SlideShare a Scribd company logo
1 of 14
Jimmy C. Bernal
Email Add: jimbern_15@yahoo.com.ph & jbernal@megawide.com.ph
HOME Philippine PLDT Landline no: +63437848140
Philippine Mobile : +639175048568 & +639953185767
Passport No. : EC1788219
Professional Qualifications & Personal Information
● Present Position : Maintenance Manager
● Previous Position : Maintenance Manager / Asst. Maintenance Manager
● Previous Position : Sr. Plant Electrical / Maintenance Engineer / Asst. Manager
● Degree/Education : Graduated of Bachelor of Science in Electrical Engineering
( year 1984 – 1990 ) 5 years course
● Expertise :
1) Manage a Maintenance Department.
2) Familiar with Maintenance Approaches.
3) Familiar with Maintenance Indicators.
4) Manage a Team of Technicians.
5) Spare Parts Management.
6) 5S Oriented and Familiar with Implementation as member of the committee.
7) Troubleshoot and Investigate electrical equipment failure or efficiently problems.
8) Preparing/Revising Maintenance Procedures.
9) Planning and Implementing Maintenance Management.
10) International Standard Operation for Maintenance Dept.
11) Electrical & Mechanical works troubleshooting.
12) PLC & Electrical Controls.
13) Electrical Design and Construction.
14) Pump and Motor’s & Motor Controls and VFD.
15) Preparation & Implementation of Preventive Maintenance Plan.
16) Electrical & Mechanical Safety Oriented.
17) Operation & Maintenance of Generator’s.
18) Test & Commissioning.
19) Analyzing Data.
20) Maintenance Staff Appraisal and Evaluation.
● Years of Experience : 26 years (Hands-On Solid Experience)
1) Strong Leadership & Decision Making.
2) Maintain, troubleshoot, repair and upgrading of the terminal
electrical and mechanical equipment.
3) Design and Electrical construction.
4) Manage a Quality Maintenance Management System involving
maintenance procedures , planning , organizing ,
implementation and routine monitoring.
● Affiliations : Associate Member, Institute of Integrated Electrical Engineers
- ERCSA (Saudi Arabia) , membership no: 12ERCSA-ASSO-008
Professional Regulation Commission License no. RME0013252
( Government Licensing Agency for Professional , Philippines )
Training / Seminars Attended :
√ Residential, Commercial, Industrial Electrical Design and Construction (Yr-1989)
√ High Rise Building Electrical Design (Yr-1989)
√ Modern Transmission, Distribution Designs & Protection Schemes (Yr-1989)
√ Philippine Electrical Code (Yr-1991)
√ Basic Safety Course (Yr-1998)
√ Improving the Operation & Maintenance of Boiler (Yr-1999)
√ Compressor Technology (Yr-2002)
√ Pneumatic Technology (Yr-2004)
√ Fire Prevention & Disaster Seminar (Yr-2004)
√ Industrial Laboratory Water Analysis (Yr-2005)
√ Industrial Wastewater Treatment (Yr-2007)
√ Integrated Management System – Master Class (Yr-2010)
√ KPC Integrated Management System (Yr-2011)
√ Programming Procedures of Programmable Logic Controllers and Testing & Operating
an Automatic / Manual Transfer Switch (Yr-2012)
√ Programmable Logic Controller-System Integration/Variable Frequency Drive Testing
and Commissioning (Yr-2012)
√ Sizing of Capacitor Bank, Short Circuit Calculation, Smart Energy Solution, Lighting
System & Retrofitting, Cable Tray, Bus Bar Trunk (Yr-2012)
√ Indoor Lighting Design using DIALux, Fire Alarm System, Basic Principles of High Voltage Direct
Current (HVDC) Transmission & Electrical Safety for Construction
√ Technical Writing (October 2016)
√ Reliability – Centered Maintenance (November 2016)
β€’ Age : 50 years old
● Date of Birth : June 16, 1967
β€’ Nationality : Filipino
β€’ E-Mail Address : jimberm_15@yahoo.com.ph &
jbernal@megawide.com.ph
β€’ Special Skills : Computer literate, Driving, Auto-Cad
β€’ Philippine Mobile : +639953185767 & +639175048568
β€’ Home Tel (Philippines) : +63437848140
● Passport No. : EC1788219
Professional & Work Experience
Maintenance Manager Megawide Precast Factory under Megawide Construction
( April ’16 – Present ) Corporation, MCC (Construction)
Brgy. San Juan , Taytay Rizal , Philippines
Duties and Responsibilities:
√ - Managing the precast factory maintenance department and its machineries /
equipment, and different function of the department.
√ - Implementing Maintenance System & Strategy for machine /equipment such as:
1) Ebawe Carousel System (Pallete) with 8 units of Side Shifting units,Pallete Stacker,Levelling
Machine / Helicopter,Curing Chamber & Plotter Robot, Ebawe Train, Titling Table etc.
2) Shuttering Robot
3) Shuttering Cleaning Machine
4) VGA Lattice Girder Robot
5) Wire Mesh Robot
6) IMER-ORU Batching Plant system
7) IMER-ORU Flying Concrete Bucket
8) Demag Overhead Cranes & Gantry Cranes
9) Elematic Battery Mould
10) Elematic Pulling Wagons
11) Elematic Concrete Bucket
12) Station Hooper for Flying Bucket
13) Etc..
Maintenance Manager Gulf & Safa Daries Co. LLC Dubai under National Food Products
( August ’15 – March β€˜16 ) Company (NFPC), Dubai, UAE – PO Box 61130
Certified by HACCP & Dubai Municipality@Food Control Div.
Duties and Responsibilities:
√ - Responsible to the managing and controlling of many different functions of the
Maintenance Department and personnel.
√ - Dealing with expansion projects of the factory.
√ - Implementation of maintenance system & strategy for the following equipments
such as :
1) Air Compressor Units – 4 units @ Atlas Copco
2) Boiler Unit – 3 units
3) Chiller Unit – 8 units (4 York , 2 Carrier & 2 ammonia)
4) Water Treatment Plant – 1 unit
5) Wastewater Treatment Plant – 1 unit
6) Cold Store Unit – 3 units with 10 units compressor
6) Ink Jet Printers – 16 units (Hitachi & Videojet)
7) Delmax Cup Filling Machine – 4 units (sizes: 73mm-2units, 95mm-1unit & 115mm-1
unit)
8) Delmax Bottle Filler – 2 units (PET & HDPE type)
9) Challenger Cup Filler – 3 units (73mm-2 units & 95mm-1 unit)
10)SealPack 73mm Cup Filler – 1 unit
11)Gable Top Filler NL8 – 3 units
12)Clearpack Shrink Wrap Machine – 6 units
13)Polypack Shrink Wrap Machine – 1 unit
14)Self Adhesive Labelling Machine – 1 unit
15)Bottle Unscrambler – 1 unit
16)CIP System Unit – 2 units (auto & manual)
17)HTST Pasteurizer 15000 LPH – 1 unit
18)HTST Pasteurizer 6000 LPH – 1 unit
19)HTST Water Pasteurizer – 1 unit
20)Plate Heat Exchanger – 4 units
21)Planetary Dough Mixer – 1 unit
22)Homogeniser Unit – 3 units (500, 6000 & 15000 LPH)
23)Tanks/Agitator – 31 units
24)TETRA TBA/8 1000ml S with accessories line – 1 unit
25)TETRA TBA/19 200ml S with accessories line – 2 units
26)TETRA A3 Flex 1000ml S with accessories line – 1 unit
Acting Maintenance Manager National Ready-Mix Concrete Company (Construction)
(May ’15 – August ’15) Lootah Group - PO Box 10631 Dubai, United Arab Emirates
Sr. Maintenance Engineer Certified ISO 9001
(Oct β€˜ 14 – May β€˜15)
Duties and Responsibilities:
√- Acting Maintenance Manager due to resignation of the Manager and act to the
full capacity of over-all function of the Maintenance Department.
√ - Assisting the Maintenance Manager in his full capacity as Maintenance Manager
of 15 Batching Plants for Ready-Mix Concrete Factories in United Arab Emirates.
√ - Initiates and develops maintenance strategies for all plants and equipment, and
ensure effective implementation of these strategies.
√ - Prepares and issues maintenance plan, policies and strategies.
√ - Responsible for the managing, overseeing, supervising, and inspection /
monitoring of maintenance personnel in their task of work with regards to the electromechanical
construction / modification, engineering works, planned preventive maintenance, routine
monitoring, & troubleshooting of machine & equipment within of all its branches in United Arab
Emirates.
√ - Perform related function such as prepare requisition, evaluation of quotation,
engineering analysis, deal / troubleshoot problems of equipment / machine as the need arises,
