SlideShare a Scribd company logo
1 of 7
BERNARDO F. ISIDERIO JR.
Present Address :
B10C Lot3, Camella Dos Rios, Brgy. Pittland,
Cabuyao, Laguna
Provincial Address:
31 Gen. Luna St., Iloilo City
Cell. No.-G(0917)676 3262
----------------------------------------------------------------------------------------------------------
PROFESSIONAL OBJECTIVE & PROFILE
A mechanical engineer who seeks for a career path that could enhance my
profession and my previous work experiences. A dedicated and a self-starter who works well
independently or as a team member. A resourceful who wants to explore technical knowledge
in an assigned job.
EMPLOYMENT BACKGROUND:
COMPANY : TOLMAN MANUFACTURING INC.
Reliance Drive, Carmelray 1
Canlubang, Calamba Laguna
Sept. 2012 - to present
POSITION HELD : Production/Operation Manager
Job Description:
1. Handles three(3) section of production for Tetra Pak Plant – RTD Milk & Juice Processing & Food
Preparation Plant – Powder Blending, Sauce and Syrup in pouches & juice in Pet bottle and
Engineering operations for Boiler, Refrigeration, WWTP and Water Treatment Plant.
2. Supporting initiatives on continuous improvements (process, materials, productivity, equipment,
manpower, etc.) and pro-actively gets involved / support new product development and launches /
process improvements / production trials on cost savings
3. Keeps track of day-to-day operations taking note of any deviation from norms and giving feedback
immediately to Manufacturing Director if major deviations were observed.
4. Analyzes actual production and engineering operational results in relation to agreed targets/
objectives, promptly correcting deficiencies and recognizing achievements together with Shift In-
Charge so that approved plans are achieved on time.
5. Communicates overall production and engineering performance to Manufacturing Director.
6. Communicates with Shift In-Charge and Production / Engineering personnel the relevant
information/ instruction to ensure targets are met, priorities are clear and deviations experienced
are addressed promptly.
7. Performs admin-related functions and other duties as may be assigned by the Manufacturing
Director.
8. Implements ISO / HACCP requirements to ensure high quality and safe products.
9. Act as Project Manager for Plant Expansion.
10. Responsible for operation and maintenance of Boiler, Refrigeration, Compressed Air, WWTP and
Water Treatment Plant. Target is to maintained properly to avoid major breakdown during
production.
11. Plan, Design and Implements Projects for expansion and continuous improvement of the Plant
Major Project Accomplishment:
1. Installation of New A3Flex Tetra Pak Filling Machine complete with
Distribution Equipment(Helix 30, Cap 30 and Cardboard Packer
2. Installation of Tetra Pre-Processing Equipment for Coco Water.
3. Installation of Steam Modulating Valve in Food Preparation section for
Steam Jacketed Tank for automatic heating purposes
Continuing Improvement Project for Expansion:
1. Plan and design for engineering utilities expansion project e.g. steam,
refrigeration system, compressed air, water treatment and waste water
treatment.
2. Installation of New Tetra Processing Equipment ( A-Tank, UHT, Mixing
Tank & CIP System)
COMPANY : RFM CORPORATION MILK & JUICE DIVISION
Manggahan Light Industrial Park
Manggahan, Pasig City
Nov. 2003 – Aug. 2012
POSITION HELD : Engineering Supervisor
Nov. 2006 – Aug. 2012
Work Description:
Responsibilities:
1. Handles the 2007 Pet Line 1 Installation of Packaging Lines from bottle infeed conveyor,
Rinsing Filling and Capping Machine, Tilting Conveyor, Cooling Tunnel, Dryer,
Labelling Machine and Shrink Tunnel and also installation of Pet Blowing Machines.
2. Handles the 2009 Selecta Expansion Project by compressing M&J production areas
• Overall project engineer for the RFM side
- design of equipment layout of Tetra Machines based on existing building.
- design of new utility piping layout for steam, water, compressed air & chilled
water based on remaining four(4) TP Machines.
- design for the relocation of QA laboratory, Eng’g stockroom, holding section,
filling machine section and packaging section.
- Interfacing with Selecta’s Eng’g. Manager for project planning & execution and
Tetra Pak Project Manager for the installation of sanitary piping works,
reconfiguration of Aseptic Filling Machine and installation of filling machine
utilities piping.
3. Handles the 2011 TBA8 One Liter Machine Installation act as Project Manager, RFM side
• Prepare project timetable to achieve plan schedule for commercial run.
• Conduct shop floor meeting between contractor and Project Manager, Tetra side.
• Prepare project weekly update report and highlights concerns or issue between
each contractor.
• Daily monitoring of major activities for alignment & positioning of the machines,
electrical & mechanical works, FM technical assessment, water test, and sterility
test run (STR).
• Coordination works between Tetra Pak Project Manager for issues or concerns
