Manual Work & Worker-Machine
Systems
Sections:
1. Manual Work Systems
2. Worker-Machine Systems
3. Automated Work Systems
4. Determining Worker and Machine
Requirements
5. Machine Clusters
Chapter 2
Three Categories of Work Systems
1. Manual work system
 Worker performing one or more tasks
without the aid of powered tools
2. Worker-machine system
 Human worker operates powered
equipment
3. Automated work system
 Process performed without the direct
participation of a human worker
Manual Work System
Worker-Machine System
Automated System
Some Definitions
Work unit – the object that is processed by the work
system
 Workpiece being machined (production work)
 Material being moved (logistics work)
 Customer in a store (service work)
 Product being designed (knowledge work)
Unit operations – tasks and processes that are
treated as being independent of other work
activities
Manual Work Systems
Human body accomplishing some physical task
without an external source of power
 With or without hand tools
 When hand tools are used, the power to
operate them is derived from the strength of a
human worker
 Other human faculties are required, such as hand-
eye coordination and mental effort
Pure Manual Work
Involves the physical and mental capabilities of the
human worker, and no machines, tools, or other
implements are employed in performing the task.
 Material handler moving cartons in a warehouse
 Workers loading furniture into a moving van without
the use of dollies
 Dealer at a casino table dealing cards
 Office worker filing documents
 Assembly worker snap-fitting two parts together
Manual Work with Hand Tools
Manual tasks are commonly improved by the use of
hand tools. A tool is a device or implement for
making changes to some object (e.g., the work
unit), such as cutting, grinding, striking, squeezing,
or other process. A hand tool is a small tool that is
operated by the strength and skill of the human
user. Examples of manual tasks involving the use of
hand tools include the following:
 Machinist filing a part
 Assembly worker using screwdriver
 Painter using paintbrush to paint door trim
 QC inspector using micrometer to measure a shaft
diameter
Repetitive vs. Nonrepetitive Tasks
 Repetitive Task
 Relatively short duration (usually a few
minutes or less)
 High degree of similarity from one cycle to
the next
 Nonrepetitive Task
 Takes a long time
 Work cycles are not similar
Cycle Time Variations
 A main objective in work design is to determine the one
best method for a task, and then to standardize its use
 Once the method has been standardized, the actual time
to perform the task is a variable because of:
 Differences in worker performance
 differences in hand and body motions
 Mistakes by worker
 Variations in starting work units
 The learning curve phenomenon
 Differences in the physical and cognitive attributes
among workers performing the task
 Variations in the methods used by different workers to
perform the task
Worker Performance
Defined as the pace or relative speed of working
 As worker performance increases, cycle time
decreases
 From the employer’s viewpoint, it is desirable for
worker performance to be high
 What is a reasonable pace to expect from a
worker?
Normal Performance
A pace of working that can be maintained by a
properly trained average worker throughout an
entire work shift without injurious effect on the
worker’s health or physical well-being
 The work shift is usually 8 hours, during which
periodic rest breaks are allowed
 Normal performance = 100% performance
 Common benchmark of normal performance:
 Walking at 3 miles/hr
Normal Time
 The time to complete a task when working at
normal performance
 Actual time to perform the cycle depends on
worker performance
Tc = Tn / Pw
where Tc = cycle time, Tn = normal time, and
Pw = worker performance or pace
Example: Normal Performance
 Given: A man walks in the early morning for health
and fitness. His usual route is 1.85 miles. A typical
time is 30 min. The benchmark of normal
performance = 3 miles/hr.
 Determine: (a) how long the route would take at
normal performance and (b) the man’s performance
when he completes the route in 30 min.
Example: Solution
(a) At 3 miles/hr, time = 1.85 miles / 3 miles/hr