recommendation for improvement and training / evaluation of maintenance personnel.
Engineering and Maintenance Head Essential Fruits Incorporated
(July ’14 – October β€˜14) ( Fruits and Beverages Processing Plant )
KM. 82 Brgy. Malatgao, Narra , Palawan, Philippines
Duties and Responsibilities:
√ - To perform full capacity as Head of Engineering and Maintenance Dept.
√ - Overseeing and monitoring the work of maintenance personnel with regards to
Engineering and Planned Preventive Maintenance.
√ - Prepare, Manage and Assign Quality Maintenance Management System involving
maintenance procedure, reports, checklist, word orders, breakdown analysis, suggest
modifications and revision for improvement, equipment history records and keeping all the
maintenance records.
√ - Perform requisition and purchasing works of needed spare parts and consumable
spare with proper evaluation of the recommended spare parts by the supplier.
√ - Providing training with the maintenance staff and do appraisal of their
performance.
√ - To deal / troubleshoot , and diagnose emergency breakdown as they occur with
regards to PLC hardware / controls, mechanical / electrical problem of the machine & equipment
wherein my subordinates cannot solve the problem as needed.
Asst. Maintenance Manager Al Kifah Precast Concrete Company ( Construction )
( August ’12 – Feb. ’14 ) PO Box 30789, Akrabiya Al Khobar 31952, Saudi Arabia
Sr. Plant Electrical/Maintenance Abqaiq Road, New 2nd
Industrial City, Dammam
Engineer ( August ’08 – Aug β€˜12 ) Certified ISO 9001-2008, ISO 14001-2004, OHSAS 18001-2007
Duties and Responsibilities:
√ - Assisting the Maintenance Manager with his over-all function in the Maintenance
Department.
√- Involves in electrical design & construction of the plant (5 Megawatts) as β€œHands-
On” Electrical Engineer.
√ - Reports directly to the superior any matters regarding or concerning
maintenance revision & problem matters.
√ - Responsible for planning and overseeing the maintenance team activities to
ensure safe and efficient operations of the facility and keeping maintenance records.
√ - Work as resident plant electrical engineer with minimum supervision on a variety
of complex engineering functions.
√ - Lead and recommend new continuous improvement solutions for installations or
modifications to improve existing facilities and standardization within specific fields of
endeavor.
√ - Perform engineering analysis and develop recommendations and alternatives in
the solution of complex problems related to the plants electrical and control system.
√ - Work on the electrical engineering aspects and produce full design packages for
the required plant modifications.
√ - Prepare and plan routine maintenance schedules and reports.
√ -Assign preventive and corrective maintenance jobs as per the direction of
Maintenance Manager.
√ - Supervises and coordinates activities of maintenance staff.
√ - Make periodic inspection of equipment and system to observe operating
condition in actual or thru monitoring checklist of equipment and need for repair & adjustment.
√ - Keep maintenance records, prepares reports and composes correspondence
related to work.
√ - Executes work order through Maintenance Management System and
coordinates with maintenance supervisor / foremen for job completion and technical matters.
√ - Maintain such communications and relations as are necessary to report on the
status of matters requiring action and to ensure that corrective action is undertaken.
√ - Helps Maintenance Manager in executing corrective and planned maintenance
with due regard to schedule maintenance plan.
√ - To perform technical evaluation of quotation received from purchased
department and recommend appropriate choice.
√ - Plans and controls expenditures in accordance with the operating budget of the
department.
√ - To prepare purchase requisitions for spare parts and consumables ensuring
budgetary constraints and arrange strategic spares availability to cope up with the maintenance
requirements.
√ - Review and recommend new maintenance procedures and work instructions.
√ - Supervise, direct and co-ordinate the activities of all personnel to his area.
√ - Ensure environment aspect – impact and hazard risk assessment are carried out,
controlled & updated.
√ - Implement, monitor and report IMS (Integrated Management System) objectives,
targets and programs.
√ - Provide necessary resources for effective implementation and sustenance of IMS
(Integrated Management System) and report performance to the management periodically.
√ - Ensure identification of root cause for the identified non-
conformances/deviations in IMS (Integrated Management System) and to implement corrective
actions/preventive actions.
√ - Identify the competency gap for their subordinate personnel and carry out
annual performance evaluation of reporting employees.
√ - Provide training to new employees and evaluate their performance.
√- To deal & diagnose emergency breakdown as they occur for equipments &
machines such as :
1 ) Elematic precast concrete machineries
5 units - Steel Wire Pulling Device ( EN 875 ,)
3 units - Saw Machine ( EL 1300 )
2 units - Extruder Machine ( EL 900E )
1 unit - Stressing Device
2 units - Cleaning Machine ( EL 400 )
7 units - Shuttle Concrete Machine ( EB 405 )
2 units - Lifting Beam ( 2 X 5T ) ( EN 886/16 )
1 unit - Maturity Control System (EL 490 )
5 units - Portable Concrete Shute 5.4T, 380 volt
5 units - Intermediate Hopper EB 120
2 units – Concrete Shuttle Bucket Gantry
2 units - Bed Master Machine
2 ) Ebawe precast concrete machineries
1 unit - Central Shifting Machine
2 units - Concrete Distributor Machine
2 units - Tilting Table
2 units – Side Shifting units
2 units – Compacting devices
3 ) Boiler – Make: Viesman, 80 HP – 1 unit
4 ) Stressing Jack ( CCL ) – for pre-stress beam – 1 unit
5 ) Kone Overhead Crane – 20 units
6 ) 1020 KVA Cummins Generator – 4 units
7 ) 456 KVA Caterpillar Generator – 1 unit
8 ) Synchronizing Panel & Main Distribution Panels
9 ) Batching Plant 1 – one mixer ( 37 KW )
10) Batching Plant 2 - two mixer ( 2 x 37 KW )
11) Aggregates Washing Plant no. 1
12) Ice Batcher no. 1 & 2
13) Desalination Plant
a) Sedimentation Tank – 2 tank
b) Domestic Tank – 2 tank
c) Sweet Water Tank – 1 tank
d) R.O. Treatment – 200 cu. mtr. capacity
e) Domestic Pump (2) with one jockey pump
f) Fire Fighting Pump (2)
g) Sweet Water Pump (2) with one jockey pump
14) Chiller Plant with 2 units compressor & one chilled
Sweet water tank with 2 units pump.
15) Air Compressor Unit
a) 4 units Sullar air compressor , 10 bar
b) 1 unit Ingressor Rand , 10 bar
c) 1 unit Atlas air compressor , 8 bar
d) 3 units Champion Piston Type (big)
e) 5 units Champion Piston Type (small)
16) Air Conditioning Units
a) Split Type – 60 units
b) Window Type – 140 units
17) Heavy Duty Miller Welding Machine , 380 ac volt,
63 amp. Max - 36 units & 2 units Heavy Duty MIG
18) Mobile Crane
3 units – Groove 70T (one) & Groove 80T (two)
3 units - Tadano 70T (two) & Tadano 80T (one)
1 unit – Liebherr 130T
19) Haulotte Manlifter , 360 degrees turn (articulation)
20) Genie Manlifter, boom type
21) Wheeloader , 1 unit – Brand: Kawasaki
22) Truck Mixer – 1 unit
23) Forklift (Toyota) – 1 unit
24) Bar Cutting Machine (3 units) & Bar Bending
Machine (4 units )
25) Vibrator / Inverter Machine , 3 phase, 380 V. -3 units
26) Sheering Machine , 380 volts , 3 phase – 1 unit
27) Bending Machine , 380 volts , 3 phase – 1 unit
28) Lathe Machine , 380 volts , 3 phase – 1 unit
√ - In- charge for Workshop operation and Vehicle maintenance & repair.
√ - To carry out any other duty assigned to by the management from time to time
and perform related duties as required such as :
1) Assisting the Design Department for the electrical matter of the project and
act as the Consultant for the electrical plan.
2) Assisting the QA / QC Department for the electrical matter of the project