during installation of the machine.
4. Supervise three (3) filling machine technician, two (2) utility technician and one (1)
engineering staff(maintenance planner).
5. Overall in charge of Tetra Pak maintenance program to achieve set target machine
efficiency.
6. Responsible for the operation and maintenance of refrigeration system using ammonia as
refrigerant powered by 230KW ABB Stal, SVA 26 screw compressor for chilled water
application in the processing of Milk & Juices.
7. Coordinate with Selecta engineering department regarding the operation of compressed
air, water treatment, waste water treatment, steam generation and power generation
system necessary in the processing of milk and juices operation.
8. Overall in-charge of monthly repair & maintenance & electricity cost budget for planning
analysis & historical data to achieve target DLOH.
9. SAP Management(Purchase Request, GR Sales Invoices and MIGO Operation)
POSITION HELD : Maintenance Planner
Feb. 2005 – Nov. 2006
Work Description:
Responsibilities:
1. Monitors/schedule weekly maintenance activities.
• Classifies job request according to priority, scope & nature
• Withdrawal of spare parts prior to maintenance activities
• Provides assistance to contractors during maintenance works
• Inform Tetra Pak Phils. for monthly hour machine reading
• Conduct TPMS schedule for every 1000 hours running of filling machines.
2. Provides claim parts to Tetra Pak Phils.
3. Provides project proposal based on engineering economy for approval.
4. SAP Encoding and delivery of items
5. Provides data for top management meetings and other departments.
6. Non-stock spare parts inventory.
7. Generates reports on daily, weekly and monthly basis.
8. Assigned as acting shift production supervisor whenever needed.
Responsibilities:
a. Oversee the whole operation of milk & juice manufacturing.
b. Scheduling/dispatching of contractual based on machine running.
c. Responsible for materials consumption per batch as per scheduled on a weekly basis
d. Monitor the production output, yield and machine breakdown.
e. Analyze data for machine breakdown through WCM (World Class Manufacturing)
Methodology.
Experiences Gained:
1. Knowledge of Tetra Pak Filling Machines(TBA 19, TCA A1)
2. Preventive Maintenance Scheduling
3. Technical Knowledge of Processing Equipment
4. Computation of electricity cost allocation.
5. Project Management
6. SAP Management(Purchase Request, GR Sales Invoices and MIGO Operation)
POSITION HELD : PPIC Analyst/Production Planner
Feb. 2003 – Feb. 2005
Work Description:
Responsibilities:
1. Provides logistical support for seven (7) toll processors.
2. Responsible for the transfer of raw and packaging materials needed in the production of toll
processors based on weekly schedule.
3. Responsible for the scheduling/dispatching of six(6) ten wheeler wing van truck on a daily
basis for the delivery of raw and packaging materials to toll processors and at the same time
transfer of finished goods from toll processors to RFM warehouse.
4. Daily interfacing with toll processors to monitor production status and record logistical
information needed for a smooth operation.
5. Create Framework Order through SAP for reference in warehouse encoding of raw materials
issuance and finished goods delivery.
6. Conduct monthly inventory for toll processors together with accounting & quality control
personnel.
Experiences Gained:
1. Knowledge of Computer Excel, Windows and PowerPoint
2. Proven initiative and ability to work with minimal supervision.
3. Good team player and multitasking capabilities.
4. Knowledge of SAP operation.
5. Logistics experience in the field of food manufacturing specially toll processors operation.
6. Knowledge in Warehouse Management System using SAP, ERP
COMPANY : F.F. MARINE CORPORATION (SUBSIDIARY
OF F.F. CRUZ AND COMPANY INC.)
800 Edsa Cubao, Quezon City
April 5, 1997 to July 14, 2002
POSITION HELD : DREDGE ENGINEER
Work Description:
Responsibilities:
1. Assigned on different dredging works like channelling, reclamation, harbors and others on-
board on twin grab and suction dredges.
2. Implementing and scheduling of works based on project plan.
3. Monitor equipment operation and made recommendation reports for top management
approval.
4. Responsible for various maintenance repair of dredger based on operational parameters.
5. Job orders on various maintenance repair of dredger during annual schedule in dry docking.
6. Corrective maintenance on different operational system of dredger.
Experiences Gained:
1. Supervisory works.
2. Technical experience on steam generating unit system, internal combustion engine system,
hydraulic system and pneumatic system.
3. Maintenance works on different machines on board dredges.
4. Dredging operation.
5. Set-up dredge for different dredging project approach as per contract.
COMPANY : PHIL. BIO-INDUSTRIES (ISO 9002)
Carmelray Industrial Park, Canlubang, Laguna
Jan. 15, 1994 - March 29, 1997
