Facility Master Plan – Hackensack, NJ
Hackensack University Medical; Center
• Stated goals:
• Move to high acuity platform for tertiary /. Quaternary care
• Expand medical education and research on campus
• Developed Short term(1-2 yr), intermediate (3-5 yr) and long term plan (5+ yr)
• Increase percentage of private rooms over time to 100%
• Increase ICU and OR capacity
• Focus on tertiary & quaternary care in key service lines
• Research / academic expansion
Jones Lang LaSalle
Mini-Master Plan & ED Assessment – Queens, NY
Saint John’s Episcopal Hospital
• Eight-week mini master plan with partners evaluating demographics and data
• Short-term solutions provided by ED physician partner who addressed throughput
and efficiency
• Identified two- to ten-year plan, addressing immediate solutions to ED expansion and
longer-term solutions for future growth
Hospital Expansion – Norwalk, CT
Norwalk Hospital
• $110 million ambulatory care pavilion, parking garage & renovations
• 92,000-s.f., three-story ambulatory care pavilion
• 630-car, 223,000-s.f. parking garage and road relocations
• 45,000 renovations and infrastructure upgrades
Beth Israel Replacement Hospital – New York, NY
Continuum Health Partners
• First study evaluated 4 on-site solutions under consideration
• Second study developed strategic plan, budget, schedule and program approved by Board
• Goal to reduce to 400 bed hospital, monetize property & develop 50% new hospital (Ph. 1)
• Phase 1 = Phased Seven year, $550 million, 342,000 SF, 240 bed 12 story tower plus
125,000 SF renovation / consolidation / infrastructure upgrades
Jones Lang LaSalle
Children’s Hospital Feasibility Studies – Bronx, NY
Montefiore Medical Center
• Multiple studies for Children’s Hospital expansion partnered with architects and C.M.
• Evaluated sites for constructability, site logistics, decanting, zoning FAR & lot coverage,
budget & schedule
• Studies included adjacent 165,000 SF expansion ($260 mm) , adjacent 280,000 SF
overbuild ($520 MM) and alternate site 545,000 SF + 400 car parking ($1.0 billion)
CASESTUDIES
Infrastructure Upgrade Program – New York, NY
New York Presbyterian Hospital
• System-wide, 8 year $575+ million infrastructure upgrades
• At Weill Cornell, Columbia Presbyterian and The Allen Hospital campuses
• JLL Developed system-wide Program Management Work Plan
• After Hurricane sandy, JLL developed separate Hazardous Mitigation Assessment Program
Hutch Metro Ambulatory Care Center – Bronx, NY
Montefiore Medical Center
• 280,000 SF, 12-story, multi-specialty ambulatory care development
• Includes Imaging, 12 OR’s, + 4 Procedure, Heart Center, Pain Management, PAT
• Scheduled for completion Spring 2014
Jones Lang LaSalle
Center For Advanced Medicine – Lake Success, NY
North Shore Long Island Jewish Health System
• Multi-program development management of high-end ambulatory services projects
• Current program: $88 million, 120,000 s.f. oncology projects scheduled for 2012 completion
• 4 vault, 1 C radiation-oncology suite with 24 new infusion bays
• Other current program includes surgical-oncology, gyn-onc, brain tumor, imaging,
conference center
• Future program includes ambulatory surgery, mammography, bio-skills
CASESTUDIES
Center for Comprehensive Care –New York, NY
North Shore LIJ Health System
• 150,000 SF, $125mm retrofit of landmark building
• First free-standing Emergency Department in New York State
• Combined Healthcare project management and development advisory services
• Program includes 23 bay ED, Ambulatory Surgery, Imaging Center

More Related Content

Viewers also liked

Maggio Article re Off-Campus Ambulatory Development
Maggio Article re Off-Campus Ambulatory DevelopmentMaggio Article re Off-Campus Ambulatory Development
Maggio Article re Off-Campus Ambulatory Development
Charles S. Maggio
 
GENERIC - Comparing Different Construction Delivery Methods - Aug 2014_r1
GENERIC - Comparing Different Construction Delivery Methods - Aug 2014_r1GENERIC - Comparing Different Construction Delivery Methods - Aug 2014_r1
GENERIC - Comparing Different Construction Delivery Methods - Aug 2014_r1
Charles S. Maggio
 

Viewers also liked (14)

Maggio Article re Off-Campus Ambulatory Development
Maggio Article re Off-Campus Ambulatory DevelopmentMaggio Article re Off-Campus Ambulatory Development
Maggio Article re Off-Campus Ambulatory Development
 
Декоративная новогодняя ёлочка текстильная
Декоративная новогодняя ёлочка текстильнаяДекоративная новогодняя ёлочка текстильная
Декоративная новогодняя ёлочка текстильная
 
