SlideShare a Scribd company logo
1 of 3
JEFFERSON PANGAN
Address: #24 Purok 4 Brgy. Triala Guimba Nueva Ecija Philippines
Contact Details:
Mobile #: +639173026091/+639276194791
E-mail: panganjefferson@yahoo.com
PROFESSIONAL OBJECTIVE:
 To establish a successful and rewarding career by achieving and maintaining a good position in a progressive
organization through my experience and skills.
PERSONAL INFORMATION:
 Birth Date : March 27,1983
 Passport Number : : SS0281115
 Nationality : Filipino
SKILLS:
 Expert on Vacuum Technology and thin Film Deposition (PECVD).
 Capable of reading schematic and electrical diagrams for basis and troubleshooting.
 Expert in operating HMI (Human Machine Interface) and Manufacturing Execution System (MES).
 Excellent communication skills, speaking, writing, and reading in English as well as presentation skills.
 Active Statistical Process Control member.
 Knowledgeable in uses and functions of instrumentation tools such as vacuum gauges, thermocouples, etc.
 Expert on B&R Software Automation Studio.
 Knowledge in maintenance and operation of
-Chillers
-Pumps
-CDA Compressors
-Air Dryers
-Cooling Towers
-Scrubber Units
-General Exhausts
-Chemical Dispense Systems
ACHIEVEMENTS:
 Projects Implemented to improve machine availability and yield performance:
• Sourced out alternative dry pump that reduced more than 50% of cost and repair.(ADP 122 H)
• Modification of loader and unloader parts that reduced the yield loss to 30%.
• Improvement on carrier top plate that reduced breakdown occurrence by 40%.
• Installation of sensor in loader module to detect not fully inserted wafers into the cassette.
• Sourced out new carbon plates design to eliminate wafer misalignment.
• Installation of of quick connect fittings for booster pumps for quick troubleshooting and electrical
safety. Also to prevent turning off the PCW supply that may also affect the Pumpstand Unit.
EMPLOYMENT HISTORY:
Equipment/Machine Handled:
 PECVD Sin ARC Process (OTB)for Solar Cell Manufacturer
 Jusung PECVD Process for Solar Cell Manufacturer
 Leak Checker (Alcatel and Pfeiffer) for Solar Cell Manufacturer
 Diffusion Process (MRL Industries) for Solar Cell Manufacturer
 APCVD Process (Sierratherm)) for Solar Cell Manufacturer
 PECVD bARC Process (Roth and Rau) for Solar Cell Manufacturer
 Kurdex Process for Solar Cell Manufacturer
 Trane Water and Air Cooled Chillers
 Trane Chillers Systems
 HuntAir Air Handling Units
 Trane Air Handling Units
 Allen Bradley,ABB and Danfoss VFDs
 Kruger General Exhaust Motors
 Scrubber Units
 SunPower Philippines Manufacturing Limited (April 2014-Present)
Position: Facilities Sustaining Engineer
Overall Responsibilities:
• Attends Daily Facilities Operations Meeting.
• Attends Daily Huddle meeting with MFG and EE Team.
• Walk-thru on all facilities area to ensure that is free from safety hazard on people and equipment.
• Implements Created PM Schedule for all facilities utilities (Mechanical,Electrical,WWTP,RODI and CDS).
• Implements developed strategic and tactics programs to meet the vision and mission of the company and
to accomplish set goals.
• Assists in carrying out reliability and hardening programs and engineering solutions on assigned Process
Equipment concerns
 SunPower Philippines Manufacturing Limited (December 2012 – April 2014)
Position: Facilities Sustaining– Mechanical Process
Overall Responsibilities:
• Attends Daily Facilities Operations.
• Assists in managing in-house Facilities operations contractor.
• Walk-thru on the area of responsibilities to ensure area is free from safety hazard on people and
equipment.
• Monitors Preventive maintenance Program (Water Cooled Chillers, Air Cooled Chillers, CHWP’s, Air
Compressors, Air Dryers, Vacuum Pumps, Make-up Air Units, Air-Handling Units & General Exhaust).
• Implements Created PM Schedule – HVAC system, Compressed Air system & Vacuum system.
• Provides data and information in generating reports on evaluation on Pm performance, Compliance Vs
Backlog (HVAC system, Compressed Air system & Vacuum system).
