SlideShare a Scribd company logo
1 of 4
Download to read offline
Strong People
Superior Projects
Solid Choice
THE CHOICE FOR HEALTHCARE
Today’s healthcare complexes are invested in building
the most technologically advanced facilities for both
research and patient care as efficiently, effectively
and safely as possible. Whether it’s a clinical care
facility or Bio-Safety Level 3 Laboratory, Beezley’s
professionals understand the critical challenges
associated with collaborating, programming, and
building these specialized facilities.
PROVEN STRATEGIES
Beezley has proven strategies for procuring and
building the robust mechanical, medical gases,
electrical, and plumbing systems associated with these
assets. We also employ the latest technologies to
maximize sustainability and power-efficiency.
Pretask plans rule our process and we follow all
Infection Control Risk Assessment (ICRA) protocols and
Interim Life Safety Measures with facility-specific
requirements.
Beezley understands the importance of isolating work
zones while performing renovation and expansion
projects within active, operational healthcare or
research facilities. We also keep abreast of the latest
industry trends and use Integrated Project Delivery
and Lean Construction techniques wherever possible to
fast-track the design and construction process to
expedite completion.
HEALTHCARE FOCUS
We have successfully managed the complexities of
construction for many elite healthcare clients. With this
experience, Beezley offers a highly specialized team
for building healthcare facilities, such as
 general and inpatient facilities,
 ambulatory and emergency care centers,
 nursing homes, and
 a wide range of laboratory, educational and
research facilities.
FRAUENSHUH HEALTHCARE NASSAU COUNTY
MEDICAL CENTER
Minneapolis, MN
Contract Value: $88M
Responsible as the Senior Consultant to Frauenshuh
Healthcare, a $3B healthcare developer for $80
million in preconstruction and construction management
healthcare projects including new healthcare
construction, at Nassau University Medical Center in
Long Island, NY. In addition to new construction at the
hospital structure, Beezley Management also
construction managed a new medical science building
and three new precast garages.
Performed property-wide utility assessments in concert
with subcontracted mechanical, electrical, plumbing
and fire/life/safety engineers. Evaluated risk issues
related to earthquake and other disaster impacts
Coordinated and managed the demolition and
deconstruction process associated with any
rehabilitated space. Performed offsite preconstruction
and bid administration, along with on-site construction
management and inspection services.
NEW YORK HOSPITAL GROUP, LLC NEW YORK
UNIVERSITY MEDICAL CENTER CAMPUS
New York, NY
Value: $144M
The New York Hospital Group required the addition
of 200 new beds, a LAB21 wet pathology lab and
research facility on the NYU Medical Center Campus.
Remodel and systems upgrades, including
Architectural, Structural, MEP, Emergency Back-Up
Systems at Common area, OR’s, ER’s, Exam Rooms,
Lounges, etc. Work was accomplished in “live” facility,
requiring daily interfacing with hospital administrative
and faculty staff, hospital scheduling, permitting-
inspection authorities.
NEW YORK HOSPITAL SURGICAL GROUP, LLC
NEW YORK UNIVERSITY MEDICAL CENTER
New York, NY
Value: $69M
Beezley defined the project parameters and
assembled the entire design and construction team for
a multiple-level surgical complex in New York City.
The project consisted of multiple renovations and
rehabilitation of Accreditation Association for
Ambulatory Health Care (AAAHC) and DOH
certifications.
Responsible for the commercial construction
management and program management of hospital
renovations including chemistry and biology
laboratories, allied health services center and
outpatient services center.
Assisted with managing seismic and utility upgrades,
inspection of work, relocation/move management,
construction notifications, daily reports, project
engineering and other related tasks.
CITY OF HOPE NATIONAL MEDICAL CENTER
Monrovia, CA
Value: $100M
Responsible as the Senior Consultant to City of Hope
in their application and acceptance into the FEMA
Seismic Hazard Mitigation Program for Hospitals
(SHMPH), as well as liaison with the City of Hope
Master Planning Committee. The SHMPH process
realized in excess of $100M in FEMA funding for the
new City of Hope Main Hospital Building.
Performed campus-wide utility assessments in concert
with subcontracted mechanical, electrical, plumbing
and fire/life/safety engineers. Evaluated risk issues
related to earthquake and other disaster impacts
Coordinated the historicity evaluation by the State of
California’s Office of Emergency Services to several
structures including the Philadelphia building, the Gift
Shop, the former Main Hospital Structure, and other
out-buildings.
Managed the demolition and deconstruction process
associated with the FEMA SHMPH process. Performed
offsite preconstruction and bid administration, along
with on-site Construction Management and Inspection
services.
KAISER PERMANENTE HOSPITAL, MEDICAL
FACILITY
Vallejo, CA
The Vallejo campus is composed of a 267-bed
hospital and large outpatient medical office building.
Hospital contains well-equipped emergency
department, operating rooms, intensive care unit,
transitional care unit, labor and delivery suite, and
medical surgical units.
Participated as Owner’s Representatives and
Construction Consultants with MDI supporting the
capital program for the Facilities Services Division at
Remodel and systems upgrades; including
Architectural, Structural, MEP, Emergency Back-Up
Systems at Common area, OR’s, ER’s, Exam Rooms,
Lounges, etc. Work was accomplished in “live” facility,
requiring daily interfacing with hospital administrative
and faculty staff, hospital scheduling, permitting-
inspection authorities.
Houses the Kaiser Foundation Rehabilitation Center on
the third floor, providing state-of-the-art rehab
services to Kaiser members, including radiology
services/ imaging, CT and MRI scans.
Includes three outpatient pharmacies and a testing
laboratory.
THE UNIVERSITY OF CALIFORNIA, SAN
FRANCISCO, PARNASSUS MEDICAL CENTER
San Francisco, CA
Value: $35M
Responsible for the commercial construction
management and program management of campus
renovations to the Parnassus Campus, including
chemistry and biology laboratories, animal research
center, allied health services center and outpatient
services center. Total construction $35.6M during a
three year period. Served under Project Manager
who reported through UCSF Facilities Services Division.
Assisted with managing seismic and utility upgrades,
inspection of work, relocation/move management,
construction notifications, daily reports, project
engineering and other related tasks.
“I would highly recommend Beezley
Management as an owner’s representative
or construction consultant in any planning,
design and construction projects. Their
expertise in the field will make a decided,
positive difference in getting the job done
correctly, on time and within budget.”
Dr. Tyree Wieder, Past Chancellor
Los Angeles Community College District
BEEZLEY IS READY FOR YOUR
NEXT HEALTHCARE PROJECT
Contact Rob Nichols at
413-685-5025 or
nichols@beezleymanagement.com
International Headquarters
23632 Calabasas Road, Suite 105
Calabasas, California 91302
818-591-8555x107
www.beezleymanagement.com
Additional Offices
San Francisco, CA Miami, FL
Arlington, VA Philadelphia, PA
New York, NY Boston, MA

