working skills :
o Preparation of a 3D PDMS model for all plant areas within the contract Scope,
o The 3D model is showing the plant and the integration into the existing. The
Model includes:
i. Plant co-ordinates and elevations
ii. All equipment items acc. to equipment list.
iii. Clearances for disassembly, maintenance and operation.
iv. Clearances for pipe- and cable runs.
v. Requirements for steel structure (buildings & pipe racks).
vi. Pipe routing for major process piping (main process route).
vii. Equipment Arrangement according the layout standard & safety gaps
viii. The required steel structure Develop and issue isometric drawings including pipe
Supports for construction using 3D Model.
o Preparing complete design of piping general arrangement layouts and key plans using P&ID's and vendor data.
o Design Review for lines, equipment and structure in Navisworks, & PDMS Reviews for completeness (routing feasibility and requirements of process and accessibility).
o Prepare piping Daily & weekly reports.
o Attend hazed kick of meeting
o Follow up tenders
o Attend engineering weekly meetings to review progress & schedule
o Field Technical support.
o Site verification on isometric Drawing & layouts for new lines/tie in's.
o Developing AS BUILT Drawing.
o Testing procedures as applicable to Fabricated Equipment & Piping with knowledge of Isometric drawings and P& ID's
o Prepare transmittal report
And now i am working a piping design engineer at UNEPP
You can find my resume attached below as i will gladly provide any further information may be required
thank you
Best Regards
Mohamed osama
Monitor construction activities, ensuring the safety of all personnel on site as the top priority;
Oversee total field construction effort to ensure project is constructed in accordance with design, budget, safety and schedule requirements;
Perform routine quality audits to ensure that work is progressing per the TransCanada specifications and initiate corrective actions where appropriate;
Document incidents using the Incident and Issues Tracking (IIT) system and participate in incident investigations;
Guide and direct proper project completion, including commissioning, close out of punch list, and training where appropriate;
Coordinate and ensure the timely completion of project documentation;
Ensure Company environmental policies and safety standards and local regulations are followed by all construction and inspection personnel;
Provide leadership for issue resolution during project construction and commissioning phases;
Ensure site inspections are carried out in a timely and efficient manner to avoid delays to the construction progress;
Review contractors’ request for changes and make recommendations to the Project Manager regarding necessity, effect, cost, and schedule implications;
Ensure scope changes are managed in accordance with contract terms and conditions;
Monitor construction progress and initiate corrective action when the contractor deviates from project specifications, requirements, or schedule;
Address any construction non-conformance issues;
Ensure design deviations are properly red lined and drawings are included in the project record file;
Coordinate plans with field engineering to overcome any inconsistencies;
Provide detailed direction of construction specifications;
Collaborate with Company Safety Representatives to promote awareness and understanding of safety performance on projects;
Provide construction management support for emergency repair and restoration activities on both oil and natural gas pipeline systems;
Other tasks as required.
working skills :
o Preparation of a 3D PDMS model for all plant areas within the contract Scope,
o The 3D model is showing the plant and the integration into the existing. The
Model includes:
i. Plant co-ordinates and elevations
ii. All equipment items acc. to equipment list.
iii. Clearances for disassembly, maintenance and operation.
iv. Clearances for pipe- and cable runs.
v. Requirements for steel structure (buildings & pipe racks).
vi. Pipe routing for major process piping (main process route).
vii. Equipment Arrangement according the layout standard & safety gaps
viii. The required steel structure Develop and issue isometric drawings including pipe
Supports for construction using 3D Model.
o Preparing complete design of piping general arrangement layouts and key plans using P&ID's and vendor data.
o Design Review for lines, equipment and structure in Navisworks, & PDMS Reviews for completeness (routing feasibility and requirements of process and accessibility).
o Prepare piping Daily & weekly reports.
o Attend hazed kick of meeting
o Follow up tenders
o Attend engineering weekly meetings to review progress & schedule
o Field Technical support.
o Site verification on isometric Drawing & layouts for new lines/tie in's.
o Developing AS BUILT Drawing.