POSITION HELD : PRODUCTION OPERATOR
Work Description:
Responsibilities:
1. Responsible for the processing of refined carrageenan by monitoring production
activities in the Distributed Control System ( DCS),
2. Record the daily production activities and maintain production parameters.
3. Advise the maintenance engineer for replacement of different mechanical equipments like
gyratory sifter, pumps , valves, filter screens and others, if non-conformity of production
parameters of such equipment,
4. Dismantle and repair pumps and valves if trouble arises.
5. Operates DCS based on different commands of all process instruments and
equipments.
6. Adjusting and turning off temperature controllers through commands on DCS.
7. Opening or closing of valve and starting or stopping pumps, agitator and ventilator
through commands on DCS,
8. Troubleshoot if pump fails to pump paste or muds.
9. Assist the maintenance personnel for replacement of parts of different mechanical
equipments like gyratory sifter, pumps, valves, filter screens and others.
10. Monitoring of water softener and feed water and regenerate if the results were high.
11. Record keeping and monitoring of 350 Hp Fire Tube Boiler (double fast) in the utility area.
Experiences Gained:
1. Good team player and multitasking capabilities.
2. Knowledge of DCS operation.
3. Knowledge for the processing of refined carrageenan.
4. Self discipline and initiative.
COMPANY : SAN MIGUEL CORPORATION (Magnolia Division)
Ungka II, Pavia, Iloilo
April to October 1991
POSITION HELD : PRODUCTION OPERATOR
Work Description:
Responsibilities:
1. Ice cream filling (1 gallon, ½ gallon and pints).
2. Operate continuous freezer machine, ripple machine.
3. CIP and doing preventive maintenance of such equipment.
4. Other production related tasks like preparation of ingredients for each batch of flavored ice
cream.
5. Doing some warehousing jobs and assists the maintenance personnel for some maintenance
works.
6. Assigned in cold storage for re-processing of ice cream products.
Experiences Gained:
1. Knowledge in Ice Cream Manufacturing.
2. Freezer and ripple machine operation.
3. Develop a sense of responsibility.
SEMINARS AND TRAINING ATTENDED:
TITLE: BASIC SUPERVISORY WORKSHOP
February 26, 1998, conducted at Punta Villa, Arevalo, Iloilo City.
SCOPE: Elements of Supervisory Management: Planning, Organizing,
Coordinating, and Leading.
TITLE: STEAM GENERATING UNIT OPERATION AND MAINTENANCE
August 4 to September 4, 1998, conducted on board Dredge Saranggani Bay
SPECS: Water tube boiler, 20,000 kg/hr of steam and 40 kg/cm2 drum pressure.
TITLE: OCCUPATIONAL SAFETY AND HEALTH IN CONSTRUCTION
Construction Manpower Development Foundation(CMDF)
6/F Prudential Bank Bldg. 2182 Pasong Tamo St., Makati City
May 7-11, 2001
TITLE: FORKLIFT OPERATION
Conducted at Philippine Bio-Industries, Canlubang, Laguna
January 15 to 20, 1992
TITLE: DISTRIBUTED CONTROL SYSTEM (DCS) OPERATION
Conducted at Philippine Bio-Industries, Canlubang, Laguna
January 21 to 25, 1992
TITLE: HACCP SEMINAR
Conducted at Philippine Trade Training Center, Pasay, City
January 23 to 25, 2008
TITLE: ENERGY EFFICIENCY SEMINAR
Conducted at University of the Philippines Campus
November 2010 by Energy Efficiency Association of the Phils.(ENPAP)
TITLE: PROJECT MANAGEMENT
Conducted by Production Management Association of the Phils.(PROMAP)
July 30, 2011
TITLE: LEADERSHIP DEVELOPMENT TRAINING
Conducted at RFM Corporation, 8th
Floor Lanai Hall
August 8 – 10, 2011 by M. Bacsa
TITLE: ENVIRONMENTAL MANAGEMENT FOR MANAGING HEADS
Conducted by Department of Environment and Natural Resources
At FCIE Locator’s Hall, Brgy. Langkaan, Dasmarinas, Cavite
April 23, 2015
TITLE: MANAGEMENT ORIENTATION & AWARENESS, QMS PLANNING,
cGMP, FSMS Planning & HACCP(12 step CODEX Guidelines(FSSC 22000
Certification Preparation)
Conducted by Rosehall Management Consultants, Inc
At Tolman Manufacturing, Inc, Carmelray 1, Industrial Park, Reliance Drive
March 19-20, 2015
TITLE: TPM Journey: Autonomous Maintenance
Conducted by Six Sigma Belt Guru
At Richmonde Hotel Ortigas, Pasig
April 07-08, 2016
EDUCATIONAL ATTAINMENT:
College : University of San Agustin
March 1990
Course : Bachelor of Science in Mechanical Engineering
Passed: PRC Registered Mechanical Engineer Exam.
License No. 41553
High School : University of Iloilo
March 1985
Elementary : Iloilo Central Elementary School
March 1981
Short Courses : Secretarial Computer for Office Personnel and
Professionals (SCOPE)
Interface Computer College, Iloilo City
Feb.10 - March 10, 1998
Domestic Refrigeration and Air Conditioning
NMYC presently TESDA
Iloilo City
AWARDS & CITATION : 2010 RFM Idol Finalist – part of company anniversary
awarded to deserving employee
PERSONAL DATA:
Civil Status : Married w/ two(2) children
Birth date : December 15, 1967
Birthplace : Iloilo City
Religion : Baptist
Height : 5’4”
Weight : 60 kgs.
Nationality : Filipino
Hobbies : Reading technical books, playing chess and basketball