= 0.6167 hr = 37 min
(b) Rearranging equation, Pw = Tn / Tc
Pw = 37 min / 30 min = 1.233 = 123.3 %
Alternative approach in (b):
Using velocity = 1.85 miles / 0.5 hr = 3.7 miles/hr
Pw = 3.7 miles/hr / 3.0 miles/hr = 1.233 %
Standard Performance
Same as normal performance, but acknowledges
that periodic rest breaks must be taken by the
worker
 Periodic rest breaks are allowed during the work
shift
 Federal law requires employer to pay the
worker during these breaks
 Other interruptions and delays also occur during
the shift
PFD Allowance
To account for the delays due to:
 Personal time (P)
 Bathroom breaks, personal phone calls
 Fatigue (F)
 Rest breaks are intended to deal with fatigue
 Delays (D)
 Interruptions, equipment breakdowns
Standard Time
Defined as the normal time but with an allowance
added in to account for losses due to personal
time, fatigue, and delays
Tstd = Tn (1 + Apfd)
where Tstd = standard time, Tn = normal time, and
Apfd = PFD allowance factor
 Also called the allowed time
Irregular Work Elements
 Elements that are performed with a frequency of
less than once per cycle
 Examples:
 periodic changing of tools (e.g., changing a
knife blade)
 Irregular elements are prorated into the regular
cycle according to their frequency
Example: Determining Standard
Time
 Given: The normal time to perform the regular work
cycle is 3.23 min. In addition, an irregular work
element with a normal time = 1.25 min is performed
every 5 cycles. The PFD allowance factor is 15%.
 Determine (a) the standard time and (b) the number of
work units produced during an 8-hr shift if the worker's
pace is consistent with standard performance.
Standard Hours and Worker
Efficiency
 Two common measures of worker productivity used in
industry to assess a worker’s productivity are standard
hours and worker efficiency
Standard hours – represents the amount of work actually
accomplished
Hstd = Q Tstd
Hstd = standard hours accomplished; Q = quantity of work
units completed; Tstd = standard time per work unit
Worker efficiency – work accomplished as a proportion of
shift hours
Ew = Hstd / Hsh
Ew = worker efficiency; Hstd = # of standard hours of work
accomplished; Hsh = # of shift hours (8 hr)
Worker efficiency
 Worker efficiency is commonly used to evaluate
workers in industry.
 In many incentive wage payment plans, the worker’s
earnings are based on his or her efficiency or the
number of standard hours accomplished.
 Worker efficiency and standard hours are easily
computed, because the number of hours in the shift
and the standard time are known, and the number of
work units produced can be readily counted.
Worker-Machine Systems
 When worker operates a powered equipment we
refer to the arrangement as a worker-machine
system.
 Examples:
 Machinist operating a milling machine
 Factory worker loading and unloading parts at
a machine tool.
 Truck driver driving an 18-wheel tractor-trailer
 Worker crew operating a rolling mill that
converts hot steel blocks into flat plates.
 Clerical worker entering data into a PC
Types of Powered Equipment
Distinguished from hand tools by the fact that a source of power
other than human strength is used to operate it. Common power
sources are electric, pneumatic, hydraulic, and fossil fuel motors
1. Portable power tools are light enough in weight
 portable power drills, rotary saws, chain saws, and electric
hedge trimmers.
2. Mobile powered equipment are generally heavy pieces of
equipment
 Transportation equipment, agricultural and lawn-keeping,
forklift trucks, electric power generator at construction site
3. Stationary powered machines stand on the floor or ground
and cannot be moved while they are operating
 Machine tools (e.g., turning, drilling, milling); office
equipment (personal computers, photocopiers, telephones,
fax machines); cash registers, heat treatment furnaces
Classification of Powered
Machinery
Numbers of Workers and Machines
Means of classifying worker-machine systems is according to
whether there are one or more workers and one or more machines
One worker and
One machine
 Taxicab driver and
taxi
One worker & Multiple
machines
 A worker tending
several production
machines
Multiple workers and
One machine
