High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Reda cv en
1. Reda Rezk Gomaa Abo Saad
27 EL- Emaan st. Tura El- Esment - Maadi – Cairo- Egypt
Mobile No. : 0565702904 , 0548616634
E-mail : redarezk322@yahoo.com
Objective
I am now looking to build on my extensive range of technical skills within a
suitablychallenging role. I am keen to achieve further professional development.
Personal Information
Date of Birth: 25/1/1981
Place of Birth: Cairo.
Nationality: Egyptian.
Religion:Moslem.
Marital Status: married.
Military status :. Finished ( 3 years)
Hobbies: Swimming and walking.
Languages
Arabic : Mother tongue
English : Good
Education
High education stage :
• University name: Helwan.
• Faculty name : Mattaria.
• B.SC in power mechanical engineering Degree.
• Grade of graduation : good.
• Grade of project : Excellent.
• Date of graduation : 2005
Bachelor project
• Design And Calculation Of Central Air Conditioning system (using E20-II
Carrier Software ) civil And architecture engineering building
Jop Objective
1. A designer for machine, Planning
2. Petroleum field
3. Water field
2. Personality Key Strength
• Ability to work under pressure.
• Excellent team worker (as both team leader or member)
• Excellent communication skills.
• Totally committed to any work requirment unconditionally.
• Self learning ability.
• Good thinkig in solving problems .
• Excellent negotiation skills .
Computer Skills
• Operating Systems (Windows 95, 98, ME, 2000, XP).
• MS Office (Word , PowerPoint , Excel ).
• CAD packages (AutoCAD).
• Having good knowledge of computer hardware .
• Internet .
• Computer Maintenance.
• Solid works
Some knowledge about:
• Vessels & piping design
i have attended courses
• Piping design & construction in ( AUC )
• Fire Fighting systems in ( syndicate of engineers)
• Plumping systems in ( syndicate of engineers)
• HVAC systems Design training course
Job Experience
• Summer training in Tura Portland cement company.
First job :
• Place : Automatic slaughter of chicken in suez
• Work : Maintenance Engineer.
Job Description
1. reading the trouble and solved it
2. contacts with Maintenance companys
3. Supervising on the erection work and production cycle
second job :
• Place : geometrical Branch of militarism centrical zone.
• Work : Project Engineer.
Job Description :.
1. Making the suitable offer
2. Making the final offer by suitable documentation and filing
3. Supervising on the erection work.
4. contacts with Maintenance companys
3. Third job :
• Place : Al masry office for engineering.
• Work : Project Engineer ( water & waste water ) dept.
Job Description :.
o Making the suitable offer
o Making the final offer by suitable documentation and filling
o Supervising on the erection work.
Some Of My Projects
Project :Electromechanical works (Supply &erection) for replace and refurbish water
station
• Location: abo sultan – fayed ( EL- Esmailiya)
• Consultant: NOPWASD
• Client:. Mokhtar Ebraheem co
Project: Electromechanical works (Supply &erection) of the sewage pumping station
• Location: Kafer EL Daghayda – Gharbia Governorate
• Consultant: SEECO Dr.Medhat Saleh .
• Client:. Arab Contractors Co
Project: Electromechanical works (Supply &erection) of the sewage pumping station
• Location: Alsamlawin – Gharbia Governorate
• Consultant : SEECO Dr.Medhat Saleh
Client:. Arab Contractors Co
Project: Electromechanical works (Supply &erection) of the sewage pumping station
• Location: Khozam – Qena Governorate
• Consultant: Moharram Bakhoum.