More Related Content

What's hot (20)

Karthick mm
Karthick  mmKarthick  mm
Karthick mm
 
Resume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna PillaiResume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna Pillai
 
FUV CV
FUV CVFUV CV
FUV CV
 
Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)
 
sengu cv
sengu cvsengu cv
sengu cv
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CV
 
joseph_resume UPDATED 08192015
joseph_resume UPDATED 08192015joseph_resume UPDATED 08192015
joseph_resume UPDATED 08192015
 
Hesham_cv
Hesham_cvHesham_cv
Hesham_cv
 
Consultant presentation english
Consultant presentation english Consultant presentation english
Consultant presentation english
 
Consultant presentation-English
Consultant presentation-English Consultant presentation-English
Consultant presentation-English
 
Amos dennis cv new
Amos dennis  cv newAmos dennis  cv new
Amos dennis cv new
 
Cv(Haytham Ashrey)
Cv(Haytham Ashrey)Cv(Haytham Ashrey)
Cv(Haytham Ashrey)
 
Resume-Ramasamy Ganapathy
Resume-Ramasamy GanapathyResume-Ramasamy Ganapathy
Resume-Ramasamy Ganapathy
 
Dinesh Chauhan
Dinesh ChauhanDinesh Chauhan
Dinesh Chauhan
 
DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016
 
1 - NEW RESUME OKT 2016
1 - NEW RESUME OKT 20161 - NEW RESUME OKT 2016
1 - NEW RESUME OKT 2016
 
CONDINO, JEM
CONDINO, JEMCONDINO, JEM
CONDINO, JEM
 
MVD'Ornellas CV to use 09.03.2011
MVD'Ornellas CV to use 09.03.2011MVD'Ornellas CV to use 09.03.2011
MVD'Ornellas CV to use 09.03.2011
 
CONDINO, JEM
CONDINO, JEMCONDINO, JEM
CONDINO, JEM
 
Charles Lagarejos Resume 2 (3)
Charles Lagarejos Resume 2 (3)Charles Lagarejos Resume 2 (3)
Charles Lagarejos Resume 2 (3)
 

Viewers also liked

Slide share assignment busn 210
Slide share assignment busn 210Slide share assignment busn 210
Slide share assignment busn 210chandreshpatel817
 
Salim Resume
Salim ResumeSalim Resume
Salim Resumesalim0024
 
바카라사이트\\【SX797。СOM】\\생중계바카라 사이트
바카라사이트\\【SX797。СOM】\\생중계바카라 사이트바카라사이트\\【SX797。СOM】\\생중계바카라 사이트
바카라사이트\\【SX797。СOM】\\생중계바카라 사이트yhidfjgdio
 
Indicadores de las universidades españolas: el proyecto U-Ranking
Indicadores de las universidades españolas: el proyecto U-RankingIndicadores de las universidades españolas: el proyecto U-Ranking
Indicadores de las universidades españolas: el proyecto U-RankingIvie
 
Un limoncello all'inferno (prima stazione)
Un limoncello all'inferno (prima stazione)Un limoncello all'inferno (prima stazione)
Un limoncello all'inferno (prima stazione)elnovovassor
 
실시간카지노//OX600。СOM//생중계바카라 싸이트
실시간카지노//OX600。СOM//생중계바카라 싸이트실시간카지노//OX600。СOM//생중계바카라 싸이트
실시간카지노//OX600。СOM//생중계바카라 싸이트yhidfjgdio
 
인터넷카지노\\【SX797。СOM】\\생방송카지노 사이트
인터넷카지노\\【SX797。СOM】\\생방송카지노 사이트인터넷카지노\\【SX797。СOM】\\생방송카지노 사이트
인터넷카지노\\【SX797。СOM】\\생방송카지노 사이트yhidfjgdio
 
Simpsons family tree
Simpsons family treeSimpsons family tree
Simpsons family treemartha a cruz
 
Philippine society under spain
Philippine society under spainPhilippine society under spain
Philippine society under spainschool
 

Viewers also liked (16)