More Related Content

Viewers also liked

Steward Suffolk Team Partnership RN CH SRC 072612
Steward Suffolk Team Partnership RN CH SRC 072612Steward Suffolk Team Partnership RN CH SRC 072612
Steward Suffolk Team Partnership RN CH SRC 072612Robert Roy Nichols
 
Alon Orion-UX Design
Alon Orion-UX DesignAlon Orion-UX Design
Alon Orion-UX DesignAlon Orion
 
1. Java Collections Framework Introduction
1. Java Collections Framework Introduction1. Java Collections Framework Introduction
1. Java Collections Framework IntroductionBharat Savani
 
Thermosetting, thermoplastics and elastomers
Thermosetting, thermoplastics and elastomersThermosetting, thermoplastics and elastomers
Thermosetting, thermoplastics and elastomershelena_23_12
 

Viewers also liked (9)

N3 Inc 060203
N3 Inc 060203N3 Inc 060203
N3 Inc 060203
 
Steward Suffolk Team Partnership RN CH SRC 072612
Steward Suffolk Team Partnership RN CH SRC 072612Steward Suffolk Team Partnership RN CH SRC 072612
Steward Suffolk Team Partnership RN CH SRC 072612
 
BEA deck 2.22.13
BEA deck   2.22.13BEA deck   2.22.13
BEA deck 2.22.13
 
Plastics
PlasticsPlastics
Plastics
 
Creative brief
Creative briefCreative brief
Creative brief
 
Creative brief
Creative briefCreative brief
Creative brief
 
Alon Orion-UX Design
Alon Orion-UX DesignAlon Orion-UX Design
Alon Orion-UX Design
 
