, K S A
ARMED FORCES FACILITIES PROJECT
BALLAST NEDAM General Contractor
KHAMIS MUSHAYT, K S A
DUTIES AND RESPONSIBILITIES:
Work under site Supervisory of workers and their assignment and progress for daily activities:
1) Responsible for daily allocation report; planning for the job; Doing safety task
assignment for daily work activities; Supervising for the job of skilled workers.
2) Responsible and familiar about schematic drawings as well as sketch plan and location
plan layout.
3) Give instruction to all foreman and skilled workers for the following daily work
activities.
4) Daily site surveillance of electrical / instrument works which are in progress, checking
if construction is working according to Client’s specifications, details, drawings, IEC,
and NEC.
5) Preliminary inspection of electrical works together with sub-contractor QA, QC
Inspector for any changes in location and prepares punch list items.
6) Responsible for installation of heat tracing cables, glanding and termination, line
check, megger test and grounding system installation.
7) Responsible in preparation of tools, materials and equipment be use for installation.
8) Responsible for the installation of Supports, Conduit pipes,Cable trays and junction
box For lighting system
9) Responsible of the Engineering & Construction for Redline the drawing before
inspection of the owner engineer on Metallic conduit & fittings, cabinets & junction
boxes, cable trays, cable ducts, low voltages & medium voltages cables below ground
installation.
10) Responsible to check the location of the specified drawing prior to inspection.
11) Responsible for Panel alignment, and cable pulling works.
12) Rectification of Discipline Punch list as per Area & System.
13) Coordinate to the Engineering Manager for site changes and associated red line
drawings.
14) Always coordinate to the Sub Contractor Supervisor of the field if there’s an as-built
operation of the drawing.
15) Responsible of checking the area for site changes and draft the changes as red line
drawings & as-built drawings.
3
4. 16) Responsible for the installation of telecommunication system,Paging and Fire alarm
system.
17) Assisting on commissioning for all motor run test with vibration and temperature of
motors.
18) Responsible for the coordination and direction of the HSE program, reporting directly
to the project manager.
19) Preparation of cable drum for what cable scheduled to be pulled.
20) Preparing of Power Layout Drawing, Cable Schedule and Drum Schedule.
21) Cable Pulling Works at the Cable Trench and Cable Trays, from Process Area to
Switchgear.
22) Preparing for RFI and Attachment Document for Inspection.
23) Discuss of Safety procedure and Safety precaution required, to ensure that all workers
are fully aware and understand control measure.
24) Discuss any potential hazards and organize the job steps to all workers.
25) Plans and develop work schedules.
26) Trains or informs employees of new methods or procedures.
27) Check for update Electrical Design for review by the engineer and for approval by the
consultant.
28) Provide approved Electrical Drawings to the electrical personnel for proper work
distribution
29) Monitoring progress of work and prepare request for materials and supplies.
30) Responsible for underground PVC Pipe / Duct Bank installation.
31) Responsible for request of inspection(RFI)for QA/QC base to the work activity done.
WORK EXPERIENCE
KEMYA HALOBUTYL SAUDI ELASTOMER PROJECT
TECHNIP MAIN CONTRACTOR
PO BOX 2152, JUBAIL 31951, SAUDI ARABIA
DATE : March 17, 2014 up to present
POSITION : Electrical Supervisor
PETRON BATAAN REFINERY
DAELIM ENGINEERING AND CONSTRUCTION COMPANY
MAIN CONTRACTOR, FOR THE CONSTRUCTION OF
DM GNS PHIL.INC. DAEMYUNG PHILS.
DATE : October 30, 2013 up to present
POSITION : Electrical Supervisor
RUWAIS REFINERY EXPANSION PROJECT
SK E&C – MAIN CONTRACTOR
4
5. SENDAN GULF – SUB CONTRACTOR
RUWAIS UNITED ARAB EMIRATES
DATE : September 10, 2012 to September 12,2013
POSITION : Electrical Supervisor
BINJARALLAH GROUP OF COMPANY
Riyadh, Kingdom of Saudi Arabia
CONSTRUCTION OF GIZAN 200 BEDS UNIVERSITY HOSPITAL
And HAIL MEDICAL COLLEGE UNIVERSITY
Date : May 23, 2010 up to June 13, 2012
Position : Electrical Superviso
AL HASOUN SEJONG ELECTROMECHANICAL EST
FOR THE CONSTRUCTION OF IWPP, HYUNDAI RAPO
INDIPENDENT WATER AND POWER PROJECT
HYUNDAI ENGINEERING & CONSTRUCTION COLTD. General Contractor
RAS LAFFAN “C”, RAS LAFFAN, STATE OF QATAR
Date : April 27, 2009 to January 4, 2010
Position : Electrical Supervisor
AL HASOUN SEJONG ELECTROMECHANICAL EST.