WeeTect Ski Goggles
WeeTect Ski GogglesWeeTect Ski Goggles
WeeTect Ski Goggles
 
Ёлочка из гофрированной бумаги
Ёлочка из гофрированной бумагиЁлочка из гофрированной бумаги
Ёлочка из гофрированной бумаги
 
moisey1
moisey1moisey1
moisey1
 
Education
EducationEducation
Education
 
Ejercitario 2 regresión lineal
Ejercitario 2   regresión linealEjercitario 2   regresión lineal
Ejercitario 2 regresión lineal
 
Estadística 1
Estadística 1Estadística 1
Estadística 1
 
Новогодний шар из текстиля
Новогодний шар из текстиляНовогодний шар из текстиля
Новогодний шар из текстиля
 
Новогодний сувенир в технике декупажа. Символ года 2017
Новогодний сувенир в технике декупажа. Символ года 2017Новогодний сувенир в технике декупажа. Символ года 2017
Новогодний сувенир в технике декупажа. Символ года 2017
 
Новогодняя елочка из конфет
Новогодняя елочка из конфетНовогодняя елочка из конфет
Новогодняя елочка из конфет
 
елочка из фоамирана
елочка из фоамиранаелочка из фоамирана
елочка из фоамирана
 
Оформление подарочной упаковки
Оформление подарочной упаковки  Оформление подарочной упаковки
Оформление подарочной упаковки
 
GENERIC - Comparing Different Construction Delivery Methods - Aug 2014_r1
GENERIC - Comparing Different Construction Delivery Methods - Aug 2014_r1GENERIC - Comparing Different Construction Delivery Methods - Aug 2014_r1
GENERIC - Comparing Different Construction Delivery Methods - Aug 2014_r1
 

Similar to Maggio JLL Mini Case Studies

Linda Kosnik Resume 10172016
Linda Kosnik Resume 10172016Linda Kosnik Resume 10172016
Linda Kosnik Resume 10172016
Linda Kosnik
 
Susan Marks Resume 2015-external
Susan Marks Resume 2015-externalSusan Marks Resume 2015-external
Susan Marks Resume 2015-external
Susan Marks
 
Advisory_EY CV Draft DeniseHargrove
Advisory_EY CV  Draft DeniseHargroveAdvisory_EY CV  Draft DeniseHargrove
Advisory_EY CV Draft DeniseHargrove
Denise Hargrove
 
Carl Roper Resume Long
Carl Roper Resume LongCarl Roper Resume Long
Carl Roper Resume Long
Carl Roper
 
Connor Christy - Master Document
Connor Christy - Master DocumentConnor Christy - Master Document
Connor Christy - Master Document
christy connor
 
Erin Resume 6-12 for LI
Erin Resume 6-12 for LIErin Resume 6-12 for LI
Erin Resume 6-12 for LI
Erin Diaz
 
lamontresume2011rev2doc (1)
lamontresume2011rev2doc (1)lamontresume2011rev2doc (1)
lamontresume2011rev2doc (1)
Lamont Pippins
 
Ian Legg Apr15
Ian Legg Apr15Ian Legg Apr15
Ian Legg Apr15
Ian Legg
 
Resume_August_2016
Resume_August_2016Resume_August_2016
Resume_August_2016
Barry Hamp
 
Resume RONNY FRYAR June 2016
Resume RONNY FRYAR June 2016Resume RONNY FRYAR June 2016
Resume RONNY FRYAR June 2016
Ron Fryar
 
Current Resume 101316
Current Resume 101316Current Resume 101316
Current Resume 101316
Lori Miller
 

Similar to Maggio JLL Mini Case Studies (20)

Linda Kosnik Resume 10172016
Linda Kosnik Resume 10172016Linda Kosnik Resume 10172016
Linda Kosnik Resume 10172016
 
Susan Marks Resume 2015-external
Susan Marks Resume 2015-externalSusan Marks Resume 2015-external
Susan Marks Resume 2015-external
 
Advanced Process Simulation Methodology To Plan Facility Renovation
Advanced Process Simulation Methodology To Plan Facility RenovationAdvanced Process Simulation Methodology To Plan Facility Renovation
Advanced Process Simulation Methodology To Plan Facility Renovation
 
WAW - Exc CV May 9
WAW - Exc CV  May 9 WAW - Exc CV  May 9
WAW - Exc CV May 9
 
Healthcare-brochure
Healthcare-brochureHealthcare-brochure
Healthcare-brochure
 
Advisory_EY CV Draft DeniseHargrove
Advisory_EY CV  Draft DeniseHargroveAdvisory_EY CV  Draft DeniseHargrove
Advisory_EY CV Draft DeniseHargrove
 
Lane M Hickey
Lane M HickeyLane M Hickey
Lane M Hickey
 
Carl Roper Resume Long
Carl Roper Resume LongCarl Roper Resume Long
Carl Roper Resume Long
 
Carl roper resume long
Carl roper resume longCarl roper resume long
Carl roper resume long
 
Connor Christy - Master Document
Connor Christy - Master DocumentConnor Christy - Master Document
Connor Christy - Master Document
 
