1. Anam Bastari AR
Komplek PUSRI SAKO, Blok J II No.8 Palembang, South Sumatra, Indonesia
Cell +628194812133 E-mail : anambastariarst@yahoo.co.id
OBJECTIVE
With 8 years experiences in Utilities Operations at Petrochemical Industry, seeking a
challenging position as …….……….., which will allow to utilize prior experience, expertise and
personal abilities to achieve the objectives.
RESUME SUMMARY
Current Position : Senior Operator in PUSRI
Current Specialization : Utilities Operations
Highest Education : Bachelor’s Degree in Engineering (Civil)
WORKING EXPERIENCE
PUSRI ( PUPUK SRIWIDJAJA, Indonesia ) 2007 – Present
Position Title : Senior Operator
Level : Operator
Industry : Petrochemical / Fertilizer
Main Responsibility :
Operating and monitoring Utilities equipment, consist of :
• Gas Turbine Generators, cap 4 x 15 MW / 13.8 KV
• Diesel Generators, cap 4 x 1.2 MW / 2.4 KV
• Waste Heat Recovery Boilers with supplementary firing system , cap 4 x 90 T/H,
press 43 kg/cm2, temp 408 °C
• Gas Fired Boilers, cap 4 x 100 T/H, press 43 kg/cm2, temp 408 °C
• Electrical Distribution systems using Voltage 13.8 KV in Generator and for main
Busbar, 13.8 KV / 2.4 KV for distribution, 2.4 KV / 440 V for Motors, 440V / 220V for
lighting, MOV etc, 125 VDC for DCS/PLC Power Supply.
• Demineralizing Units :
Carbon Filters, Cation/Anion Exchanger, Mixbed Polisher and Neutralizer Tank.
• Pumps House : Water Intake Pumps and Fire Water Pumps.
• Water Treatment Plant : Filtered Water and Potable Water.
• Boiler Feed Water Systems :
Deaeration, Deaerating Heater and Chemical injection systems.
• High Pressure Boiler Feed Water Pumps :
Motor Pumps and Steam Turbine Pumps
• Cooling Water System :
Cooling Towers with Cooling Water Treatment, Induce Draft Fans, Motor Pumps and
Steam Turbine Pumps.
• Instrument Air / Plant Air :
Motor Air Compressors, Diesel Air Compressors, Air Dryers, Air Knocked Out Drums.
Job Descriptions :
2. • Monitoring and Operating Utilities equipment.
• Carries out daily inspection of plant and equipment to ensure all production assets
are available and operated in a normal operations, in line with agreed plant operating
philosophies and in line with current Production Procedures.
• Good work in the team of 6 Field Operators, 2 Control Room Operators, 1 Field
Leader Operator, 1 Operations Foreman and 1 Senior Operations Foreman to meet
the day to day requirements of the jobs.
• The activities during routine operation, Plant start up, shutdown and emergency
situation to ensure targets are achieved. Identifies source of problem and initiates
corrective actions during periods of unstable operation.
• Participates commissioning and Start Up of new equipment and facilities.
• Report to Senior Operation Foreman on daily activities and work progress.
• Take work procedures and Permit to work instructions from leader during
maintenance and other activities within area of responsibility including detailed
complex preparation of equipment to carry out specialized activities.
• Take effective action in accordance with established Health, Safety and Environment
Regulations to control emergencies and contain hazards with in area of responsibility
in close cooperation with Senior Operation Foreman.
• Interface with maintenance staff to cooperation breakdown/routine maintenance
work in facilities and plants to ensure minimum deferment of production. Participates
in Overhaul and Plant Turn Around Maintenance activities.
Career Summary :
• Field Operator June 2007 – November 2010
• Control Room Operator December 2010 – Present
Job Accomplishment :
• Shutting-Down & Starting-Up Team for Plant Turn-Around Maintenance on December
2009
• Shutting-Down & Starting-Up Team for Plant Turn-Around Maintenance on December
2011
• Shutting-Down & Starting-Up Team for Plant Turn-Around Maintenance on December
2013
Company Profile :
PUSRI is one of the largest Fertilizer Company in the South East Asia with 2730
employees in 2011, located in Palembang South Sumatra, Indonesia. PT. PUSRI started
production from its first plant (PUSRI I) in 1959, presently PUSRI complex comprises four
completely integrated plants: PUSRI II (1974) PUSRI III (1976) PUSRI IV (1977) and PUSRI
IB (1994) includes all processing units, power plant, utilities, offsite, jett y and infrastructure
to produce Ammonia and Urea, treating more than 250 MMSCF Natural Gas per day with
total production of 1.330.000 tons of Ammonia and 2.350.000 tons of Urea annum.
EDUCATIONAL BACKGROUND
Bachelor’s Degree of Engineering Graduation Date : 2006
Major : Civil Engineering
3. Institute/University : Sriwijaya University Palembang, Indonesia
GPA : 3.28/4
Senior High School Graduation Date : 2002
Major :IPA (Sains)
Institute :SMU Negeri 1 Lubuk Linggau, Indonesia
PERSONAL PARTICULARS & PREFERENCES
• Date of Birth : December 11, 1984
• Nationality : Indonesia
• Permanent Residence: Indonesia
• Gender : Male
• Religion : Moslem
• Marital Status : Married
• Number of Children : Two
• Availability : Immediately after notice period of 1 month
ADDITIONAL INFO
Summary of Skill :
• Skilled in operates assigned equipment or areas of Utilities Plant and have a full
understanding of the full life cycle of a Utility Systems in Fertilizer industry.
• Have full knowledge of Boilers, Demin Plant, Generators, Transformers, Motors,
Turbines, Compressors, Pumps, Piping, Valves, Process Instruments, Electrical
Equipments and PLC / DCS Operations.
• Understand process flow diagram and piping & instrumentation diagram (P&ID)
• Having good analytical skill and strong motivation.
• Able to work under pressure.
• Creative problem solving and troubleshooting skills.
• Internet and Computer Literate (MS Word, Excel, Power Point & MS Out Look).
• Eager to learn and ability to work on own initiative and within a team.
Certification :
2007 Fire Fighting Training Program
PUSRI Training Center | www.pusri.co.id
2013 License first class of Boiler Operator
Ministry of Manpower and Transmigrassion| www.depnakertrans.go.id
2013 The Occupational Safety and Health Engineering
Ministry of Manpower and Transmigrassion| www.depnakertrans.go.id
2013 Certification of field Operator
Indonesian Fertilizer Producer Association | www.appi.or.id
2013 Achievement Motivation Training
4. PUSRI Training Center | www.pusri.co.id
2015 Good Corporate Governance Training
PUSRI Training Center | www.pusri.co.id
2015 Improving the competence of the operator by Gajah Mada University
Trainer
PUSRI Training Center | www.pusri.co.id
2015 UtilitiesProjectfor PUSRI2B plant
RekayasaIndustri TrainingCenter| www.rekind.co.id