Supply Chain
Supply ChainSupply Chain
Supply Chain
 
Slide share assignment busn 210
Slide share assignment busn 210Slide share assignment busn 210
Slide share assignment busn 210
 
Salim Resume
Salim ResumeSalim Resume
Salim Resume
 
Cuerpo 3
Cuerpo 3Cuerpo 3
Cuerpo 3
 
바카라사이트\\【SX797。СOM】\\생중계바카라 사이트
바카라사이트\\【SX797。СOM】\\생중계바카라 사이트바카라사이트\\【SX797。СOM】\\생중계바카라 사이트
바카라사이트\\【SX797。СOM】\\생중계바카라 사이트
 
Indicadores de las universidades españolas: el proyecto U-Ranking
Indicadores de las universidades españolas: el proyecto U-RankingIndicadores de las universidades españolas: el proyecto U-Ranking
Indicadores de las universidades españolas: el proyecto U-Ranking
 
Rebus Ad
Rebus AdRebus Ad
Rebus Ad
 
Un limoncello all'inferno (prima stazione)
Un limoncello all'inferno (prima stazione)Un limoncello all'inferno (prima stazione)
Un limoncello all'inferno (prima stazione)
 
TDV
TDVTDV
TDV
 
Corproate & Institutional Training Catalogue 1.0
Corproate & Institutional Training Catalogue 1.0Corproate & Institutional Training Catalogue 1.0
Corproate & Institutional Training Catalogue 1.0
 
실시간카지노//OX600。СOM//생중계바카라 싸이트
실시간카지노//OX600。СOM//생중계바카라 싸이트실시간카지노//OX600。СOM//생중계바카라 싸이트
실시간카지노//OX600。СOM//생중계바카라 싸이트
 
인터넷카지노\\【SX797。СOM】\\생방송카지노 사이트
인터넷카지노\\【SX797。СOM】\\생방송카지노 사이트인터넷카지노\\【SX797。СOM】\\생방송카지노 사이트
인터넷카지노\\【SX797。СOM】\\생방송카지노 사이트
 
La Música y El Cerebro
La Música y El CerebroLa Música y El Cerebro
La Música y El Cerebro
 
Il colore della musica - Luca DeGennaro
Il colore della musica   - Luca DeGennaroIl colore della musica   - Luca DeGennaro
Il colore della musica - Luca DeGennaro
 
Simpsons family tree
Simpsons family treeSimpsons family tree
Simpsons family tree
 
Philippine society under spain
Philippine society under spainPhilippine society under spain
Philippine society under spain
 

Similar to nickbiodata160427

Similar to nickbiodata160427 (20)

New Resume Francis Ellivera.. (1)
New Resume Francis Ellivera.. (1)New Resume Francis Ellivera.. (1)
New Resume Francis Ellivera.. (1)
 
khaled-engineering
khaled-engineeringkhaled-engineering
khaled-engineering
 
Danilo B. Lim
Danilo B. LimDanilo B. Lim
Danilo B. Lim
 
Siswanto 30-05-2016
Siswanto 30-05-2016Siswanto 30-05-2016
Siswanto 30-05-2016
 
Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016
 
Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016
 
Job description factory services engineer
Job description   factory services engineerJob description   factory services engineer
Job description factory services engineer
 
CV 1
CV 1CV 1
CV 1
 
AbhijitSinha
AbhijitSinhaAbhijitSinha
AbhijitSinha
 
Akashkore Ravi
Akashkore RaviAkashkore Ravi
Akashkore Ravi
 
MOHAMMED IMRAN_CV_O&M
MOHAMMED IMRAN_CV_O&MMOHAMMED IMRAN_CV_O&M
MOHAMMED IMRAN_CV_O&M
 
MOHAMMED IMRAN_CV_O&M
MOHAMMED IMRAN_CV_O&MMOHAMMED IMRAN_CV_O&M
MOHAMMED IMRAN_CV_O&M
 
CV_Maricel Molina rev 1
CV_Maricel Molina rev 1CV_Maricel Molina rev 1
CV_Maricel Molina rev 1
 
Circulem viate
Circulem viateCirculem viate
Circulem viate
 
RahulNavale
RahulNavaleRahulNavale
RahulNavale
 
Resume_geetha
Resume_geethaResume_geetha
Resume_geetha
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
 
