Experience unparalleled accessibility to the city – and beyond. With a hotel and shopping mall right within Trion@KL, and public transportation and major highways linking your home to everything else, this is the epitome of a world of ease within reach.
5. OVERVIEW
Developer
Binastra Land Sdn Bhd
Freehold
4.075 acres
Project Name
COMPONENTS
Trion@KL
2 Blocks 66-Storey Serviced Apartment
1 Block 37-Storey Serviced Apartment
Mercure Hotel Kuala Lumpur
Commercial ComponentAddress
Jalan Sungai Besi,
off Jalan Chan Sow Lin,
Kuala Lumpur
LAND TENURE
LAND ACRE
Location
Kuala Lumpur
Block A – 66 Storey
Block B – 66 Storey
Block C – 56 Storey
6. ,
Total Units (Residential) 1344 (Block a - 536 , Block b - 592, Block c - 216)
Unit Per Floor (Residental) Block A - 10 units/floor | Block B - 11 units/floor | Block C - 8 units/floor
overview
No. of Lift
Total No. of Retail Lots
Total of Retail Area
Block A - 6 + 1 | Block B - 6 + 1 | Block C - 4 + 1
38
60,918 SQ. FT.
Block A - RM549,800 - RM946,800
Block B - RM549,800 - RM914,800
Block C - RM594,800 - RM831,800
Schedule of Payment
Expected 1st SPA Signing
Expected Completion Date
Maintenance Fee
Total Carparks
Under Schedule H (Applicable to residential unit only)
Yet To Confirm
Q3 of 2024
RM 0.36 psf
Residential - 1,665 | Hotel & Retail - 402
Selling Price
Total No. of Hotel Rooms 235 Rooms
7.
8. A WoRld Of Ease
Dual-key
OPTIONS
Practical layouts for every individual or
family from 797 sq. ft. to 1,055 sq. ft.,
with sub-meters in place.
A World-Class
Hotel
The 4-star hotel, Mercure Kuala Lumpur,
comes with 235 rooms and lavish facilities,
from a bar to its own swimming pool.
Vast
Possibilities
38 units of retail options will be available here,
offering exciting opportunities.
A Haven
of flavours
A variety of F&B offerings will be available
at Trion@KL to tempt your taste buds.
A wARM
wELCOME home
All units come partially furnished.
SKY- HIGH
ADVANTAGES
A host of amenities and facilities are offered,
together with KL’s iconic skyline views.
9. A REFRESHING
RESPITE
With more than 40 facilities available,
excitement can be found throughout
Levels 8, 54-55, and 66.
Lavish
Services BY
MERCURE
KUALA LUMPUR
Enjoy a la carte services for residents
within your own home, including
housekeeping, laundry pick-up & delivery,
room service, and event & catering.
A WoRld Of Ease
easy
aCCESSIBILITY
Blocks A and B come with 6 + 1 lifts,
while Tower C has 4 + 1 lifts.
Committed
To The Future
Trion@KL’s residential units come with
an Automatic Waste Collection System, an
innovative green technology that reduces costs
and ensures the highest hygienic standards.
11. Connections That
Bring You Further
Trion@KL connects you to the heart of
Kuala Lumpur – and beyond.
Seek the near, or go further with
unparalleled accessibility to major
highways and rail transportation.
Connectivity
To Petaling Jaya
ToSriPetaling
To Taman Connaught
KUALA LUMPUR
TAMAN DESA
BANDAR
MALAYSIA
CHERAS
BANGSAR
ROYAL
SELANGOR
CLUB
KL TOWER
KLCC
JLN. DUA
JLN.CHANSOWLIN
JALAN LOKE YEW
JALANSYEDPUTRA
JALAN CHERAS
JLN.SUNGAIBESIJLN.YEW
JALAN KAMPUNG PANDAN
LEBUHRAYASUNGAIBESI(BESRAYA)
LEBUHRAYA HUBUNGAN TIMUR - BARAT
LEBUHRAYASUNGAIBESI(BESRAYA)
JALAN ISTANA
To Mont Kiara
LEBUHRAYAKL-SEREMBAN
12. Amenities
To Petaling Jaya
ToSriPetaling
To Taman Connaught
KUALA LUMPUR
TAMAN DESA
BANDAR
MALAYSIA
CHERAS
BANGSAR
ROYAL
SELANGOR
CLUB
KL TOWER
KLCC
JLN. DUA
JLN.CHANSOWLIN
JALAN LOKE YEW
JALANSYEDPUTRA
JALAN CHERAS
JLN.SUNGAIBESIJLN.YEW
JALAN KAMPUNG PANDAN
LEBUHRAYASUNGAIBESI(BESRAYA)
LEBUHRAYA HUBUNGAN TIMUR - BARAT
LEBUHRAYASUNGAIBESI(BESRAYA)
JALAN ISTANA
To Mont Kiara
LEBUHRAYAKL-SEREMBAN
VIVA
Home
Pavilion
Kuala Lumpur
Prince Court
Medical Centre
Tung Shin
Hospital
Times
Square
Tsun Jin
High School
SJK (C)
Chung Kwo
HELP
College
IKEA
Cheras
TRX
Southgate
Commercial
Centre
BHP
Sunway
Velocity
Mall
AEON
Taman
Maluri
LRT Chan
Sow Lin
NU
Sentral
KL Sentral
Bangsar
Village
Mid Valley
Megamall
LRT Cheras
KTM Salak Selatan
Sekolah
Menengah
Teknik Cheras
University
Hospital
TESCO
EXTRA
Cheras
TREC
LRT Salak Selatan
Cultivating
Creative eNergy
With a world of opportunities at
your feet, you choose where you
channel your energy into.
From young professionals to
urban explorers, advantage is
on your side here.
14. PAVILION
KUALA LUMPUR
4.4km
TESCO EXTRA
CHERAS
7km
VIVA HOME
3kM
BANGSAR
VILLAGE
10kM
Sunway
Velocity Mall
2km
MID VALLEY
MEGAMALL
8km
TIMES SQUARE
3.4km
Nu sentral
6km
Ikea Cheras
(Mytown)
1.9km
SHOPPING MALLS
Shopping
malls
16. ijn
6.2km
Tung shin
Hospital
4km
prince court
medical centre
3km
healthcare
education & healthcare
TSUN JIN
HIGH SCHOOL
3.6km ; 1.7km (walk)
SJK (C)
CHUNG KWO
1.3km
SMT CHERAS
3.3km
Alice Smith
International
School
3.3km
HELP COLLEGE
1.2km
EDUCATION
Sunway VELOCITY
Medical Center
2km
17. Elevation Plan
BLOCK A BLOCK B
BLOCK C
CAR PARK
MERCURE HOTEL
*Only for illustration purpose.
66-Storey
Serviced Apartment
Mercure Hotel
Kuala Lumpur
Commercial Component
18. Elevation Plan
BLOCK A BLOCK B
BLOCK C
LEVEL 66
SKY FACILITIES
M&E Facility
LEVEL 8 PODIUM FACILITIES
COMMERCIAL
LEVEL 55 (BLOCK B)
SKY FACILITIES
M&E Facility
CAR PARK
MERCURE HOTEL
*Only for illustration purpose.
