QSB60504 Estimating
Tutorial 2 (Question 1)
Group Members :
Lai Hui Ying 0333416
Low Wan Jing 0329214
Ngeow Yee Ling 0329178
Penny Leung 0328245
Tan Shen Sin 0324602
Thasia 0329051
a. Explain to your client the importance of estimating at different stages
of procurement.
Pre-contract
• Estimation of cost and time
• Cost control
• Allocate budget
• Prediction of construction period
• To establish a construction schedule
• Assist clients to get the most competitive tender
Advantages of estimating
Advantages of estimating
Post Contract
Construction
· Budget to management
· Used for many assessment
· Control cost
· Cash flow
· Assist client in making changes
Tenancy and occupation
· Certificate of completion and compliance(ccc) issued after tests
for tenancy suitability
b. Explain to your client the differences of measurement,
tendering and estimating
c. Explain to your client what preliminaries items are and provide
five (5) examples.
Preliminary costs are expenses that will be incurred during construction, which
are directly related to the running of the project and have not been included in the
materials, labour or overheads.
2. Tools (Hammer, spanners, screwdrivers,
saws, etc)
Examples:
1. Workers’ accommodation
3. Scaffolding 4. Temporary Work
5. Insurance (All Risk Insurance, Workman’s Compensation)
This value becomes a budget or allowance that the foreman must keep within
when the project commences. The total amount is transferred to the final
summary of the tender and forms part of the financial mark-up on the tender
price.
Estimating group 1

More Related Content

What's hot

Itd project one (a) 4 m
Itd project one (a) 4 mItd project one (a) 4 m
Itd project one (a) 4 m
euxuanong
 
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfQuantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Chong Yi Hui
 
Costing for-civil-engineering-project
Costing for-civil-engineering-projectCosting for-civil-engineering-project
Costing for-civil-engineering-project
hlksd
 
Quantity surveying -scope and purpose
Quantity surveying -scope and purposeQuantity surveying -scope and purpose
Quantity surveying -scope and purpose
Abhijeet Bhosale
 
Job Responsibilities from January 2011 to March 2013
Job Responsibilities from January 2011 to March 2013Job Responsibilities from January 2011 to March 2013
Job Responsibilities from January 2011 to March 2013
Mohamed. Zaki
 

What's hot (14)

Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
Assignment - Tender Submission Part 2
Assignment - Tender Submission Part 2Assignment - Tender Submission Part 2
Assignment - Tender Submission Part 2
 
Mega project
Mega projectMega project
Mega project
 
NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
 
Itd project one (a) 4 m
Itd project one (a) 4 mItd project one (a) 4 m
Itd project one (a) 4 m
 
Concrete Footing Worksheet
Concrete Footing WorksheetConcrete Footing Worksheet
Concrete Footing Worksheet
 
Preliminary estimate
Preliminary estimatePreliminary estimate
Preliminary estimate
 
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfQuantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdf
 
Costing for-civil-engineering-project
Costing for-civil-engineering-projectCosting for-civil-engineering-project
Costing for-civil-engineering-project
 
PP1 assignment presentation slides
PP1 assignment presentation slidesPP1 assignment presentation slides
PP1 assignment presentation slides
 
Quantity surveying -scope and purpose
Quantity surveying -scope and purposeQuantity surveying -scope and purpose
Quantity surveying -scope and purpose
 
Pp2 group assignment
Pp2 group assignmentPp2 group assignment
Pp2 group assignment
 
Job Responsibilities from January 2011 to March 2013
Job Responsibilities from January 2011 to March 2013Job Responsibilities from January 2011 to March 2013
Job Responsibilities from January 2011 to March 2013
 
Quantity take off
Quantity take offQuantity take off
Quantity take off
 

Similar to Estimating group 1

Pp1 report
Pp1 reportPp1 report
Pp1 report
ahmong4
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
Pang Khai Shuen
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
Pang Khai Shuen
 
COVERTITLE PAGE Table of ContentsI. Integrated Projec
COVERTITLE PAGE Table of ContentsI. Integrated ProjecCOVERTITLE PAGE Table of ContentsI. Integrated Projec
COVERTITLE PAGE Table of ContentsI. Integrated Projec
CruzIbarra161
 
Cbb 512 assignment_1
Cbb 512 assignment_1Cbb 512 assignment_1
Cbb 512 assignment_1
Maatla Moadi
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentation
Timun Loh
 