1. Java Collections Framework Introduction
1. Java Collections Framework Introduction1. Java Collections Framework Introduction
1. Java Collections Framework Introduction
 
Thermosetting, thermoplastics and elastomers
Thermosetting, thermoplastics and elastomersThermosetting, thermoplastics and elastomers
Thermosetting, thermoplastics and elastomers
 

Similar to Healthcare-brochure

Resume201606110122 (1)
Resume201606110122 (1)Resume201606110122 (1)
Resume201606110122 (1)Steve Murrell
 
My resume July 2 2015 (1)
My resume July 2 2015 (1)My resume July 2 2015 (1)
My resume July 2 2015 (1)Arthur Thomas
 
Mark Olson Current Resume
Mark Olson Current ResumeMark Olson Current Resume
Mark Olson Current ResumeMark Olson
 
Michael jones 05_04_2016_senior_engineering_facilities_director_resume_6...
Michael jones 05_04_2016_senior_engineering_facilities_director_resume_6...Michael jones 05_04_2016_senior_engineering_facilities_director_resume_6...
Michael jones 05_04_2016_senior_engineering_facilities_director_resume_6...Mike Jones,CHSP-FSM, EMS, CCOS, CRCM
 
Healthcare PM Capability Statement
Healthcare PM Capability StatementHealthcare PM Capability Statement
Healthcare PM Capability StatementVon Lambert
 
Mr. Tak Saito Resume October Full 2010pa
Mr. Tak Saito Resume October Full  2010paMr. Tak Saito Resume October Full  2010pa
Mr. Tak Saito Resume October Full 2010pataksaito
 
Maggio JLL Mini Case Studies
Maggio JLL Mini Case StudiesMaggio JLL Mini Case Studies
Maggio JLL Mini Case StudiesCharles S. Maggio
 
Karen Knight Resume 07262015
Karen Knight Resume 07262015Karen Knight Resume 07262015
Karen Knight Resume 07262015Karen Knight
 
Healthcare PM Capability Statement
Healthcare PM Capability StatementHealthcare PM Capability Statement
Healthcare PM Capability StatementDavid Powers
 
Douglas james lab dir az hcj
Douglas james   lab dir   az   hcjDouglas james   lab dir   az   hcj
Douglas james lab dir az hcjDoug James
 
Hospital administration overview ii
Hospital administration overview iiHospital administration overview ii
Hospital administration overview iitahirakram13
 
Resume - Michele Emond Mar 16
Resume - Michele Emond Mar 16Resume - Michele Emond Mar 16
Resume - Michele Emond Mar 16Michele Emond
 
Connor Christy - Master Document
Connor Christy - Master DocumentConnor Christy - Master Document
Connor Christy - Master Documentchristy connor
 
spurlin portfolio (lo res)
spurlin portfolio (lo res)spurlin portfolio (lo res)
spurlin portfolio (lo res)kdspurlin
 
Bill Allen Resume 2013
Bill Allen Resume 2013Bill Allen Resume 2013
Bill Allen Resume 2013Bill Allen
 

Similar to Healthcare-brochure (20)

resume george
resume georgeresume george
resume george
 
Resume201606110122 (1)
Resume201606110122 (1)Resume201606110122 (1)
Resume201606110122 (1)
 
My resume July 2 2015 (1)
My resume July 2 2015 (1)My resume July 2 2015 (1)
My resume July 2 2015 (1)
 
Mark Olson Current Resume
Mark Olson Current ResumeMark Olson Current Resume
Mark Olson Current Resume
 
Garst Jim 2015-Update
Garst Jim 2015-UpdateGarst Jim 2015-Update
Garst Jim 2015-Update
 
Michael jones 05_04_2016_senior_engineering_facilities_director_resume_6...
Michael jones 05_04_2016_senior_engineering_facilities_director_resume_6...Michael jones 05_04_2016_senior_engineering_facilities_director_resume_6...
Michael jones 05_04_2016_senior_engineering_facilities_director_resume_6...
 