 Ship's crew
Multiple workers and
Multiple machines
 Emergency repair
crew responding to
machine breakdowns
in a factory
One Worker and One Machine
Good work design attempts to achieve the following
objectives:
 Design the controls of the machine to be logical and
easy to operate for the worker.
 Design the work sequence so that as much of the
worker’s task as possible can be accomplished
while the machine is operating, thereby minimizing
worker idle time.
 Minimize the idle times of both the worker and the
machine.
 Design the task and the machine to be safe for the
worker.
Level of Operator Attention
 Full-time attention
 Welders performing arc welding
 Part-time attention during each work cycle
 Worker loading and unloading a production
machine on semi-automatic cycle
 Periodic attention with regular servicing
 Crane operator in steel mill
 Periodic attention with random servicing
 Firefighters responding to alarms
Two welders
performing arc
welding on pipe
- requires full-
time attention of
workers (photo
courtesy of
Lincoln Electric
Co.)
Cycle Time Analysis in Worker
Machine System
In terms of cycle time analysis, worker-machine
systems fall into two categories:
(1) systems in which the machine time depends on
operator control, the task can be either repetitive or
nonrepetitive
(2) systems in which the machine time is constant and
independent of operator control, and the work cycle is
repetitive.
Cycle Time with no Overlap between
Worker and Machine
 If there is no overlap in work elements between the worker
and the machine, then the normal time for the cycle is
simply the sum of their respective normal times:
 Normal time for cycle
Tn = Tnw + Tm
Where Tnw = normal time for the worker-controlled portion of the cycle,
min: and Tm = machine cycle time (assumed constant).
 Standard time for cycle
Tstd = Tnw (1 + Apfd) + Tm (1 + Am)
where Tnw = normal time of the worker, min; Tm = constant time for the
machine cycle, min; Am = machine allowance factor, used in the
equation as a decimal fraction
Worker-Machine Systems with
Internal Work Elements
 In the operation of a worker-machine system, it is
important to distinguish between the operator’s work
elements that are performed in succession with the
machine’s work elements and those that are
performed simultaneously with the machine elements.
 Operator elements that are performed sequentially
are called external work elements while those that
are performed simultaneously with the machine cycle
are called internal work elements.
Example 2.10 Internal Versus External
Work Elements in Cycle Time Analysis
 The work cycle in a worker-machine system
consists of the elements and associated times
given in the table below.
 All of the operator’s work elements are external
to the machine time.
 Can some of the worker’s elements be made
internal to the machine cycle, and if so, what is
the expected cycle time for the operation?
Comment
 Although the total times for the worker and the machine are
the same as before, element 4 in the revised cycle (which
Consists of elements 1, 2, and 6 from the original work
cycle) is performed simultaneously with the machine time,
resulting in the following new cycle time:
Tc = 0.10 + 0.12 + 0.75 = 0.97 min
 This represents a 34% reduction in cycle time, which
translates into a 53% increase in production rate.
 When internal elements are present in the work cycle, it
must then be determined whether the machine cycle time
or the sum of the worker’s internal elements take longer.
Automated Work Systems
Automation is the technology by which a process
or procedure is accomplished without human
assistance
 Implemented using a program of instructions
combined with a control system that executes
the instructions
 Power is required to drive the process and
operate the control system
Levels of Automated Systems
 Semiautomated machine
 Performs a portion of the work cycle under
some form of program control
 Human worker tends the machine for the
remainder of the cycle, by loading and
unloading it
 Operator must be present every cycle
 Fully automated machine
 Operates for extended periods of time with
no human attention
Automated
robotic
spot
welding
cell (photo
courtesy of
Ford Motor
Company)

