Architect
Foundation in Natural &
Built Environment
January 2015
Ar. SW Lee
EXCLUSIVE
Detached Unit
favourite design
Role & Responsibility
of an Architect
SW Lee Architect
his company
Company Profile: SW Lee Architect
Interviewee Profile: SW Lee
Roles & Responsibility
Projects Involved
Project #1: Detached Unit
Project #2: Mini Convention Centre
Differences between Two Projects
Ar.Lee formed his
own company - S W
Lee Architect with a
new approach which
i s t o d e v e l o p a
company which can
stay ahead in design,
suit the contextual
environment, and
based on a unique
c o n c e p t . H e
p e r s o n a l l y h a n d
picked his staffs with
a g o o d c r e a t i v e
q u a l i t y a n d
c o m m i t m e n t . H i s
company started out
with a team of 8
members and started
up a small office in
Taman Bukit Emas.
Content
SW Lee ArchitectCOMPANY
PROFILE
1
2
3
4
5
7
8
page | 1
Ar. SW Lee
Ar. Lee had been working for 25 years as an architect. He studied architecture in the
National University of Singapore (NUS) in 1982 and finished his masters in 1988. He then
worked as an architect for 4 years in Singapore. After 4 years of working experience in
Singapore, he started a partnership company in Seremban named Architect Saujana.
Finally, in year 1995, he started his own company named SW Lee Architect.
INTERVIEWEE
PROFILE
He have his own way of dealing with
different clients,. He is flexible in his
approach especially to those who are
extra fussy. Some of the clients do not
know what they want so it’s his
responsible to lead and advice them.
What keeps him going on his journey
as an architect was the satisfaction when
each project was completed and it is
appreciated by the clients. He will be
motivated to do better every single time
to fulfill the client’s requirements.
NEVER
say die
&
NEVER
give up
“
”
page | 2
Basically, an architect fulfill the
requirements of every clients based on the
types of projects offered. He will have to
come out with various conceptual design
sketches and put them into drawings for
submission and construction. In addition,
he will also have to help in preparing many
tender documents and work alongside with
contractors. During construction, he is
responsible to supervise the works on site
and check whether the works are done
accordingly to their drawings as well as
solving every problem that arise during
construction. He is also authorized to issue
the Certificate of Compliance and
Completion ( CCC ) when the building is
completed.
Roles & Responsibility
S o m e o f t h e c o m m o n
problems faced are technical
problems that arise during
construction period for example
errors in the joints, the building
was not built accordingly to the
plan provided.
page | 3
Projects
Involved
He is in charge of various projects ranging
from the smallest to the slightly bigger ones
namely residential buildings, commercial
buildings, industrial buildings, educational
buildings and many more.
For the residential building, he was employed
to design bungalows, housing areas, semi-
detached units and detached units.
On the other hand, he had designed shop lots,
hotels and shopping malls which falls under
the category of commercial buildings.
For the industrial building, he was employed to
design a factory at Port Klang as well as
schools which are educational buildings.
He is also involved in many other projects for
example, hospitals, community blocks and etc.
page | 4
Residential Building
Commercial Building
Industrial Building
Educational Building
Hospital
One of his favourite project designing a
resort style detached unit. The design process
for the detached unit begins with analyzing the
site which includes a few main aspects
namely topography, microclimate, visual study
and character of the site. Then, a brief will be
given by the client and he will have to plan
accordingly to the client’s requirements. For
this project, he was requested to design a
resort style detached unit which blends the
inside and outside. The client also requested
that the detached unit must have good
ventilation , shade and comfort.
A conceptual design will be proposed
after combining all the ideas and
requirements of the client. After having an
overall idea of the design, he then draw out
the building using computer aided
software’s like AutoCAD and Sketchup.
A budget for the detached unit will be
establish as soon as the plans are ready.
He will get advices from other profession
about the building which includes the
suitability of design, and the estimated cost
and time of construction.
Detached UnitPROJECT
#1
page | 5
After the client has approved the outcome
of the design, it will be send to the local
authorities for approval. After the approval,
construction is able to start. During
construction, regular site visits are needed to
ensure the project is running on time and to the
building specifications as well as resolving any
problems that arise during the construction
period.
The legal and contractual procedures for
all the projects are quite the same which is to
prepare an award letter and a contractor
document to the successful contractor as it will
spell out all the terms and conditions for the
contractors to finish their work. Submission of
progressive reports on the progress of the
construction to local authorities are also
needed to keep them updated at anytime.
Next, he will propose the design to the
client for approval by using plans, sketched
and models. He will also answer every
question that the clients asked and make
changes if there is any.
page | 6
There are some problems met
during construction of this detached
unit. First is the retaining wall issues
because it is connected to the
neighbouring wall. In order to solve
this problem , they need to do it
carefully so the retaining wall will not
affect the neighbour’s existing wall.