LEVEL 54 (Block a)
SKY FACILITIES
M&E Facility
LEVEL 21 (Block C)
SKY FACILITIES
M&E Facility
27. JALAN DUA
GROUND FLOOR
1. Retail
2. Hotel Lounge
3. Hotel Reception
4. Hotel Lobby
5. Lobby Tower A
6. Mail Room Block A
7. Surau
8. Management Office
9. Lobby Tower B
10. Mail Room Block B
11. Lobby Tower C
12. Mail Room Block C
13. Drop-Off Zone
14. Landscape Plaza with
Interactive Fountain
28.
29. LEVEL 54 & 55 SKY FACILITIES
LEVEL 54
Block A
M&E M&E
LEVEL 55
Block B
Block C
1. Sky Garden Lounge
2. Kid’s Play Area
3. Reading Corner
4. Sky Garden Swing
9. Viewing Lounge
10. Game Corner
11. Floating Cube
12. Toilet
5. Cloud 9 Jogging (310m Length)
6. Chilled Out Lounge
7. Sky Yoga Deck
8. Sky Workout
30. Level 66 SKY facilities
1. Raised Party Deck
2. Rooftop Garden
3. Sky Gym
4. Starry Lounge
5. Toilet
Block A Block B
34. ,
Type Built-up No. of bedrooms & bathroom(s) No. of unitS
A, A1, A2, A3, A4
2 Bed, 1 Bath
689 sq. ft. / 64 SQ. M. 260
52A5, A6 700 sq. ft. / 65 SQ. M.
B, B1, B2, B3, B4, B5 2 Bed, 2 Bath807 sq. ft. / 75 SQ. M. 208
C, C1, C2, C3, C4, C5, C6 2 Bed, 2 Bath797 sq. ft. / 74 SQ. M. 440
D, D2, D3
3 Bed, 3 Bath
1023 sq. ft. / 95 SQ. M. 146
22D1 1055 sq. ft. / 98 SQ. M.
E 2 Bed, 1 Bath710 sq. ft. / 66 SQ. M. 54
F
2 Bed, 2 Bath
840 sq. ft. / 78 SQ. M. 135
F1
TOTAL UNITS
980 sq. ft. / 91 SQ. M. 27
1,344
UNIT OVERVIEW
BlockA+BBlockC
35. Unit Plan
689 sq. ft. / 64 Sq. M.
2 BeDROOMS, 1 BATHROOM
TYPE A
BLOCK A - 104
Total Unit - 104
BLOCK A BLOCK B BLOCK C
6600
10700
LIVINGBEDROOM 1
BATH 1
BEDROOM 2
A/C
YARD
DINING
KITCHEN
36. BLOCK A BLOCK B BLOCK C
Unit Plan
TYPE A1
BLOCK A - 31
BLOCK B - 32
Total Unit - 63
689 sq. ft. / 64 Sq. M.
2 BeDROOMS, 1 BATHROOM
6600
10700
LIVINGBEDROOM 1
BEDROOM 2
A/C
YARD
DINING
KITCHEN
BATH 1
37. TYPE A2
BLOCK A - 21
BLOCK B - 20
Total Unit - 41
689 sq. ft. / 64 Sq. M.
2 BeDROOMS, 1 BATHROOM
6600
10700
LIVINGBEDROOM 1
BEDROOM 2
A/C
DINING
KITCHEN
BATH 1
YARD
BLOCK A BLOCK B BLOCK C
Unit Plan
38. TYPE A3
BLOCK B - 32
Total Unit - 32
689 sq. ft. / 64 Sq. M.
2 BeDROOMS, 1 BATHROOM
6600
10700
LIVINGBEDROOM 1
BEDROOM 2
A/C
DINING
KITCHEN
BATH 1
YARD
BLOCK A BLOCK B BLOCK C
Unit Plan
39. TYPE A4
BLOCK B - 20
Total Unit - 20
689 sq. ft. / 64 Sq. M.
2 BeDROOMS, 1 BATHROOM
6600
10700
LIVINGBEDROOM 1
BEDROOM 2
A/C
DINING
KITCHEN
BATH 1
YARD
BLOCK A BLOCK B BLOCK C
Unit Plan
40. TYPE A5
BLOCK A - 31
Total Unit - 31
700 sq. ft. / 65 Sq. M.
2 BeDROOMS, 1 BATHROOM
6600
11350
LIVINGBEDROOM 1
BEDROOM 2
A/C
DINING
KITCHEN
BATH 1
YARD
BLOCK A BLOCK B BLOCK C
Unit Plan
41. TYPE A6
BLOCK A - 21
Total Unit - 21
700 sq. ft. / 65 Sq. M.
2 BeDROOMS, 1 BATHROOM
6600
11350
LIVINGBEDROOM 1
BEDROOM 2
A/C
DINING
KITCHEN
BATH 1
YARD
BLOCK A BLOCK B BLOCK C
Unit Plan
44. TYPE B
Unit Plan
BLOCK A - 46
Total Unit - 46
807 sq. ft. / 75 Sq. M.
2 BeDROOMS, 2 BATHROOMS
10600
8000
A/C
BALCONY
LIVING DINING
KITCHEN
BEDROOM 1
BATH 1
YARD
A/C
MASTER
BEDROOM
MASTER
BATH
BLOCK A BLOCK B BLOCK C
45. TYPE B1
BLOCK A - 18
Total Unit - 18
807 sq. ft. / 75 Sq. M.
2 BeDROOMS, 2 BATHROOMS
10600
8000
A/C
BALCONY
LIVING DINING
KITCHEN
BEDROOM 1
BATH 1
YARD
A/C
MASTER
BEDROOM
MASTER
BATH
BLOCK A BLOCK B BLOCK C
Unit Plan
46. TYPE B2
BLOCK A - 40
BLOCK B - 43
Total Unit - 83
807 sq. ft. / 75 Sq. M.
2 BeDROOMS, 2 BATHROOMS
10600
8000
A/C
BALCONY
LIVING DINING
KITCHEN
BEDROOM 1
BATH 1
YARD
A/C
MASTER
BEDROOM
MASTER
BATH
BLOCK A BLOCK B BLOCK C
Unit Plan
47. TYPE B3
BLOCK B - 9
Total Unit - 9
807 sq. ft. / 75 Sq. M.
2 BeDROOMS, 2 BATHROOMS
10600
8000
A/C
BALCONY
LIVING DINING
KITCHEN
BEDROOM 1
BATH 1
YARD
A/C
MASTER
BEDROOM
MASTER
BATH
BLOCK A BLOCK B BLOCK C
Unit Plan
48. TYPE B4
BLOCK B - 43
Total Unit - 43
807 sq. ft. / 75 Sq. M.
2 BeDROOMS, 2 BATHROOMS
10600
8000
A/C
BALCONY
LIVING DINING
KITCHEN
BEDROOM 1
BATH 1
YARD
A/C
MASTER
BEDROOM
MASTER
BATH
BLOCK A BLOCK B BLOCK C
Unit Plan
49. TYPE B5
BLOCK B - 9
Total Unit - 9
807 sq. ft. / 75 Sq. M.
