AUC Diploma in Professional Program in Project Management (PRGM)
* Cost & Budget *Planning *Primavera
* FIDIC& Contract *Feasibility Study *Resources Management
COMPUTER SKILLS
Microsoft Office (Windows, Excel, WinWord, Access,..)
Microsoft project2000, &Primavera P3
basic of AutoCAD, PowerPoint
Familiar with most available software.
B) EXPERIENCE BRIEF: -
2. 2of 8
From To
11 05/2008 NOW
HASSAN ALLAM SONS CO
Electro mechanical tendering
Director and technical support
(Head Office)
10 01/2006 04/2008
consolidated Contractor CO
(CCC)
Section Head
(Mechanical Engineering Section)
9 10/2003 06/2005
DSD FERROMETALCO
(German Co.)
Project Control Manager
8 10/2001 10/2003
HASSAN ALLAM SONS CO
Electro mechanical technical and
estimation manager (Head Office)
7 03/2000 09/2001
MHDA Industrial Contracting
Co
Electro-mechanical Construction
manager.
6 01/1998 02/2000 HASSAN ALLAM SONS CO Site manager
5 12/1996 01/1998
International Steel Rolling Mill
(BESHAY STEEL)
Mechanical maintenance dep.
Manager
4 03/1996 12/1996
Kobelco- Kobe Steel
(International Japanese Co.)
Quality control inspector eng.
3 01/1993 01/1996
International Steel Rolling Mill
(BESHAY STEEL)
Mechanical site manager
2 01/1991 12/1992
Namlah corp. G.D.M.W. – Saudi
Arabia
Site engineer
1 11/1989 01/1991
Timsah Shipbuilding co. - Suez
canal auth
Site engineer
Period
Company PositionPeriod
C) EXPERIENCE DETAIL: -
11th
period
05/2008 – NOW
Employing Co. HASSAN ALLAM SONS CO
POSITION
Tendering Manager /Director E/M (MEP and Industrial projects) : -
Scope of work
Lead estimation teams consists of 18 persons
Estimation of pricing (direct & indirect cost) for under bidding projects (Piping,
Equipment, MEP and Steel Structure)
Technical offers preparation.
General study preparations
Prepare top sheet.
POSITION
Electro mechanical technical office manager (Head Office)
Scope of work
Follow up for current projects:-
Home office supporting staff-site staff to follow up the execution of this-plan- to ensure
compliance with the contract requirements; and to report to the has management on the
quality status of the project,
3. 3of 8
, weekly and monthly progress reports shall be used to monitor the work progress at
sites
Documents control
Procurement control
Cost control
10th period
Nov.03- Now
Employing Co.: CONSOLIDATED CONTRACTORS CO
9.1 Project name & location
KHURASANIYAH GAS PLANT PROJECT (KGPP)
Saudi Arabia
Value of work:
Value of work: 1,300,000,000 US$
Volume of Mechanical work:
Piping Work =75000 Ton- 52000 ISO`s.
Pipe Support= 7000 Ton.
Steel Work = 55000 Ton
Embeds & Bracing= 4000 Ton.
Client: ARAMCO Engineering & Supply : Bechtel & Technip
Position
Section Head (Mechanical Engineering Section)
Supervising 52 (Engineers,Checkers,Draftsmen,Operators,Clercks)
Scope of work
Markup & Spooling by 52000 ISO`s (Taliso Program)
Shop drawing for all fabrication items (Embeds & Bracing= 4000 Ton & Pipe Support=
7000 Ton.
Piping (75000 t) &Pipe support(7000t) Material Control (Talisman Program)
9th period
Nov.03- Now
Employing Co.: DSD FERROMETALCO
9.1 Project name & location
Hot & Cold Rolling Mill (Flat Steel)
Value of work:
Value of work: (Supply and installation for mech. & elec. Work) 100,000,000 L.E
Mechanical Work =13000Ton.
Piping Work =700 Ton.
Steel Work = 4000 Ton
Client: Ministry Of Military Production
Engineering & Supply : SMS , LOI, Siemens
Position
Project Control Manager
4. 4of 8
Scope of work
Planning.