o Testing procedures as applicable to Fabricated Equipment & Piping with knowledge of Isometric drawings and P& ID's
o Prepare transmittal report
And now i am working a piping design engineer at UNEPP
You can find my resume attached below as i will gladly provide any further information may be required
thank you
Best Regards
Mohamed osama
Monitor construction activities, ensuring the safety of all personnel on site as the top priority;
Oversee total field construction effort to ensure project is constructed in accordance with design, budget, safety and schedule requirements;
Perform routine quality audits to ensure that work is progressing per the TransCanada specifications and initiate corrective actions where appropriate;
Document incidents using the Incident and Issues Tracking (IIT) system and participate in incident investigations;
Guide and direct proper project completion, including commissioning, close out of punch list, and training where appropriate;
Coordinate and ensure the timely completion of project documentation;
Ensure Company environmental policies and safety standards and local regulations are followed by all construction and inspection personnel;
Provide leadership for issue resolution during project construction and commissioning phases;
Ensure site inspections are carried out in a timely and efficient manner to avoid delays to the construction progress;
Review contractors’ request for changes and make recommendations to the Project Manager regarding necessity, effect, cost, and schedule implications;
Ensure scope changes are managed in accordance with contract terms and conditions;
Monitor construction progress and initiate corrective action when the contractor deviates from project specifications, requirements, or schedule;
Address any construction non-conformance issues;
Ensure design deviations are properly red lined and drawings are included in the project record file;
Coordinate plans with field engineering to overcome any inconsistencies;
Provide detailed direction of construction specifications;
Collaborate with Company Safety Representatives to promote awareness and understanding of safety performance on projects;
Provide construction management support for emergency repair and restoration activities on both oil and natural gas pipeline systems;
Other tasks as required.
Dear Sir
I am pleased to attach herein my personal CV, hopping to joint your respectable company. This is my phone number (00201018733999------00201206598787)
Please accept my best regard
Mohamed Roshdi
1. 1
Curriculum Vitea
Khaled Hussein El-Sayed Sonbol
PERSONAL DATA:
Name : Khaled Hussein El-Sayed Sonbol
Date of Birth : 12th
of December 1962
Nationality : Egyptian
Marital Status : Married+3child
Mobile : 01020480866
01025051418
Phone : 0403313709
Home Address : Fathi basha Street, from Botros Street
Tanta, Gharbia, Egypt
Email : khaledsonbol@yahoo.com
Driving License : Available
Passport No. : a15616909 Expiry Date: 29/05/2022
QUALIFICATION:
B.SC. Power Mechanical Engineering, June 1985, Alexandria University
LANGUAGES:
Arabic : Mother Tongue
English : excellent
SKILLS
Computer Skills: Microsoft Office (Word + Excel), AutoCAD, Internet Browsers,
Emails and Hardware background.
2. 2
TRAINING COURSES
Projects Management (C.P.M).
Hydraulic Circuits
PREVIOUS EXPERIEN
1. Sep 2013 – to date
EMPLOYER: GAMA FOR CONTRACTING&TRADING.
Project: EDITA II 6TH
OCTOBER
Consultant: COSMOS
Owner: EDITA
Position: Construction Manager.
Duties:
1-Electromechanical installations for the factory which includes:
a- HVAC
b- Firefighting (pumps-piping-sprinkler system-FM200-CO2-FHC)
c- Water supply system.
d- Compressed air system.
e- Steam piping.
f- Plumbing system.
2. Feb 2013 – Sep 2013
EMPLOYER: O RASCOM CONSTRUCTION
Project: Greater Cairo METRO III
Contractor: COLLAS RAIL
Project Manager: VENCI CONSTRUCTION GRAND PROJECTS.
Owner: NATIONAL AUTHORITY OF TUNNELS
Position: Deputy Construction Manager.
Duties:
Installation of Elevators for stations (Thyssen Krupp).
Installation of Ascalators for stations (Thyssen Krupp).
Installation of metro work shop (abbasia) complete with all utility
Electromechanical works(hvac, fire fighting and plumbing).
3. Apr 2009 – Nov2012
EMPLOYER: ORASCOM CONSTRUCTION ALGERIA
3. 3
Project: SORFERT FERTILIZER COMPLEX, ALGERIA
FERTILIZER PLANT ARZEW
Contractor: UHDE –AWG (GERMANY)
Project Manager: SORFERT (2 billion $)
Owner: SONATRAC&ORASCOM
Position: Construction Manager.
Duties:
Installation of steam power plant of the project (3x50MW) HITACHI -
SIEMENS.
Installation of sea water intake equipment ,tanks & piping.
Installation of NH3 Process Equipment(Static-Rotating)&piping
( steel structure, cladding ,equipments and piping works) .
Installation of gas pressure reduction station & gas metering station.
4. May 2006 – up Apr 2009:
EMPLOYER: ORASCOM CONSTRUCTION NIGERIA
Project: UCC, CALABAR, UNICEM, NIGERIA
CEMENT PLANT
Contractor: F L SMIDTH (DENMARK)
Project Manager: ORASOM
Owner: UNICEM
Position: Mech. Construction Manager.
Duties:
Installation of preheater tower steel structure ,equipments and piping.
Installation of klinker storage steel structure and equipments Work.
Installation of captive power plant 3(+1)x18V50DF,WARTSILA FINLAND.