Kanwaljit.doc
Kanwaljit.docKanwaljit.doc
Kanwaljit.doc
 
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
 
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
 

nickbiodata160427

  • 1. BERNARDO F. ISIDERIO JR. Present Address : B10C Lot3, Camella Dos Rios, Brgy. Pittland, Cabuyao, Laguna Provincial Address: 31 Gen. Luna St., Iloilo City Cell. No.-G(0917)676 3262 ---------------------------------------------------------------------------------------------------------- PROFESSIONAL OBJECTIVE & PROFILE A mechanical engineer who seeks for a career path that could enhance my profession and my previous work experiences. A dedicated and a self-starter who works well independently or as a team member. A resourceful who wants to explore technical knowledge in an assigned job. EMPLOYMENT BACKGROUND: COMPANY : TOLMAN MANUFACTURING INC. Reliance Drive, Carmelray 1 Canlubang, Calamba Laguna Sept. 2012 - to present POSITION HELD : Production/Operation Manager Job Description: 1. Handles three(3) section of production for Tetra Pak Plant – RTD Milk & Juice Processing & Food Preparation Plant – Powder Blending, Sauce and Syrup in pouches & juice in Pet bottle and Engineering operations for Boiler, Refrigeration, WWTP and Water Treatment Plant. 2. Supporting initiatives on continuous improvements (process, materials, productivity, equipment, manpower, etc.) and pro-actively gets involved / support new product development and launches / process improvements / production trials on cost savings 3. Keeps track of day-to-day operations taking note of any deviation from norms and giving feedback immediately to Manufacturing Director if major deviations were observed. 4. Analyzes actual production and engineering operational results in relation to agreed targets/ objectives, promptly correcting deficiencies and recognizing achievements together with Shift In- Charge so that approved plans are achieved on time. 5. Communicates overall production and engineering performance to Manufacturing Director. 6. Communicates with Shift In-Charge and Production / Engineering personnel the relevant information/ instruction to ensure targets are met, priorities are clear and deviations experienced are addressed promptly. 7. Performs admin-related functions and other duties as may be assigned by the Manufacturing Director. 8. Implements ISO / HACCP requirements to ensure high quality and safe products. 9. Act as Project Manager for Plant Expansion.
  • 2. 10. Responsible for operation and maintenance of Boiler, Refrigeration, Compressed Air, WWTP and Water Treatment Plant. Target is to maintained properly to avoid major breakdown during production. 11. Plan, Design and Implements Projects for expansion and continuous improvement of the Plant Major Project Accomplishment: 1. Installation of New A3Flex Tetra Pak Filling Machine complete with Distribution Equipment(Helix 30, Cap 30 and Cardboard Packer 2. Installation of Tetra Pre-Processing Equipment for Coco Water. 3. Installation of Steam Modulating Valve in Food Preparation section for Steam Jacketed Tank for automatic heating purposes Continuing Improvement Project for Expansion: 1. Plan and design for engineering utilities expansion project e.g. steam, refrigeration system, compressed air, water treatment and waste water treatment. 2. Installation of New Tetra Processing Equipment ( A-Tank, UHT, Mixing Tank & CIP System) COMPANY : RFM CORPORATION MILK & JUICE DIVISION Manggahan Light Industrial Park Manggahan, Pasig City Nov. 2003 – Aug. 2012 POSITION HELD : Engineering Supervisor Nov. 2006 – Aug. 2012 Work Description: Responsibilities: 1. Handles the 2007 Pet Line 1 Installation of Packaging Lines from bottle infeed conveyor, Rinsing Filling and Capping Machine, Tilting Conveyor, Cooling Tunnel, Dryer, Labelling Machine and Shrink Tunnel and also installation of Pet Blowing Machines. 2. Handles the 2009 Selecta Expansion Project by compressing M&J production areas • Overall project engineer for the RFM side - design of equipment layout of Tetra Machines based on existing building. - design of new utility piping layout for steam, water, compressed air & chilled water based on remaining four(4) TP Machines. - design for the relocation of QA laboratory, Eng’g stockroom, holding section, filling machine section and packaging section. - Interfacing with Selecta’s Eng’g. Manager for project planning & execution and Tetra Pak Project Manager for the installation of sanitary piping works, reconfiguration of Aseptic Filling Machine and installation of filling machine utilities piping. 3. Handles the 2011 TBA8 One Liter Machine Installation act as Project Manager, RFM side • Prepare project timetable to achieve plan schedule for commercial run. • Conduct shop floor meeting between contractor and Project Manager, Tetra side.