2 BeDROOMS, 2 BATHROOMS
10600
8000
A/C
BALCONY
LIVING DINING
KITCHEN
BEDROOM 1
BATH 1
YARD
A/C
MASTER
BEDROOM
MASTER
BATH
BLOCK A BLOCK B BLOCK C
Unit Plan
53. TYPE C
Unit Plan
BLOCK A - 35
BLOCK B - 76
Total Unit - 111
797 sq. ft. / 74 Sq. M.
2 BeDROOMS, 2 BATHROOMS 8000
10600
BALCONY
LIVINGDINING
KITCHEN
A/C
BEDROOM 1
BATH 1
YARD
A/C
MASTER
BEDROOM
MASTER
BATH
BLOCK A BLOCK B BLOCK C
54. TYPE C1
Unit Plan
BLOCK A - 11
BLOCK B - 42
Total Unit - 53
797 sq. ft. / 74 Sq. M.
2 BeDROOMS, 2 BATHROOMS 8000
10600
BALCONY
LIVINGDINING
KITCHEN
A/C
BEDROOM 1
BATH 1
YARD
A/C
MASTER
BEDROOM
MASTER
BATH
BLOCK A BLOCK B BLOCK C
55. TYPE C2
Unit Plan
BLOCK A - 34
BLOCK B - 81
Total Unit - 115
797 sq. ft. / 74 Sq. M.
2 BeDROOMS, 2 BATHROOMS 8000
10600
BALCONY
LIVINGDINING
KITCHEN
A/C
BEDROOM 1
BATH 1
YARD
A/C
MASTER
BEDROOM
MASTER
BATH
BLOCK A BLOCK B BLOCK C
56. TYPE C3
Unit Plan
BLOCK A - 10
BLOCK B - 46
Total Unit - 56
797 sq. ft. / 74 Sq. M.
2 BeDROOMS, 2 BATHROOMS 8000
10600
BALCONY
LIVINGDINING
KITCHEN
A/C
BEDROOM 1
BATH 1
YARD
A/C
MASTER
BEDROOM
MASTER
BATH
BLOCK A BLOCK B BLOCK C
57. TYPE C4
Unit Plan
BLOCK A - 22
BLOCK B - 42
Total Unit - 64
797 sq. ft. / 74 Sq. M.
2 BeDROOMS, 2 BATHROOMS 8000
10600
BALCONY
LIVINGDINING
KITCHEN
A/C
BEDROOM 1
BATH 1
YARD
A/C
MASTER
BEDROOM
MASTER
BATH
BLOCK A BLOCK B BLOCK C
58. TYPE C5
Unit Plan
BLOCK B - 20
Total Unit - 20
797 sq. ft. / 74 Sq. M.
2 BeDROOMS, 2 BATHROOMS 8000
10600
BALCONY
LIVINGDINING
KITCHEN
A/C
BEDROOM 1
BATH 1
YARD
A/C
MASTER
BEDROOM
MASTER
BATH
BLOCK A BLOCK B BLOCK C
59. TYPE C6
Unit Plan
BLOCK B - 21
Total Unit - 21
797 sq. ft. / 74 Sq. M.
2 BeDROOMS, 2 BATHROOMS 8000
10600
BALCONY
LIVINGDINING
KITCHEN
A/C
BEDROOM 1
BATH 1
YARD
A/C
MASTER
BEDROOM
MASTER
BATH
BLOCK A BLOCK B BLOCK C
61. TYPE D
Unit Plan
BLOCK A - 21
Total Unit - 21
1023 sq. ft. / 95 Sq. M.
3 BeDROOMS, 3 BATHROOMS
13500
8000
LIVING
BEDROOM 1
BALCONY
BEDROOM 2
KITCHEN
DINING
YARD
A/C
A/C
BATH 2BATH 1
MASTER
BEDROOM
MASTER
BATH
BLOCK A BLOCK B BLOCK C
62. TYPE D1
Unit Plan
BLOCK A - 22
Total Unit - 22
1055 sq. ft. / 98 Sq. M.
3 BeDROOMS, 3 BATHROOMS
13500
8000
LIVING
BEDROOM 1
BALCONY 1 BALCONY 2
BEDROOM 2
KITCHEN
DINING
YARD
A/C
A/C
BATH 2BATH 1
MASTER
BEDROOM
MASTER
BATH
BLOCK A BLOCK B BLOCK C
63. TYPE D2
Unit Plan
BLOCK A - 24
Total Unit - 24
1023 sq. ft. / 95 Sq. M.
3 BeDROOMS, 3 BATHROOMS
13500
8000
LIVING
BATH 2
BEDROOM 1
BALCONY
BEDROOM 2
BATH 1
KITCHEN
DINING
YARD
A/C
A/C
MASTER
BEDROOM
MASTER
BATH
BLOCK A BLOCK B BLOCK C
64. TYPE D3
Unit Plan
BLOCK A - 45
BLOCK B - 56
Total Unit - 101
1023 sq. ft. / 95 Sq. M.
3 BeDROOMS, 3 BATHROOMS
13500
8000
LIVING
BATH 2
BEDROOM 1
BALCONY
BEDROOM 2
BATH 1
KITCHEN
DINING
YARD
A/C
A/C
MASTER
BEDROOM
MASTER
BATH
BLOCK A BLOCK B BLOCK C
67. TYPE E
Unit Plan
BLOCK C - 54
Total Unit - 54
710 sq. ft. / 66 Sq. M.
2 BeDROOMs, 1 BATHROOM
7300
9900
LIVING
BEDROOM 1
BATH 1
KITCHEN
DINING
STUDY
A/C
BLOCK A BLOCK B BLOCK C
69. TYPE F
Unit Plan
BLOCK C - 135
Total Unit - 135
840 sq. ft. / 78 Sq. M.
2 BeDROOMS, 2 BATHROOMS
10950
7850
BALCONY
KITCHEN
MASTER
BEDROOM
MASTER
BATH
BEDROOM 1
BATH 1
LIVINGDINING
A/C
BLOCK A BLOCK B BLOCK C
70. TYPE F1
Unit Plan
BLOCK C - 27
Total Unit - 27
980 sq. ft. / 91 Sq. M.