and act as Consultant for the electrical plan.
3) Planning and Scheduling of Building maintenance and repair for office,
accommodation and auxiliary building.
Utility Control Captain / Yakult Philippines Incorporated ( Food & Beverages Manufacturing )
Facilities Engineer Bo. Makiling , Calamba , Laguna , Philippines
( Aug. ’98 – July β€˜ 08 ) Certified ISO 9001, 14001,OHSAS 18001 & HACCP
Duties and Responsibilities:
√ - To restore and retain plant equipment, to ensure the safely, availability and reliability
of the plant and equipment through well-design system categorized as routine,
preventive and predictive maintenance along their life cycle.
√ - Supervision & Preparation of activities for Engineering Staffs
√ - Supervision of Building Maintenance and repair by Staffs
√ - Supervision of Operation and Maintenance & Troubleshooting of Facility Machineries
such as :
● Substation & Switchgear room
1) Transformer 2000 KVA
2) 2000 KVA Caterpillar Generator
3) 500 KVA Caterpillar Generator
4) Capacitor Cells ( for unity power factor )
5) Main Distribution Panelboards
● Intake & Exhaust Systems
● Airconditioning Units
1) 4 units Centralized Type
2) 15 units Split Type
3) 10 units Window Type
● Air compressor systems
1) 2 units Atlas , 11 kw
2) 1 units Atlas , 22 kw
3) 2 units Atlas , 44 kw
4) 4 units Atlas Air Dryer
● Water Treatment Facilities
1) 2 tank- Sedimentation Tank
2) 2 units- Deepwell pump
3) 2 units- Sand Filter
4) 2 tank- Cistern Tank
5) 2 units- Chlorine Dosing pump
6) 1 unit- Chlorine Analyzer
7) 1 tank- Accumulator Tank
8) 1 tank- Hydro-pneumatic Tank
9) 2 units- Softener Tank
10) 2 units- Carbon Filter Tank
11) 1 lot – Chilled Bank (treated water) with
Cooling system (glycol)
12) 3 units- Sand filter Pump
13) 1 unit – Accumulator Pump
14) 3 units Hydro-pneumatic Pump
15) 1 unit – Booster Pump
● Boiler’s
2 units – Enertec Horizontal tube w/ wet back 150 hp & 80 hp
● Chilled water Systems – glycol cooling in chill
with 2 units – condensing unit
● Cooling tower system
2 units - Big & Small Cooling tower
Centralized Cold Store Unit – 4 unit compressors●
● Motor & Pumps systems
● Waste Water Treatment Facilities
1) Biological Activated Sludge System- aerobic
2) 500 cu. meter treatment capacity
3) Laboratory for BOD , COD , Tss/MLss ,
Oil & Grease , P/N testing
4) Control Room
5) Submersible Pumps & Motors for :
a) Lifting
b) Transfer
c) Cleaning (portable)
6) Aeration Tank
7) Clarification Tank w/ motor scraper
8) Chlorine Contact Chamber w/ chlorine
dosing
Pump
9) Sludge Thickener Tank with feed pump
10) Sludge Holding Tank with transfer pump
11) 3 units – 50 HP Root type Air Blower
12) 1 unit – Sludge Belt-Press Machine with
Chemical pump & tanks
● Lighting Systems
√ - Supervision of Preventive Maintenance of All Electrical Machines & Equipments.
√ - Supervision of mechanical & electrical controls troubleshooting for Machineries &
Equipments.
√ - Assigned as SAFETY OFFICER of the factory and member of the HEALTH & SAFETY
COMMITTEE OF THE COMPANY & performed the duties as follows :
a.) Anticipate , identify & evaluate hazardous
conditions & practices.
b.) Develop hazard control designs , methods ,
procedures & programs.
c.) Implement , administer & advise others on
hazard control programs.
d.) Measure , audit and evaluate the effectiveness
of hazard control programs.
e.) Draft a future safety plan & statement based on
real time experiences and facts.
f.) Implement industrial hygiene & toxicology , fire
protection system , system & process safety ,
education & training methods and
measurement of safety performance.
√ - Supervised the Expansion Project of the factory regarding additional electrical
design & construction.
Maintenance Supervisor Foodlinks Incorporated ( Fast food Chain Restaurant’s )
(March ’98 – Aug. β€˜98) Tektite Tower, Ortigas Center, Pasig , Philippines
Duties and Responsibilities:
√ - Supervision for the operation , maintenance & troubleshooting of fast food
equipment & machineries such as :
a) Soft-drink Dispenser Machine
b) Ice Maker Machine
c) Refrigeration Cabinet (chest type & upright)
d) Food Warmer
e) Dishwashing Machine
f) Air-conditioning units
g) Intake & exhaust system w/ motor’s
h) Coffee Maker Machine
i) Chilled Cabinets
j) Microwave Oven
k) Water pumps & motors
l) Lighting System & fixtures
m) Generators
n) Ice Cream Maker Machine
o) Chicken & French Fries Fryer
p) Burner ( gas & electric )
√ - Supervision for the electrical & mechanical troubleshooting.
√ - Supervision for the implementation of preventive maintenance of all electrical
equipment & machineries.
√ - Supervision for building maintenance and repair by subordinates.
Officer in Charge
(Gen. Maintenance Dept.) Emerald Pizza Incorporated ( Pizza Hut Restaurant’s )
(Feb. ’91 - March ’98) Annapolis Greenhills , San Juan City , Philippines
Duties and Responsibilities:
√ - Supervise & Monitor the maintenance staff & technicians for their specific task &
duties to be properly done.
√ - Supervision for the staff’s work during building maintenance and repair.
√ - Supervise the troubleshooting of all electrical equipments & machineries.
√- Supervision of the operation, maintenance & troubleshooting for all electrical
equipments & machineries such as :
a) Pizza Oven ( conveyor & gas type )
b) Dough Mixer
c) Dough Roller
d) Dishwashing Machine
e) Chiller unit
f) Refrigeration Cabinet
g) Microwave Machine
h) Freezer cabinet ( chest & upright freezer )
i) Air-conditioning unit ( centralized , split type &
window type )
j) Intake & exhaust motors
k) Ice Maker Machine
l) Chicken & French fries Fryer
m) Soft-drink Dispenser
n) Drainage System
o) Coffee Maker Machine
p) Water Pumps & Motors
q) Generators
√ - Preparation & Implementation of the Preventive maintenance Schedule of all
electrical equipments & machineries.
√ - Ensure the implementation of Health & Safety Policies of the company.
√ - Prepare the electrical design and installation for the construction of additional
Pizza Hut Restaurant’s.
Industrial Electrician Cosmos Bottling Corporation ( Food & Beverages Manufacturing )
(July ’90 – Jan β€˜ 91) Mc Arthur Highway , Bulacan , Philippines
Duties and Responsibilities:
√ - Assigned as Shift Industrial Electrician
√ - Performed building maintenance and repair such as plumbing ,carpentry ,
painting , electrical , drainage system , ac units , welding & acytheline works etc.
√ - Troubleshooting of electrical wiring & controls , Pump & Motor & Motor
controls.
√ - Installation of electrical wires, lighting fixtures & electrical controls.
√ - Operation & Maintenance and troubleshooting of generators.
Electrician/Technician 680 Home Appliances Incorporation
(Jan ’87 – May ’88) (Home Appliances Commercial Establishment)
Edsa, Quezon City, Philippines
Duties and Responsibilities:
√ - Assigned as Electrician / Technician
√ -Assigned for the building maintenance and repair works such as electrical,
mechanical, painting, carpentry, ac units, plumbing, drainage system , welding works , etc.
√ - Operation, Maintenance & Troubleshooting of generator.
√ - Troubleshooting of electrical panel, wires & appliances.
√ - Installation of electrical wires & control’s & lighting fixtures.
REFERENCE:
1) Mark Santana
IMS-MR / LEAD AUDITOR
AL KIFAH PRECAST COMPANY
Abqaiq Road, New 2nd
Industrial city, Ad Dammam, Saudi Arabia
Tel. : +96638029144-9166 ext. 092
Mobile No: +966566249482
2) Rolando β€œrolly” Pena
UTILITY DEPARTMENT SUPERVISOR
YAKULT PHILIPPINES INCORPORATED
Bo. Makiling, Calamba City, Laguna, Philippines
Mobile No: +639198252580 or +639173070448
3) Roberto Almorfe
AGRI / ADMINISTRATION MANAGER
ESSENTIAL FRUITS INCORPORATED (EFI)
Km. 80 , Brgy. Malatgao, Narra Palawan
Mobile no. +639175770320
4) Engr. Joenel M. Raposon Jr.
TECHNICAL MANAGER
National Ready-Mix Company
Lootah Group
Mobile no. +971552121332