(steel structure, cladding, equipments, feul &oil tanks and piping works)
Installation of cable gallery steel structure
Installation of cement silo steel structure and equipments
Commissioning works for the a/m buildings +Rotary kiln and Klinker Cooler
5. September2004 – up to May 2006:
EMPLOYER: Industrial & Construction Engineering Co. (SIAC)
Project: President El-Saleh Mosque – Sana'a - Yemen
Contractor: SIAC
Project Manager: Presidency office of Yemen
Consultant: DAR EL-HANDASA (International)
4. 4
Owner: Arab Republic of Yemen
Position: MEP Construction Engineer & technical office
Duties:
Following up & Submitting for approval the materials & shop drawings of
HVAC, Plumbing & Fire Fighting Work
Following up the executing of Builders Work.
Electro-Mechanical / Civil coordination.
Following up the fabrication & erection of MEP works.
Checking of pumps and fans head calculation and material submittals.
6. April2004 – Sep. 2004:
Industrial & Construction Engineering Co. (SIAC)
Project: Alex. City Center ( Carrefour)
Contractor: Joint Venture (Murray & Roberts and SIAC)
Consultant: A. MEZ & MOH. HEGAZY
Owner: Maged Al-Fateem
Position: MEP Senior Construction Engineer
Duties:
Following up the executing of Builders Work on site.
Following up the fabrication & erection of firefighting, HVAC & Plumbing
.works.
7. August2002 – April2004:
Industrial & Construction Engineering Co. (SIAC)
Project: Plant for cement at Al-Areesh - Sinai
Contractor: SIAC
Owner: Sinai Cement Co.
Position: Mechanical Engineer
Duties:
Erection of mech. Equipments & piping ( packing line )
Executing, Testing & start up & commissioning of Mechanical Works.
8. August2003 – July2004:
Industrial & Construction Engineering Co. (SIAC)
Project: Plant for steel rebar at Suez
Contractor: SIAC
Owner: Al-Attal.
Position: executive manager
Duties:
Executing, Testing & Operating of Piping Networks for Rolling Mill Plant
such as (compressed air, water supply, fuel, natural gas & Oxygen).
Executing, Testing, Pickling & Flushing of Hydraulic Piping System.
5. 5
Erection of Mechanical Equipments of Rolling Mill Plant.
Overhead cranes.
9. August2001 – July2003:
Industrial & Construction Engineering Co. (SIAC)
Project: Plant for steel melt shop at Suez
Contractor: SIAC
Owner: Suez Steel Company
Position: Mechanical Engineer
Duties:
Executing, Testing & Operating of Piping Networks for Rolling Mill Plant
such as (compressed air, water supply, fuel, natural gas & Oxygen).
Executing, Testing, Pickling & Flushing of Hydraulic Piping System.
Erection of Mechanical Equipments of melt shop Plant (pump station, comp.
stations, cooling towers).
Fume extraction plant.
10. August1998 – July2001:
Industrial & Construction Engineering Co. (SIAC)
Project: Special Steel Factory at El-Sadat City
Contractor: SIAC
Owner: Arab Company for Special Steel (ARCO STEEL)
Position: Mechanical Engineer
Duties:
Executing, Testing & Operating of Piping Networks for Rolling Mill Plant
such as (compressed air, water supply, fuel, natural gas & Oxygen).
Executing, Testing, Pickling & Flushing of Hydraulic Piping System.
Erection of Mechanical Equipments of Melt shop Plant.
11. Oct.1996 – August 1998:
Integrated Oil Industry Company
Position: Maintenance Section Head
Duties:
Maintenance of the factory equipments such as:-
Boilers ( high – medium pressure )
Water treatment plant
Refining equipments
Packing lines.
12. Feb.1991 – Sep.1996:
Sinai Manganese Company
Position: Maintenance Engineer
Duties:
6. 6
Maintenance of the factory equipments such as:-
21 KVA elect. furnace
All the facility for the factory.
Material handling equipments (crushers, belt conveyors, vibrators).
Overhead cranes – hyd. Equipments – piping – pump station )
Gas cleaning plant ( filter house )
Erection & Industrial Services Co. (ERISCOM)
1. June 1988 – Jan. 1991:
a) July 1990- Jan.1991
Project: Ferro-manganese Plant at south of Sinai
Contractor: ERISCOM
Owner: Sinai Manganese Company
Position: Mechanical Engineer
Duties:
Erection of gas turbine power plant 3x120MW (SIMENS) .
Erection & operating of machines
Executing, Testing & Operating of Piping Networks .
b) June.1988-June 1990
Project: Valves & Pipe fittings factory
Contractor: ERISCOM
Owner: El-Nasr Casting Company
Position: Mechanical Engineer
Duties:
Executing, Testing & Operating of Piping Networks.
Erection of machines (furnace, material handling, O.H. cranes, cooling
towers, pump stations, comp. stations).
2. Oct. 1985 – Jan. 1988:
Ministry of Defense
Position: Tech. Affairs Officer ( Army )
Duties:
Maintenance and repair of heavy equipments in the army .