More Related Content

What's hot

Combustion chamber
Combustion chamberCombustion chamber
Combustion chamberShahu Sonu
 
Engine mechanical components system
Engine mechanical components systemEngine mechanical components system
Engine mechanical components systemTubalinalJerick
 
Station Performance and Operation Characteristics
Station Performance and Operation Characteristics Station Performance and Operation Characteristics
Station Performance and Operation Characteristics Sirat Mahmood
 
Steam jet refrigeration system.pptx
Steam jet refrigeration system.pptxSteam jet refrigeration system.pptx
Steam jet refrigeration system.pptxSANIABAISOYA
 
IC engines -emission and its control
IC engines -emission and its controlIC engines -emission and its control
IC engines -emission and its controlappu kumar
 
Inspection & Maintenance
Inspection & MaintenanceInspection & Maintenance
Inspection & MaintenanceWylieFireRescue
 
Diesel Particulate Filters Control Systems
Diesel Particulate Filters Control SystemsDiesel Particulate Filters Control Systems
Diesel Particulate Filters Control Systemsmichaeljmack
 
diesel cycle presentation
diesel cycle  presentationdiesel cycle  presentation
diesel cycle presentationSomesh Jain
 
Basics of automobile
Basics of automobile Basics of automobile
Basics of automobile Munish Kumar
 
testing & fault finding of resiprocating compressor
testing & fault finding of resiprocating compressortesting & fault finding of resiprocating compressor
testing & fault finding of resiprocating compressorsai vishal
 
Combustion Chambers
Combustion ChambersCombustion Chambers
Combustion ChambersRajat Seth
 
Refrigerants and Their Environmental Impact
Refrigerants and Their Environmental ImpactRefrigerants and Their Environmental Impact
Refrigerants and Their Environmental ImpactSamet Baykul
 

What's hot (20)

Combustion chamber
Combustion chamberCombustion chamber
Combustion chamber
 
Turbocharger
Turbocharger Turbocharger
Turbocharger
 
GAS TURBINE
GAS TURBINEGAS TURBINE
GAS TURBINE
 
Engine mechanical components system
Engine mechanical components systemEngine mechanical components system
Engine mechanical components system
 
Station Performance and Operation Characteristics
Station Performance and Operation Characteristics Station Performance and Operation Characteristics
Station Performance and Operation Characteristics
 
Robotics Safety
Robotics SafetyRobotics Safety
Robotics Safety
 
Steam jet refrigeration system.pptx
Steam jet refrigeration system.pptxSteam jet refrigeration system.pptx
Steam jet refrigeration system.pptx
 
IC engines -emission and its control
IC engines -emission and its controlIC engines -emission and its control
IC engines -emission and its control
 
Inspection & Maintenance
Inspection & MaintenanceInspection & Maintenance
Inspection & Maintenance
 
Diesel Particulate Filters Control Systems
Diesel Particulate Filters Control SystemsDiesel Particulate Filters Control Systems
Diesel Particulate Filters Control Systems
 
ME 6404 THERMAL ENGINEERING UNIT I
ME 6404 THERMAL ENGINEERING UNIT IME 6404 THERMAL ENGINEERING UNIT I
ME 6404 THERMAL ENGINEERING UNIT I
 
diesel cycle presentation
diesel cycle  presentationdiesel cycle  presentation
diesel cycle presentation
 
Turbocharger presentation
Turbocharger presentationTurbocharger presentation
Turbocharger presentation
 
Basics of automobile
Basics of automobile Basics of automobile
Basics of automobile
 
testing & fault finding of resiprocating compressor
testing & fault finding of resiprocating compressortesting & fault finding of resiprocating compressor
testing & fault finding of resiprocating compressor
 
How Gas Turbine Engine Works
How Gas Turbine Engine WorksHow Gas Turbine Engine Works
How Gas Turbine Engine Works
 
Ic engine emissions
Ic engine emissionsIc engine emissions
Ic engine emissions
 
Combustion Chambers
Combustion ChambersCombustion Chambers
Combustion Chambers
 
Refrigerants and Their Environmental Impact
Refrigerants and Their Environmental ImpactRefrigerants and Their Environmental Impact
Refrigerants and Their Environmental Impact
 