More Related Content

What's hot

Mechanical Engineer
Mechanical EngineerMechanical Engineer
Mechanical Engineerashrafelmalak
Β 
Tariq CV
Tariq CVTariq CV
Tariq CVTariq Khan
Β 
JAMES_Hill_CV_2015
JAMES_Hill_CV_2015JAMES_Hill_CV_2015
JAMES_Hill_CV_2015JAMES HILL
Β 
Caterpillar cat tl1055 telehandler operation and maintenance manual
Caterpillar cat tl1055 telehandler operation and maintenance manualCaterpillar cat tl1055 telehandler operation and maintenance manual
Caterpillar cat tl1055 telehandler operation and maintenance manualfujskekfmsme
Β 
Maintenance Manager CV
Maintenance Manager CVMaintenance Manager CV
Maintenance Manager CVMohd Suliman
Β 
New Anam Bastari AR Resume
New Anam Bastari AR ResumeNew Anam Bastari AR Resume
New Anam Bastari AR ResumeAnam Bastari
Β 
noelabejuela_resume (2)
noelabejuela_resume (2)noelabejuela_resume (2)
noelabejuela_resume (2)Noel Abejuela
Β 
JOHN CAMPBELL WAHLIN RESUME 2014
JOHN CAMPBELL WAHLIN RESUME 2014JOHN CAMPBELL WAHLIN RESUME 2014
JOHN CAMPBELL WAHLIN RESUME 2014John Wahlin
Β 
HARI RESUME 2016
HARI RESUME 2016HARI RESUME 2016
HARI RESUME 2016Hariprasath V
Β 
Atul Gangwar Resume
Atul Gangwar ResumeAtul Gangwar Resume
Atul Gangwar Resumeatul gangwar
Β 

What's hot (19)

Mechanical Engineer
Mechanical EngineerMechanical Engineer
Mechanical Engineer
Β 
Tariq CV
Tariq CVTariq CV
Tariq CV
Β 
JAMES_Hill_CV_2015
JAMES_Hill_CV_2015JAMES_Hill_CV_2015
JAMES_Hill_CV_2015
Β 
Resume 1 (1)
Resume 1 (1)Resume 1 (1)
Resume 1 (1)
Β 
ketul
ketulketul
ketul
Β 
Caterpillar cat tl1055 telehandler operation and maintenance manual
Caterpillar cat tl1055 telehandler operation and maintenance manualCaterpillar cat tl1055 telehandler operation and maintenance manual
Caterpillar cat tl1055 telehandler operation and maintenance manual
Β 
Maintenance Manager CV
Maintenance Manager CVMaintenance Manager CV
Maintenance Manager CV
Β 
Karthick mm
Karthick  mmKarthick  mm
Karthick mm
Β 
Resume
ResumeResume
Resume
Β 
New Anam Bastari AR Resume
New Anam Bastari AR ResumeNew Anam Bastari AR Resume
New Anam Bastari AR Resume
Β 
Buckton
BucktonBuckton
Buckton
Β 
ansar CV
ansar CVansar CV
ansar CV
Β 
VENKADESAN RESUME.
VENKADESAN RESUME.VENKADESAN RESUME.
VENKADESAN RESUME.
Β 
noelabejuela_resume (2)
noelabejuela_resume (2)noelabejuela_resume (2)
noelabejuela_resume (2)
Β 
JOHN CAMPBELL WAHLIN RESUME 2014
JOHN CAMPBELL WAHLIN RESUME 2014JOHN CAMPBELL WAHLIN RESUME 2014
JOHN CAMPBELL WAHLIN RESUME 2014
Β 
OrrinGRESUME
OrrinGRESUMEOrrinGRESUME
OrrinGRESUME
Β 
Victor 2015
Victor 2015Victor 2015
Victor 2015
Β 
HARI RESUME 2016
HARI RESUME 2016HARI RESUME 2016
HARI RESUME 2016
Β 
Atul Gangwar Resume
Atul Gangwar ResumeAtul Gangwar Resume
Atul Gangwar Resume
Β 

