Introduction
In this Introduction to Construction Industry project, we were asked to find a
specificempty land to initiate a small construction project. The size of the
land must be around 900 square meters to 1200 square meters. We had
been given some purposesforour proposal.For example, recreation area,
commercialarea, industrial area, agricultural area, tourism area and
residential area. We had chosenour site which is located at Jalan Desa
Budiman, Bandar Sungai Long, Kajang, Selangor.
Purpose
The purpose of this projectis to let us feelwhat it is like to be a city
planner, as well as testing our creativity. It also helps reflectour
personalities,whether if we care about the nature or we are a selfishbunch
of student. Beside that, it also let us learn mroe about the construction
industry, because we have to do research on how to propose our concept.
Concept
This area had been neglected forquite a long time so we decided to use
this area for our final project. The area that we had chosenis 934.84 m² big
and it is big enough to build a fast food restaurant.
The conceptis a 4-storey, multi-restaurant building, with the ground
floor being the Car park, Mcdonald’s in the 2nd floor, KFC in the 3rd floor
and Domino in the highest floor. Due to the small size of our site, we decided
to put the car park at the ground flooras we do not have to dedicate a
specificarea for car park, which is impossible.
The multi-restaurant conceptis to provide more variety for the
residents nearby, which a drive-thru located at the 2nd floorMcdonalds’. In
order to pull off this 2nd floor drive-thru concept,we designed a “bridge”
where the drivers can go up and drive-thru, and underneath the bridge is the
entrance to the car park.
The building consists many gigantic glass pane to provide a modern
look as well as allowing natural sunlight into the building. By doing this, less
energy will be used to light up the building during the day, thus making this
building a green building.
We also decidedto plant grass, as well as palm trees alongside the
road in front of the building. This creates a contrast betweentechnology and
natural, providing a good sceneryfor the customers inside the building. It
also helps counterbalance the amount of carbon dioxide emitted from the
vehicles.
However, due to it being a restaurant, littering will be inevitable,
because you know, Malaysians. But, one way to solve this problem is to put
trash cans everywhere around the building. Another way is just hired some
cleaners to clean up the rubbish every now and then.
Why we choose McDonalds’ ?
The nearest McDonalds’ from our site is a distance of 8.1 km. It takes
you 17 minutes of drive to there, assuming the traffic isn’t bad as always. It is
very inconvenient for the residents of Jalan Desa Budiman.
Therefore,McDonalds’is one of the good choices to be proposedin
this project. Since our site is surrounded by residential area, there will be a
lot of students living there. McDonalds’ is also a nice place to chill and some
students also can study at McDonalds’ because McDonalds’will provides a
good environment to relax and study.
Beside that, it also provides fast and easy food for the busy ones,
because nowadays, the people would rather starve their tummy just to earn
money. That’s even more unhealthier than eating junk food!
Moreover, the location is very suitable for a drive-thru restaurant as it’s
a cross junction. This means that the street will be always busy, which in turn
means that the restaurants will get a tons of customers everyday.
Site Plan
Our Site At Jalan Desa Budiman, Bandar Sungai
Long,Kajang Selangor.
Front View
Side View
Site Context
YELLOW= Residential Area
RED= Our Site
Residential Area at Jalan Desa
Budiman
Site Analysis
Introduction to our site
Our site is surrounded by residential area and has a big space for
parking in case there are too many cars want to come here. The
environment of our site is quiet so residents can just chill at the fast
food tower that we propose. The residents can reach our site easily
as it is nearby the residential area.
Advantages
● Near to residential area.
● At the side of the junctions, good geography.
● Easy to reach
● Open Space
● Green Spaces
Disadvantages
● Wasted Area.
● Hilly.
● There is no way to exit to the main road.
● Not shady.
● There is not safe because there is not guard house nearby.
Improvement
● Make a way to the junctions.
● Mini guard house created at the site.
● Provide more shade.