Professional Practice I Assignment
Professional Practice I AssignmentProfessional Practice I Assignment
Professional Practice I Assignment
ashleyyeap
 

Similar to Estimating group 1 (20)

Seminar 1 - Question 1
Seminar 1 - Question 1Seminar 1 - Question 1
Seminar 1 - Question 1
 
Pp1 presentation 2
Pp1 presentation 2Pp1 presentation 2
Pp1 presentation 2
 
Estimating presentation (question 1)
Estimating presentation (question 1)Estimating presentation (question 1)
Estimating presentation (question 1)
 
Professional practice 1 report
Professional practice 1 reportProfessional practice 1 report
Professional practice 1 report
 
Assignment - Management Contracting
Assignment - Management ContractingAssignment - Management Contracting
Assignment - Management Contracting
 
Pp1 report
Pp1 reportPp1 report
Pp1 report
 
Study on Procurement Method Selection Procedure in Construction Industry
Study on Procurement Method Selection Procedure in Construction IndustryStudy on Procurement Method Selection Procedure in Construction Industry
Study on Procurement Method Selection Procedure in Construction Industry
 
PP1 report
PP1 reportPP1 report
PP1 report
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
 
COVERTITLE PAGE Table of ContentsI. Integrated Projec
COVERTITLE PAGE Table of ContentsI. Integrated ProjecCOVERTITLE PAGE Table of ContentsI. Integrated Projec
COVERTITLE PAGE Table of ContentsI. Integrated Projec
 
Cbb 512 assignment_1
Cbb 512 assignment_1Cbb 512 assignment_1
Cbb 512 assignment_1
 
Pp1 assignment group 8
Pp1 assignment group 8Pp1 assignment group 8
Pp1 assignment group 8
 
Introduction to construction project.pptx
Introduction to construction project.pptxIntroduction to construction project.pptx
Introduction to construction project.pptx
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slides
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentation
 
PP1 presentation
PP1 presentationPP1 presentation
PP1 presentation
 
Professional Practice I Assignment
Professional Practice I AssignmentProfessional Practice I Assignment
Professional Practice I Assignment
 
Project managment (pm) solved assignments summer 2015
Project managment  (pm) solved assignments summer 2015Project managment  (pm) solved assignments summer 2015
Project managment (pm) solved assignments summer 2015
 
KENA PRE.pptx
KENA PRE.pptxKENA PRE.pptx
KENA PRE.pptx
 

More from Lai Vlyn (7)

Compilation
CompilationCompilation
Compilation
 
Fififinalnal
FififinalnalFififinalnal
Fififinalnal
 
Pp
Pp Pp
Pp
 
Pp
PpPp
Pp
 
Pp 2
Pp 2Pp 2
Pp 2
 
element
elementelement
element
 
ESTIMATING
ESTIMATING ESTIMATING
ESTIMATING
 

Recently uploaded

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
meharikiros2
 

Recently uploaded (20)

Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257
 

Estimating group 1

  • 1. QSB60504 Estimating Tutorial 2 (Question 1) Group Members : Lai Hui Ying 0333416 Low Wan Jing 0329214 Ngeow Yee Ling 0329178 Penny Leung 0328245 Tan Shen Sin 0324602 Thasia 0329051
  • 2. a. Explain to your client the importance of estimating at different stages of procurement.
  • 3. Pre-contract • Estimation of cost and time • Cost control • Allocate budget • Prediction of construction period • To establish a construction schedule • Assist clients to get the most competitive tender Advantages of estimating
  • 4. Advantages of estimating Post Contract Construction · Budget to management · Used for many assessment · Control cost · Cash flow · Assist client in making changes Tenancy and occupation · Certificate of completion and compliance(ccc) issued after tests for tenancy suitability
  • 5. b. Explain to your client the differences of measurement, tendering and estimating
  • 6. c. Explain to your client what preliminaries items are and provide five (5) examples. Preliminary costs are expenses that will be incurred during construction, which are directly related to the running of the project and have not been included in the materials, labour or overheads. 2. Tools (Hammer, spanners, screwdrivers, saws, etc) Examples: 1. Workers’ accommodation
  • 7. 3. Scaffolding 4. Temporary Work
  • 8. 5. Insurance (All Risk Insurance, Workman’s Compensation) This value becomes a budget or allowance that the foreman must keep within when the project commences. The total amount is transferred to the final summary of the tender and forms part of the financial mark-up on the tender price.