Air Compressor
Air CompressorAir Compressor
Air Compressor
 

Similar to Chapter-2-Manual_Work_and_Worker-MachineSystems.ppt

02_Ch(2)_Work Systems and How They Work.pptx
02_Ch(2)_Work Systems and How They Work.pptx02_Ch(2)_Work Systems and How They Work.pptx
02_Ch(2)_Work Systems and How They Work.pptxAhmed Sobhi
 
APPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNETAPPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNETMdRakibHasan27
 
Flow queue analysis co4.pptx business process management
Flow  queue analysis co4.pptx business process managementFlow  queue analysis co4.pptx business process management
Flow queue analysis co4.pptx business process management21120061
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxLakshayKumar504432
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurementAkash Bakshi
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materialspikuoec
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materialspikuoec
 
Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11Rahul Jain
 
Work measurement ppt @ bec doms
Work measurement ppt @ bec domsWork measurement ppt @ bec doms
Work measurement ppt @ bec domsBabasab Patil
 

Similar to Chapter-2-Manual_Work_and_Worker-MachineSystems.ppt (20)

02_Ch(2)_Work Systems and How They Work.pptx
02_Ch(2)_Work Systems and How They Work.pptx02_Ch(2)_Work Systems and How They Work.pptx
02_Ch(2)_Work Systems and How They Work.pptx
 
03.ppt
03.ppt03.ppt
03.ppt
 
APPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNETAPPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNET
 
Time & motion study
Time & motion studyTime & motion study
Time & motion study
 
Flow queue analysis co4.pptx business process management
Flow  queue analysis co4.pptx business process managementFlow  queue analysis co4.pptx business process management
Flow queue analysis co4.pptx business process management
 
4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx
 
Work Measurement
Work MeasurementWork Measurement
Work Measurement
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
 
Unit 3 iem part 2
Unit 3  iem part  2Unit 3  iem part  2
Unit 3 iem part 2
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
 
Garments
Garments Garments
Garments
 
DesignPeopleSystem
DesignPeopleSystemDesignPeopleSystem
DesignPeopleSystem
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
TIME STUDY
TIME STUDYTIME STUDY
TIME STUDY
 
Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11
 
Unit 3 problems
Unit 3 problemsUnit 3 problems
Unit 3 problems
 
Work measurement ppt @ bec doms
Work measurement ppt @ bec domsWork measurement ppt @ bec doms
Work measurement ppt @ bec doms
 
IE training
IE training IE training
IE training
 

Recently uploaded

Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelDrAjayKumarYadav4
 
Cybercrimes in the Darknet and Their Detections: A Comprehensive Analysis and...
Cybercrimes in the Darknet and Their Detections: A Comprehensive Analysis and...Cybercrimes in the Darknet and Their Detections: A Comprehensive Analysis and...
Cybercrimes in the Darknet and Their Detections: A Comprehensive Analysis and...dannyijwest
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessorAshwiniTodkar4
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Unsatisfied Bhabhi ℂall Girls Ahmedabad Book Esha 6378878445 Top Class ℂall G...
Unsatisfied Bhabhi ℂall Girls Ahmedabad Book Esha 6378878445 Top Class ℂall G...Unsatisfied Bhabhi ℂall Girls Ahmedabad Book Esha 6378878445 Top Class ℂall G...
Unsatisfied Bhabhi ℂall Girls Ahmedabad Book Esha 6378878445 Top Class ℂall G...Payal Garg #K09
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Compressing and Sparsifying LLM in GenAI Applications
Compressing and Sparsifying LLM in GenAI ApplicationsCompressing and Sparsifying LLM in GenAI Applications
Compressing and Sparsifying LLM in GenAI ApplicationsMFatihSIRA
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptamrabdallah9
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)ChandrakantDivate1
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 

Recently uploaded (20)

Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
Cybercrimes in the Darknet and Their Detections: A Comprehensive Analysis and...
Cybercrimes in the Darknet and Their Detections: A Comprehensive Analysis and...Cybercrimes in the Darknet and Their Detections: A Comprehensive Analysis and...
Cybercrimes in the Darknet and Their Detections: A Comprehensive Analysis and...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Unsatisfied Bhabhi ℂall Girls Ahmedabad Book Esha 6378878445 Top Class ℂall G...
Unsatisfied Bhabhi ℂall Girls Ahmedabad Book Esha 6378878445 Top Class ℂall G...Unsatisfied Bhabhi ℂall Girls Ahmedabad Book Esha 6378878445 Top Class ℂall G...
Unsatisfied Bhabhi ℂall Girls Ahmedabad Book Esha 6378878445 Top Class ℂall G...
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Compressing and Sparsifying LLM in GenAI Applications
Compressing and Sparsifying LLM in GenAI ApplicationsCompressing and Sparsifying LLM in GenAI Applications
Compressing and Sparsifying LLM in GenAI Applications
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 

Chapter-2-Manual_Work_and_Worker-MachineSystems.ppt

  • 1. Manual Work & Worker-Machine Systems Sections: 1. Manual Work Systems 2. Worker-Machine Systems 3. Automated Work Systems 4. Determining Worker and Machine Requirements 5. Machine Clusters Chapter 2
  • 2. Three Categories of Work Systems 1. Manual work system  Worker performing one or more tasks without the aid of powered tools 2. Worker-machine system  Human worker operates powered equipment 3. Automated work system  Process performed without the direct participation of a human worker
  • 6. Some Definitions Work unit – the object that is processed by the work system  Workpiece being machined (production work)  Material being moved (logistics work)  Customer in a store (service work)  Product being designed (knowledge work) Unit operations – tasks and processes that are treated as being independent of other work activities
  • 7. Manual Work Systems Human body accomplishing some physical task without an external source of power  With or without hand tools  When hand tools are used, the power to operate them is derived from the strength of a human worker  Other human faculties are required, such as hand- eye coordination and mental effort
  • 8. Pure Manual Work Involves the physical and mental capabilities of the human worker, and no machines, tools, or other implements are employed in performing the task.  Material handler moving cartons in a warehouse  Workers loading furniture into a moving van without the use of dollies  Dealer at a casino table dealing cards  Office worker filing documents  Assembly worker snap-fitting two parts together
  • 9. Manual Work with Hand Tools Manual tasks are commonly improved by the use of hand tools. A tool is a device or implement for making changes to some object (e.g., the work unit), such as cutting, grinding, striking, squeezing, or other process. A hand tool is a small tool that is operated by the strength and skill of the human user. Examples of manual tasks involving the use of hand tools include the following:  Machinist filing a part  Assembly worker using screwdriver  Painter using paintbrush to paint door trim  QC inspector using micrometer to measure a shaft diameter
  • 10. Repetitive vs. Nonrepetitive Tasks  Repetitive Task  Relatively short duration (usually a few minutes or less)  High degree of similarity from one cycle to the next  Nonrepetitive Task  Takes a long time  Work cycles are not similar
  • 11. Cycle Time Variations  A main objective in work design is to determine the one best method for a task, and then to standardize its use  Once the method has been standardized, the actual time to perform the task is a variable because of:  Differences in worker performance  differences in hand and body motions  Mistakes by worker  Variations in starting work units  The learning curve phenomenon  Differences in the physical and cognitive attributes among workers performing the task  Variations in the methods used by different workers to perform the task
  • 12. Worker Performance Defined as the pace or relative speed of working  As worker performance increases, cycle time decreases  From the employer’s viewpoint, it is desirable for worker performance to be high  What is a reasonable pace to expect from a worker?
  • 13. Normal Performance A pace of working that can be maintained by a properly trained average worker throughout an entire work shift without injurious effect on the worker’s health or physical well-being  The work shift is usually 8 hours, during which periodic rest breaks are allowed  Normal performance = 100% performance  Common benchmark of normal performance:  Walking at 3 miles/hr