Healthcare PM Capability Statement
Healthcare PM Capability StatementHealthcare PM Capability Statement
Healthcare PM Capability Statement
 
Mr. Tak Saito Resume October Full 2010pa
Mr. Tak Saito Resume October Full  2010paMr. Tak Saito Resume October Full  2010pa
Mr. Tak Saito Resume October Full 2010pa
 
Maggio JLL Mini Case Studies
Maggio JLL Mini Case StudiesMaggio JLL Mini Case Studies
Maggio JLL Mini Case Studies
 
Karen Knight Resume 07262015
Karen Knight Resume 07262015Karen Knight Resume 07262015
Karen Knight Resume 07262015
 
Healthcare PM Capability Statement
Healthcare PM Capability StatementHealthcare PM Capability Statement
Healthcare PM Capability Statement
 
Douglas james lab dir az hcj
Douglas james   lab dir   az   hcjDouglas james   lab dir   az   hcj
Douglas james lab dir az hcj
 
Hospital administration overview ii
Hospital administration overview iiHospital administration overview ii
Hospital administration overview ii
 
Resume - Michele Emond Mar 16
Resume - Michele Emond Mar 16Resume - Michele Emond Mar 16
Resume - Michele Emond Mar 16
 
Connor Christy - Master Document
Connor Christy - Master DocumentConnor Christy - Master Document
Connor Christy - Master Document
 
PHIL'S RESUME 2015
PHIL'S RESUME 2015PHIL'S RESUME 2015
PHIL'S RESUME 2015
 
spurlin portfolio (lo res)
spurlin portfolio (lo res)spurlin portfolio (lo res)
spurlin portfolio (lo res)
 
Bill Allen Resume 2013
Bill Allen Resume 2013Bill Allen Resume 2013
Bill Allen Resume 2013
 