FOR THE CONSTRUCTION OF AL TAWEELAH, A 10 PROJECT
DOOSAN General Contractor
AL TAWEELAH, ABU DHABI, UNITED ARAB EMIRATES
Date : January 23, 2008 to January 19, 2009
Position : Electrical Supervisor
KENTECH SAKHALIN TECHNICAL SERVICES
CHIODA TOYO SAKHALIN DEVELOPMENT (CTSD) LTD.
GENERAL CONTRACTOR
FOR THE CONSTRUCTION OF SAKHALIN PHASE 2 LNG PLANT
AND OET (OIL EXPORTING TERMINAL) PROJECT
SAKHALIN RUSSIA
Date : July 6, 2006 to August 27, 2007
Position : Electrical Foreman
DONG YEONG ENGINEERING & CONST. CO.
LG ENGINEERING & CONST.CORP. General Contractor
P.O. BOX 50021, MESAIEED INDUSTRIAL CITY
STATE OF QATAR
FOR THE CONSTRUCTION OF QP LAB PROJECT
Date : February 22, 2005 to December 24, 2005
Position : Electrical Foreman
DAESUN ENGINEERING AND CONSTRUCTION CO.LTD.
SAMSUNG SAUDI ARABIA LTD. General contractor
SPC PDH/POLYPROPYLENE PROJECT P.O.BOX 35816,JUBAIL K.S.A.
Date : January 31, 2003 to January 30, 2004
5
6. Position : Electrical Foreman
DEREV GENERAL TRADING& ELECTRICAL CONTRACTOR (DGTEC)
YAMATAKE PHILIPPINES INC.General Contractor
36th
Floor, Rufino Towers
6784 Ayala Avenue, Makati City, Philippines
Date : July 4, 2000 to December 2001
Position : Electrical Foreman
Project :
FUTABA Automatic Control for HVAC System
NSG Automatic Control for HVAC System
HICAP Automatic Control for HVAC System
NIDEC Automatic Control for HVAC System and Monitoring
System
Address Laguna TechnoparkInc., Biñan, Laguna
SHINDENGEN Automatic Control for HVAC and Monitoring
System
TOTOKU PHASE 2 Automatic Control for AHU
ALCOA Automatic Control for Sliding Door
Address Carmel Ray 1 & 2, Canlubang, Calamba City
AIR LIQUIDE Automatic Control for Monitoring System
Address Pinagbuhatan, Pasig City
SANYO CAPACITOR Automatic Control for HVAC System
Address Luisita Industrial Park, Tarlac, Tarlac City
(CCIC) CONSOLIDATED CONTRUCTOR INT’L.COMPANY S.A.L.
BECHTEL and TECHNIP General Contractor
ONSHORE GAS DEVELOPMENT PROJECT – PHASE 2
HABSHAN, ABU DHABI, U.A.E.
Date : November 6, 1999 to June 5, 2000
Position : Lead Man Electrician
SAMSUNG ENGINEERING AND CONSTRUCTION COMPANY
FOR THE CONSTRUCTION OF FORMOSA PETROCHEMICAL COMPANY
MAILIAO, YUAN LIN PROVINCE
TAIWAN, R.O.C.
Date : October 28, 1998 to July 21, 1999
Position : Lead Man Electrician
6
7. DONG YEONG ENGINEERING & CONSTRUCTION CO., LTD.
SAUDI SHINWHA COMPANY LTD.General contractor
ARAMCO CONSTRUCTION FOR GAS AND OIL REFINERY
RAHIMAH, RASTANURA, K.S.A.
AND AL-KHOBAR POWER AND
DESALINATION PLANT PROJECT AL-KHOBAR K.S.A.
Date : February 2, 1997 – June 3, 1998
Position : Lead Man /Industrial Electrician
TAELIM ENGINEERING & CONSTRUCTION CO.