Secondly, the swimming pool in the centre of the detached unit is a heavy structure which
cannot be connected to the other structure of the building. It will make the whole structure fall
apart due to its weight. Since it is a heavy structure, it should be built independently and not
tied back to the back of the main building structure. So, it won’t affect the main building if
there is any crack or sink.
This project takes around 2 to 3 years’ time to complete it.
Mini
Convention Centre
PROJECT
#2
The inspiration of design
concepts is implemented
from company’s
philosophy which stresses
on creativity in the
designs and also come
out with daring and bold
ideas. He said that we
should think out of box
and be creative in order to
get an attractive design.
The second projects which he was quite
satisfied with was the mini convention centre
which is still under the process of approval.
The chosen site for the mini convention
centre is located at Taman Seremban which is
surrounded by a commercial area with many
shop lots. It was designed with 49 units of
hotel rooms, a commercial block at the ground
floor, an event hall for functions to be held and
a mini theatre.
page | 7
Site Location:
For the detached unit, the site is chosen by the client beforehand. The client then look
for an architect ,which is me, to visit and analyze the site for further design process. As for
the convention centre, the site was no chosen. In fact, after I have been employed by the
client, I have to search for a site that is suitable for the construction of the convention centre
in consideration of the location, the needs of the community at that particular area, then
analyze a few chosen site and propose to the client. The client will then select from the few
sites that I have chosen through visitations to the sites and through my analysis.
Differences and
contrast between the
two projects
For the detached unit, I just need to
fulfill a small number of clients, for
example, the family members of that
particular detached unit as I just have to
fulfill their requirements. On the other
hand, for the convention centre, I have to
fulfill a large number of people, not just
the client but also the community.
Therefore, I will have to put the
requirements of the client and the
requirements of the community at that
area in consideration as the convention
centre is built for the community, not just
the client.
Landscape is one of the most important component for the detached unit where I have to
design and think where and how the landscapes of the house should be like. For example,
for this detached unit, there is an open space right in the middle of the house , which is the
grand living. I have designed an indoor landscape as one of the requirements of this project
is to blend the inside and outside.There are just minor consideration of landscapes for the
convention centre as the open areas should be car parking areas. There are just a small
area of landscape compared to the detached unit.
page | 8
Well, it’s obvious that the work load of the convention centre is far more heavier than the
detached unit as there are more details to be considered.
The budget for the detached unit is low and more flexible compared to the convention
centre as it is a private property with no business intention. The detached unit is their home so
the client are willing to pay more provided it is necessary to make their home a better place to
live in. As for the convention centre, the budget is higher as it is five times bigger than the
detached unit. Besides, it is a business based project so the budget is restricted as most of
the clients involved are business minded and will not consider to pay more if there is really not
necessary.
The legal process of the detached unit is slightly shorter compared to the convention
centre as the convention centre is a much bigger project which will have a bigger impact on
the community. Therefore, the process will take about 3 to 4 years for approval as the local
authorities will have to look very deeply in it.
page | 9
FNBE | January 2015 Intake | Introduction to the Construction Industry | Project 1B
Lee Yet Yee | Madeline Liew Zhi Qi | Law Jia Xin | Lim Woo Leon | Lee Lin Hui | Koo Jian Xiang
His target of being an architect is to leave behind a legacy as he will not be
around forever but there is something that was left behind to remember of.