• Implements developed strategic and tactics programs to meet the vision and mission of the company and
to accomplish set goals.
• Assists in carrying out reliability and hardening programs and engineering solutions on assigned Process
Equipment concerns
 SunPower Philippines Manufacturing Limited (May 2012 – December 2012)
Position: Facilities Sustaining– Instrumentation and Control
Overall Responsibilities:
• Attends to daily facilities operations
• Monitors and keeps track off Shift Reports and daily monitoring logs
• Walk-thru on the Area Of Responsibilities to ensure area is free from safety hazard on people and
equipment
• Monitors Preventive Maintenance Programs (FMS Components (PLCS and Instruments), Vertex,
Midas, and Sieger)
• Ensures execution of Create PM Schedule (FMS Components (PLCS and Instruments), Vertex, Midas,
and Sieger)
• Monitors and updates Equipment History Sheets
• Develops strategic and tactics programs to meet the vision and mission of the company and to
accomplish set goals (Key Performance Indicators)
• Develops reliability and hardening programs or Projects for Facilities Monitoring System (FMS)and
LSS
• Develops engineering solutions on assigned process equipment-issues and problems to avoid
repeat/occurrences
• Reviews of spare parts Program and ensure availability
• Responds on any incident that may occur during my shift
 SunPower Philippines Manufacturing Limited (April 2010 – April2011)
Position: Senior Equipment Technician– OTB SiN-ARC/APCVD/KURDEX
 SunPower Philippines Manufacturing Limited (June 2009 – April 2010)
Position: Equipment Technician– OTB SiN-ARC
Overall Responsibilities:
• Plans and monitors implementation of maintenance programs and activities, maintenance and
consumable change.
• Attends regular operations review.
• Schedules daily preventive maintenance.
• Prepares downtime report analysis and future plans.
• Conducts spare management and monitoring.
• Assist Equipment Engineers in designing future projects.
• Acts as Officer-in-Charge if the Engineer is not around.
• Prepares purchase request and follow-ups.
• Coordinates with vendors regarding spare parts and sourcing out other vendor for spare parts for cost
reduction.
• Respond immediately to equipment breakdown.
• Assist Junior Technician in the performance of unscheduled maintenance, which includes
troubleshooting, replacement of faulty parts, realignment and check-out to the component level.
• Recognizes and reports sub-standard equipment performance and pursues corrective actions.
• Attends and participate in yield review, 8D, and OCAP.
• Prepares documentation of outgoing items/equipment for repair.
• Active participation on Statistical Process Control.
 SunPower Philippines Manufacturing Limited (June 26, 2006 – June 2009)
Position: Lead Technician– OTB SiN-ARC/Diffusion Process(MRL Industries)
Overall Responsibilities:
• Proper endorsement every shift transition.
• Verify actual counts against overall WIP counts and its progress.
• Perform qualification run and production run of quality wafers.
• Perform 5s and proper housekeeping.
• Support PE/EE/Trainors in other activities related to process improvement.
• Escalate issues and concerns or any other tool abnormalities to immediate superior.
• Process monitoring.
• Chart Update.
• Performed GUI.
• Participate in Statistical Process Control activities.
EDUCATIONAL BACKGROUND
Tertiary Level
Nueva Ecija University of Science and Technology (2000 – 2005)
Cabanatuan City Nueva Ecija, Philippines
Bachelor of Science, Major in Mechanical Engineering
Secondary Level
Nueva Ecija National High School (1996 – 2000)
Cabanatuan City Nueva Ecija, Philippines
REFERENCES: Furnished upon request.
I hereby certify that the above-mentioned information is true and correct to the best of my knowledge and ability.
Should there be any proven falsifications is a ground for revocation of my application. For further clarifications or
inquiries, please don’t hesitate to get in touch with me on the provided contact details mentioned on this CV.