SHINWHA ENGINEERING AND CONS’T. CO.LTD. General Contractor
QATARGAS UPSTREAM DEVELOPMENT PROJECT
RAS LAFFAN, STATE OF QATAR
Date : August 6, 1995 – July 31, 1996
Position : Lead Man /Industrial Electrician
SAUDI BINLADIN GROUP / SPECIAL BUILDING DIVISION
FOR THE CONSTRUCTION OF SABIC RESIDENTIAL COMPLEXES
JUBAIL, K.S.A.
Date : September 9, 1993 to June 24, 1995
Position : Lead Man /Industrial Electrician
HADI HAIDER AND BROS. COMPANY
SCECO CONSTRUCTION (SAUDI CONSOLIDATED ELECTRIC CO.)
FOR THE PROJECT OF TRANSMISSION LINE AND SUB-STATION
AINDAR, K.S.A.
Date : August 17, 1991 to January 10, 1993
Position : Lead Man /Industrial Electrician
HADI HAIDER & BROS. COMPANY
MITSUBISHI HEAVY INDUSTIES LTD. General Contractor
SCECO CONSTRUCTION PROJECT
QURAYYAH EASTERN POWER PLANT PHASE 2
QURAYYAH, K.S.A
Date : April 13, 1990 to August 15, 1991
Position : Lead Man Electrician
HADI HAIDER & BROS. COMPANY
BALLAST NEDAM GROEP N.V. General Contractor
AFF PROJECT / KING KHALED AIR BASE
KHAMIS, MUSHAYT, K.S.A.
Date : November 8, 1988 to December 22, 1989
7
8. Position : Tunnel Electrician
HADI HAIDER & BROS. COMPANY
MITSUBISHI HEAVY INDUSTRIES LTD. General contractor
SCECO CONSTRUCTION PROJECT
QURAYYAH EASTERN POWER PLANT PHASE 1
QURAYYAH, K.S.A.
Date : September 7, 1987 to September 30, 1988
Position : Electrician
DUTIES AND RESPONSIBILITIES
1) Layout and installation of cable tray (aluminum and galvanized body)
2) Cable pulling for power panel and control panel
3) Grounding installation for electrical equipment
4) Instrument stanchion support / fabrication and installation
TRAINING AND SEMINARS
1) Basic Safety Training and Instruction
2) PTW Seminars for PTW Holder
WORK AWARDS
1) Safety Award
2) Exellent Performance Certificate
PERSONAL DATA
Date of Birth : January 13, 1965
Place of Birth : San Pablo City
Religion : Roman Catholic
Nationality : Filipino
Height : 5’2”
Weight : 115 lbs.
Passport No. : EC3208990
Date of Issue : 20 JANUARY 2015
Date of Expire : 19 JANUARY 2020
EDUCATIONAL BACKGROUND:
College : San Pablo City School of Arts and Trade
8
9. (Now Laguna State Polytechnic University)
Address : Brgy. Del Remedio, San Pablo City
Course : Technical Electricity
Date Graduated : March 30, 1985
Secondary : San Pablo City School of Arts and Trade
Address : Brgy. Del Remedio, San Pablo City
Date Graduated : April 1, 1982
Elementary : San Vicente Elementary School
Address : Brgy. San Vicente, San Pablo City
Date Graduated : March 30, 1978
Special Skills :
Electrical Supervisor / Foreman / E & I in Oil Field Construction: Power Plant, Gas and Oil
Refinery, Petrochemical, Desalination Plant, Buildings and Tunnels.
I hereby certify that the above statement is true and correct to the best of my knowledge and
beliefs.
Vivencio D. Atienza
Electrical Supervisor
9
10. (Now Laguna State Polytechnic University)
Address : Brgy. Del Remedio, San Pablo City
Course : Technical Electricity
Date Graduated : March 30, 1985
Secondary : San Pablo City School of Arts and Trade
Address : Brgy. Del Remedio, San Pablo City
Date Graduated : April 1, 1982
Elementary : San Vicente Elementary School
Address : Brgy. San Vicente, San Pablo City
Date Graduated : March 30, 1978
Special Skills :
Electrical Supervisor / Foreman / E & I in Oil Field Construction: Power Plant, Gas and Oil
Refinery, Petrochemical, Desalination Plant, Buildings and Tunnels.
I hereby certify that the above statement is true and correct to the best of my knowledge and
beliefs.
Vivencio D. Atienza
Electrical Supervisor
9