T
o accommodate expansion of
the clinical and future patient
spaces, McKenney’s relocated
existing equipment for the Northeast Georgia
Medical Center in Braselton, Georgia.
THE CHALLENGE
Fourteen rooftop fans, one MRI chiller, and
two CRAC units serving the base hospital
needed to be relocated to make way for the
addition of one story onto the diagnostic and
treatment wing and two stories onto the patient
tower. All of these construction changes had to
be completed without disrupting patient care
in the live hospital environment.
THE SOLUTION
The McKenney’s team helped develop a
detailed coordination plan for relocating and/
or replacing the equipment, carefully mapping
out every step to ensure success. The plan
kept everyone—the general contractor,
electricians, controls subcontractor, hospital
maintenance and operations staff, as well as
McKenney’s internal sheet metal, HVAC piping
and startup-up/commissioning teams—
involved, synchronized and on task.
THE RESULTS
Northeast Georgia Medical Center was able to
continue providing services to patients during
the equipment relocations, which paved the
way for the build-out of the new floors.
Synchronized for Success
PROJECT NAME
žž Northeast Georgia
Medical Center Expansion
PROJECT LOCATION
žž Braselton, Georgia
PROJECT TEAM
žž Owner: Northeast Georgia
Health System
žž General Contractor: Turner
Construction Company
žž Subcontractor: McKenney’s, Inc.
SPECIALIZATIONS
	Design/Assist
	 Pipe Shop Prefab
	 Sheet Metal Shop Prefab
MARKETS
žž Healthcare
The content of this document is not intended as an endorsement.
www.mckenneys.com
© 2016 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.
404-622-5000
info@mckenneys.com
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
704-357-1200
info@mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214

More Related Content

Similar to Synchronized for Success - Medical Center Expansion Project

Michael_K_Roberts_Resume_2014
Michael_K_Roberts_Resume_2014Michael_K_Roberts_Resume_2014
Michael_K_Roberts_Resume_2014
Mike Roberts
 
Maggio JLL Mini Case Studies
Maggio JLL Mini Case StudiesMaggio JLL Mini Case Studies
Maggio JLL Mini Case Studies
Charles S. Maggio
 
cmc_cv_comprehensive_01_2017
cmc_cv_comprehensive_01_2017cmc_cv_comprehensive_01_2017
cmc_cv_comprehensive_01_2017
Camille Cecere
 
Premier modular case_studies_-_north_middlesex_hospital_-final
Premier modular case_studies_-_north_middlesex_hospital_-finalPremier modular case_studies_-_north_middlesex_hospital_-final
Premier modular case_studies_-_north_middlesex_hospital_-final
wandysgal
 

Similar to Synchronized for Success - Medical Center Expansion Project (20)

Michael_K_Roberts_Resume_2014
Michael_K_Roberts_Resume_2014Michael_K_Roberts_Resume_2014
Michael_K_Roberts_Resume_2014
 
Maggio JLL Mini Case Studies
Maggio JLL Mini Case StudiesMaggio JLL Mini Case Studies
Maggio JLL Mini Case Studies
 
Healthcare-brochure
Healthcare-brochureHealthcare-brochure
Healthcare-brochure
 
How one Hospital Shaved Off 88 Minutes from their ALOS
How one Hospital Shaved Off 88 Minutes from their ALOSHow one Hospital Shaved Off 88 Minutes from their ALOS
How one Hospital Shaved Off 88 Minutes from their ALOS
 
Michael jones 05_04_2016_senior_engineering_facilities_director_resume_6...
Michael jones 05_04_2016_senior_engineering_facilities_director_resume_6...Michael jones 05_04_2016_senior_engineering_facilities_director_resume_6...
Michael jones 05_04_2016_senior_engineering_facilities_director_resume_6...
 
spurlin portfolio (lo res)
spurlin portfolio (lo res)spurlin portfolio (lo res)
spurlin portfolio (lo res)
 
!dRA Project List
!dRA Project List!dRA Project List
!dRA Project List
 
clinic flow poster
clinic flow posterclinic flow poster
clinic flow poster
 
An Educated Approach to HVAC
An Educated Approach to HVACAn Educated Approach to HVAC
An Educated Approach to HVAC
 
How to start a Old Hospital with New ideas
How to start a Old Hospital with New ideasHow to start a Old Hospital with New ideas
How to start a Old Hospital with New ideas
 
Garst Jim 2015-Update
Garst Jim 2015-UpdateGarst Jim 2015-Update
Garst Jim 2015-Update
 
Generating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit ProjectGenerating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit Project
 
Trimming Cost, Delivering Solutions - Hospital Design/Build
Trimming Cost, Delivering Solutions - Hospital Design/Build Trimming Cost, Delivering Solutions - Hospital Design/Build
Trimming Cost, Delivering Solutions - Hospital Design/Build
 
BayCare Health System: Improving Clinical Outcomes & Raising Care Quality fo...
BayCare Health System:  Improving Clinical Outcomes & Raising Care Quality fo...BayCare Health System:  Improving Clinical Outcomes & Raising Care Quality fo...
BayCare Health System: Improving Clinical Outcomes & Raising Care Quality fo...
 