More Related Content

What's hot (18)

Pankaj-prajapati
Pankaj-prajapatiPankaj-prajapati
Pankaj-prajapati
 
AMIT KR BASU
AMIT KR BASUAMIT KR BASU
AMIT KR BASU
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
Resume - Satnam Singh
Resume - Satnam SinghResume - Satnam Singh
Resume - Satnam Singh
 
Md.Azharuddin CV
Md.Azharuddin CVMd.Azharuddin CV
Md.Azharuddin CV
 
Resume
ResumeResume
Resume
 
ResumeSujit
ResumeSujitResumeSujit
ResumeSujit
 
Royster menezes - Mechanical Engineer
Royster menezes - Mechanical EngineerRoyster menezes - Mechanical Engineer
Royster menezes - Mechanical Engineer
 
David Lawrence11
David Lawrence11David Lawrence11
David Lawrence11
 
Naveesh Kapoor - resume
Naveesh Kapoor - resumeNaveesh Kapoor - resume
Naveesh Kapoor - resume
 
CV
CVCV
CV
 
AVINASH . Basrur
AVINASH . BasrurAVINASH . Basrur
AVINASH . Basrur
 
Suresh Resume
Suresh ResumeSuresh Resume
Suresh Resume
 
Electronic Controls Engineer
Electronic Controls EngineerElectronic Controls Engineer
Electronic Controls Engineer
 
CV_E. R Caoile_rev
CV_E. R Caoile_revCV_E. R Caoile_rev
CV_E. R Caoile_rev
 
ALESSIA NEWTON HARRELL RESUME_2015
ALESSIA NEWTON HARRELL RESUME_2015ALESSIA NEWTON HARRELL RESUME_2015
ALESSIA NEWTON HARRELL RESUME_2015
 
troy resume final
troy resume finaltroy resume final
troy resume final
 
Lidia-Resume-v2
Lidia-Resume-v2Lidia-Resume-v2
Lidia-Resume-v2
 

Similar to Pangan_Jefferson_CV

Resume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceResume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceDHRUVA MISHRA
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceDHRUVA MISHRA
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_15Asdfghjkl
 
Joseph Phillips - Resume 2016
Joseph Phillips - Resume 2016Joseph Phillips - Resume 2016
Joseph Phillips - Resume 2016Joe Phillips
 
SHERIF EISSA - Resume-
SHERIF EISSA - Resume-SHERIF EISSA - Resume-
SHERIF EISSA - Resume-Sherif Eissa
 
resume-ts-current- edit 02-08
resume-ts-current- edit 02-08resume-ts-current- edit 02-08
resume-ts-current- edit 02-08Thomas Savard
 
Resume
ResumeResume
ResumeK Raji
 
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)Albert Aivan Laguador
 
SUMMARY OF SKILLSAn experienced professional with a divers.docx
SUMMARY OF SKILLSAn experienced professional with a divers.docxSUMMARY OF SKILLSAn experienced professional with a divers.docx
SUMMARY OF SKILLSAn experienced professional with a divers.docxpicklesvalery
 

Similar to Pangan_Jefferson_CV (20)

CV
CVCV
CV
 
jhon_dechavez resume
jhon_dechavez resumejhon_dechavez resume
jhon_dechavez resume
 
resume2016.doc1
resume2016.doc1resume2016.doc1
resume2016.doc1
 
Resume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceResume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experience
 
RESUME
RESUMERESUME
RESUME
 
robert calleja (2)
robert calleja (2)robert calleja (2)
robert calleja (2)
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experience
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
 
Joseph Phillips - Resume 2016
Joseph Phillips - Resume 2016Joseph Phillips - Resume 2016
Joseph Phillips - Resume 2016
 
SHERIF EISSA - Resume-
SHERIF EISSA - Resume-SHERIF EISSA - Resume-
SHERIF EISSA - Resume-
 
msanjuan_RESUME
msanjuan_RESUMEmsanjuan_RESUME
msanjuan_RESUME
 
randycordero
randycorderorandycordero
randycordero
 
resume-ts-current- edit 02-08
resume-ts-current- edit 02-08resume-ts-current- edit 02-08
resume-ts-current- edit 02-08
 
SAGUINSIN, KRISTOFFER CARLO B. (RESUME)
SAGUINSIN, KRISTOFFER CARLO B. (RESUME)SAGUINSIN, KRISTOFFER CARLO B. (RESUME)
SAGUINSIN, KRISTOFFER CARLO B. (RESUME)
 