  • 14. Normal Time  The time to complete a task when working at normal performance  Actual time to perform the cycle depends on worker performance Tc = Tn / Pw where Tc = cycle time, Tn = normal time, and Pw = worker performance or pace
  • 15. Example: Normal Performance  Given: A man walks in the early morning for health and fitness. His usual route is 1.85 miles. A typical time is 30 min. The benchmark of normal performance = 3 miles/hr.  Determine: (a) how long the route would take at normal performance and (b) the man’s performance when he completes the route in 30 min.
  • 16. Example: Solution (a) At 3 miles/hr, time = 1.85 miles / 3 miles/hr = 0.6167 hr = 37 min (b) Rearranging equation, Pw = Tn / Tc Pw = 37 min / 30 min = 1.233 = 123.3 % Alternative approach in (b): Using velocity = 1.85 miles / 0.5 hr = 3.7 miles/hr Pw = 3.7 miles/hr / 3.0 miles/hr = 1.233 %
  • 17. Standard Performance Same as normal performance, but acknowledges that periodic rest breaks must be taken by the worker  Periodic rest breaks are allowed during the work shift  Federal law requires employer to pay the worker during these breaks  Other interruptions and delays also occur during the shift
  • 18. PFD Allowance To account for the delays due to:  Personal time (P)  Bathroom breaks, personal phone calls  Fatigue (F)  Rest breaks are intended to deal with fatigue  Delays (D)  Interruptions, equipment breakdowns
  • 19. Standard Time Defined as the normal time but with an allowance added in to account for losses due to personal time, fatigue, and delays Tstd = Tn (1 + Apfd) where Tstd = standard time, Tn = normal time, and Apfd = PFD allowance factor  Also called the allowed time
  • 20. Irregular Work Elements  Elements that are performed with a frequency of less than once per cycle  Examples:  periodic changing of tools (e.g., changing a knife blade)  Irregular elements are prorated into the regular cycle according to their frequency
  • 21. Example: Determining Standard Time  Given: The normal time to perform the regular work cycle is 3.23 min. In addition, an irregular work element with a normal time = 1.25 min is performed every 5 cycles. The PFD allowance factor is 15%.  Determine (a) the standard time and (b) the number of work units produced during an 8-hr shift if the worker's pace is consistent with standard performance.
  • 22.
  • 23.
  • 24.
  • 25. Standard Hours and Worker Efficiency  Two common measures of worker productivity used in industry to assess a worker’s productivity are standard hours and worker efficiency Standard hours – represents the amount of work actually accomplished Hstd = Q Tstd Hstd = standard hours accomplished; Q = quantity of work units completed; Tstd = standard time per work unit Worker efficiency – work accomplished as a proportion of shift hours Ew = Hstd / Hsh Ew = worker efficiency; Hstd = # of standard hours of work accomplished; Hsh = # of shift hours (8 hr)
  • 26.
  • 27.
  • 28. Worker efficiency  Worker efficiency is commonly used to evaluate workers in industry.  In many incentive wage payment plans, the worker’s earnings are based on his or her efficiency or the number of standard hours accomplished.  Worker efficiency and standard hours are easily computed, because the number of hours in the shift and the standard time are known, and the number of work units produced can be readily counted.
  • 29. Worker-Machine Systems  When worker operates a powered equipment we refer to the arrangement as a worker-machine system.  Examples:  Machinist operating a milling machine  Factory worker loading and unloading parts at a machine tool.  Truck driver driving an 18-wheel tractor-trailer  Worker crew operating a rolling mill that converts hot steel blocks into flat plates.  Clerical worker entering data into a PC
  • 30. Types of Powered Equipment Distinguished from hand tools by the fact that a source of power other than human strength is used to operate it. Common power sources are electric, pneumatic, hydraulic, and fossil fuel motors 1. Portable power tools are light enough in weight  portable power drills, rotary saws, chain saws, and electric hedge trimmers. 2. Mobile powered equipment are generally heavy pieces of equipment  Transportation equipment, agricultural and lawn-keeping, forklift trucks, electric power generator at construction site 3. Stationary powered machines stand on the floor or ground and cannot be moved while they are operating  Machine tools (e.g., turning, drilling, milling); office equipment (personal computers, photocopiers, telephones, fax machines); cash registers, heat treatment furnaces