Quality Improvement Through Effective Staff Handover
Quality Improvement Through Effective Staff Handover Quality Improvement Through Effective Staff Handover
Quality Improvement Through Effective Staff Handover
 
cmc_cv_comprehensive_01_2017
cmc_cv_comprehensive_01_2017cmc_cv_comprehensive_01_2017
cmc_cv_comprehensive_01_2017
 
Premier modular case_studies_-_north_middlesex_hospital_-final
Premier modular case_studies_-_north_middlesex_hospital_-finalPremier modular case_studies_-_north_middlesex_hospital_-final
Premier modular case_studies_-_north_middlesex_hospital_-final
 
Advanced Process Simulation Methodology To Plan Facility Renovation
Advanced Process Simulation Methodology To Plan Facility RenovationAdvanced Process Simulation Methodology To Plan Facility Renovation
Advanced Process Simulation Methodology To Plan Facility Renovation
 
St. Johns Mercy Heart Hospital
St. Johns Mercy Heart HospitalSt. Johns Mercy Heart Hospital
St. Johns Mercy Heart Hospital
 
JessicaBGarcia resume 2016
JessicaBGarcia resume 2016JessicaBGarcia resume 2016
JessicaBGarcia resume 2016
 

More from McKenney's Inc

More from McKenney's Inc (20)

CRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GACRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GA
 
Mission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NC
 
Lab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory RenovationLab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory Renovation
 
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingBlowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
 
Design/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GADesign/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GA
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems Projects
 
Keeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementKeeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems Replacement
 
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildA Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
 
Installation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionInstallation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality Construction
 
Covering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationCovering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems Installation
 
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
 
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectTurnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
 
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
 
Efficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingEfficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate Harvesting
 
Plumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsPlumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial Buildings
 
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
 
Creating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationCreating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems Installation
 
A Greener Hospital by Design
A Greener Hospital by DesignA Greener Hospital by Design
A Greener Hospital by Design
 
Playing Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality ConstructionPlaying Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality Construction
 
A High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use ConstructionA High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use Construction
 

Recently uploaded

NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
Khaled Al Awadi
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
nafizanafzal
 
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
prakheeshc
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
LR1709MUSIC
 

Recently uploaded (20)

How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfProgress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
 
Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.
 
wagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORIwagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORI
 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
 
Beyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingBeyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic Accounting
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
 
Moradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in PenacovaMoradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in Penacova
 
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
 
Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024
 
How to refresh to be fit for the future world
How to refresh to be fit for the future worldHow to refresh to be fit for the future world
How to refresh to be fit for the future world
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
 
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
 
What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...
 
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
 
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxGoal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
 
hyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statementshyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statements
 

Synchronized for Success - Medical Center Expansion Project

  • 1. T o accommodate expansion of the clinical and future patient spaces, McKenney’s relocated existing equipment for the Northeast Georgia Medical Center in Braselton, Georgia. THE CHALLENGE Fourteen rooftop fans, one MRI chiller, and two CRAC units serving the base hospital needed to be relocated to make way for the addition of one story onto the diagnostic and treatment wing and two stories onto the patient tower. All of these construction changes had to be completed without disrupting patient care in the live hospital environment. THE SOLUTION The McKenney’s team helped develop a detailed coordination plan for relocating and/ or replacing the equipment, carefully mapping out every step to ensure success. The plan kept everyone—the general contractor, electricians, controls subcontractor, hospital maintenance and operations staff, as well as McKenney’s internal sheet metal, HVAC piping and startup-up/commissioning teams— involved, synchronized and on task. THE RESULTS Northeast Georgia Medical Center was able to continue providing services to patients during the equipment relocations, which paved the way for the build-out of the new floors. Synchronized for Success PROJECT NAME žž Northeast Georgia Medical Center Expansion PROJECT LOCATION žž Braselton, Georgia PROJECT TEAM žž Owner: Northeast Georgia Health System žž General Contractor: Turner Construction Company žž Subcontractor: McKenney’s, Inc. SPECIALIZATIONS Design/Assist Pipe Shop Prefab Sheet Metal Shop Prefab MARKETS žž Healthcare The content of this document is not intended as an endorsement. www.mckenneys.com © 2016 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 info@mckenneys.com 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 info@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214