2 BeDROOMS, 2 BATHROOMS
13160
7850
BALCONY
KITCHEN
MASTER
BEDROOM
MASTER
BATH
BEDROOM 1
BATH 1
LIVINGDINING
A/C
BLOCK A BLOCK B BLOCK C
71. A A B B A1 A5
D3 D2 C2 C2
A1 A3
C3 C2 C2 C2 D3
B2 B4 C2 C3
F F
F
E E F F
F1
LOUNGE
A A B B A2 A6
D3 D2 C C
A2 A4
C1 C C C D3
B2 B4 C C1
F F
F
E E F F
F1
FLOOR PLAN
LEVEL 9
Level 10, 20, 32, 40, 42, 50, 52, 60, 62
BLOCK C
BLOCK C
BLOCK B
BLOCK B
BLOCK A
BLOCK A
Block A + B
72. FLOOR PLAN
Level 11, 31, 41, 51,61
Level 12, 30
BLOCK C
BLOCK C
BLOCK B
BLOCK B
BLOCK A
BLOCK A
F F
F
E E F F
F1
LOUNGE
F F
F
E E F F
F1
A A B B A1 A5
D3 D2 C2 C2
A1 A3
C3 C2 C2 C2 D3
B2 B4 C2 C3
A A B B A2 A6
D3 D2 C C
A2 A4
C1 C C C D3
B2 B4 C C1
Block A + B
73. FLOOR PLAN
Level 13, 28, 43, 48, 53, 58, 63
Level 14, 34, 44, 64
BLOCK C
BLOCK C
BLOCK B
BLOCK B
BLOCK A
BLOCK A
A A B1 B1 A1 A5
D1 D1 C4 C4
A1 A3
C5 C4 C4 C4 D3
B3 B5 C4 C5
F F
F
E E F F
F1
A A B2 B2 A1 A5
D D3 C2 C3
A1 A3
C3 C6 C2 C2 D3
B2 B4 C2 C3
F F
F
E E F F
F1
Block A + B
Block A + B
74. A A B2 B2 A1 A5
D D3 C2 C3
A1 A3
C3 C6 C2 C2 D3
B2 B4 C2 C3
F F
F
E E F F
F1
A A B2 B2 A2 A6
D D3 C C1
A2 A4
C1 C6 C C D3
B2 B4 C C1
F F
F
E E F F
F1
LOUNGE
FLOOR PLAN
Level 15, 27, 45, 47, 57, 65
Level 16, 26, 46, 56
BLOCK C
BLOCK C
BLOCK B
BLOCK B
BLOCK A
BLOCK A
Block A + B
Block A + B
75. A A B2 B2 A2 A6
D D3 C1
A2 A4
C1 C6 C C D3
B2 C C1
F F
F
E E F F
F1
A A B1 B1 A1 A5
D1 D1 C4 C4
A1 A3
C5 C4 C4 C4 D3
B3 B5 C4 C5
F F
F
E E F F
F1
LOUNGE
C
B4
FLOOR PLAN
Level 17, 25, 35
Level 18, 33
BLOCK C
BLOCK C
BLOCK B
BLOCK B
BLOCK A
BLOCK A
76. FLOOR PLAN
Level 19, 29, 39, 49, 59
Level 21
BLOCK C
BLOCK C
BLOCK B
BLOCK B
BLOCK A
BLOCK A
A A B B A1 A5
D3 D2 C2 C2
A1 A3
C3 C2 C2 C2 D3
B2 B4 C2 C3
F F
F
E E F F
F1
A A B B A1 A5
D3 D2 C2 C2
A1 A3
C3 C2 C2 C2 D3
B2 B4 C2 C3
M&E
M&E
FACILITIES
FACILITIES
LOUNGE
Block A + B
77. FLOOR PLAN
Level 22
Level 23
BLOCK C
BLOCK C
BLOCK B
BLOCK B
BLOCK A
BLOCK A
M&E
D3 D2 C C C1 C C C D3
M&E
VOID
VOID
VOID
VOID
VOID
D1 D1 C4 C4 C5 C4 C4 C4 D3
F F
F
E E F F
F1
VOID
78. FLOOR PLAN
Level 24
Level 36
BLOCK C
BLOCK C
BLOCK B
BLOCK B
BLOCK A
BLOCK A
A A B2 B2 A1 A5
D D3 C2 C3
A1 A3
C3 C6 C2 C2 D3
B2 B4 C2 C3
F F
F
E E F F
F1
LOUNGE
A A B2 B2 A1 A5
D D3 C2 C3
A1 A3
C3 C6 C2 C2 D3
B2 B4 C2 C3
F F
F
E E F F
F1
LOUNGE
79. FLOOR PLAN
Level 37
Level 38
BLOCK CBLOCK B
BLOCK B
BLOCK A
BLOCK A
D1 D1 C4 C4 C5 C4 C4 C4 D3
VOID VOID
M&E
D D3 C C1 C1 C6 C C D3
F F
F
E E F F
F1
M&E
80. FACILITIES
A A B2 B2 A2 A6
D D3 C C1
M&E
FACILITIES
M&E A1 A3
C3 C6 C2 C2 D3
B2 B4 C2 C3
FLOOR PLAN
Level 54
Level 55
BLOCK B
BLOCK B
BLOCK A
BLOCK A
81. Sales Chart Block A
66TH LIFT MOTOR 66TH LIFT MOTOR
66TH(RL) 66TH(RL)
65TH A A B2 B2 A2 A6 C1 C D3 D 65TH A2 A4 B2 B4 C C1 D3
64TH A A B2 B2 A1 A5 C3 C2 D3 D 64TH A1 A3 B2 B4 C2 C3 D3
63TH A A B1 B1 A1 A5 C4 C4 D1 D1 63TH A1 A3 B3 B5 C4 C5 D3
62TH A A B B A2 A6 C C D2 D3 62TH A2 A4 B2 B4 C C1 D3
61TH A A B B A1 A5 C2 C2 D2 D3 61TH A1 A3 B2 B4 C2 C3 D3
60TH A A B B A2 A6 C C D2 D3 60TH A2 A4 B2 B4 C C1 D3
59TH A A B B A1 A5 C2 C2 D2 D3 59TH A1 A3 B2 B4 C2 C3 D3
58TH A A B1 B1 A1 A5 C4 C4 D1 D1 58TH A1 A3 B3 B5 C4 C5 D3
57TH A A B2 B2 A2 A6 C1 C D3 D 57TH A2 A4 B2 B4 C C1 D3
56TH A A B2 B2 A1 A5 C3 C2 D3 D 56TH A1 A3 B2 B4 C2 C3 D3
55TH A A B2 B2 A2 A6 C1 C D3 D 55TH
54TH 54TH A1 A3 B2 B4 C2 C3 D3
53TH A A B1 B1 A1 A5 C4 C4 D1 D1 53TH A1 A3 B3 B5 C4 C5 D3
52TH A A B B A2 A6 C C D2 D3 52TH A2 A4 B2 B4 C C1 D3
51TH A A B B A1 A5 C2 C2 D2 D3 51TH A1 A3 B2 B4 C2 C3 D3
50TH A A B B A2 A6 C C D2 D3 50TH A2 A4 B2 B4 C C1 D3
49TH A A B B A1 A5 C2 C2 D2 D3 49TH A1 A3 B2 B4 C2 C3 D3
48TH A A B1 B1 A1 A5 C4 C4 D1 D1 48TH A1 A3 B3 B5 C4 C5 D3
47TH A A B2 B2 A2 A6 C1 C D3 D 47TH A2 A4 B2 B4 C C1 D3
46TH A A B2 B2 A1 A5 C3 C2 D3 D 46TH A1 A3 B2 B4 C2 C3 D3
45TH A A B2 B2 A2 A6 C1 C D3 D 45TH A2 A4 B2 B4 C C1 D3
44TH A A B2 B2 A1 A5 C3 C2 D3 D 44TH A1 A3 B2 B4 C2 C3 D3
43TH A A B1 B1 A1 A5 C4 C4 D1 D1 43TH A1 A3 B3 B5 C4 C5 D3
42TH A A B B A2 A6 C C D2 D3 42TH A2 A4 B2 B4 C C1 D3
41TH A A B B A1 A5 C2 C2 D2 D3 41TH A1 A3 B2 B4 C2 C3 D3
40TH A A B B A2 A6 C C D2 D3 40TH A2 A4 B2 B4 C C1 D3
39TH A A B B A1 A5 C2 C2 D2 D3 39TH A1 A3 B2 B4 C2 C3 D3
38TH C4 C4 D1 D1 38TH D3
37TH C1 C D3 D 37TH D3
36TH A A B2 B2 A1 A5 C3 C2 D3 D 36TH A1 A3 B2 B4 C2 C3 D3
35TH A A B2 B2 A2 A6 C1 C D3 D 35TH A2 A4 B2 B4 C C1 D3
34TH A A B2 B2 A1 A5 C3 C2 D3 D 34TH A1 A3 B2 B4 C2 C3 D3
33TH A A B1 B1 A1 A5 C4 C4 D1 D1 33TH A1 A3 B3 B5 C4 C5 D3
