1. 1
Namig Osmanov
Address: KLCC, Jalan Persiaran 5, “Park Seven” Condo, Unit G5,
50450, Kuala Lumpur, Malaysia
Mobile : +6 016 570-25-93
+994 55 440-05-50
Email: osmanov.namig@gmail.com
Most Recent Position: Senior Well / Drilling Engineer
Years in Oilfield: 12+ years
Languages: English – Fluent
Russian – Fluent
Azeri – Fluent
Current Certification: Well Control IWCF (exp: Nov, 2018)
BOSIET (exp: Aug, 2016)
Azerbaijan
Russia
Malaysia
Relocation:
Area of expertise:
Date of birth: 19.09.1980
Passport: Azerbaijani
Marital Status: married (2 kids)
Current Residence: Malaysia
Eligible to work without
Visa Sponsorship in:
Drilling Engineering
Project ManagementEngineering
QA/QC & HSE Audits
Financial Budgeting & Tendering
Exploration & Developmentwells
Sidetracks
Plug & Abandonmentof wells
ERD Wells
Highly Depleted Reservoir Drilling (EOR project)
Offshore
Onshore
Semi-automated and Fully-automated Drilling Rigs
Floater
Jack Up
Tender Assisted Rig
No restrictions. I am 100% mobile and my family is also
experienced with international living
2. 2
Work History &
Professional Experience:
SCHLUMBERGER IPM
(PETRONAS-SCHLUMBERGER ALLIANCE)
Senior Well (Drilling) Engineer, July 2013- Apr 2016:
Have been responsible for full Engineering support& Planning ofDrilling Campaign for 2nd & 3rd phase
of EOR Project. Roles & responsibilities included butwere notlimited to:
o Following HSE requirements ofPCSB group during concept/ design selection activities for the
project.
o Assessmentofvarious ProjectDevelopmentStrategies, Drilling Designs & old wells
AbandonmentDesigns.
o Selection ofoptimal & mostapplicable Conceptual Designs for proposed drilling campaign.
o Preparation ofDetailed Deterministic & Probabilistic Cost/ Budgetfor these various Conceptual
designs & projectdevelopmentplans.
o Liaison with Subsurface team in creation and agreementof BOD for ProjectDevelopment
Concept
o Preparation ofBasis ofDesign for drilling new wells & side-tracks as well as work overs & P&As of
the existing wells using Jack Up Rig
o Heavy participation in “Technical Limit Process” by delivering detailed timing data analysis &
inputs
o On weekly basis maintaining engagement with other disciplines by participating & leading
meetings with Completions, Production Technology, Reservoir, Facilities engineers on Targets,
Design, Uncertainties, Risks, Schedule and Costs issues to provide seamless transition between
the disciplines during projectexecution in future.
o Working closely with Project Management team as well as Operator’s Central Team Experts to
ensure projectcompliance with Governance rules & requirements
o Improving and Updating numbers in on-going Costoptimization process
o Assuring deliverability & reliability ofselected Drilling designs by running and checking
Schlumberger Software – Tubular Design & Analysis System (TDAS) and equipmentTorque &
Drag analysis (DOX)
o Writing detailed Drilling & Abandonment Programs, Procedures and MOCs
o Preparing Well Diagrams, Plans & Layouts
o Conducting detailed pre-job planning sessions with vendors and offshore teams,
o Providing Quality Assurance Control ofall drilling equipment –meetings, discussions,
preparations, checks and audits
o Providing full 24/7 Engineering Supportduring Drilling Operations as the Single Pointof
Accountability coordinating problem solving sessions with both onshore and offshore teams
o Performing Post – job analysis and failure investigations
o Assuring Performance Tracking- EOWR, Success Stories, SPE Paper, Time & CostSummaries),
capturing and communicating key learning, Providing Vendors’ performance assessments
o Applying leadership skills in day to day work by providing support& supervision to the team,
mentoring young engineers & replacing Drilling Team Leader during his absence
3. 3
BAHAR ENERGY OPERATING COMPANY
Senior Drilling Engineer, Sep 2012 – June 2013:
Have been:
o Responsible for Full Planning & Engineering supportofBahar oilfield drilling campaign.