Cost Control & Invoices.
Project & Progress Control.
Material & Document Control.
8th
period
10/2001 – Oct. 03
Employing Co.
HASSAN ALLAM SONS CO
POSITION
Electro mechanical technical office manager (Head Office)
Scope of work
Follow up for current projects:-
Home office supporting staff-site staff to follow up the execution of this-plan- to ensure
compliance with the contract requirements; and to report to the has management on the
quality status of the project,
, weekly and monthly progress reports shall be used to monitor the work progress at
sites
Documents control
Procurement control
Cost control
Study of new bids: -
Estimation of pricing for under bidding projects.
Technical offers preparation.
General study preparations.
7th
period
3/2000 – 9/2001
Employing co.
MHDA Industrial Contracting Co.
POSITION
Electro-mechanical Construction manager.
7.1 Project name & location
Sinai cement project
Client: Sama el-arish co.
Engineer: Cairo University
Value of work: (8,000,000 l.e)
7.2 Project name & location
Wadi Elnokra sub station (Aswan)
Client: Alstom co. (Main contractor)
Engineer: Ministry of electricity
Value of work: 1500000 le.
7.3 Project name & location
Heavy equipment work shop (Eltbeen)
Client: Aresco
Engineer: Aresco
Value of work: 2300000 L.E.
5. 5of 8
7.4 Project name & location
Golden pyramids hotel
Client: CCC & Orascom (main contractor)
Engineer: Dr. Shaker
Value of work: 300000 le.
Scope of work
. Managing the following processes
Supply ; fabrication and installation of steel-structure- & cladding work - 2500ton
Supply ; installation and commissioning of 3000 m of sewage network (10” & 8”
polyethylene pipes)
Installation and commissioning of fire fighting systems & water supply net work (6” &
8” polyethylene pipes 6500 m)
Installation and commissioning of interconnection piping work
Installation and commissioning of fire fighting system
Supply & installation and commissioning of plumbing systems (polypropylene; UPVC
& galvanized etc...).
Supply Fabrication am Inst all Mechanical Equipment of Olympic swimming Pool
6th
period
Jan 98- Feb. 2000
Employing co.: HASSAN ALLAM SONS
6.1 Project name & location
Dolcy cooled store (supply & installation - size 48 mt * 24 mt * 8 mt.)
Value of work:
(Supply & installation for mech. & elec. Work) 4 million L.E
Employing co.: Senior chief engineer.
Engineering : Heweedy consultant
Scope of work
Installation of cold store steel structure work
Installation of refrigeration equipments, including compressors, evaporators, cooling
towers…
Installation of piping work & pipe supports
Testing start up & commissioning
6.2 Project name & location
Beni Sueif Grain Silos Complex
Client: Middle Egypt flour mills co.
Engineering: CIMBRIA (Denmark)
Duration of erection: May. 1998 - May. 1999
Value of work: (Supply and installation for mech. & elec. Work) 1 5,3 59,615 L.E.
Local supplies =3,374,508 L.E.
Imported supplies =12,085,167 L.E.
Position
Site manager
Scope of work
Installation of galvanized steel silos (6).
Installation of mechanical equipments, including elevators, conveyors, cleaner, weigher,
compressors, etc.
Installation of steel structure work.
6. 6of 8
Installation of dusting system including, Ductwork conveyors, and tanks.
Testing & pre-commissioning and start up.
Fabrication and installation of grain rail, road & mill intake hoppers.
6.3 Project name & location
Citro Misr Chemical Plant
Client:
Citro miser
Engineer:
Sabour consultants
Duration of erection:
2/1999 – 2/2000
Value of work:
4,000,000 L.E. (Erection & installation only)
Position
Site manager
Scope of work
Erection of carbon steel piping system of various diameters (DN 15 up to DN 800)
total lengths 6500mt
Erection of stainless steel piping system of various diameters (DN 25 up to DN 250)
total lengths 7200mt, material of stainless steel pipes are aisi 304, 316, 316 l & 321
Erection of GRP piping system (DN 50 up to DN 200) total length 980mt
Supply fabrication & erection of pipe supports of various steel sections total weight
160 ton
Supply and apply of heat insulation material
Supply and installation of electrical heat tracing system.