● Make it to a better place to chill and relax.
● Add in some decorations.
● More plants planted at the hilly area.
Elements
Landscape:
Grass Turf
Cost of lawn installation and maintenance
Installation costs per square foot:
● Hydroseed: $.50-1.00
● Sod: $3.50
● Artificial turf: $8-$12
● Backyard putting greens: $14
● Sprinkler systems for turf: $2
Maintenance costs:
● Mowing and edging: $30-$40 per visit for small suburban lots
● Aeration and overseeding: $40-$60 per 1000 square feet
● Fertilizing and weed control: $60 for an average application
Palm
Tree
Equipment:
Full Series LuxuryCatering Equipmentfast food kitchen equipment
FOB Price: US $1,200 - 1,500 / Set
Min.Order
Quantity:
1 Set/Sets fast food kitchen equipment
Supply
Ability:
5000 Set/Sets per Month
Port: HUANGPU
Payment
Terms:
T/T,Western Union
Square high quality KFC, Starbuck,Buffet, Mcdonald's Long dining
Restaurant dining table set
FOB Price: US $40 - 300 / Piece
Min.Order
Quantity:
50 Piece/Pieces
Supply Ability: 1000 Piece/Pieces per Month
Port: Shenzhen
Payment Terms: T/T,Western Union
APPLICATION FOR PLAN APPROVAL
PROCEDURE (RESIDENTIAL /
COMMERCIAL /INSTITUTIONAL)
BUILDING PLANAPPROVALAPPLICATION
Building DepartmentNilai Council
Building Definition :
By Act 133, the Street, Drainage and Building, part 1 of section3, 'The
building includes a house,hut, shed or roofed enclosure,whetherused
for residentialor otherwise such as wall, fence,platform, stage,
dendeng board,lancerplace,dock,wharf,pier,jetty, landing stage or
bridge or any structure orfoundationassociated with the above
'Construct a building without prior written permissionof the Council is a nd
offenceand a fine of up to 20 X Payment for processing plan [ACT 133
STREET,DRAINAGE AND BUILDING 1976,
SECTION(70) SUB 13 & 14].
PLAN APPROVAL PROCEDURE
(RESIDENTIAL / COMMERCIAL
/INSTITUTIONAL)
Each application have to attach with below documents:
1. Application letter signed by the applicant’s Architect / Engineer
2. Form A (Certificate of building plan/structure).
3. Copy of Architects / Engineers Registration Certificate
4. Copies of Company Registration, MAA Form and Form 49.
5. Official Search Certificate / documents relevant to land
ownership.
6. Copy of premium.
7. Copies of the land tax and assessment tax receipt.
8. Copy of the Planning Permission Approval.
9. Copy of the Infrastructural and Earthworks Application Letter to
the Engineering
Department of MPN.
10. Verification form for the use of local construction materials.
11. Plan processing fees inclusive of the plan processing
calculation form.
12. Cleanliness Deposit payment of RM 500.00 an acre based on
the development area.DEPARTMENT OF TECHNICAL
REQUIREMENTS
The building plans which have been certified by the appointed
Architect / Engineer must be submitted together with the
application letter to the Internal and External Technical
Department through Local Centre (OSC).
INTERNAL TECHNICAL DEPARTMENT
1. Building Department - 3 sets (1 linen)
(The plans submitted to the Building Department should include
Appendix A )
2. Engineering Department- 4 sets (1 linen)
(Please refer to the checklist of the Engineering Department)
3. City Planning Department- 1 set (paper)
4. Landscape Department- 1 set (paper)
EXTERNAL TECHNICAL DEPARTMENT
1. Fire Department
2. Water Supply Department
3. Tenaga Nasional Berhad
4. Telecommunication Company
5. Indah Water Konsortium
The flow chart
Costing of the project
Item Description Unit Qty Amount
(RM)
Concrete Strong supportive material kg 20k 50000
Steel Strong supportive material kg 10k 100000
Glass Beautiful piece of material m² 5k 10000
Ceramic
Tiles
Beautiful piece of material m² 5k 25000
Cement Base material m3
20k
Palm
Tree
Softscape no. 12 180
Lawn Softscape m² 100 15000
Grass
Lighting Equipment no. 50 5000
Table set Equipment no. 45 6750
Kitchen
Set
Equipment no. 3 10800
Fridge Equipment no. 18 90000
Trash can Equipment no. 100 2000
Soft
Drinks
Dispenser
Equipment no. 6 6000
Toilet set Equipment no. 6 60000
Counter
set
Equipment no. 3 3000
Dining
Set
Equipment no. 200 4000
Conclusion
After doing this project, we understand of the building
team, its organization, duties and inter-relations. Besides
that, we are also have the ability to justify the feasibility of a
development and improve the proposal to serve the
purpose of the development.
In addition, my teammate and I are getting better in
teamwork. We helped each other and finally managed to
finish our work successfully on time.

