1. Reda Rezk Gomaa Abo Saad
27 EL- Emaan st. Tura El- Esment - Maadi – Cairo- Egypt
Mobile No. : 0565702904 , 01271869340
E-mail : redarezk322@yahoo.com
Objective
I am now looking to build on my extensive range of technical skills within a
suitablychallenging role. I am keen to achieve further professional development.
Personal Information
Date of Birth: 25/1/1981
Place of Birth: Cairo.
Nationality: Egyptian.
Religion:Moslem.
Marital Status: married.
Military status :. Finished ( 3 years)
Hobbies: Swimming and walking.
Languages
Arabic : Mother tongue
English : Good
Education
High education stage :
• University name: Helwan.
• Faculty name : Mattaria.
• B.SC in power mechanical engineering Degree.
• Grade of graduation : good.
• Grade of project : Excellent.
• Date of graduation : 2005
Bachelor project
• Design And Calculation Of Central Air Conditioning system (using E20-II
Carrier Software ) civil And architecture engineering building
Jop Objective
1. A designer for machine, Planning
2. Petroleum field
3. Water field
2. Personality Key Strength
• Ability to work under pressure.
• Excellent team worker (as both team leader or member)
• Excellent communication skills.
• Totally committed to any work requirment unconditionally.
• Self learning ability.
• Good thinkig in solving problems .
• Excellent negotiation skills .
Computer Skills
• Operating Systems (Windows 95, 98, ME, 2000, XP).
• MS Office (Word , PowerPoint , Excel ).
• CAD packages (AutoCAD).
• Having good knowledge of computer hardware .
• Internet .
• Computer Maintenance.
• Solid works
Some knowledge about:
• Vessels & piping design
i have attended courses
• Piping design & construction in ( AUC )
• Fire Fighting systems in ( syndicate of engineers)
• Plumping systems in ( syndicate of engineers)
• HVAC systems Design training course
Job Experience
• Summer training in Tura Portland cement company.
First job :
• Place : Automatic slaughter of chicken in suez
• Work : Maintenance Engineer.
Job Description
1. reading the trouble and solved it
2. contacts with Maintenance companys
3. Supervising on the erection work and production cycle
second job :
• Place : geometrical Branch of militarism centrical zone.
• Work : Project Engineer.
Job Description :.
1. Making the suitable offer
2. Making the final offer by suitable documentation and filing
3. Supervising on the erection work.
4. contacts with Maintenance companys
3. Third job :
• Place : Al masry office for engineering.
• Work : Project Engineer ( water & waste water ) dept.
Job Description :.
o Making the suitable offer
o Making the final offer by suitable documentation and filing
o Supervising on the erection work.
Some Of My Projects
Project :Electromechanical works (Supply &erection) for replace and refurbish water
station
• Location: abo sultan – fayed ( EL- Esmailiya)
• Consultant: NOPWASD
• Client:. Mokhtar Ebraheem co
Project: Electromechanical works (Supply &erection) of the sewage pumping station
• Location: Kafer EL Daghayda – Gharbia Governorate
• Consultant: SEECO Dr.Medhat Saleh .
• Client:. Arab Contractors Co
Project: Electromechanical works (Supply &erection) of the sewage pumping station
• Location: Alsamlawin – Gharbia Governorate
• Consultant : SEECO Dr.Medhat Saleh
Client:. Arab Contractors Co
Project: Electromechanical works (Supply &erection) of the sewage pumping station
• Location: Khozam – Qena Governorate
• Consultant: Moharram Bakhoum.
• Client:. Mokhtar Ebraheem co
Project:: (Supply &erection) of the water hammer protection vessel
• Location: Omar abn ELkhatab ( Suez )
• Consultant: NOPWASD
• Client: Arab Contractors Company
Project:: (Supply &erection) of the water hammer protection vessel
• Location: Abo Hamad ( EL-Sharqya)
4. • Consultant: NOPWASD
• Client: Mokhtar Ebraheem co
Project: Electromechanical, works (Supply) (134 –pcs) Gates of sewage from GRP
Consultant: NOPWASD
Client:. Mokhtar Ebraheem co
Project: (Supply &erection)pressure reducing valves
• Location: abo aref station ( Suez )
• . Consultant: NOPWASD
• Client:. Mokhtar Ebraheem co
Project: (Supply and installation) and purified water lifting units to the upper reservoir
• Location: Arab Contractors Branch Building, east and central Delta - Gharbia
Governorate
• Client: Arab Contractors
Project:: penstock gates (Supply, erection)diameter ( 600 , 800 , 900 , 1000 ,1200 )mm
• Location of sanitary drainage stations :
• Abo Hamad ( EL-Sharqya)………………...( 5 penstock gates )
• Welad Saqr ( EL-Sharqya)………………..( 1 penstock gates )
• Manya ELqamh ( EL-Sharqya)……………..( 3 penstock gates )
• Mashtool EL sooq ( EL-Sharqya)…………..( 4 penstock gates )
• Kafr Saqr ( EL-Sharqya)…………………….( 1 penstock gates )
• El Qanayat ( EL-Sharqya)…………………..( 1 penstock gates )
• Client: Mokhtar Ebraheem co.
Project:: (Supply &erection) of the Tiles filters in water stations and insulation :
Client: Metito Co.
•Water plant Khouzam( Qena)
• Water plant Abousabl & Sriaqos
• Water plant bany Ahmed Minia
• Water plant Atfih
• Water plant Elsaf
5. • Water plant Imbaba
• water plant Ghzert Eldahab
•Hellwan Water Station
•Ebshadat Water Station . Elmenia
•Bany Amer Water Station . Elmenia
Project: (Supply, erection) M-Bloks
• Location: Menia elkamh Water Station
• Location: Elmahmudea Water Station
• Location: Meetghamr Water Station
Fourth job :
• Place : Talaat Moustafa Construction ( Madinaty Project)
• Job Title: - Mechanical Engineer (sewage and water networks
)Supervision at the site and design review)
• current job :
- working as a site engineer in ABCD @SBG (SAUDI BINLADN GROUP )
electromechanical division – JEDDA -Housing Project of the National Guard
750 Villa ,
- my responsibilities are :
• Making shop drawings according to latest modification .
• Execution of mechanical works in site .
• Coordination between electromechanical work and other works .
• Material estimation concerning mechanical works .
• Participating in suppliers selection according to technical and financial offers
- working as a site engineer in ABCD @SBG (SAUDI BINLADN GROUP )
electromechanical division – madina haram expansion project P1600,
- my responsibilities are :
• Supervising on the erection work.
• .Coordination between electromechanical work and other works .
• Material estimation concerning mechanical works .
• Follow up safety works in site
• Execution of mobilization works in site .
Part time job :
- :: Place : ( SMG) company for (MEP) works
Project
6. • Design of Villa AL JALLAF in dubai
• Villa badr in dubai
• Villa sharaf al hashimi in Saudi Arabia
• Villa obaid belal in dubai
• Central Air Conditioning for Hotel
• Housing workers
• Conditioning of the mosque
• Conditioning of the guard house
7. • Design of Villa AL JALLAF in dubai
• Villa badr in dubai
• Villa sharaf al hashimi in Saudi Arabia
• Villa obaid belal in dubai
• Central Air Conditioning for Hotel
• Housing workers
• Conditioning of the mosque
• Conditioning of the guard house