Similar to Cv resume jimmy c. bernal

Sr Position in Engineering
Sr Position in EngineeringSr Position in Engineering
Sr Position in Engineeringmsuresh1946
Β 
khaled-engineering
khaled-engineeringkhaled-engineering
khaled-engineeringkhaled El sayed
Β 
Utility TTIPL RESUME 1 -new Address Copy
Utility TTIPL RESUME 1 -new Address  CopyUtility TTIPL RESUME 1 -new Address  Copy
Utility TTIPL RESUME 1 -new Address Copyumesh gowda
Β 
Rjm resume updated(technician)
Rjm resume updated(technician)Rjm resume updated(technician)
Rjm resume updated(technician)Rico Jay Mariano
Β 
Curriculum vitae original
Curriculum vitae originalCurriculum vitae original
Curriculum vitae originalkamlesh shanichare
Β 
Efoghe Oscar - Genset Electrical & Maint CV
Efoghe Oscar - Genset Electrical & Maint CVEfoghe Oscar - Genset Electrical & Maint CV
Efoghe Oscar - Genset Electrical & Maint CVOSCAR EFOGHE
Β 
Danilo B. Lim
Danilo B. LimDanilo B. Lim
Danilo B. LimDanilo Lim
Β 
IKRAM ULLAH KHAN.cv new.docx111
IKRAM ULLAH KHAN.cv new.docx111IKRAM ULLAH KHAN.cv new.docx111
IKRAM ULLAH KHAN.cv new.docx111IKRAM ULLAH KHAN
Β 
EHAB GAMEEL LAMEE
EHAB GAMEEL LAMEEEHAB GAMEEL LAMEE
EHAB GAMEEL LAMEEEhab Lamee
Β 
Kamal resume
Kamal resumeKamal resume
Kamal resumekamal wadhwa
Β 
CV- Sreekumar GN
CV- Sreekumar GNCV- Sreekumar GN
CV- Sreekumar GNSreekumar Nair
Β 
Zhanyun Liu - CV standard
Zhanyun Liu - CV standardZhanyun Liu - CV standard
Zhanyun Liu - CV standardzhanyun Liu
Β 

Similar to Cv resume jimmy c. bernal (20)

Islam Magdy Resume...
Islam Magdy Resume...Islam Magdy Resume...
Islam Magdy Resume...
Β 
Sr Position in Engineering
Sr Position in EngineeringSr Position in Engineering
Sr Position in Engineering
Β 
khaled-engineering
khaled-engineeringkhaled-engineering
khaled-engineering
Β 
Utility TTIPL RESUME 1 -new Address Copy
Utility TTIPL RESUME 1 -new Address  CopyUtility TTIPL RESUME 1 -new Address  Copy
Utility TTIPL RESUME 1 -new Address Copy
Β 
Resume E&I
Resume E&IResume E&I
Resume E&I
Β 
Rjm resume updated(technician)
Rjm resume updated(technician)Rjm resume updated(technician)
Rjm resume updated(technician)
Β 
Curriculum vitae original
Curriculum vitae originalCurriculum vitae original
Curriculum vitae original
Β 
Efoghe Oscar - Genset Electrical & Maint CV
Efoghe Oscar - Genset Electrical & Maint CVEfoghe Oscar - Genset Electrical & Maint CV
Efoghe Oscar - Genset Electrical & Maint CV
Β 
ANKIT CV
ANKIT CVANKIT CV
ANKIT CV
Β 
New Resume Francis Ellivera.. (1)
New Resume Francis Ellivera.. (1)New Resume Francis Ellivera.. (1)
New Resume Francis Ellivera.. (1)
Β 
Danilo B. Lim
Danilo B. LimDanilo B. Lim
Danilo B. Lim
Β 
CV Dewaharbabu
CV DewaharbabuCV Dewaharbabu
CV Dewaharbabu
Β 
Pangan_Jefferson_CV
Pangan_Jefferson_CVPangan_Jefferson_CV
Pangan_Jefferson_CV
Β 
IKRAM ULLAH KHAN.cv new.docx111
IKRAM ULLAH KHAN.cv new.docx111IKRAM ULLAH KHAN.cv new.docx111
IKRAM ULLAH KHAN.cv new.docx111
Β 
EHAB GAMEEL LAMEE
EHAB GAMEEL LAMEEEHAB GAMEEL LAMEE
EHAB GAMEEL LAMEE
Β 
Kumaran Murugesan CV
Kumaran Murugesan CVKumaran Murugesan CV
Kumaran Murugesan CV
Β 
Kamal resume
Kamal resumeKamal resume
Kamal resume
Β 
CV- Sreekumar GN
CV- Sreekumar GNCV- Sreekumar GN
CV- Sreekumar GN
Β 
Zhanyun Liu - CV standard
Zhanyun Liu - CV standardZhanyun Liu - CV standard
Zhanyun Liu - CV standard
Β 
nickbiodata160427
nickbiodata160427nickbiodata160427
nickbiodata160427
Β 

Recently uploaded

CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
Β 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
Β 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
Β 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
Β 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
Β 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
Β 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
Β 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
Β 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
Β 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
Β 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
Β 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
Β 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
Β 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
Β 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
Β 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
Β 
Call Us ≽ 8377877756 β‰Ό Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 β‰Ό Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 β‰Ό Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 β‰Ό Call Girls In Shastri Nagar (Delhi)dollysharma2066
Β 

Recently uploaded (20)

CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
Β 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
Β 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
Β 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Β 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
Β 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
Β 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
Β 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
Β 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
Β 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
Β 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
Β 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
Β 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
Β 
young call girls in Green ParkπŸ” 9953056974 πŸ” escort Service
young call girls in Green ParkπŸ” 9953056974 πŸ” escort Serviceyoung call girls in Green ParkπŸ” 9953056974 πŸ” escort Service
young call girls in Green ParkπŸ” 9953056974 πŸ” escort Service
Β 
β˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
β˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCRβ˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
β˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
Β 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
Β 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
Β 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Β 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
Β 
Call Us ≽ 8377877756 β‰Ό Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 β‰Ό Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 β‰Ό Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 β‰Ό Call Girls In Shastri Nagar (Delhi)
Β 