More Related Content

What's hot

ICI final project report
ICI final project reportICI final project report
ICI final project reportqayyum23
 
Combine Certificate Aljhon
Combine Certificate AljhonCombine Certificate Aljhon
Combine Certificate AljhonAljhon Compuesto
 
Alag abode dombivali information brochure
Alag abode dombivali information brochureAlag abode dombivali information brochure
Alag abode dombivali information brochureRanveer Rathor
 
Ici final-individual-loon-jing-wei
Ici final-individual-loon-jing-weiIci final-individual-loon-jing-wei
Ici final-individual-loon-jing-weiRoy Loon
 

What's hot (7)

ICI final project report
ICI final project reportICI final project report
ICI final project report
 
Combine Certificate Aljhon
Combine Certificate AljhonCombine Certificate Aljhon
Combine Certificate Aljhon
 
Alag abode dombivali information brochure
Alag abode dombivali information brochureAlag abode dombivali information brochure
Alag abode dombivali information brochure
 
Jithin Portfolio
Jithin PortfolioJithin Portfolio
Jithin Portfolio
 
Provident central-park
Provident central-parkProvident central-park
Provident central-park
 
Ici final-individual-loon-jing-wei
Ici final-individual-loon-jing-weiIci final-individual-loon-jing-wei
Ici final-individual-loon-jing-wei
 
Bageshree kalashree residential project by nanded_city pune
Bageshree kalashree residential project by nanded_city puneBageshree kalashree residential project by nanded_city pune
Bageshree kalashree residential project by nanded_city pune
 

Viewers also liked

Inteligencia artificialdos
Inteligencia artificialdosInteligencia artificialdos
Inteligencia artificialdosmauricio1833
 
Ementa cofg cba gen
Ementa cofg cba genEmenta cofg cba gen
Ementa cofg cba genElton Dias
 
Вебинар на тему Групповые процессы
Вебинар на тему Групповые процессыВебинар на тему Групповые процессы
Вебинар на тему Групповые процессыYuliana Milovanova
 
La Figura del Business Angel - Cambridge House Network
La Figura del Business Angel - Cambridge House NetworkLa Figura del Business Angel - Cambridge House Network
La Figura del Business Angel - Cambridge House NetworkPedro Bisbal Andrés
 
Sigareni Collieries
Sigareni CollieriesSigareni Collieries
Sigareni CollieriesVenkatesh Kg
 
Fondamenti di GNU/Linux: FileSystem e Partizioni
Fondamenti di GNU/Linux: FileSystem e PartizioniFondamenti di GNU/Linux: FileSystem e Partizioni
Fondamenti di GNU/Linux: FileSystem e PartizioniDaniele Costarella
 
julio Panza Actividad 5
julio Panza Actividad 5julio Panza Actividad 5
julio Panza Actividad 5Jpanza26
 

Viewers also liked (9)

Inteligencia artificialdos
Inteligencia artificialdosInteligencia artificialdos
Inteligencia artificialdos
 
Ementa cofg cba gen
Ementa cofg cba genEmenta cofg cba gen
Ementa cofg cba gen
 
Вебинар на тему Групповые процессы
Вебинар на тему Групповые процессыВебинар на тему Групповые процессы
Вебинар на тему Групповые процессы
 
La Figura del Business Angel - Cambridge House Network
La Figura del Business Angel - Cambridge House NetworkLa Figura del Business Angel - Cambridge House Network
La Figura del Business Angel - Cambridge House Network
 
Competencias comunicativas
Competencias comunicativasCompetencias comunicativas
Competencias comunicativas
 