o Working closely with PSCM team during Selecting & Ordering ofDrilling equipmentwith extremely
short delivery time limits.
o Ensuring procurementofproper equipmentin a timely manner.
o Optimizing Drilling Schedule through meetings with various disciplines involved in order to
improve delivery timeline ofthe project.
o Leading Risk Assessment, OffsetWells Review & Lessons Learned meeting with Drilling team &
Vendors as partof Continuous ImprovementProcess
o Initiating & Leading multi-discipline interaction (i.e. meetings, discussions, workshops) with
subsurface, production, logistics & facilities teams to improve & optimize plan forward.
o Planning & Successfully delivered first3 x production wells ahead ofthe time & below the budget
o Actively Supervising New Rig start up process
o Successfully Planned & deployed first7" Liner in Bahar field
o Fully Supervising office & offshore teams during execution ofthe wells
o Optimizing Logistic plan to have safe & efficient way ofdelivering & loading outdrilling equipment
to the rig.
BP EXPLORATION OPERATING COMPANY LIMITED
Drilling Engineer, Sep 2009 Sep2012
Have been:
o Providing full engineering planning for offshore platform and semi sub wells, including butnot
limited to running drilling engineering software’s- Hydraulics, Kick Tolerance, Casing Running
Surge, Casing Wear, Torque & Drag models; preparing risk analysis for each well; preparing wells
time & costestimates; participating in SOR meetings; optimizing proven techniques and practices
while writing procedures;preparing drilling program and conducting Pre-spud presentations for
offshore team on the rig and preparing MOC documents under the requirement.
o Delivering platform and subsea wells, providing full onshore supporton any engineering or logistic
issues during execution ofthe wells.(with examples ofexcellentdrilling performance with less than
8.2% overall well NPT )
o Preparing procedures and equipmentfor conductor driving campaign for few ACG platforms.
o Working closely with costengineers in preparing DCUS and AFE for respective wells.
o Interacting with reservoir, geology and production for optimizing the well design without
compromising basic objectives
o Evaluating new drilling equipmentand procedures to reduce costand increase drilling efficiency
o Preparing offsetanalysis for different well sections.
o Reviewing and verifying scope ofwork done on respective service companies invoices
o Completing well’s Final Reports and reviewed vendors End ofwell Reports on each respective
well, as well as lead After Action Reviews and Lessons Learned sessions for each well
4. 4
o Participating in vendor’s performance improvementby providing regular feedbacks during
quarterly contractors meetings, reviewing and approving vendors scorecards, creating Non
Conformance Reports and follow up on their closure.
o Working on several projects as an example, butnotlimited to: “increasing kick tolerance ”, “
obtaining better cementjob on conductor casing”, “improving cementing equipmentto eliminate
top up job”, “ choosing proper drilling equipmentto reduce Stick/ Slip vibration”
Offshore Night Drilling Supervisor at 4th generation semi-automated semi-submersible Drilling
rig, Aug 2008- 2009
Have been:
o Supporting Senior Well site Leader in operational leadership,in line with BP Leadership
Framework as well as providing visible safety leadership.
o Monitoring Safety Critical Equipment(SCE) Maintenance activities including deferrals
o Ensuring all Environmental Rules & Regulations were adhered
o Ensuring BP staff and Contractors participation in the rig safety observation and safety
intervention systems that had been used
o Conducting audits (Continuous Audit Process)
o Ensuring segregation and offloading ofwaste materials offshore are done in accordance with
company and legislative requirements
o Directing DC&I well site operations in accordance with approved Operational programs
o Supporting Senior WSL to ensure all deviations to the agreed plan are discussed with the rig
managementteam and appropriate people in town
o Supporting Tech Limit offshore activities and assisting to drive Continuous Improvement
o Ensuring efficient movementofall personnel, equipmentand materials to/from the rig
o Providing supportto Senior WSL in conducting morning calls with onshore operations team
o Assuring all offshore downtimes and failures were reported onshore and inputted into the system
in a timely manner
o Inputting Drilling Reports into the system on a daily basis
o Being responsible for onsite costmanagement(People and equipment)
o Leading After Action Reviews and lessons Learned meetings
o Maintaining healthy working environmentby providing necessary motivation and encouragement
Offshore/ Office Drilling Engineer, July 2005-2008
Have been:
o Working in different positions as partof 6 months CDC on job training on Dada Gorgud Semi-sub
rig:
Safety Induction; Roustabout; Roughneck; Derrikman; AssistantDriller; Subsea Engineer; Barge
Engineer
o Overseeing all drilling related activities as operator Representative
o Capturing learning, for improvementoffuture operations
o Interpreting and implementing drilling and completion programs to achieve well objectives
o Writing rig work instructions based on Drilling programs (Rig move, Drilling, Running casing/ liner,
Cementing, LOT, Wireline ops.)