• Client:. Mokhtar Ebraheem co
Project:: (Supply &erection) of the water hammer protection vessel
• Location: Omar abn ELkhatab ( Suez )
• Consultant: NOPWASD
• Client: Arab Contractors Company
Project:: (Supply &erection) of the water hammer protection vessel
• Location: Abo Hamad ( EL-Sharqya)
4. • Consultant: NOPWASD
• Client: Mokhtar Ebraheem co
Project: Electromechanical, works (Supply) (134 –pcs) Gates of sewage from GRP
Consultant: NOPWASD
Client:. Mokhtar Ebraheem co
Project: (Supply &erection)pressure reducing valves
• Location: abo aref station ( Suez )
• . Consultant: NOPWASD
• Client:. Mokhtar Ebraheem co
Project: (Supply and installation) and purified water lifting units to the upper reservoir
• Location: Arab Contractors Branch Building, east and central Delta - Gharbia
Governorate
• Client: Arab Contractors
Project:: penstock gates (Supply, erection)diameter ( 600 , 800 , 900 , 1000 ,1200 )mm
• Location of sanitary drainage stations :
• Abo Hamad ( EL-Sharqya)………………...( 5 penstock gates )
• Welad Saqr ( EL-Sharqya)………………..( 1 penstock gates )
• Manya ELqamh ( EL-Sharqya)……………..( 3 penstock gates )
• Mashtool EL sooq ( EL-Sharqya)…………..( 4 penstock gates )
• Kafr Saqr ( EL-Sharqya)…………………….( 1 penstock gates )
• El Qanayat ( EL-Sharqya)…………………..( 1 penstock gates )
• Client: Mokhtar Ebraheem co.
Project:: (Supply &erection) of the Tiles filters in water stations and insulation :
Client: Metito Co.
•Water plant Khouzam( Qena)
• Water plant Abousabl & Sriaqos
• Water plant bany Ahmed Minia
• Water plant Atfih
• Water plant Elsaf
5. • Water plant Imbaba
• water plant Ghzert Eldahab
•Hellwan Water Station
•Ebshadat Water Station . Elmenia
•Bany Amer Water Station . Elmenia
Project: (Supply, erection) M-Bloks
• Location: Menia elkamh Water Station
• Location: Elmahmudea Water Station
• Location: Meetghamr Water Station
Fourth job :
• Place : Talaat Moustafa Construction ( Madinaty Project)
• Job Title: - Mechanical Engineer (sewage and water networks
)Supervision at the site and design review)
• my responsibilities are :
1- Building Water supply inside building
2- Drainage Networks Inside Building Including Underground & Aboveground Networks
3- infrastructure for all network in the site
4- Coordination between electromechanical work and other works .
5- Material estimation concerning mechanical works .
6 -Follow up safety works in site
7- Making shop drawings according to latest modification .
8 - Execution of mobilization works in site .
9- Participating in suppliers selection according to technical and financial offers
Part time training :
Place : ( SMG) company for training in (HVAC) design
Project
1- Design of Villa AL JALLAF in dubai
2-Villa badr in dubai
3-Villa sharaf al hashimi in Saudi Arabia
4-Villa obaid belal in dubai
5-Central Air Conditioning for Hotel
6-Housing workers
7-Conditioning of the mosque
8-Conditioning of the guard house
• current job : from 2013 to now
Project : Housing Project of the National Guard 750 Villa ,
6. working as a site engineer in ABCD @SBG (SAUDI BINLADN GROUP )
electromechanical division – JEDDA
- my responsibilities are :
1- Building Water supply inside building
2- Drainage Networks Inside Building Including Underground & Aboveground Networks
3- infrastructure for all network in the site
4- Coordination between electromechanical work and other works .
5- Material estimation concerning mechanical works .
6 -Follow up safety works in site
7- Making shop drawings according to latest modification .
8 - Execution of mobilization works in site .
9- Participating in suppliers selection according to technical and financial offers
Project : Prophet Mosque Expansion / The New Building of the Mosque &
Piazza .
- Location : Prophet Mohamed Mosque (New Building & Piazza ).
- Project Initial Expected Budget 200.00 Billion Riyal (Open Cost).
- my responsibilities are ::-
1- Building Water supply inside building including Zamzam Water Network with Stainless
Steel 316L Pipe Material , Cold and Warm Water Lines With Copper,
2- Drainage Networks Inside Building Including Underground & Aboveground Networks with
Cast Iron Pipe Material, Rain Water and Forced Main lines with Ductile Iron Pipe Material ,
Waste Lines behind marbles with 316L Sch. 20s, Vacuum Lines with 316L Sch. 20s.
3- Chilled Water Pipes up to 300 mm Diam. with seamless Black Steel pre-insulated.
4- Firefighting Water Networks Stainless Steel 316L Sch. 40s.
5- Firefighting Water Mist System Pipes 316L Sch. 80s.
6- Coordination between electromechanical work and other works .
7- Material estimation concerning mechanical works .
8 -Follow up safety works in site
9- Follow up installation of cathodic protection system
10 - Execution of mobilization works in site .