Cv resume jimmy c. bernal

  • 1. Jimmy C. Bernal Email Add: jimbern_15@yahoo.com.ph & jbernal@megawide.com.ph HOME Philippine PLDT Landline no: +63437848140 Philippine Mobile : +639175048568 & +639953185767 Passport No. : EC1788219 Professional Qualifications & Personal Information ● Present Position : Maintenance Manager ● Previous Position : Maintenance Manager / Asst. Maintenance Manager ● Previous Position : Sr. Plant Electrical / Maintenance Engineer / Asst. Manager ● Degree/Education : Graduated of Bachelor of Science in Electrical Engineering ( year 1984 – 1990 ) 5 years course ● Expertise : 1) Manage a Maintenance Department. 2) Familiar with Maintenance Approaches. 3) Familiar with Maintenance Indicators. 4) Manage a Team of Technicians. 5) Spare Parts Management. 6) 5S Oriented and Familiar with Implementation as member of the committee. 7) Troubleshoot and Investigate electrical equipment failure or efficiently problems. 8) Preparing/Revising Maintenance Procedures. 9) Planning and Implementing Maintenance Management. 10) International Standard Operation for Maintenance Dept. 11) Electrical & Mechanical works troubleshooting. 12) PLC & Electrical Controls. 13) Electrical Design and Construction. 14) Pump and Motor’s & Motor Controls and VFD. 15) Preparation & Implementation of Preventive Maintenance Plan. 16) Electrical & Mechanical Safety Oriented. 17) Operation & Maintenance of Generator’s. 18) Test & Commissioning. 19) Analyzing Data. 20) Maintenance Staff Appraisal and Evaluation.
  • 2. ● Years of Experience : 26 years (Hands-On Solid Experience) 1) Strong Leadership & Decision Making. 2) Maintain, troubleshoot, repair and upgrading of the terminal electrical and mechanical equipment. 3) Design and Electrical construction. 4) Manage a Quality Maintenance Management System involving maintenance procedures , planning , organizing , implementation and routine monitoring. ● Affiliations : Associate Member, Institute of Integrated Electrical Engineers - ERCSA (Saudi Arabia) , membership no: 12ERCSA-ASSO-008 Professional Regulation Commission License no. RME0013252 ( Government Licensing Agency for Professional , Philippines ) Training / Seminars Attended : √ Residential, Commercial, Industrial Electrical Design and Construction (Yr-1989) √ High Rise Building Electrical Design (Yr-1989) √ Modern Transmission, Distribution Designs & Protection Schemes (Yr-1989) √ Philippine Electrical Code (Yr-1991) √ Basic Safety Course (Yr-1998) √ Improving the Operation & Maintenance of Boiler (Yr-1999) √ Compressor Technology (Yr-2002) √ Pneumatic Technology (Yr-2004) √ Fire Prevention & Disaster Seminar (Yr-2004) √ Industrial Laboratory Water Analysis (Yr-2005) √ Industrial Wastewater Treatment (Yr-2007) √ Integrated Management System – Master Class (Yr-2010) √ KPC Integrated Management System (Yr-2011) √ Programming Procedures of Programmable Logic Controllers and Testing & Operating an Automatic / Manual Transfer Switch (Yr-2012) √ Programmable Logic Controller-System Integration/Variable Frequency Drive Testing and Commissioning (Yr-2012) √ Sizing of Capacitor Bank, Short Circuit Calculation, Smart Energy Solution, Lighting System & Retrofitting, Cable Tray, Bus Bar Trunk (Yr-2012) √ Indoor Lighting Design using DIALux, Fire Alarm System, Basic Principles of High Voltage Direct Current (HVDC) Transmission & Electrical Safety for Construction √ Technical Writing (October 2016) √ Reliability – Centered Maintenance (November 2016)
  • 3. β€’ Age : 50 years old ● Date of Birth : June 16, 1967 β€’ Nationality : Filipino β€’ E-Mail Address : jimberm_15@yahoo.com.ph & jbernal@megawide.com.ph β€’ Special Skills : Computer literate, Driving, Auto-Cad β€’ Philippine Mobile : +639953185767 & +639175048568 β€’ Home Tel (Philippines) : +63437848140 ● Passport No. : EC1788219 Professional & Work Experience Maintenance Manager Megawide Precast Factory under Megawide Construction ( April ’16 – Present ) Corporation, MCC (Construction) Brgy. San Juan , Taytay Rizal , Philippines Duties and Responsibilities: √ - Managing the precast factory maintenance department and its machineries / equipment, and different function of the department. √ - Implementing Maintenance System & Strategy for machine /equipment such as: 1) Ebawe Carousel System (Pallete) with 8 units of Side Shifting units,Pallete Stacker,Levelling Machine / Helicopter,Curing Chamber & Plotter Robot, Ebawe Train, Titling Table etc. 2) Shuttering Robot 3) Shuttering Cleaning Machine 4) VGA Lattice Girder Robot 5) Wire Mesh Robot 6) IMER-ORU Batching Plant system 7) IMER-ORU Flying Concrete Bucket 8) Demag Overhead Cranes & Gantry Cranes 9) Elematic Battery Mould 10) Elematic Pulling Wagons 11) Elematic Concrete Bucket 12) Station Hooper for Flying Bucket 13) Etc..
  • 4. Maintenance Manager Gulf & Safa Daries Co. LLC Dubai under National Food Products ( August ’15 – March β€˜16 ) Company (NFPC), Dubai, UAE – PO Box 61130 Certified by HACCP & Dubai Municipality@Food Control Div. Duties and Responsibilities: √ - Responsible to the managing and controlling of many different functions of the Maintenance Department and personnel. √ - Dealing with expansion projects of the factory. √ - Implementation of maintenance system & strategy for the following equipments such as : 1) Air Compressor Units – 4 units @ Atlas Copco 2) Boiler Unit – 3 units 3) Chiller Unit – 8 units (4 York , 2 Carrier & 2 ammonia) 4) Water Treatment Plant – 1 unit 5) Wastewater Treatment Plant – 1 unit 6) Cold Store Unit – 3 units with 10 units compressor 6) Ink Jet Printers – 16 units (Hitachi & Videojet) 7) Delmax Cup Filling Machine – 4 units (sizes: 73mm-2units, 95mm-1unit & 115mm-1 unit) 8) Delmax Bottle Filler – 2 units (PET & HDPE type) 9) Challenger Cup Filler – 3 units (73mm-2 units & 95mm-1 unit) 10)SealPack 73mm Cup Filler – 1 unit 11)Gable Top Filler NL8 – 3 units 12)Clearpack Shrink Wrap Machine – 6 units 13)Polypack Shrink Wrap Machine – 1 unit 14)Self Adhesive Labelling Machine – 1 unit 15)Bottle Unscrambler – 1 unit 16)CIP System Unit – 2 units (auto & manual) 17)HTST Pasteurizer 15000 LPH – 1 unit 18)HTST Pasteurizer 6000 LPH – 1 unit 19)HTST Water Pasteurizer – 1 unit 20)Plate Heat Exchanger – 4 units 21)Planetary Dough Mixer – 1 unit 22)Homogeniser Unit – 3 units (500, 6000 & 15000 LPH) 23)Tanks/Agitator – 31 units 24)TETRA TBA/8 1000ml S with accessories line – 1 unit 25)TETRA TBA/19 200ml S with accessories line – 2 units 26)TETRA A3 Flex 1000ml S with accessories line – 1 unit
  • 5. Acting Maintenance Manager National Ready-Mix Concrete Company (Construction) (May ’15 – August ’15) Lootah Group - PO Box 10631 Dubai, United Arab Emirates Sr. Maintenance Engineer Certified ISO 9001 (Oct β€˜ 14 – May β€˜15) Duties and Responsibilities: √- Acting Maintenance Manager due to resignation of the Manager and act to the full capacity of over-all function of the Maintenance Department. √ - Assisting the Maintenance Manager in his full capacity as Maintenance Manager of 15 Batching Plants for Ready-Mix Concrete Factories in United Arab Emirates. √ - Initiates and develops maintenance strategies for all plants and equipment, and ensure effective implementation of these strategies. √ - Prepares and issues maintenance plan, policies and strategies. √ - Responsible for the managing, overseeing, supervising, and inspection / monitoring of maintenance personnel in their task of work with regards to the electromechanical construction / modification, engineering works, planned preventive maintenance, routine monitoring, & troubleshooting of machine & equipment within of all its branches in United Arab Emirates. √ - Perform related function such as prepare requisition, evaluation of quotation, engineering analysis, deal / troubleshoot problems of equipment / machine as the need arises, recommendation for improvement and training / evaluation of maintenance personnel. Engineering and Maintenance Head Essential Fruits Incorporated (July ’14 – October β€˜14) ( Fruits and Beverages Processing Plant ) KM. 82 Brgy. Malatgao, Narra , Palawan, Philippines Duties and Responsibilities: √ - To perform full capacity as Head of Engineering and Maintenance Dept. √ - Overseeing and monitoring the work of maintenance personnel with regards to Engineering and Planned Preventive Maintenance. √ - Prepare, Manage and Assign Quality Maintenance Management System involving maintenance procedure, reports, checklist, word orders, breakdown analysis, suggest modifications and revision for improvement, equipment history records and keeping all the maintenance records. √ - Perform requisition and purchasing works of needed spare parts and consumable spare with proper evaluation of the recommended spare parts by the supplier.