o Providing vendors Performance monitoring
o Preparing BHA design and selections, modelling for vibration mitigation and stabilisation strategy,
quantifying downhole vibration issues.
o Staying accountable for cost, materials requisitions and stock levels
o Ensuring DIMS (reporting system) was being updated on the daily bases – Casing, Cementing,
and Pipe tally. Daily: Costs, POB, Safety for Daily Morning Reports
o Updating BHA, Bit and Well performance indicators for the future EOWR and section summaries
5. 5
o Performing all necessary calculation (Tongue & Drag, Hydraulics, etc.)
o Preparing Casing tallies, inner / landing strings for casing running operations.
o Documenting all pressure and function tests, along with operations, as required
o Delivering End of Well Reports for drilled wells
o Providing Equipmentsupportfor Offshore
o Maintaining inventory ofdrilling related equipmentin order, for platform stock - Bits, Subs, Hole
Openers, Reamers, Casing, Cementheads, Hangers.
o Performing QA/QC audits- ensuring that drilling equipmentis maintained in good condition
o Ensuring all the key contingency equipmentand procedures are available in time for deployment
o Assisting the Drilling Supervisor
o Stand in as Night Drilling Supervisor on various locations when required
o Investigated problems with vendor’s NPTand prepared Investigation reportwith recommendation
for the further improvements.
o Analysing and optimizing trouble time ofexisting offsetwells
BP EXPLORATION OPERATING COMPANY LIMITED
Production Technician – Operations, Apr 2004-July 2005
Have been:
o Performing inspection ofoperating process equipmentand utility systems.
o Records and loging ofprocess variables and other activities as instructed during equipment
testing.
o Maintaining an overview ofthe permitto work system and all activities in progress
o Performing first line maintenance, identifying and reporting faults
o Assuring actual lines, valves and gauges alignment to be fully coincide with documented P&IDs
while platform maintenance and start up.
AZERBAIJAN AIRLINES “AZAL”
Avionics Engineer, “BOEING” servicing division, Nov 2003 -Jan2004
Have been:
o Assisting in installing and servicing avionics communications equipment.
o Ensuring that newly installed and repaired systems meetrequirements mandated by the Federal
Aviation Administration and specifications setby aircraft manufacturers.
o Participating in designing, purchasing, testing and calibrating avionic systems such as computer
and electronic communication panels.
o Preparing reports and close-outpaperwork on the conducted work scope.