  • 3. • Prepare project weekly update report and highlights concerns or issue between each contractor. • Daily monitoring of major activities for alignment & positioning of the machines, electrical & mechanical works, FM technical assessment, water test, and sterility test run (STR). • Coordination works between Tetra Pak Project Manager for issues or concerns during installation of the machine. 4. Supervise three (3) filling machine technician, two (2) utility technician and one (1) engineering staff(maintenance planner). 5. Overall in charge of Tetra Pak maintenance program to achieve set target machine efficiency. 6. Responsible for the operation and maintenance of refrigeration system using ammonia as refrigerant powered by 230KW ABB Stal, SVA 26 screw compressor for chilled water application in the processing of Milk & Juices. 7. Coordinate with Selecta engineering department regarding the operation of compressed air, water treatment, waste water treatment, steam generation and power generation system necessary in the processing of milk and juices operation. 8. Overall in-charge of monthly repair & maintenance & electricity cost budget for planning analysis & historical data to achieve target DLOH. 9. SAP Management(Purchase Request, GR Sales Invoices and MIGO Operation) POSITION HELD : Maintenance Planner Feb. 2005 – Nov. 2006 Work Description: Responsibilities: 1. Monitors/schedule weekly maintenance activities. • Classifies job request according to priority, scope & nature • Withdrawal of spare parts prior to maintenance activities • Provides assistance to contractors during maintenance works • Inform Tetra Pak Phils. for monthly hour machine reading • Conduct TPMS schedule for every 1000 hours running of filling machines. 2. Provides claim parts to Tetra Pak Phils. 3. Provides project proposal based on engineering economy for approval. 4. SAP Encoding and delivery of items 5. Provides data for top management meetings and other departments. 6. Non-stock spare parts inventory. 7. Generates reports on daily, weekly and monthly basis. 8. Assigned as acting shift production supervisor whenever needed. Responsibilities: a. Oversee the whole operation of milk & juice manufacturing. b. Scheduling/dispatching of contractual based on machine running. c. Responsible for materials consumption per batch as per scheduled on a weekly basis d. Monitor the production output, yield and machine breakdown. e. Analyze data for machine breakdown through WCM (World Class Manufacturing) Methodology.
  • 4. Experiences Gained: 1. Knowledge of Tetra Pak Filling Machines(TBA 19, TCA A1) 2. Preventive Maintenance Scheduling 3. Technical Knowledge of Processing Equipment 4. Computation of electricity cost allocation. 5. Project Management 6. SAP Management(Purchase Request, GR Sales Invoices and MIGO Operation) POSITION HELD : PPIC Analyst/Production Planner Feb. 2003 – Feb. 2005 Work Description: Responsibilities: 1. Provides logistical support for seven (7) toll processors. 2. Responsible for the transfer of raw and packaging materials needed in the production of toll processors based on weekly schedule. 3. Responsible for the scheduling/dispatching of six(6) ten wheeler wing van truck on a daily basis for the delivery of raw and packaging materials to toll processors and at the same time transfer of finished goods from toll processors to RFM warehouse. 4. Daily interfacing with toll processors to monitor production status and record logistical information needed for a smooth operation. 5. Create Framework Order through SAP for reference in warehouse encoding of raw materials issuance and finished goods delivery. 6. Conduct monthly inventory for toll processors together with accounting & quality control personnel. Experiences Gained: 1. Knowledge of Computer Excel, Windows and PowerPoint 2. Proven initiative and ability to work with minimal supervision. 3. Good team player and multitasking capabilities. 4. Knowledge of SAP operation. 5. Logistics experience in the field of food manufacturing specially toll processors operation. 6. Knowledge in Warehouse Management System using SAP, ERP COMPANY : F.F. MARINE CORPORATION (SUBSIDIARY OF F.F. CRUZ AND COMPANY INC.) 800 Edsa Cubao, Quezon City April 5, 1997 to July 14, 2002 POSITION HELD : DREDGE ENGINEER Work Description: Responsibilities: 1. Assigned on different dredging works like channelling, reclamation, harbors and others on- board on twin grab and suction dredges. 2. Implementing and scheduling of works based on project plan. 3. Monitor equipment operation and made recommendation reports for top management approval. 4. Responsible for various maintenance repair of dredger based on operational parameters. 5. Job orders on various maintenance repair of dredger during annual schedule in dry docking. 6. Corrective maintenance on different operational system of dredger.