Resume
ResumeResume
Resume
 
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
 
SUMMARY OF SKILLSAn experienced professional with a divers.docx
SUMMARY OF SKILLSAn experienced professional with a divers.docxSUMMARY OF SKILLSAn experienced professional with a divers.docx
SUMMARY OF SKILLSAn experienced professional with a divers.docx
 
Res 10-30-15
Res 10-30-15Res 10-30-15
Res 10-30-15
 
Martin Andrew Tombucon_resume_updated
Martin Andrew Tombucon_resume_updatedMartin Andrew Tombucon_resume_updated
Martin Andrew Tombucon_resume_updated
 
Zackhayer3
Zackhayer3Zackhayer3
Zackhayer3
 

Pangan_Jefferson_CV

  • 1. JEFFERSON PANGAN Address: #24 Purok 4 Brgy. Triala Guimba Nueva Ecija Philippines Contact Details: Mobile #: +639173026091/+639276194791 E-mail: panganjefferson@yahoo.com PROFESSIONAL OBJECTIVE:  To establish a successful and rewarding career by achieving and maintaining a good position in a progressive organization through my experience and skills. PERSONAL INFORMATION:  Birth Date : March 27,1983  Passport Number : : SS0281115  Nationality : Filipino SKILLS:  Expert on Vacuum Technology and thin Film Deposition (PECVD).  Capable of reading schematic and electrical diagrams for basis and troubleshooting.  Expert in operating HMI (Human Machine Interface) and Manufacturing Execution System (MES).  Excellent communication skills, speaking, writing, and reading in English as well as presentation skills.  Active Statistical Process Control member.  Knowledgeable in uses and functions of instrumentation tools such as vacuum gauges, thermocouples, etc.  Expert on B&R Software Automation Studio.  Knowledge in maintenance and operation of -Chillers -Pumps -CDA Compressors -Air Dryers -Cooling Towers -Scrubber Units -General Exhausts -Chemical Dispense Systems ACHIEVEMENTS:  Projects Implemented to improve machine availability and yield performance: • Sourced out alternative dry pump that reduced more than 50% of cost and repair.(ADP 122 H) • Modification of loader and unloader parts that reduced the yield loss to 30%. • Improvement on carrier top plate that reduced breakdown occurrence by 40%. • Installation of sensor in loader module to detect not fully inserted wafers into the cassette. • Sourced out new carbon plates design to eliminate wafer misalignment. • Installation of of quick connect fittings for booster pumps for quick troubleshooting and electrical safety. Also to prevent turning off the PCW supply that may also affect the Pumpstand Unit. EMPLOYMENT HISTORY: Equipment/Machine Handled:  PECVD Sin ARC Process (OTB)for Solar Cell Manufacturer  Jusung PECVD Process for Solar Cell Manufacturer  Leak Checker (Alcatel and Pfeiffer) for Solar Cell Manufacturer  Diffusion Process (MRL Industries) for Solar Cell Manufacturer  APCVD Process (Sierratherm)) for Solar Cell Manufacturer  PECVD bARC Process (Roth and Rau) for Solar Cell Manufacturer  Kurdex Process for Solar Cell Manufacturer  Trane Water and Air Cooled Chillers  Trane Chillers Systems  HuntAir Air Handling Units  Trane Air Handling Units
  • 2.  Allen Bradley,ABB and Danfoss VFDs  Kruger General Exhaust Motors  Scrubber Units  SunPower Philippines Manufacturing Limited (April 2014-Present) Position: Facilities Sustaining Engineer Overall Responsibilities: • Attends Daily Facilities Operations Meeting. • Attends Daily Huddle meeting with MFG and EE Team. • Walk-thru on all facilities area to ensure that is free from safety hazard on people and equipment. • Implements Created PM Schedule for all facilities utilities (Mechanical,Electrical,WWTP,RODI and CDS). • Implements developed strategic and tactics programs to meet the vision and mission of the company and to accomplish set goals. • Assists in carrying out reliability and hardening programs and engineering solutions on assigned Process Equipment concerns  SunPower Philippines Manufacturing Limited (December 2012 – April 2014) Position: Facilities Sustaining– Mechanical Process Overall Responsibilities: • Attends Daily Facilities Operations. • Assists in managing in-house Facilities operations contractor. • Walk-thru on the area of responsibilities to ensure area is free from safety hazard on people and equipment. • Monitors Preventive maintenance Program (Water Cooled Chillers, Air Cooled Chillers, CHWP’s, Air Compressors, Air Dryers, Vacuum Pumps, Make-up Air