Erin Resume 6-12 for LI
Erin Resume 6-12 for LIErin Resume 6-12 for LI
Erin Resume 6-12 for LI
 
Research design & conduct service
Research design & conduct serviceResearch design & conduct service
Research design & conduct service
 
lamontresume2011rev2doc (1)
lamontresume2011rev2doc (1)lamontresume2011rev2doc (1)
lamontresume2011rev2doc (1)
 
GAmira_Resume_01232016
GAmira_Resume_01232016GAmira_Resume_01232016
GAmira_Resume_01232016
 
Ian Legg Apr15
Ian Legg Apr15Ian Legg Apr15
Ian Legg Apr15
 
Resume_August_2016
Resume_August_2016Resume_August_2016
Resume_August_2016
 
Resume - LV - 8-1 (1) (2)
Resume - LV - 8-1  (1) (2)Resume - LV - 8-1  (1) (2)
Resume - LV - 8-1 (1) (2)
 
Resume RONNY FRYAR June 2016
Resume RONNY FRYAR June 2016Resume RONNY FRYAR June 2016
Resume RONNY FRYAR June 2016
 
Current Resume 101316
Current Resume 101316Current Resume 101316
Current Resume 101316
 
Amie jacobs rn resume v4 (1)
Amie jacobs rn resume v4 (1)Amie jacobs rn resume v4 (1)
Amie jacobs rn resume v4 (1)
 

Maggio JLL Mini Case Studies

  • 1. CASESTUDIES Facility Master Plan – Hackensack, NJ Hackensack University Medical; Center • Stated goals: • Move to high acuity platform for tertiary /. Quaternary care • Expand medical education and research on campus • Developed Short term(1-2 yr), intermediate (3-5 yr) and long term plan (5+ yr) • Increase percentage of private rooms over time to 100% • Increase ICU and OR capacity • Focus on tertiary & quaternary care in key service lines • Research / academic expansion Jones Lang LaSalle Mini-Master Plan & ED Assessment – Queens, NY Saint John’s Episcopal Hospital • Eight-week mini master plan with partners evaluating demographics and data • Short-term solutions provided by ED physician partner who addressed throughput and efficiency • Identified two- to ten-year plan, addressing immediate solutions to ED expansion and longer-term solutions for future growth Hospital Expansion – Norwalk, CT Norwalk Hospital • $110 million ambulatory care pavilion, parking garage & renovations • 92,000-s.f., three-story ambulatory care pavilion • 630-car, 223,000-s.f. parking garage and road relocations • 45,000 renovations and infrastructure upgrades
  • 2. Beth Israel Replacement Hospital – New York, NY Continuum Health Partners • First study evaluated 4 on-site solutions under consideration • Second study developed strategic plan, budget, schedule and program approved by Board • Goal to reduce to 400 bed hospital, monetize property & develop 50% new hospital (Ph. 1) • Phase 1 = Phased Seven year, $550 million, 342,000 SF, 240 bed 12 story tower plus 125,000 SF renovation / consolidation / infrastructure upgrades Jones Lang LaSalle Children’s Hospital Feasibility Studies – Bronx, NY Montefiore Medical Center • Multiple studies for Children’s Hospital expansion partnered with architects and C.M. • Evaluated sites for constructability, site logistics, decanting, zoning FAR & lot coverage, budget & schedule • Studies included adjacent 165,000 SF expansion ($260 mm) , adjacent 280,000 SF overbuild ($520 MM) and alternate site 545,000 SF + 400 car parking ($1.0 billion) CASESTUDIES Infrastructure Upgrade Program – New York, NY New York Presbyterian Hospital • System-wide, 8 year $575+ million infrastructure upgrades • At Weill Cornell, Columbia Presbyterian and The Allen Hospital campuses • JLL Developed system-wide Program Management Work Plan • After Hurricane sandy, JLL developed separate Hazardous Mitigation Assessment Program
  • 3. Hutch Metro Ambulatory Care Center – Bronx, NY Montefiore Medical Center • 280,000 SF, 12-story, multi-specialty ambulatory care development • Includes Imaging, 12 OR’s, + 4 Procedure, Heart Center, Pain Management, PAT • Scheduled for completion Spring 2014 Jones Lang LaSalle Center For Advanced Medicine – Lake Success, NY North Shore Long Island Jewish Health System • Multi-program development management of high-end ambulatory services projects • Current program: $88 million, 120,000 s.f. oncology projects scheduled for 2012 completion • 4 vault, 1 C radiation-oncology suite with 24 new infusion bays • Other current program includes surgical-oncology, gyn-onc, brain tumor, imaging, conference center • Future program includes ambulatory surgery, mammography, bio-skills CASESTUDIES Center for Comprehensive Care –New York, NY North Shore LIJ Health System • 150,000 SF, $125mm retrofit of landmark building • First free-standing Emergency Department in New York State • Combined Healthcare project management and development advisory services • Program includes 23 bay ED, Ambulatory Surgery, Imaging Center