  • 32. Numbers of Workers and Machines Means of classifying worker-machine systems is according to whether there are one or more workers and one or more machines One worker and One machine  Taxicab driver and taxi One worker & Multiple machines  A worker tending several production machines Multiple workers and One machine  Ship's crew Multiple workers and Multiple machines  Emergency repair crew responding to machine breakdowns in a factory
  • 33. One Worker and One Machine Good work design attempts to achieve the following objectives:  Design the controls of the machine to be logical and easy to operate for the worker.  Design the work sequence so that as much of the worker’s task as possible can be accomplished while the machine is operating, thereby minimizing worker idle time.  Minimize the idle times of both the worker and the machine.  Design the task and the machine to be safe for the worker.
  • 34. Level of Operator Attention  Full-time attention  Welders performing arc welding  Part-time attention during each work cycle  Worker loading and unloading a production machine on semi-automatic cycle  Periodic attention with regular servicing  Crane operator in steel mill  Periodic attention with random servicing  Firefighters responding to alarms
  • 35. Two welders performing arc welding on pipe - requires full- time attention of workers (photo courtesy of Lincoln Electric Co.)
  • 36. Cycle Time Analysis in Worker Machine System In terms of cycle time analysis, worker-machine systems fall into two categories: (1) systems in which the machine time depends on operator control, the task can be either repetitive or nonrepetitive (2) systems in which the machine time is constant and independent of operator control, and the work cycle is repetitive.
  • 37. Cycle Time with no Overlap between Worker and Machine  If there is no overlap in work elements between the worker and the machine, then the normal time for the cycle is simply the sum of their respective normal times:  Normal time for cycle Tn = Tnw + Tm Where Tnw = normal time for the worker-controlled portion of the cycle, min: and Tm = machine cycle time (assumed constant).  Standard time for cycle Tstd = Tnw (1 + Apfd) + Tm (1 + Am) where Tnw = normal time of the worker, min; Tm = constant time for the machine cycle, min; Am = machine allowance factor, used in the equation as a decimal fraction
  • 38.
  • 39.
  • 40.
  • 41. Worker-Machine Systems with Internal Work Elements  In the operation of a worker-machine system, it is important to distinguish between the operator’s work elements that are performed in succession with the machine’s work elements and those that are performed simultaneously with the machine elements.  Operator elements that are performed sequentially are called external work elements while those that are performed simultaneously with the machine cycle are called internal work elements.
  • 42. Example 2.10 Internal Versus External Work Elements in Cycle Time Analysis  The work cycle in a worker-machine system consists of the elements and associated times given in the table below.  All of the operator’s work elements are external to the machine time.  Can some of the worker’s elements be made internal to the machine cycle, and if so, what is the expected cycle time for the operation?
  • 43.
  • 44.
  • 45. Comment  Although the total times for the worker and the machine are the same as before, element 4 in the revised cycle (which Consists of elements 1, 2, and 6 from the original work cycle) is performed simultaneously with the machine time, resulting in the following new cycle time: Tc = 0.10 + 0.12 + 0.75 = 0.97 min  This represents a 34% reduction in cycle time, which translates into a 53% increase in production rate.  When internal elements are present in the work cycle, it must then be determined whether the machine cycle time or the sum of the worker’s internal elements take longer.
  • 46. Automated Work Systems Automation is the technology by which a process or procedure is accomplished without human assistance  Implemented using a program of instructions combined with a control system that executes the instructions  Power is required to drive the process and operate the control system
  • 47. Levels of Automated Systems  Semiautomated machine  Performs a portion of the work cycle under some form of program control  Human worker tends the machine for the remainder of the cycle, by loading and unloading it  Operator must be present every cycle  Fully automated machine  Operates for extended periods of time with no human attention