Sigareni Collieries
Sigareni CollieriesSigareni Collieries
Sigareni Collieries
 
Fondamenti di GNU/Linux: FileSystem e Partizioni
Fondamenti di GNU/Linux: FileSystem e PartizioniFondamenti di GNU/Linux: FileSystem e Partizioni
Fondamenti di GNU/Linux: FileSystem e Partizioni
 
The top 5 hearing aid myths exposed
The top 5 hearing aid myths exposed   The top 5 hearing aid myths exposed
The top 5 hearing aid myths exposed
 
julio Panza Actividad 5
julio Panza Actividad 5julio Panza Actividad 5
julio Panza Actividad 5
 

Similar to ICI.docx

Ici final project
Ici   final projectIci   final project
Ici final projectJoeylau97
 
Ici - final project
Ici - final projectIci - final project
Ici - final projectleejanett3
 
Ici final group
Ici final groupIci final group
Ici final groupKailyn Lee
 
Ici 3docx
Ici 3docxIci 3docx
Ici 3docxzerkai
 
ICI FINAL PROJECT
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT Yip Xiaojung
 
ici copy
ici copyici copy
ici copyjie0117
 
Ecowise 100528210344-phpapp02
Ecowise 100528210344-phpapp02Ecowise 100528210344-phpapp02
Ecowise 100528210344-phpapp02priyesh12
 
Project information
Project informationProject information
Project informationNge Chen
 
Ici final project 0w0
Ici final project 0w0Ici final project 0w0
Ici final project 0w0limziahuei
 
Ici final project 0w0
Ici final project 0w0Ici final project 0w0
Ici final project 0w0rivenhau
 
ici final project 0w0.docx
ici final project 0w0.docxici final project 0w0.docx
ici final project 0w0.docxrivenhau
 
ICI final project
ICI final projectICI final project
ICI final projectMarco Leong
 
Project Management Project 2
Project Management Project 2Project Management Project 2
Project Management Project 2Clement Seong
 
ICI Tam Zhao Wei's Proposal
ICI Tam Zhao Wei's ProposalICI Tam Zhao Wei's Proposal
ICI Tam Zhao Wei's ProposalTamZhaoWei
 
ICI 6. tam zhao wei
ICI 6. tam zhao weiICI 6. tam zhao wei
ICI 6. tam zhao weiashleyyeap
 

Similar to ICI.docx (20)

Ici final project
Ici   final projectIci   final project
Ici final project
 
Ici - final project
Ici - final projectIci - final project
Ici - final project
 
Ici final 2
Ici final 2Ici final 2
Ici final 2
 
Project
Project Project
Project
 
Souvenir
SouvenirSouvenir
Souvenir
 
Ici final group
Ici final groupIci final group
Ici final group
 
Iici final
Iici finalIici final
Iici final
 
Ici 3docx
Ici 3docxIci 3docx
Ici 3docx
 
ICI FINAL PROJECT
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT
 
ici copy
ici copyici copy
ici copy
 
Ecowise 100528210344-phpapp02
Ecowise 100528210344-phpapp02Ecowise 100528210344-phpapp02
Ecowise 100528210344-phpapp02
 
Project information
Project informationProject information
Project information
 
Ici final project 0w0
Ici final project 0w0Ici final project 0w0
Ici final project 0w0
 
Ici final project 0w0
Ici final project 0w0Ici final project 0w0
Ici final project 0w0
 
ici final project 0w0.docx
ici final project 0w0.docxici final project 0w0.docx
ici final project 0w0.docx
 
ICI final project
ICI final projectICI final project
ICI final project
 
F inal ici super project
F inal ici super projectF inal ici super project
F inal ici super project
 
Project Management Project 2
Project Management Project 2Project Management Project 2
Project Management Project 2
 
ICI Tam Zhao Wei's Proposal
ICI Tam Zhao Wei's ProposalICI Tam Zhao Wei's Proposal
ICI Tam Zhao Wei's Proposal
 