  • 6. √ - Providing training with the maintenance staff and do appraisal of their performance. √ - To deal / troubleshoot , and diagnose emergency breakdown as they occur with regards to PLC hardware / controls, mechanical / electrical problem of the machine & equipment wherein my subordinates cannot solve the problem as needed. Asst. Maintenance Manager Al Kifah Precast Concrete Company ( Construction ) ( August ’12 – Feb. ’14 ) PO Box 30789, Akrabiya Al Khobar 31952, Saudi Arabia Sr. Plant Electrical/Maintenance Abqaiq Road, New 2nd Industrial City, Dammam Engineer ( August ’08 – Aug β€˜12 ) Certified ISO 9001-2008, ISO 14001-2004, OHSAS 18001-2007 Duties and Responsibilities: √ - Assisting the Maintenance Manager with his over-all function in the Maintenance Department. √- Involves in electrical design & construction of the plant (5 Megawatts) as β€œHands- On” Electrical Engineer. √ - Reports directly to the superior any matters regarding or concerning maintenance revision & problem matters. √ - Responsible for planning and overseeing the maintenance team activities to ensure safe and efficient operations of the facility and keeping maintenance records. √ - Work as resident plant electrical engineer with minimum supervision on a variety of complex engineering functions. √ - Lead and recommend new continuous improvement solutions for installations or modifications to improve existing facilities and standardization within specific fields of endeavor. √ - Perform engineering analysis and develop recommendations and alternatives in the solution of complex problems related to the plants electrical and control system. √ - Work on the electrical engineering aspects and produce full design packages for the required plant modifications. √ - Prepare and plan routine maintenance schedules and reports. √ -Assign preventive and corrective maintenance jobs as per the direction of Maintenance Manager. √ - Supervises and coordinates activities of maintenance staff. √ - Make periodic inspection of equipment and system to observe operating condition in actual or thru monitoring checklist of equipment and need for repair & adjustment. √ - Keep maintenance records, prepares reports and composes correspondence related to work. √ - Executes work order through Maintenance Management System and coordinates with maintenance supervisor / foremen for job completion and technical matters. √ - Maintain such communications and relations as are necessary to report on the status of matters requiring action and to ensure that corrective action is undertaken.
  • 7. √ - Helps Maintenance Manager in executing corrective and planned maintenance with due regard to schedule maintenance plan. √ - To perform technical evaluation of quotation received from purchased department and recommend appropriate choice. √ - Plans and controls expenditures in accordance with the operating budget of the department. √ - To prepare purchase requisitions for spare parts and consumables ensuring budgetary constraints and arrange strategic spares availability to cope up with the maintenance requirements. √ - Review and recommend new maintenance procedures and work instructions. √ - Supervise, direct and co-ordinate the activities of all personnel to his area. √ - Ensure environment aspect – impact and hazard risk assessment are carried out, controlled & updated. √ - Implement, monitor and report IMS (Integrated Management System) objectives, targets and programs. √ - Provide necessary resources for effective implementation and sustenance of IMS (Integrated Management System) and report performance to the management periodically. √ - Ensure identification of root cause for the identified non- conformances/deviations in IMS (Integrated Management System) and to implement corrective actions/preventive actions. √ - Identify the competency gap for their subordinate personnel and carry out annual performance evaluation of reporting employees. √ - Provide training to new employees and evaluate their performance. √- To deal & diagnose emergency breakdown as they occur for equipments & machines such as : 1 ) Elematic precast concrete machineries 5 units - Steel Wire Pulling Device ( EN 875 ,) 3 units - Saw Machine ( EL 1300 ) 2 units - Extruder Machine ( EL 900E ) 1 unit - Stressing Device 2 units - Cleaning Machine ( EL 400 ) 7 units - Shuttle Concrete Machine ( EB 405 ) 2 units - Lifting Beam ( 2 X 5T ) ( EN 886/16 ) 1 unit - Maturity Control System (EL 490 ) 5 units - Portable Concrete Shute 5.4T, 380 volt 5 units - Intermediate Hopper EB 120 2 units – Concrete Shuttle Bucket Gantry 2 units - Bed Master Machine 2 ) Ebawe precast concrete machineries 1 unit - Central Shifting Machine 2 units - Concrete Distributor Machine 2 units - Tilting Table 2 units – Side Shifting units 2 units – Compacting devices
  • 8. 3 ) Boiler – Make: Viesman, 80 HP – 1 unit 4 ) Stressing Jack ( CCL ) – for pre-stress beam – 1 unit 5 ) Kone Overhead Crane – 20 units 6 ) 1020 KVA Cummins Generator – 4 units 7 ) 456 KVA Caterpillar Generator – 1 unit 8 ) Synchronizing Panel & Main Distribution Panels 9 ) Batching Plant 1 – one mixer ( 37 KW ) 10) Batching Plant 2 - two mixer ( 2 x 37 KW ) 11) Aggregates Washing Plant no. 1 12) Ice Batcher no. 1 & 2 13) Desalination Plant a) Sedimentation Tank – 2 tank b) Domestic Tank – 2 tank c) Sweet Water Tank – 1 tank d) R.O. Treatment – 200 cu. mtr. capacity e) Domestic Pump (2) with one jockey pump f) Fire Fighting Pump (2) g) Sweet Water Pump (2) with one jockey pump 14) Chiller Plant with 2 units compressor & one chilled Sweet water tank with 2 units pump. 15) Air Compressor Unit a) 4 units Sullar air compressor , 10 bar b) 1 unit Ingressor Rand , 10 bar c) 1 unit Atlas air compressor , 8 bar d) 3 units Champion Piston Type (big) e) 5 units Champion Piston Type (small) 16) Air Conditioning Units a) Split Type – 60 units b) Window Type – 140 units 17) Heavy Duty Miller Welding Machine , 380 ac volt, 63 amp. Max - 36 units & 2 units Heavy Duty MIG 18) Mobile Crane 3 units – Groove 70T (one) & Groove 80T (two) 3 units - Tadano 70T (two) & Tadano 80T (one) 1 unit – Liebherr 130T 19) Haulotte Manlifter , 360 degrees turn (articulation) 20) Genie Manlifter, boom type 21) Wheeloader , 1 unit – Brand: Kawasaki 22) Truck Mixer – 1 unit 23) Forklift (Toyota) – 1 unit 24) Bar Cutting Machine (3 units) & Bar Bending Machine (4 units ) 25) Vibrator / Inverter Machine , 3 phase, 380 V. -3 units 26) Sheering Machine , 380 volts , 3 phase – 1 unit 27) Bending Machine , 380 volts , 3 phase – 1 unit