Units, Air-Handling Units & General Exhaust). • Implements Created PM Schedule – HVAC system, Compressed Air system & Vacuum system. • Provides data and information in generating reports on evaluation on Pm performance, Compliance Vs Backlog (HVAC system, Compressed Air system & Vacuum system). • Implements developed strategic and tactics programs to meet the vision and mission of the company and to accomplish set goals. • Assists in carrying out reliability and hardening programs and engineering solutions on assigned Process Equipment concerns  SunPower Philippines Manufacturing Limited (May 2012 – December 2012) Position: Facilities Sustaining– Instrumentation and Control Overall Responsibilities: • Attends to daily facilities operations • Monitors and keeps track off Shift Reports and daily monitoring logs • Walk-thru on the Area Of Responsibilities to ensure area is free from safety hazard on people and equipment • Monitors Preventive Maintenance Programs (FMS Components (PLCS and Instruments), Vertex, Midas, and Sieger) • Ensures execution of Create PM Schedule (FMS Components (PLCS and Instruments), Vertex, Midas, and Sieger) • Monitors and updates Equipment History Sheets • Develops strategic and tactics programs to meet the vision and mission of the company and to accomplish set goals (Key Performance Indicators) • Develops reliability and hardening programs or Projects for Facilities Monitoring System (FMS)and LSS • Develops engineering solutions on assigned process equipment-issues and problems to avoid repeat/occurrences • Reviews of spare parts Program and ensure availability • Responds on any incident that may occur during my shift  SunPower Philippines Manufacturing Limited (April 2010 – April2011) Position: Senior Equipment Technician– OTB SiN-ARC/APCVD/KURDEX
  • 3.  SunPower Philippines Manufacturing Limited (June 2009 – April 2010) Position: Equipment Technician– OTB SiN-ARC Overall Responsibilities: • Plans and monitors implementation of maintenance programs and activities, maintenance and consumable change. • Attends regular operations review. • Schedules daily preventive maintenance. • Prepares downtime report analysis and future plans. • Conducts spare management and monitoring. • Assist Equipment Engineers in designing future projects. • Acts as Officer-in-Charge if the Engineer is not around. • Prepares purchase request and follow-ups. • Coordinates with vendors regarding spare parts and sourcing out other vendor for spare parts for cost reduction. • Respond immediately to equipment breakdown. • Assist Junior Technician in the performance of unscheduled maintenance, which includes troubleshooting, replacement of faulty parts, realignment and check-out to the component level. • Recognizes and reports sub-standard equipment performance and pursues corrective actions. • Attends and participate in yield review, 8D, and OCAP. • Prepares documentation of outgoing items/equipment for repair. • Active participation on Statistical Process Control.  SunPower Philippines Manufacturing Limited (June 26, 2006 – June 2009) Position: Lead Technician– OTB SiN-ARC/Diffusion Process(MRL Industries) Overall Responsibilities: • Proper endorsement every shift transition. • Verify actual counts against overall WIP counts and its progress. • Perform qualification run and production run of quality wafers. • Perform 5s and proper housekeeping. • Support PE/EE/Trainors in other activities related to process improvement. • Escalate issues and concerns or any other tool abnormalities to immediate superior. • Process monitoring. • Chart Update. • Performed GUI. • Participate in Statistical Process Control activities. EDUCATIONAL BACKGROUND Tertiary Level Nueva Ecija University of Science and Technology (2000 – 2005) Cabanatuan City Nueva Ecija, Philippines Bachelor of Science, Major in Mechanical Engineering Secondary Level Nueva Ecija National High School (1996 – 2000) Cabanatuan City Nueva Ecija, Philippines REFERENCES: Furnished upon request. I hereby certify that the above-mentioned information is true and correct to the best of my knowledge and ability. Should there be any proven falsifications is a ground for revocation of my application. For further clarifications or inquiries, please don’t hesitate to get in touch with me on the provided contact details mentioned on this CV.