ICI 6. tam zhao wei
ICI 6. tam zhao weiICI 6. tam zhao wei
ICI 6. tam zhao wei
 

More from mkyong1996

CNC-report.pdf
CNC-report.pdfCNC-report.pdf
CNC-report.pdfmkyong1996
 
EPC - Mural Art Note.pptx.pdf
EPC - Mural Art Note.pptx.pdfEPC - Mural Art Note.pptx.pdf
EPC - Mural Art Note.pptx.pdfmkyong1996
 
english 2 slide.pdf
english 2 slide.pdfenglish 2 slide.pdf
english 2 slide.pdfmkyong1996
 
english 2 slide.pdf
english 2 slide.pdfenglish 2 slide.pdf
english 2 slide.pdfmkyong1996
 
English2-ComparativeTradeReport.pdf
English2-ComparativeTradeReport.pdfEnglish2-ComparativeTradeReport.pdf
English2-ComparativeTradeReport.pdfmkyong1996
 
RealEng2P1.pdf
RealEng2P1.pdfRealEng2P1.pdf
RealEng2P1.pdfmkyong1996
 
CONSTRUCTED LANDSCAPE PROJECT 1.pptx
CONSTRUCTED LANDSCAPE PROJECT 1.pptxCONSTRUCTED LANDSCAPE PROJECT 1.pptx
CONSTRUCTED LANDSCAPE PROJECT 1.pptxmkyong1996
 
CONSTRUCTED LANDSCAPE PROJECT 1.pptx
CONSTRUCTED LANDSCAPE PROJECT 1.pptxCONSTRUCTED LANDSCAPE PROJECT 1.pptx
CONSTRUCTED LANDSCAPE PROJECT 1.pptxmkyong1996
 
ENBEREPORT.docx
ENBEREPORT.docxENBEREPORT.docx
ENBEREPORT.docxmkyong1996
 
ICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxmkyong1996
 

More from mkyong1996 (12)

CNC-report.pdf
CNC-report.pdfCNC-report.pdf
CNC-report.pdf
 
EPC - Mural Art Note.pptx.pdf
EPC - Mural Art Note.pptx.pdfEPC - Mural Art Note.pptx.pdf
EPC - Mural Art Note.pptx.pdf
 
english 2 slide.pdf
english 2 slide.pdfenglish 2 slide.pdf
english 2 slide.pdf
 
english 2 slide.pdf
english 2 slide.pdfenglish 2 slide.pdf
english 2 slide.pdf
 
English2-ComparativeTradeReport.pdf
English2-ComparativeTradeReport.pdfEnglish2-ComparativeTradeReport.pdf
English2-ComparativeTradeReport.pdf
 
RealEng2P1.pdf
RealEng2P1.pdfRealEng2P1.pdf
RealEng2P1.pdf
 
CONSTRUCTED LANDSCAPE PROJECT 1.pptx
CONSTRUCTED LANDSCAPE PROJECT 1.pptxCONSTRUCTED LANDSCAPE PROJECT 1.pptx
CONSTRUCTED LANDSCAPE PROJECT 1.pptx
 
CONSTRUCTED LANDSCAPE PROJECT 1.pptx
CONSTRUCTED LANDSCAPE PROJECT 1.pptxCONSTRUCTED LANDSCAPE PROJECT 1.pptx
CONSTRUCTED LANDSCAPE PROJECT 1.pptx
 