32TH A A B B A2 A6 C C D2 D3 32TH A2 A4 B2 B4 C C1 D3
31TH A A B B A1 A5 C2 C2 D2 D3 31TH A1 A3 B2 B4 C2 C3 D3
30TH A A B B A2 A6 C C D2 D3 30TH A2 A4 B2 B4 C C1 D3
29TH A A B B A1 A5 C2 C2 D2 D3 29TH A1 A3 B2 B4 C2 C3 D3
28TH A A B1 B1 A1 A5 C4 C4 D1 D1 28TH A1 A3 B3 B5 C4 C5 D3
27TH A A B2 B2 A2 A6 C1 C D3 D 27TH A2 A4 B2 B4 C C1 D3
26TH A A B2 B2 A1 A5 C3 C2 D3 D 26TH A1 A3 B2 B4 C2 C3 D3
25TH A A B2 B2 A2 A6 C1 C D3 D 25TH A2 A4 B2 B4 C C1 D3
24TH A A B2 B2 A1 A5 C3 C2 D3 D 24TH A1 A3 B2 B4 C2 C3 D3
23TH C4 C4 D1 D1 23TH D3
22TH C C D2 D3 22TH D3
21TH A A B B A1 A5 C2 C2 D2 D3 21TH A1 A3 B2 B4 C2 C3 D3
20TH A A B B A2 A6 C C D2 D3 20TH A2 A4 B2 B4 C C1 D3
19TH A A B B A1 A5 C2 C2 D2 D3 19TH A1 A3 B2 B4 C2 C3 D3
18TH A A B1 B1 A1 A5 C4 C4 D1 D1 18TH A1 A3 B3 B5 C4 C5 D3
17TH A A B2 B2 A2 A6 C1 C D3 D 17TH A2 A4 B2 B4 C C1 D3
16TH A A B2 B2 A1 A5 C3 C2 D3 D 16TH A1 A3 B2 B4 C2 C3 D3
15TH A A B2 B2 A2 A6 C1 C D3 D 15TH A2 A4 B2 B4 C C1 D3
14TH A A B2 B2 A1 A5 C3 C2 D3 D 14TH A1 A3 B2 B4 C2 C3 D3
13TH A A B1 B1 A1 A5 C4 C4 D1 D1 13TH A1 A3 B3 B5 C4 C5 D3
12TH A A B B A2 A6 C C D2 D3 12TH A2 A4 B2 B4 C C1 D3
11TH A A B B A1 A5 C2 C2 D2 D3 11TH A1 A3 B2 B4 C2 C3 D3
10TH A A B B A2 A6 C C D2 D3 10TH A2 A4 B2 B4 C C1 D3
9TH A A B B A1 A5 C2 C2 D2 D3 9TH A1 A3 B2 B4 C2 C3 D3
8TH
7TH
6TH
5TH
4TH
3RD
2ND
1ST
M
GF
BS
BLOCK A BLOCK B
M&E FACILITY M&E
CORE CORE
M&E
CARPARK CARPARK
M&E FACILITY
BREAK TANK BREAK TANK
BREAK TANK BREAK TANK
CARPARK CARPARK
CARPARK CARPARK
CARPARK CARPARK
FACILITY FACILITY
CARPARK CARPARK
CARPARK CARPARK
CARPARK CARPARK
RETAIL RETAIL
RETAIL RETAIL
CARPARK CARPARK
TYPE A (689 SQ FT)
TYPE A1 (689 SQ FT)
TYPE A2 (689 SQ FT)
TYPE A3 (689 SQ FT)
TYPE A4 (689 SQ FT)
TYPE A5 (700 SQ FT)
TYPE A6 (700 SQ FT)
TYPE B (807 SQ FT)
TYPE B1 (807 SQ FT)
TYPE B2 (807 SQ FT)
TYPE B3 (807 SQ FT)
TYPE B4 (807 SQ FT)
TYPE B5 (807 SQ FT)
CARPARK
RETAIL
TYPE A
TYPE B
82. Sales Chart Block A
CARPARK
RETAIL
TYPE C (797 SQ FT)
TYPE C1 (797 SQ FT)
TYPE C2 (797 SQ FT)
TYPE C3 (797 SQ FT)
TYPE C4 (797 SQ FT)
TYPE C5 (797 SQ FT)
TYPE C6 (797 SQ FT)
TYPE D (1023 SQ FT)
TYPE D1 (1055 SQ FT)
TYPE D2 (1023 SQ FT)
TYPE D3 (1023 SQ FT)
TYPE C
TYPE D
LIFT MOTOR 66TH LIFT MOTOR
66TH(RL)
B2 B2 A2 A6 C1 C D3 D 65TH A2 A4 B2 B4 C C1 D3 C C C6 C1
B2 B2 A1 A5 C3 C2 D3 D 64TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C6 C3
B1 B1 A1 A5 C4 C4 D1 D1 63TH A1 A3 B3 B5 C4 C5 D3 C4 C4 C4 C5
B B A2 A6 C C D2 D3 62TH A2 A4 B2 B4 C C1 D3 C C C C1
B B A1 A5 C2 C2 D2 D3 61TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C2 C3
B B A2 A6 C C D2 D3 60TH A2 A4 B2 B4 C C1 D3 C C C C1
B B A1 A5 C2 C2 D2 D3 59TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C2 C3
B1 B1 A1 A5 C4 C4 D1 D1 58TH A1 A3 B3 B5 C4 C5 D3 C4 C4 C4 C5
B2 B2 A2 A6 C1 C D3 D 57TH A2 A4 B2 B4 C C1 D3 C C C6 C1
B2 B2 A1 A5 C3 C2 D3 D 56TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C6 C3
B2 B2 A2 A6 C1 C D3 D 55TH
54TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C6 C3
B1 B1 A1 A5 C4 C4 D1 D1 53TH A1 A3 B3 B5 C4 C5 D3 C4 C4 C4 C5
B B A2 A6 C C D2 D3 52TH A2 A4 B2 B4 C C1 D3 C C C C1
B B A1 A5 C2 C2 D2 D3 51TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C2 C3
B B A2 A6 C C D2 D3 50TH A2 A4 B2 B4 C C1 D3 C C C C1
B B A1 A5 C2 C2 D2 D3 49TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C2 C3
B1 B1 A1 A5 C4 C4 D1 D1 48TH A1 A3 B3 B5 C4 C5 D3 C4 C4 C4 C5
B2 B2 A2 A6 C1 C D3 D 47TH A2 A4 B2 B4 C C1 D3 C C C6 C1
B2 B2 A1 A5 C3 C2 D3 D 46TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C6 C3
B2 B2 A2 A6 C1 C D3 D 45TH A2 A4 B2 B4 C C1 D3 C C C6 C1
B2 B2 A1 A5 C3 C2 D3 D 44TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C6 C3
B1 B1 A1 A5 C4 C4 D1 D1 43TH A1 A3 B3 B5 C4 C5 D3 C4 C4 C4 C5
B B A2 A6 C C D2 D3 42TH A2 A4 B2 B4 C C1 D3 C C C C1
B B A1 A5 C2 C2 D2 D3 41TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C2 C3
B B A2 A6 C C D2 D3 40TH A2 A4 B2 B4 C C1 D3 C C C C1
B B A1 A5 C2 C2 D2 D3 39TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C2 C3
C4 C4 D1 D1 38TH D3 C4 C4 C4 C5
C1 C D3 D 37TH D3 C C C6 C1 37TH F F1 F F
B2 B2 A1 A5 C3 C2 D3 D 36TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C6 C3 36TH F F1 F F
B2 B2 A2 A6 C1 C D3 D 35TH A2 A4 B2 B4 C C1 D3 C C C6 C1 35TH F F1 F F
B2 B2 A1 A5 C3 C2 D3 D 34TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C6 C3 34TH F F1 F F
B1 B1 A1 A5 C4 C4 D1 D1 33TH A1 A3 B3 B5 C4 C5 D3 C4 C4 C4 C5 33TH F F1 F F