Curric. vit. cs
Curric. vit. csCurric. vit. cs
Curric. vit. cs
 
resumemjs02122015
resumemjs02122015resumemjs02122015
resumemjs02122015
 

Healthcare-brochure

  • 1. Strong People Superior Projects Solid Choice THE CHOICE FOR HEALTHCARE Today’s healthcare complexes are invested in building the most technologically advanced facilities for both research and patient care as efficiently, effectively and safely as possible. Whether it’s a clinical care facility or Bio-Safety Level 3 Laboratory, Beezley’s professionals understand the critical challenges associated with collaborating, programming, and building these specialized facilities. PROVEN STRATEGIES Beezley has proven strategies for procuring and building the robust mechanical, medical gases, electrical, and plumbing systems associated with these assets. We also employ the latest technologies to maximize sustainability and power-efficiency. Pretask plans rule our process and we follow all Infection Control Risk Assessment (ICRA) protocols and Interim Life Safety Measures with facility-specific requirements. Beezley understands the importance of isolating work zones while performing renovation and expansion projects within active, operational healthcare or research facilities. We also keep abreast of the latest industry trends and use Integrated Project Delivery and Lean Construction techniques wherever possible to fast-track the design and construction process to expedite completion. HEALTHCARE FOCUS We have successfully managed the complexities of construction for many elite healthcare clients. With this experience, Beezley offers a highly specialized team for building healthcare facilities, such as  general and inpatient facilities,  ambulatory and emergency care centers,  nursing homes, and  a wide range of laboratory, educational and research facilities. FRAUENSHUH HEALTHCARE NASSAU COUNTY MEDICAL CENTER Minneapolis, MN Contract Value: $88M Responsible as the Senior Consultant to Frauenshuh Healthcare, a $3B healthcare developer for $80 million in preconstruction and construction management healthcare projects including new healthcare construction, at Nassau University Medical Center in Long Island, NY. In addition to new construction at the hospital structure, Beezley Management also construction managed a new medical science building and three new precast garages. Performed property-wide utility assessments in concert with subcontracted mechanical, electrical, plumbing and fire/life/safety engineers. Evaluated risk issues related to earthquake and other disaster impacts Coordinated and managed the demolition and deconstruction process associated with any rehabilitated space. Performed offsite preconstruction and bid administration, along with on-site construction management and inspection services.
  • 2. NEW YORK HOSPITAL GROUP, LLC NEW YORK UNIVERSITY MEDICAL CENTER CAMPUS New York, NY Value: $144M The New York Hospital Group required the addition of 200 new beds, a LAB21 wet pathology lab and research facility on the NYU Medical Center Campus. Remodel and systems upgrades, including Architectural, Structural, MEP, Emergency Back-Up Systems at Common area, OR’s, ER’s, Exam Rooms, Lounges, etc. Work was accomplished in “live” facility, requiring daily interfacing with hospital administrative and faculty staff, hospital scheduling, permitting- inspection authorities. NEW YORK HOSPITAL SURGICAL GROUP, LLC NEW YORK UNIVERSITY MEDICAL CENTER New York, NY Value: $69M Beezley defined the project parameters and assembled the entire design and construction team for a multiple-level surgical complex in New York City. The project consisted of multiple renovations and rehabilitation of Accreditation Association for Ambulatory Health Care (AAAHC) and DOH certifications. Responsible for the commercial construction management and program management of hospital renovations including chemistry and biology laboratories, allied health services center and outpatient services center. Assisted with managing seismic and utility upgrades, inspection of work, relocation/move management, construction notifications, daily reports, project engineering and other related tasks.
  • 3. CITY OF HOPE NATIONAL MEDICAL CENTER Monrovia, CA Value: $100M Responsible as the Senior Consultant to City of Hope in their application and acceptance into the FEMA Seismic Hazard Mitigation Program for Hospitals (SHMPH), as well as liaison with the City of Hope Master Planning Committee. The SHMPH process realized in excess of $100M in FEMA funding for the new City of Hope Main Hospital Building. Performed campus-wide utility assessments in concert with subcontracted mechanical, electrical, plumbing and fire/life/safety engineers. Evaluated risk issues related to earthquake and other disaster impacts Coordinated the historicity evaluation by the State of California’s Office of Emergency Services to several structures including the Philadelphia building, the Gift Shop, the former Main Hospital Structure, and other out-buildings. Managed the demolition and deconstruction process associated with the FEMA SHMPH process. Performed offsite preconstruction and bid administration, along with on-site Construction Management and Inspection services. KAISER PERMANENTE HOSPITAL, MEDICAL FACILITY Vallejo, CA The Vallejo campus is composed of a 267-bed hospital and large outpatient medical office building. Hospital contains well-equipped emergency department, operating rooms, intensive care unit, transitional care unit, labor and delivery suite, and medical surgical units. Participated as Owner’s Representatives and Construction Consultants with MDI supporting the capital program for the Facilities Services Division at Remodel and systems upgrades; including Architectural, Structural, MEP, Emergency Back-Up Systems at Common area, OR’s, ER’s, Exam Rooms, Lounges, etc. Work was accomplished in “live” facility, requiring daily interfacing with hospital administrative and faculty staff, hospital scheduling, permitting- inspection authorities. Houses the Kaiser Foundation Rehabilitation Center on the third floor, providing state-of-the-art rehab services to Kaiser members, including radiology services/ imaging, CT and MRI scans. Includes three outpatient pharmacies and a testing laboratory.
  • 4. THE UNIVERSITY OF CALIFORNIA, SAN FRANCISCO, PARNASSUS MEDICAL CENTER San Francisco, CA Value: $35M Responsible for the commercial construction management and program management of campus renovations to the Parnassus Campus, including chemistry and biology laboratories, animal research center, allied health services center and outpatient services center. Total construction $35.6M during a three year period. Served under Project Manager who reported through UCSF Facilities Services Division. Assisted with managing seismic and utility upgrades, inspection of work, relocation/move management, construction notifications, daily reports, project engineering and other related tasks. “I would highly recommend Beezley Management as an owner’s representative or construction consultant in any planning, design and construction projects. Their expertise in the field will make a decided, positive difference in getting the job done correctly, on time and within budget.” Dr. Tyree Wieder, Past Chancellor Los Angeles Community College District BEEZLEY IS READY FOR YOUR NEXT HEALTHCARE PROJECT Contact Rob Nichols at 413-685-5025 or nichols@beezleymanagement.com International Headquarters 23632 Calabasas Road, Suite 105 Calabasas, California 91302 818-591-8555x107 www.beezleymanagement.com Additional Offices San Francisco, CA Miami, FL Arlington, VA Philadelphia, PA New York, NY Boston, MA