ENBEREPORT.docx
ENBEREPORT.docxENBEREPORT.docx
ENBEREPORT.docx
 
ICI.pdf
ICI.pdfICI.pdf
ICI.pdf
 
ICI.pdf
ICI.pdfICI.pdf
ICI.pdf
 
ICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptx
 

ICI.docx

  • 1. Foundation in Natural and Built Environment 08/14 Introduction To The Construction Industry (QSB30105) Final Project -Proposal of a Commercial Area - Name: Terence Tan Peng Ong & Yong Man Kit Student ID : 0320275 & 0319778 Tutor : Ms Ann See Peng SUBMISSION DATE :18th Nov 2014 Introduction
  • 2. In this Introduction to Construction Industry project, we were asked to find a specificempty land to initiate a small construction project. The size of the land must be around 900 square meters to 1200 square meters. We had been given some purposesforour proposal.For example, recreation area, commercialarea, industrial area, agricultural area, tourism area and residential area. We had chosenour site which is located at Jalan Desa Budiman, Bandar Sungai Long, Kajang, Selangor. Purpose The purpose of this projectis to let us feelwhat it is like to be a city planner, as well as testing our creativity. It also helps reflectour personalities,whether if we care about the nature or we are a selfishbunch of student. Beside that, it also let us learn mroe about the construction industry, because we have to do research on how to propose our concept. Concept This area had been neglected forquite a long time so we decided to use this area for our final project. The area that we had chosenis 934.84 m² big and it is big enough to build a fast food restaurant.
  • 3.
  • 4.
  • 5. The conceptis a 4-storey, multi-restaurant building, with the ground floor being the Car park, Mcdonald’s in the 2nd floor, KFC in the 3rd floor and Domino in the highest floor. Due to the small size of our site, we decided to put the car park at the ground flooras we do not have to dedicate a specificarea for car park, which is impossible. The multi-restaurant conceptis to provide more variety for the residents nearby, which a drive-thru located at the 2nd floorMcdonalds’. In order to pull off this 2nd floor drive-thru concept,we designed a “bridge” where the drivers can go up and drive-thru, and underneath the bridge is the entrance to the car park. The building consists many gigantic glass pane to provide a modern look as well as allowing natural sunlight into the building. By doing this, less energy will be used to light up the building during the day, thus making this building a green building. We also decidedto plant grass, as well as palm trees alongside the road in front of the building. This creates a contrast betweentechnology and natural, providing a good sceneryfor the customers inside the building. It also helps counterbalance the amount of carbon dioxide emitted from the vehicles. However, due to it being a restaurant, littering will be inevitable, because you know, Malaysians. But, one way to solve this problem is to put trash cans everywhere around the building. Another way is just hired some cleaners to clean up the rubbish every now and then. Why we choose McDonalds’ ?
  • 6. The nearest McDonalds’ from our site is a distance of 8.1 km. It takes you 17 minutes of drive to there, assuming the traffic isn’t bad as always. It is very inconvenient for the residents of Jalan Desa Budiman. Therefore,McDonalds’is one of the good choices to be proposedin this project. Since our site is surrounded by residential area, there will be a lot of students living there. McDonalds’ is also a nice place to chill and some students also can study at McDonalds’ because McDonalds’will provides a good environment to relax and study. Beside that, it also provides fast and easy food for the busy ones, because nowadays, the people would rather starve their tummy just to earn money. That’s even more unhealthier than eating junk food! Moreover, the location is very suitable for a drive-thru restaurant as it’s a cross junction. This means that the street will be always busy, which in turn means that the restaurants will get a tons of customers everyday. Site Plan
  • 7. Our Site At Jalan Desa Budiman, Bandar Sungai Long,Kajang Selangor. Front View Side View
  • 8. Site Context YELLOW= Residential Area RED= Our Site
  • 9. Residential Area at Jalan Desa Budiman Site Analysis
  • 10. Introduction to our site Our site is surrounded by residential area and has a big space for parking in case there are too many cars want to come here. The environment of our site is quiet so residents can just chill at the fast food tower that we propose. The residents can reach our site easily as it is nearby the residential area. Advantages ● Near to residential area. ● At the side of the junctions, good geography. ● Easy to reach ● Open Space ● Green Spaces Disadvantages ● Wasted Area. ● Hilly. ● There is no way to exit to the main road. ● Not shady. ● There is not safe because there is not guard house nearby. Improvement ● Make a way to the junctions. ● Mini guard house created at the site. ● Provide more shade. ● Make it to a better place to chill and relax. ● Add in some decorations. ● More plants planted at the hilly area.