B B A2 A6 C C D2 D3 32TH A2 A4 B2 B4 C C1 D3 C C C C1 32TH F F1 F F
B B A1 A5 C2 C2 D2 D3 31TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C2 C3 31TH F F1 F F
B B A2 A6 C C D2 D3 30TH A2 A4 B2 B4 C C1 D3 C C C C1 30TH F F1 F F
B B A1 A5 C2 C2 D2 D3 29TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C2 C3 29TH F F1 F F
B1 B1 A1 A5 C4 C4 D1 D1 28TH A1 A3 B3 B5 C4 C5 D3 C4 C4 C4 C5 28TH F F1 F F
B2 B2 A2 A6 C1 C D3 D 27TH A2 A4 B2 B4 C C1 D3 C C C6 C1 27TH F F1 F F
B2 B2 A1 A5 C3 C2 D3 D 26TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C6 C3 26TH F F1 F F
B2 B2 A2 A6 C1 C D3 D 25TH A2 A4 B2 B4 C C1 D3 C C C6 C1 25TH F F1 F F
B2 B2 A1 A5 C3 C2 D3 D 24TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C6 C3 24TH F F1 F F
C4 C4 D1 D1 23TH D3 C4 C4 C4 C5 23TH F F1 F F
C C D2 D3 22TH D3 C C C C1 22TH
B B A1 A5 C2 C2 D2 D3 21TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C2 C3 21TH
B B A2 A6 C C D2 D3 20TH A2 A4 B2 B4 C C1 D3 C C C C1 20TH F F1 F F
B B A1 A5 C2 C2 D2 D3 19TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C2 C3 19TH F F1 F F
B1 B1 A1 A5 C4 C4 D1 D1 18TH A1 A3 B3 B5 C4 C5 D3 C4 C4 C4 C5 18TH F F1 F F
B2 B2 A2 A6 C1 C D3 D 17TH A2 A4 B2 B4 C C1 D3 C C C6 C1 17TH F F1 F F
B2 B2 A1 A5 C3 C2 D3 D 16TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C6 C3 16TH F F1 F F
B2 B2 A2 A6 C1 C D3 D 15TH A2 A4 B2 B4 C C1 D3 C C C6 C1 15TH F F1 F F
B2 B2 A1 A5 C3 C2 D3 D 14TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C6 C3 14TH F F1 F F
B1 B1 A1 A5 C4 C4 D1 D1 13TH A1 A3 B3 B5 C4 C5 D3 C4 C4 C4 C5 13TH F F1 F F
B B A2 A6 C C D2 D3 12TH A2 A4 B2 B4 C C1 D3 C C C C1 12TH F F1 F F
B B A1 A5 C2 C2 D2 D3 11TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C2 C3 11TH F F1 F F
B B A2 A6 C C D2 D3 10TH A2 A4 B2 B4 C C1 D3 C C C C1 10TH F F1 F F
B B A1 A5 C2 C2 D2 D3 9TH A1 A3 B2 B4 C2 C3 D3 C2 C2 C2 C3 9TH F F1 F F
BLOCK A BLOCK B BLOCK C
M&E FACILITY M&E FACILITY
CORE CORE
M&E
ARPARK CARPARK CARPARK
FACILITY
M&E FACILITY
BREAK TANK BREAK TANK
CORE
BREAK TANK BREAK TANK
M&E
ARPARK CARPARK CARPARK
ARPARK CARPARK CARPARK
ARPARK CARPARK CARPARK
FACILITY FACILITY FACILITY
ARPARK CARPARK CARPARK
ARPARK CARPARK CARPARK
ARPARK CARPARK CARPARK
RETAIL RETAIL RETAIL
RETAIL RETAIL RETAIL
ARPARK CARPARK CARPARK
83. Sales Chart Block C
CARPARK
RETAIL
TYPE E (710 SQ FT)
TYPE E
TYPE F (840 SQ FT)
TYPE F1 (980 SQ FT)
TYPE F
B2 B4 C C1 D3 C C C6 C1
B2 B4 C2 C3 D3 C2 C2 C6 C3
B3 B5 C4 C5 D3 C4 C4 C4 C5
B2 B4 C C1 D3 C C C C1
B2 B4 C2 C3 D3 C2 C2 C2 C3
B2 B4 C C1 D3 C C C C1
B2 B4 C2 C3 D3 C2 C2 C2 C3
B3 B5 C4 C5 D3 C4 C4 C4 C5
B2 B4 C C1 D3 C C C6 C1
B2 B4 C2 C3 D3 C2 C2 C6 C3
B2 B4 C2 C3 D3 C2 C2 C6 C3
B3 B5 C4 C5 D3 C4 C4 C4 C5
B2 B4 C C1 D3 C C C C1
B2 B4 C2 C3 D3 C2 C2 C2 C3
B2 B4 C C1 D3 C C C C1
B2 B4 C2 C3 D3 C2 C2 C2 C3
B3 B5 C4 C5 D3 C4 C4 C4 C5
B2 B4 C C1 D3 C C C6 C1
B2 B4 C2 C3 D3 C2 C2 C6 C3
B2 B4 C C1 D3 C C C6 C1
B2 B4 C2 C3 D3 C2 C2 C6 C3
B3 B5 C4 C5 D3 C4 C4 C4 C5
B2 B4 C C1 D3 C C C C1
B2 B4 C2 C3 D3 C2 C2 C2 C3
B2 B4 C C1 D3 C C C C1
B2 B4 C2 C3 D3 C2 C2 C2 C3
D3 C4 C4 C4 C5
D3 C C C6 C1 37TH F F1 F F E E F F
B2 B4 C2 C3 D3 C2 C2 C6 C3 36TH F F1 F F E E F F
B2 B4 C C1 D3 C C C6 C1 35TH F F1 F F E E F F
B2 B4 C2 C3 D3 C2 C2 C6 C3 34TH F F1 F F E E F F
B3 B5 C4 C5 D3 C4 C4 C4 C5 33TH F F1 F F E E F F
B2 B4 C C1 D3 C C C C1 32TH F F1 F F E E F F
B2 B4 C2 C3 D3 C2 C2 C2 C3 31TH F F1 F F E E F F
B2 B4 C C1 D3 C C C C1 30TH F F1 F F E E F F
B2 B4 C2 C3 D3 C2 C2 C2 C3 29TH F F1 F F E E F
B3 B5 C4 C5 D3 C4 C4 C4 C5 28TH F F1 F F E E F F
B2 B4 C C1 D3 C C C6 C1 27TH F F1 F F E E F
F
B2 B4 C2 C3 D3 C2 C2 C6 C3 26TH F F1 F F E E F F
B2 B4 C C1 D3 C C C6 C1 25TH F F1 F F E E F F
B2 B4 C2 C3 D3 C2 C2 C6 C3 24TH F F1 F F E E F F
D3 C4 C4 C4 C5 23TH F F1 F F E E F F
D3 C C C C1 22TH
B2 B4 C2 C3 D3 C2 C2 C2 C3 21TH
B2 B4 C C1 D3 C C C C1 20TH F F1 F F E E F F
B2 B4 C2 C3 D3 C2 C2 C2 C3 19TH F F1 F F E E F F
B3 B5 C4 C5 D3 C4 C4 C4 C5 18TH F F1 F F E E F F
B2 B4 C C1 D3 C C C6 C1 17TH F F1 F F E E F F
B2 B4 C2 C3 D3 C2 C2 C6 C3 16TH F F1 F F E E F F
B2 B4 C C1 D3 C C C6 C1 15TH F F1 F F E E F F
B2 B4 C2 C3 D3 C2 C2 C6 C3 14TH F F1 F F E E F F
B3 B5 C4 C5 D3 C4 C4 C4 C5 13TH F F1 F F E E F F
B2 B4 C C1 D3 C C C C1 12TH F F1 F F E E F F
B2 B4 C2 C3 D3 C2 C2 C2 C3 11TH F F1 F F E E F F
B2 B4 C C1 D3 C C C C1 10TH F F1 F F E E F F
B2 B4 C2 C3 D3 C2 C2 C2 C3 9TH F F1 F F E E F F
CORE
M&E
CARPARK CARPARK