More Related Content

What's hot

Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Kai Yun Pang
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalKai Yun Pang
 
internship report on architecture
internship report on architectureinternship report on architecture
internship report on architecturebiruktigistu1
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeepSandeep Yadav
 
Professional Practice I Assignment
Professional Practice I AssignmentProfessional Practice I Assignment
Professional Practice I Assignmentashleyyeap
 
Professional Practice for Architecture II
Professional Practice for Architecture IIProfessional Practice for Architecture II
Professional Practice for Architecture IIAr. Mukunda K.S
 
Project Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A ProjectProject Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A ProjectNekumi Kida
 
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006Melvin Lim
 
Professional Practice 1 Assignment
Professional Practice 1 AssignmentProfessional Practice 1 Assignment
Professional Practice 1 AssignmentMelvin Lim
 
Interior Design Project Proposal PowerPoint Presentation Slides
Interior Design Project Proposal PowerPoint Presentation SlidesInterior Design Project Proposal PowerPoint Presentation Slides
Interior Design Project Proposal PowerPoint Presentation SlidesSlideTeam
 
Architectural competitions
Architectural  competitionsArchitectural  competitions
Architectural competitionszehbamp
 
The future of coworking space in India
The future of coworking space in IndiaThe future of coworking space in India
The future of coworking space in IndiaShaswata Mukherjee
 
Project brief 1 architecture studio 4 august2015
Project brief 1 architecture studio 4 august2015Project brief 1 architecture studio 4 august2015
Project brief 1 architecture studio 4 august2015Preston Liew
 
Group Housing (Library Study)
Group Housing (Library Study)Group Housing (Library Study)
Group Housing (Library Study)Mansi Pushpakar
 
PP2 final report
PP2 final reportPP2 final report
PP2 final reportArissa Loh
 
Role of Indian Institute of Architects as a professional body in India
Role of Indian Institute of Architects as a professional body in IndiaRole of Indian Institute of Architects as a professional body in India
Role of Indian Institute of Architects as a professional body in IndiaKrittika Walia
 
The architect as contract administrator a legal perspective - presentation ...
The architect as contract administrator   a legal perspective - presentation ...The architect as contract administrator   a legal perspective - presentation ...
The architect as contract administrator a legal perspective - presentation ...Zainab Zainordin
 

What's hot (20)

Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost Appraisal
 
internship report on architecture
internship report on architectureinternship report on architecture
internship report on architecture
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeep
 
Report final
Report finalReport final
Report final
 
Utility of sociology
Utility of sociologyUtility of sociology
Utility of sociology
 
Professional Practice I Assignment
Professional Practice I AssignmentProfessional Practice I Assignment
Professional Practice I Assignment
 
Professional Practice for Architecture II
Professional Practice for Architecture IIProfessional Practice for Architecture II
Professional Practice for Architecture II
 
Project Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A ProjectProject Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A Project
 
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006
 
Professional practice notes-jamia millia islamia - 5th year
Professional practice notes-jamia millia islamia - 5th year Professional practice notes-jamia millia islamia - 5th year
Professional practice notes-jamia millia islamia - 5th year
 
Professional Practice 1 Assignment
Professional Practice 1 AssignmentProfessional Practice 1 Assignment
Professional Practice 1 Assignment
 
Interior Design Project Proposal PowerPoint Presentation Slides
Interior Design Project Proposal PowerPoint Presentation SlidesInterior Design Project Proposal PowerPoint Presentation Slides
Interior Design Project Proposal PowerPoint Presentation Slides
 
Architectural competitions
Architectural  competitionsArchitectural  competitions
Architectural competitions
 
The future of coworking space in India
The future of coworking space in IndiaThe future of coworking space in India
The future of coworking space in India
 
Project brief 1 architecture studio 4 august2015
Project brief 1 architecture studio 4 august2015Project brief 1 architecture studio 4 august2015
Project brief 1 architecture studio 4 august2015
 
Group Housing (Library Study)
Group Housing (Library Study)Group Housing (Library Study)
Group Housing (Library Study)
 
PP2 final report
PP2 final reportPP2 final report
PP2 final report
 
Role of Indian Institute of Architects as a professional body in India
Role of Indian Institute of Architects as a professional body in IndiaRole of Indian Institute of Architects as a professional body in India
Role of Indian Institute of Architects as a professional body in India
 
The architect as contract administrator a legal perspective - presentation ...
The architect as contract administrator   a legal perspective - presentation ...The architect as contract administrator   a legal perspective - presentation ...
The architect as contract administrator a legal perspective - presentation ...
 