5th
period
Dec.96 - Jan 98
Employing co. International Steel Rolling Mill (Sadat City)
5.1 Project name & location
Rebar mill 100 ton /hr
Position: Mechanical maintenance dep. Manager
Scope of work
Responsible of scheduling, and executing all the routine, and preventive maintenance
programs as
Well as trouble shooting for all equipments of
The previously mentioned steel factory.
4th
period
March 96 – dec.96
Employing co.: Kobelco- Kobe Steel (International Japanese Co.)
4.1 Project name & location
Direct reduction plant at (ANSDK) project
Position :Quality control inspector eng.
Engineering :KOBELCO
Scope of work
Inspection of steel structure components including: -
7. 7of 8
Tanks, and hoppers, ducts, rollers, drums, stairs, platforms, pipe rack and power stack
and recuperator casing.
All mentioned items were fabricated in local market (ferrometalco. Hadisolb, metalco…)
3rd
period
1/93 – 1/96
Employing Co.: International Steel Rolling Mill (BESHAY STEEL) (Sadat City)
3.1 Project name & location
Construction of (used) steel rolling mill at Sadat city (brought from U.S.A.)
Position: Site engineer.
Engineering: MORGAN (USA)
Scope of work
Reconditioning of mech. Equipments
Installation of mech. Process equipment (cooling bed) including gear boxes, motors,
rolling stands conveyors…etc
Installation of piping system, including water, air, hydraulic, greasing & oil air mist
system
Testing, start up & commissioning
3.2 Project name & location
Central workshop project:
Position: Mechanical site manager
Engineering: Local
Scope of work
Erection of factory metal machining workshop equipment. (Lathes, planners, mills,
boring…etc.)
Fabrication and installation of pipe supports
Testing & startup.
3.3 Project name & location
Furnace project (100 ton/ hr.)
Position: Mechanical site manager
Engineering: LOI (Germany)
Scope of work
Erection furnace steel works
Apply thermal insulation of steel shell using refractory firebricks& castable.
Installation of mech. Equipments including cross pusher; burners, fans, different type of
conveyors …etc
All piping system (compressed air ,heavy fuel oil,hydraulic, natural gas and
combustion,..)
Fabrication and installation of pipe supports
Testing & pre commissioning
2nd
period
Jan.91 – dec.92
Employing co.
Namlah corp. G.D.M.W. – Saudi Arabia
8. 8of 8
2.1 Project name & location
Heavy vehicles workshop
Position: Site engineer
Engineering; GDMW (Ministry Of Defense)
Scope of work
Installation of various utility piping work including (: -fire fighting system, compressed
air system, greasing system, fume sensing system, & water and sewer lifting station.)
2.2 Project name & location
Main storage water tanks for the BADR city:
Position: Mechanical site manager
Engineering: GDMW (Ministry Of Defense
Scope of work
Installation of: - water supply & distribution piping system (8” pipe line 500 m)
Installation of underground sewage pipe line.
Fabrication & installation of pipe support
Testing & pre commissioning
2.3 Project name & location
Mosque and different building
Position: Mechanical site manager
Engineering: GDMW (Ministry Of Defense
Scope of work:
Installation of plumbing work piping (water supply, drainage system, fixtures, etc…)
Fabrication & installation of pipe support
Testing & pre commissioning
Fabrication and installation of equipment base frames, pipe supports and air ducts for
HVAC package unit DX
Testing & pre commissioning
1st
period
Nov.89 – jan.91
Employing co.
Timsah Shipbuilding co. - Suez canal auth
Project name & location
Executive department:
Silos project: 2silo in Giza & 4 silos in Fayom
Position: Site engineer
Scope of work: Erection and installation of steel structure, steel tanks, different types of
Conveyors &Air blowers.