  • 9. 28) Lathe Machine , 380 volts , 3 phase – 1 unit √ - In- charge for Workshop operation and Vehicle maintenance & repair. √ - To carry out any other duty assigned to by the management from time to time and perform related duties as required such as : 1) Assisting the Design Department for the electrical matter of the project and act as the Consultant for the electrical plan. 2) Assisting the QA / QC Department for the electrical matter of the project and act as Consultant for the electrical plan. 3) Planning and Scheduling of Building maintenance and repair for office, accommodation and auxiliary building. Utility Control Captain / Yakult Philippines Incorporated ( Food & Beverages Manufacturing ) Facilities Engineer Bo. Makiling , Calamba , Laguna , Philippines ( Aug. ’98 – July β€˜ 08 ) Certified ISO 9001, 14001,OHSAS 18001 & HACCP Duties and Responsibilities: √ - To restore and retain plant equipment, to ensure the safely, availability and reliability of the plant and equipment through well-design system categorized as routine, preventive and predictive maintenance along their life cycle. √ - Supervision & Preparation of activities for Engineering Staffs √ - Supervision of Building Maintenance and repair by Staffs √ - Supervision of Operation and Maintenance & Troubleshooting of Facility Machineries such as : ● Substation & Switchgear room 1) Transformer 2000 KVA 2) 2000 KVA Caterpillar Generator 3) 500 KVA Caterpillar Generator 4) Capacitor Cells ( for unity power factor ) 5) Main Distribution Panelboards ● Intake & Exhaust Systems ● Airconditioning Units 1) 4 units Centralized Type 2) 15 units Split Type 3) 10 units Window Type ● Air compressor systems
  • 10. 1) 2 units Atlas , 11 kw 2) 1 units Atlas , 22 kw 3) 2 units Atlas , 44 kw 4) 4 units Atlas Air Dryer ● Water Treatment Facilities 1) 2 tank- Sedimentation Tank 2) 2 units- Deepwell pump 3) 2 units- Sand Filter 4) 2 tank- Cistern Tank 5) 2 units- Chlorine Dosing pump 6) 1 unit- Chlorine Analyzer 7) 1 tank- Accumulator Tank 8) 1 tank- Hydro-pneumatic Tank 9) 2 units- Softener Tank 10) 2 units- Carbon Filter Tank 11) 1 lot – Chilled Bank (treated water) with Cooling system (glycol) 12) 3 units- Sand filter Pump 13) 1 unit – Accumulator Pump 14) 3 units Hydro-pneumatic Pump 15) 1 unit – Booster Pump ● Boiler’s 2 units – Enertec Horizontal tube w/ wet back 150 hp & 80 hp ● Chilled water Systems – glycol cooling in chill with 2 units – condensing unit ● Cooling tower system 2 units - Big & Small Cooling tower Centralized Cold Store Unit – 4 unit compressors● ● Motor & Pumps systems ● Waste Water Treatment Facilities 1) Biological Activated Sludge System- aerobic 2) 500 cu. meter treatment capacity 3) Laboratory for BOD , COD , Tss/MLss , Oil & Grease , P/N testing 4) Control Room 5) Submersible Pumps & Motors for : a) Lifting b) Transfer c) Cleaning (portable) 6) Aeration Tank 7) Clarification Tank w/ motor scraper
  • 11. 8) Chlorine Contact Chamber w/ chlorine dosing Pump 9) Sludge Thickener Tank with feed pump 10) Sludge Holding Tank with transfer pump 11) 3 units – 50 HP Root type Air Blower 12) 1 unit – Sludge Belt-Press Machine with Chemical pump & tanks ● Lighting Systems √ - Supervision of Preventive Maintenance of All Electrical Machines & Equipments. √ - Supervision of mechanical & electrical controls troubleshooting for Machineries & Equipments. √ - Assigned as SAFETY OFFICER of the factory and member of the HEALTH & SAFETY COMMITTEE OF THE COMPANY & performed the duties as follows : a.) Anticipate , identify & evaluate hazardous conditions & practices. b.) Develop hazard control designs , methods , procedures & programs. c.) Implement , administer & advise others on hazard control programs. d.) Measure , audit and evaluate the effectiveness of hazard control programs. e.) Draft a future safety plan & statement based on real time experiences and facts. f.) Implement industrial hygiene & toxicology , fire protection system , system & process safety , education & training methods and measurement of safety performance. √ - Supervised the Expansion Project of the factory regarding additional electrical design & construction. Maintenance Supervisor Foodlinks Incorporated ( Fast food Chain Restaurant’s ) (March ’98 – Aug. β€˜98) Tektite Tower, Ortigas Center, Pasig , Philippines Duties and Responsibilities: √ - Supervision for the operation , maintenance & troubleshooting of fast food equipment & machineries such as : a) Soft-drink Dispenser Machine b) Ice Maker Machine c) Refrigeration Cabinet (chest type & upright)
  • 12. d) Food Warmer e) Dishwashing Machine f) Air-conditioning units g) Intake & exhaust system w/ motor’s h) Coffee Maker Machine i) Chilled Cabinets j) Microwave Oven k) Water pumps & motors l) Lighting System & fixtures m) Generators n) Ice Cream Maker Machine o) Chicken & French Fries Fryer p) Burner ( gas & electric ) √ - Supervision for the electrical & mechanical troubleshooting. √ - Supervision for the implementation of preventive maintenance of all electrical equipment & machineries. √ - Supervision for building maintenance and repair by subordinates. Officer in Charge (Gen. Maintenance Dept.) Emerald Pizza Incorporated ( Pizza Hut Restaurant’s ) (Feb. ’91 - March ’98) Annapolis Greenhills , San Juan City , Philippines Duties and Responsibilities: √ - Supervise & Monitor the maintenance staff & technicians for their specific task & duties to be properly done. √ - Supervision for the staff’s work during building maintenance and repair. √ - Supervise the troubleshooting of all electrical equipments & machineries. √- Supervision of the operation, maintenance & troubleshooting for all electrical equipments & machineries such as : a) Pizza Oven ( conveyor & gas type ) b) Dough Mixer c) Dough Roller d) Dishwashing Machine e) Chiller unit f) Refrigeration Cabinet g) Microwave Machine h) Freezer cabinet ( chest & upright freezer ) i) Air-conditioning unit ( centralized , split type & window type )
  • 13. j) Intake & exhaust motors k) Ice Maker Machine l) Chicken & French fries Fryer m) Soft-drink Dispenser n) Drainage System o) Coffee Maker Machine p) Water Pumps & Motors q) Generators √ - Preparation & Implementation of the Preventive maintenance Schedule of all electrical equipments & machineries. √ - Ensure the implementation of Health & Safety Policies of the company. √ - Prepare the electrical design and installation for the construction of additional Pizza Hut Restaurant’s. Industrial Electrician Cosmos Bottling Corporation ( Food & Beverages Manufacturing ) (July ’90 – Jan β€˜ 91) Mc Arthur Highway , Bulacan , Philippines Duties and Responsibilities: √ - Assigned as Shift Industrial Electrician √ - Performed building maintenance and repair such as plumbing ,carpentry , painting , electrical , drainage system , ac units , welding & acytheline works etc. √ - Troubleshooting of electrical wiring & controls , Pump & Motor & Motor controls. √ - Installation of electrical wires, lighting fixtures & electrical controls. √ - Operation & Maintenance and troubleshooting of generators. Electrician/Technician 680 Home Appliances Incorporation (Jan ’87 – May ’88) (Home Appliances Commercial Establishment) Edsa, Quezon City, Philippines Duties and Responsibilities: √ - Assigned as Electrician / Technician √ -Assigned for the building maintenance and repair works such as electrical, mechanical, painting, carpentry, ac units, plumbing, drainage system , welding works , etc. √ - Operation, Maintenance & Troubleshooting of generator. √ - Troubleshooting of electrical panel, wires & appliances. √ - Installation of electrical wires & control’s & lighting fixtures.
  • 14. REFERENCE: 1) Mark Santana IMS-MR / LEAD AUDITOR AL KIFAH PRECAST COMPANY Abqaiq Road, New 2nd Industrial city, Ad Dammam, Saudi Arabia Tel. : +96638029144-9166 ext. 092 Mobile No: +966566249482 2) Rolando β€œrolly” Pena UTILITY DEPARTMENT SUPERVISOR YAKULT PHILIPPINES INCORPORATED Bo. Makiling, Calamba City, Laguna, Philippines Mobile No: +639198252580 or +639173070448 3) Roberto Almorfe AGRI / ADMINISTRATION MANAGER ESSENTIAL FRUITS INCORPORATED (EFI) Km. 80 , Brgy. Malatgao, Narra Palawan Mobile no. +639175770320 4) Engr. Joenel M. Raposon Jr. TECHNICAL MANAGER National Ready-Mix Company Lootah Group Mobile no. +971552121332