  • 11. Elements Landscape: Grass Turf Cost of lawn installation and maintenance Installation costs per square foot: ● Hydroseed: $.50-1.00 ● Sod: $3.50 ● Artificial turf: $8-$12 ● Backyard putting greens: $14 ● Sprinkler systems for turf: $2 Maintenance costs: ● Mowing and edging: $30-$40 per visit for small suburban lots ● Aeration and overseeding: $40-$60 per 1000 square feet
  • 12. ● Fertilizing and weed control: $60 for an average application Palm Tree
  • 14. Full Series LuxuryCatering Equipmentfast food kitchen equipment FOB Price: US $1,200 - 1,500 / Set Min.Order Quantity: 1 Set/Sets fast food kitchen equipment Supply Ability: 5000 Set/Sets per Month Port: HUANGPU Payment Terms: T/T,Western Union
  • 15. Square high quality KFC, Starbuck,Buffet, Mcdonald's Long dining Restaurant dining table set FOB Price: US $40 - 300 / Piece Min.Order Quantity: 50 Piece/Pieces Supply Ability: 1000 Piece/Pieces per Month Port: Shenzhen Payment Terms: T/T,Western Union APPLICATION FOR PLAN APPROVAL PROCEDURE (RESIDENTIAL / COMMERCIAL /INSTITUTIONAL) BUILDING PLANAPPROVALAPPLICATION Building DepartmentNilai Council Building Definition :
  • 16. By Act 133, the Street, Drainage and Building, part 1 of section3, 'The building includes a house,hut, shed or roofed enclosure,whetherused for residentialor otherwise such as wall, fence,platform, stage, dendeng board,lancerplace,dock,wharf,pier,jetty, landing stage or bridge or any structure orfoundationassociated with the above 'Construct a building without prior written permissionof the Council is a nd offenceand a fine of up to 20 X Payment for processing plan [ACT 133 STREET,DRAINAGE AND BUILDING 1976, SECTION(70) SUB 13 & 14]. PLAN APPROVAL PROCEDURE (RESIDENTIAL / COMMERCIAL /INSTITUTIONAL) Each application have to attach with below documents: 1. Application letter signed by the applicant’s Architect / Engineer 2. Form A (Certificate of building plan/structure). 3. Copy of Architects / Engineers Registration Certificate 4. Copies of Company Registration, MAA Form and Form 49. 5. Official Search Certificate / documents relevant to land ownership. 6. Copy of premium.
  • 17. 7. Copies of the land tax and assessment tax receipt. 8. Copy of the Planning Permission Approval. 9. Copy of the Infrastructural and Earthworks Application Letter to the Engineering Department of MPN. 10. Verification form for the use of local construction materials. 11. Plan processing fees inclusive of the plan processing calculation form. 12. Cleanliness Deposit payment of RM 500.00 an acre based on the development area.DEPARTMENT OF TECHNICAL REQUIREMENTS The building plans which have been certified by the appointed Architect / Engineer must be submitted together with the application letter to the Internal and External Technical Department through Local Centre (OSC). INTERNAL TECHNICAL DEPARTMENT 1. Building Department - 3 sets (1 linen) (The plans submitted to the Building Department should include Appendix A ) 2. Engineering Department- 4 sets (1 linen) (Please refer to the checklist of the Engineering Department)
  • 18. 3. City Planning Department- 1 set (paper) 4. Landscape Department- 1 set (paper) EXTERNAL TECHNICAL DEPARTMENT 1. Fire Department 2. Water Supply Department 3. Tenaga Nasional Berhad 4. Telecommunication Company 5. Indah Water Konsortium
  • 20. Costing of the project Item Description Unit Qty Amount (RM) Concrete Strong supportive material kg 20k 50000 Steel Strong supportive material kg 10k 100000 Glass Beautiful piece of material m² 5k 10000 Ceramic Tiles Beautiful piece of material m² 5k 25000 Cement Base material m3 20k Palm Tree Softscape no. 12 180 Lawn Softscape m² 100 15000
  • 21. Grass Lighting Equipment no. 50 5000 Table set Equipment no. 45 6750 Kitchen Set Equipment no. 3 10800 Fridge Equipment no. 18 90000 Trash can Equipment no. 100 2000 Soft Drinks Dispenser Equipment no. 6 6000 Toilet set Equipment no. 6 60000 Counter set Equipment no. 3 3000 Dining Set Equipment no. 200 4000
  • 22. Conclusion After doing this project, we understand of the building team, its organization, duties and inter-relations. Besides that, we are also have the ability to justify the feasibility of a development and improve the proposal to serve the purpose of the development. In addition, my teammate and I are getting better in teamwork. We helped each other and finally managed to finish our work successfully on time.