  • 5. Experiences Gained: 1. Supervisory works. 2. Technical experience on steam generating unit system, internal combustion engine system, hydraulic system and pneumatic system. 3. Maintenance works on different machines on board dredges. 4. Dredging operation. 5. Set-up dredge for different dredging project approach as per contract. COMPANY : PHIL. BIO-INDUSTRIES (ISO 9002) Carmelray Industrial Park, Canlubang, Laguna Jan. 15, 1994 - March 29, 1997 POSITION HELD : PRODUCTION OPERATOR Work Description: Responsibilities: 1. Responsible for the processing of refined carrageenan by monitoring production activities in the Distributed Control System ( DCS), 2. Record the daily production activities and maintain production parameters. 3. Advise the maintenance engineer for replacement of different mechanical equipments like gyratory sifter, pumps , valves, filter screens and others, if non-conformity of production parameters of such equipment, 4. Dismantle and repair pumps and valves if trouble arises. 5. Operates DCS based on different commands of all process instruments and equipments. 6. Adjusting and turning off temperature controllers through commands on DCS. 7. Opening or closing of valve and starting or stopping pumps, agitator and ventilator through commands on DCS, 8. Troubleshoot if pump fails to pump paste or muds. 9. Assist the maintenance personnel for replacement of parts of different mechanical equipments like gyratory sifter, pumps, valves, filter screens and others. 10. Monitoring of water softener and feed water and regenerate if the results were high. 11. Record keeping and monitoring of 350 Hp Fire Tube Boiler (double fast) in the utility area. Experiences Gained: 1. Good team player and multitasking capabilities. 2. Knowledge of DCS operation. 3. Knowledge for the processing of refined carrageenan. 4. Self discipline and initiative. COMPANY : SAN MIGUEL CORPORATION (Magnolia Division) Ungka II, Pavia, Iloilo April to October 1991 POSITION HELD : PRODUCTION OPERATOR Work Description: Responsibilities: 1. Ice cream filling (1 gallon, ½ gallon and pints). 2. Operate continuous freezer machine, ripple machine. 3. CIP and doing preventive maintenance of such equipment. 4. Other production related tasks like preparation of ingredients for each batch of flavored ice cream.
  • 6. 5. Doing some warehousing jobs and assists the maintenance personnel for some maintenance works. 6. Assigned in cold storage for re-processing of ice cream products. Experiences Gained: 1. Knowledge in Ice Cream Manufacturing. 2. Freezer and ripple machine operation. 3. Develop a sense of responsibility. SEMINARS AND TRAINING ATTENDED: TITLE: BASIC SUPERVISORY WORKSHOP February 26, 1998, conducted at Punta Villa, Arevalo, Iloilo City. SCOPE: Elements of Supervisory Management: Planning, Organizing, Coordinating, and Leading. TITLE: STEAM GENERATING UNIT OPERATION AND MAINTENANCE August 4 to September 4, 1998, conducted on board Dredge Saranggani Bay SPECS: Water tube boiler, 20,000 kg/hr of steam and 40 kg/cm2 drum pressure. TITLE: OCCUPATIONAL SAFETY AND HEALTH IN CONSTRUCTION Construction Manpower Development Foundation(CMDF) 6/F Prudential Bank Bldg. 2182 Pasong Tamo St., Makati City May 7-11, 2001 TITLE: FORKLIFT OPERATION Conducted at Philippine Bio-Industries, Canlubang, Laguna January 15 to 20, 1992 TITLE: DISTRIBUTED CONTROL SYSTEM (DCS) OPERATION Conducted at Philippine Bio-Industries, Canlubang, Laguna January 21 to 25, 1992 TITLE: HACCP SEMINAR Conducted at Philippine Trade Training Center, Pasay, City January 23 to 25, 2008 TITLE: ENERGY EFFICIENCY SEMINAR Conducted at University of the Philippines Campus November 2010 by Energy Efficiency Association of the Phils.(ENPAP) TITLE: PROJECT MANAGEMENT Conducted by Production Management Association of the Phils.(PROMAP) July 30, 2011 TITLE: LEADERSHIP DEVELOPMENT TRAINING Conducted at RFM Corporation, 8th Floor Lanai Hall August 8 – 10, 2011 by M. Bacsa TITLE: ENVIRONMENTAL MANAGEMENT FOR MANAGING HEADS Conducted by Department of Environment and Natural Resources At FCIE Locator’s Hall, Brgy. Langkaan, Dasmarinas, Cavite April 23, 2015 TITLE: MANAGEMENT ORIENTATION & AWARENESS, QMS PLANNING, cGMP, FSMS Planning & HACCP(12 step CODEX Guidelines(FSSC 22000 Certification Preparation) Conducted by Rosehall Management Consultants, Inc At Tolman Manufacturing, Inc, Carmelray 1, Industrial Park, Reliance Drive March 19-20, 2015 TITLE: TPM Journey: Autonomous Maintenance Conducted by Six Sigma Belt Guru
  • 7. At Richmonde Hotel Ortigas, Pasig April 07-08, 2016 EDUCATIONAL ATTAINMENT: College : University of San Agustin March 1990 Course : Bachelor of Science in Mechanical Engineering Passed: PRC Registered Mechanical Engineer Exam. License No. 41553 High School : University of Iloilo March 1985 Elementary : Iloilo Central Elementary School March 1981 Short Courses : Secretarial Computer for Office Personnel and Professionals (SCOPE) Interface Computer College, Iloilo City Feb.10 - March 10, 1998 Domestic Refrigeration and Air Conditioning NMYC presently TESDA Iloilo City AWARDS & CITATION : 2010 RFM Idol Finalist – part of company anniversary awarded to deserving employee PERSONAL DATA: Civil Status : Married w/ two(2) children Birth date : December 15, 1967 Birthplace : Iloilo City Religion : Baptist Height : 5’4” Weight : 60 kgs. Nationality : Filipino Hobbies : Reading technical books, playing chess and basketball