FACILITY
BREAK TANK
CORE
BREAK TANK
M&E
CARPARK
CARPARK
CARPARK
M&E
FACILITY FACILITY
CARPARK
CARPARK CARPARK
CARPARK
CARPARK CARPARK
CARPARK
CARPARK CARPARK
RETAIL RETAIL / HOTEL
RETAIL RETAIL / HOTEL
CARPARK CARPARK
84. Specifications Type A
Structure
Roof
Walls
Windows
Doors
Ironmongery
Ceiling Finishes
Floor Finishes
Wall Finishes
Sanitary Installations
Reinforced Concrete
Reinforced Concrete
Reinforced Concrete & Brick Wall
Aluminium Frame Glass Window
Entrance
Others
Quality Locksets
Fibrous Plaster Ceiling /
Paint (Where Applicable)
Living, Dining, Kitchen, Bedrooms,
Bathrooms, Balcony, Yard
A/C Ledge
Kitchen
Bathrooms
Others
Bathrooms
Kitchen
Fire Rated Door
Timber Flush Door
Sliding Door
Tiles
Tiles
Cement Screed
Tiles Up To Approx. 1500mm
High Where Applicable
Tiles Up To Ceiling Level
Paint
Wash Basin Tap
Water Closet
Shower Rose
Kitchen Sink Tap
Electrical Installations Lighting Point
Ceiling Fan Point
Air-Cond Point
Power Point
Water Heater Point
TV Point
Telephone Point
Internet Point
Door Bell Point
Intercom
Type
A
9
4
3
14
1
2
2
1
1
1
Type
A1
9
4
3
14
1
2
2
1
1
1
Type
A2
9
4
3
14
1
2
2
1
1
1
Type
A3
9
4
3
14
1
2
2
1
1
1
Type
A4
9
4
3
14
1
2
2
1
1
1
Type
A5
9
4
3
14
1
2
2
1
1
1
Type
A6
9
4
3
14
1
2
2
1
1
1
85. Specifications Type B
Structure
Roof
Walls
Windows
Doors
Ironmongery
Ceiling Finishes
Floor Finishes
Wall Finishes
Sanitary Installations
Reinforced Concrete
Reinforced Concrete
Reinforced Concrete Brick Wall
Aluminium Frame Glass Window
Entrance
Others
Quality Locksets
Fibrous Plaster Ceiling /
Paint (Where Applicable)
Living, Dining, Kitchen, Bedrooms,
Bathrooms, Balcony, Yard
A/C Ledge
Kitchen
Bathrooms
Others
Bathrooms
Kitchen
Fire Rated Door
Timber Flush Door
Sliding Door
Tiles
Tiles
Cement Screed
Tiles Up To Approx. 1500mm
High Where Applicable
Tiles Up To Ceiling Level
Paint
Wash Basin Tap
Water Closet
Shower Rose
Kitchen Sink Tap
Electrical Installations Lighting Point
Ceiling Fan Point
Air-Cond Point
Power Point
Water Heater Point
TV Point
Telephone Point
Internet Point
Door Bell Point
Intercom
Type
B
16
3
3
15
2
2
2
2
1
1
Type
B1
16
3
3
15
2
2
2
2
1
1
Type
B2
16
3
3
15
2
2
2
2
1
1
Type
B3
16
3
3
15
2
2
2
2
1
1
Type
B4
16
3
3
15
2
2
2
2
1
1
Type
B5
16
3
3
15
2
2
2
2
1
1
86. Specifications Type C
Structure
Roof
Walls
Windows
Doors
Ironmongery
Ceiling Finishes
Floor Finishes
Wall Finishes
Sanitary Installations
Reinforced Concrete
Reinforced Concrete
Reinforced Concrete Brick Wall
Aluminium Frame Glass Window
Entrance
Others
Quality Locksets
Fibrous Plaster Ceiling /
Paint (Where Applicable)
Living, Dining, Kitchen, Bedrooms,
Bathrooms, Balcony, Yard
A/C Ledge
Kitchen
Bathrooms
Others
Bathrooms
Kitchen
Fire Rated Door
Timber Flush Door
Sliding Door
Tiles
Tiles
Cement Screed
Tiles Up To Approx. 1500mm
High Where Applicable
Tiles Up To Ceiling Level
Paint
Wash Basin Tap
Water Closet
Shower Rose
Kitchen Sink Tap
Electrical Installations Lighting Point
Ceiling Fan Point
Air-Cond Point
Power Point
Water Heater Point
TV Point
Telephone Point
Internet Point
Door Bell Point
Intercom
Type
C
16
3
3
13
2
2
2
2
1
1
Type
C1
16
3
3
13
2
2
2
2
1
1
Type
C2
16
3
3
13
2
2
2
2
1
1
Type
C3
16
3
3
13
2
2
2
2
1
1
Type
C4
16
3
3
13
2
2
2
2
1
1
Type
C5
16
3
3
13
2
2
2
2
1
1
Type
C6
16
3
3
13
2
2
2
2
1
1
87. Specifications Type D
Structure
Roof
Walls
Windows
Doors
Ironmongery
Ceiling Finishes
Floor Finishes
Wall Finishes
Sanitary Installations
Reinforced Concrete
Reinforced Concrete
Reinforced Concrete Brick Wall
Aluminium Frame Glass Window
Entrance
Others
Quality Locksets
Fibrous Plaster Ceiling /
Paint (Where Applicable)
Living, Dining, Kitchen, Bedrooms,
Bathrooms, Balcony, Yard
A/C Ledge
Kitchen
Bathrooms
Others
Bathrooms
Kitchen
Fire Rated Door
Timber Flush Door
Sliding Door
Tiles
Tiles
Cement Screed
Tiles Up To Approx. 1500mm
High Where Applicable
Tiles Up To Ceiling Level
Paint
Wash Basin Tap
Water Closet
Shower Rose
Kitchen Sink Tap
Electrical Installations Lighting Point
Ceiling Fan Point
Air-Cond Point
Power Point
Water Heater Point
TV Point
Telephone Point
Internet Point
Door Bell Point
Intercom
Type
D
20
3
4
15
3
2
2
2
1
1
Type
D1
21
3
4
15
3
2
2
2
1
1
Type
D2
20
3
4
15
3
2
2
2
1
1
Type
D3
20
3
4
15
3
2
2
2
1
1
88. Specifications Type E
Structure
Roof
Walls
Windows
Doors
Ironmongery
Ceiling Finishes
Floor Finishes
Wall Finishes
Sanitary Installations
Reinforced Concrete
Reinforced Concrete
Reinforced Concrete Brick Wall