Toolkit:
o MS Windows and Office Applications
o MS Office plus Project;
o Open Wells (ex-DIMS Landmark)
o Well Plan (Landmark)
o Stress Check (Landmark)
o WellCat (Landmark- basic understanding)
o Compass (Landmark)
o TDAS (Schlumberger)
o Drill Bench (Schlumberger)
6. 6
o DOX (Schlumberger)
o C-Wear (basic understanding)
o Probabilistic Time & CostEstimation softwares:
Crystal Ball (Oracle)
P1 (AGR)
Trainings:
Leadership courses:
o June 2014 GEM1 Leadership Training, UK
o Knowledge Managementfor Wells Teams (AZ - Knoco), Baku
o Decision Making and CostForecasting (BP-Chevron School), Baku
o ProjectManagementfor Wells Delivery (ESI) , Baku
o Environmental Managementfor D&C (BP-Chevron School), Baku
o Anti-bribery and corruption e-learning , Baku
o Code ofconduct, Baku
o Influencing Skills (communication with people), Baku
o Conflicts of interest, Baku
Technical Courses:
o Dec 2014 IPM WCI Standards, KL, Malaysia
o Oct 2014, Preventative Well Control Level 2, KL, Malaysia
o June 2014 Core Completion Training for Managers, Houston USA
o Mar 2014, IPM Live Saving Rules, KL, Malaysia
o Oct. 2013 Well Control Surface IWCF, Bangkok Thailand
o Sep 2013, IPM HAZOO Level 2, KL, Malaysia
o Sep 2013, IPM SIMOPS Level 2, KL, Malaysia
o Aug 2013, IPM Stuck Pipe Prevention, KL, Malaysia
o Aug 2013 Fatigue Management Level 1, KL, Malaysia
o Aug 2013, IPM Hazard Identification Level 1, KL, Malaysia
o Apr. 2010 Well Control Surface & Subsea Certification, IWCF, Baku Azerbaijan
o May 2009 FOET, Offshore Survival re-freshing course, Baku Azerbaijan
o Apr. 2009 Formation Evaluation, Herriot Watt course, Baku Azerbaijan
o Nov. 2008 Completions Design and Sand Control, Baku Azerbaijan
o Jun. 2008 Environmental Managementfor D&C, Baku Azerbaijan
o May 2008 Production Technology, HerriotWatt course, Baku Azerbaijan
o May 2008 Pore Pressure for Drillers, Baku Azerbaijan
o Apr. 2008 Well Control Certificate Surface & Subsea, AIDC Well Cap, Baku Azerbaijan
o Feb.2008 Reservoir Engineering,HerriotWatt course, Baku Azerbaijan
o Jun. 2007 Well Productivity Awareness, HerriotWatt course, Baku Azerbaijan
o Jun. 2007 Drilling Fluids, Baku Azerbaijan
o Apr. 2007 Knowledge Managementfor Wells teams, Baku Azerbaijan
o Feb 2007 Challenge Induction Event, Houston, USA
o Dec. 2006 Fishing and Sidetrack Operations, Baku Azerbaijan
o Nov. 2006 Casing Design, Baku Azerbaijan
o Sep. 2006 Drilling Engineering and Well Planning, Houston USA
o Aug. 2006 Well Plan, Landmark Software, Baku Azerbaijan
o May 2006 Drilling Engineering, HerriotWatt course, Baku Azerbaijan
o Apr. 2006 Drill String Design and Failure Prevention, Baku Azerbaijan
o Feb. 2006 Directional Drilling and Surveying, Baku Azerbaijan
7. 7
o Jan. 2006 Cementing, Baku Azerbaijan
o Oct. 2005 Drilling Practices, Houston USA
o Sep. 2005 Hazard Identification, Baku Azerbaijan
o Sep. 2005 STOP/ASA, Baku Azerbaijan
o Jun. 2005 BOSIET, Offshore Survival Course, Baku Azerbaijan
o May 2005 Control of Work: Energy Isolation, Task Risk Assessment, Perform Authority
o Jan. 2005 Rigging and Lifting, Petrofac, Baku Azerbaijan
*All references are available upon the request
Papers:
o Optimization ofdownhole placementand shipment process ofSingle Piece Bow
Spring Centralizers in the field. (Schlumberger “In Touch” System)
Education:
AZERBAIJAN STATE AVIATION ACADEMY
Baku, Azerbaijan, 1997-2002
MSc in Electrical Engineering
Specialization- Avionics Engineer
Personal Skills:
o Team work: excellentteam player with peers, management, contractors & other disciplines.
o Innovative: open to challenge. Able to focus on and improve areas that require attention. Always
open to new ideas, opinions & discussions.
o Committed to Performance Improvementand oriented on bestin class delivery results. Able to
work on multiple tasks under pressure with limited deadlines.
o Leadership: demonstrated leadership in multi-disciplined teams as Senior Well/Drilling Engineer.
Confident, open, proactive & self-motivated
o Communication skills: experienced in international working and living- 12 years of flawless
experience in multicultural environment. Understanding and respectofdifferentcultures and
religions resulted in greatperformance, high achievements & lots offriends over the world.