Aluminium Frame Glass Window
Entrance
Others
Quality Locksets
Fibrous Plaster Ceiling /
Paint (Where Applicable)
Living, Dining, Kitchen, Bedrooms,
Bathrooms, Balcony, Yard
A/C Ledge
Kitchen
Bathrooms
Others
Bathrooms
Kitchen
Fire Rated Door
Timber Flush Door
Sliding Door
Tiles
Tiles
Cement Screed
Tiles Up To Approx. 1500mm
High Where Applicable
Tiles Up To Ceiling Level
Paint
Wash Basin Tap
Water Closet
Shower Rose
Kitchen Sink Tap
Electrical Installations Lightning Point
Ceiling Fan Point
Air-Cond Point
Power Point
Water Heater Point
TV Point
Telephone Point
Internet Point
Door Bell Point
Intercom
Type
e
9
4
3
13
1
2
2
1
1
1
89. Specifications Type F
Structure
Roof
Walls
Windows
Doors
Ironmongery
Ceiling Finishes
Floor Finishes
Wall Finishes
Sanitary Installations
Reinforced Concrete
Reinforced Concrete
Reinforced Concrete Brick Wall
Aluminium Frame Glass Window
Entrance
Others
Quality Locksets
Fibrous Plaster Ceiling /
Skim Coat Paint (Where Applicable)
Living, Dining, Kitchen, Bedrooms,
Bathrooms, Balcony, Yard
A/C Ledge
Kitchen
Bathrooms
Others
Bathrooms
Kitchen
Fire Rated Door
Timber Flush Door
Sliding Door
Tiles
Tiles
Cement Screed
Tiles Up To Approx. 1500mm
High Where Applicable
Tiles Up To Ceiling Level
Plaster Paint
Wash Basin Tap
Water Closet
Shower Rose
Kitchen Sink Tap
Electrical Installations Lighting Point
Ceiling Fan Point
Air-Cond Point
Power Point
Water Heater Point
TV Point
Telephone Point
Internet Point
Door Bell Point
Intercom
Type
F
16
2
3
13
2
2
2
2
1
1
Type
F1
18
3
3
15
2
2
2
2
1
1
91. NEWS
KUALA LUMPUR (Sept 1): The Kuala
Lumpur-Singapore high-speed rail (HSR)
mega project will be deferred for two years
without penalty to either nation, The Edge
weekly reported in its Sept 3 issue.
According to the report using sources, the
agreement was reached “in a spirit of good
neighbourliness” as Singapore recognises
the strain the construction would place on
Malaysia’s financial health.
The agreement will be in effect until May 31,
2020.
Putrajaya could have ended up paying
RM500 million in penalties to the Lion City
if the RM110 billion KL-Spore HSR project
was scrapped.
“It is worth noting that the legally binding
agreement between the two nations for
the project, signed in 2016, contains no
provisions for such a postponement,” wrote
The Edge.
Talking to the business weekly in May
during his first press interview after he was
appointed prime minister for the second
time, Tun Dr Mahathir Mohamad said: “The
terms of agreement (for the HSR) are such
that if we decide to drop the project, it will
cost us a lot of money. We have entered
into an agreement with Singapore.
“If we break the agreement, we have to pay
a very large sum of money. So, we are going
to find out how we can reduce the amount
of money we have to pay for breaking the
agreement.”
Economic Affairs Minister Datuk Seri Azmin
Ali led a Malaysian a team to negotiate the
agreement a few days ago.
He held meetings with Singapore Transport
Minister Khaw Boon Wan and the republic’s
Foreign Minister Dr Vivian Balakrishnan.
“We are inching closer towards a win-win
deal on HSR, thanks to the hardwork (sic)
of officials from both sides,” Azmin said in a
tweet on Aug 30.
Earlier last month, Azmin also said that
privatisation of the HSR project is not
among the options presented to the
Singapore government.
“What I did was to explain the current
economic situation and condition prevailing
in Malaysia,” Azmin said.
“Our priority is to reduce the government’s
expenditure, not increase our borrowings.
The (Singapore) transport minister
expressed appreciation over our
predicament (which is) to cancel the project
or defer it. Privatisation is not an offer.”
Even Deputy Defence Minister Liew Chin
Tong commented on the issue about a week
ago, saying both the HSR and the East Coast
Rail Link (ECRL) projects cost too much and
mean very little to Malaysia in terms of
connectivity and regional strategy.
Liew expressed doubts about the HSR’s
viability, noting that the passenger-only
link between Kuala Lumpur and Singapore
would never generate the sort of traffic
enjoyed between Beijing and Shanghai.
“I have doubts if HSR can even generate
income to pay for operations, not to mention
to have returns on investments.”
92. Binastra Land Projects
BUSINESS | LIFESTYLE | LE
32avenuePHASE II @ BUKIT SERD
USJ SubangBukit Jelutong
Bukit Serdang
Cheras
Cyberjaya