Viewers also liked

Challenging The Role Of The Architect
Challenging The Role Of The ArchitectChallenging The Role Of The Architect
Challenging The Role Of The ArchitectKevin Francis
 
The Role of an Architect
The Role of an ArchitectThe Role of an Architect
The Role of an ArchitectRajesh Raheja
 
Malaysia's Architect Act 1967 & Architect Rules 1996 (amended 2010)
Malaysia's Architect Act 1967 & Architect Rules 1996 (amended 2010)Malaysia's Architect Act 1967 & Architect Rules 1996 (amended 2010)
Malaysia's Architect Act 1967 & Architect Rules 1996 (amended 2010)Zhao Wei Kim
 
The role of an Architect
The role of an ArchitectThe role of an Architect
The role of an ArchitectClara Lee
 
The Role Of An Architect
The Role Of An ArchitectThe Role Of An Architect
The Role Of An Architectllangit
 
Malaysian Property Development
Malaysian Property DevelopmentMalaysian Property Development
Malaysian Property DevelopmentDebbie Loh
 
11 Things Healthy People Do Every Morning
11 Things Healthy People Do Every Morning11 Things Healthy People Do Every Morning
11 Things Healthy People Do Every MorningEason Chan
 

Viewers also liked (9)

Chapter2 slides
Chapter2 slidesChapter2 slides
Chapter2 slides
 
Challenging The Role Of The Architect
Challenging The Role Of The ArchitectChallenging The Role Of The Architect
Challenging The Role Of The Architect
 
Role of an architect
Role of an architectRole of an architect
Role of an architect
 
The Role of an Architect
The Role of an ArchitectThe Role of an Architect
The Role of an Architect
 
Malaysia's Architect Act 1967 & Architect Rules 1996 (amended 2010)
Malaysia's Architect Act 1967 & Architect Rules 1996 (amended 2010)Malaysia's Architect Act 1967 & Architect Rules 1996 (amended 2010)
Malaysia's Architect Act 1967 & Architect Rules 1996 (amended 2010)
 
The role of an Architect
The role of an ArchitectThe role of an Architect
The role of an Architect
 
The Role Of An Architect
The Role Of An ArchitectThe Role Of An Architect
The Role Of An Architect
 
Malaysian Property Development
Malaysian Property DevelopmentMalaysian Property Development
Malaysian Property Development
 
11 Things Healthy People Do Every Morning
11 Things Healthy People Do Every Morning11 Things Healthy People Do Every Morning
11 Things Healthy People Do Every Morning
 

Similar to Ici magazine final

Ici magazine final final
Ici magazine final finalIci magazine final final
Ici magazine final finalLin Hui
 
The tomorrow company power point by aung thu
The tomorrow company power point by aung thuThe tomorrow company power point by aung thu
The tomorrow company power point by aung thuSAIFULLAH MAHMUD
 
ICI_P2_MAGAZINE
ICI_P2_MAGAZINEICI_P2_MAGAZINE
ICI_P2_MAGAZINEMao Hua
 
Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...
Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...
Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...Virtu Institute
 
Defining and documenting a project
Defining and documenting a projectDefining and documenting a project
Defining and documenting a projectJing Fan Koh
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1zerospaces_
 
DPS Hi End Manufacturing Brochure
DPS Hi End Manufacturing BrochureDPS Hi End Manufacturing Brochure
DPS Hi End Manufacturing Brochureannmarie1964
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project ProposalJo Balucanag - Bitonio
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryAkshika Mahanama
 
The Bespoke Building System (BeBS) Project CharterProject Detail.docx
The Bespoke Building System (BeBS) Project CharterProject Detail.docxThe Bespoke Building System (BeBS) Project CharterProject Detail.docx
The Bespoke Building System (BeBS) Project CharterProject Detail.docxmehek4
 
Primavera Project Management P6 Course Session 1
Primavera Project Management P6 Course Session 1Primavera Project Management P6 Course Session 1
Primavera Project Management P6 Course Session 1Mohamed Adel
 
Company profile tw landscaping
Company profile tw landscapingCompany profile tw landscaping
Company profile tw landscapingTeck Wei
 
Professional_practice_coa
Professional_practice_coaProfessional_practice_coa
Professional_practice_coaYogesh Bhardwaj
 
Professional_practice_I.pptx
Professional_practice_I.pptxProfessional_practice_I.pptx
Professional_practice_I.pptxYogesh Bhardwaj
 
Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice Ar. Mukunda K.S
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020MTAF
 

Similar to Ici magazine final (20)

Ici magazine final final
Ici magazine final finalIci magazine final final
Ici magazine final final
 
Ici magazine final final
 Ici magazine final final Ici magazine final final
Ici magazine final final
 
ARTSCAPE_Introduction
ARTSCAPE_IntroductionARTSCAPE_Introduction
ARTSCAPE_Introduction
 
The tomorrow company power point by aung thu
The tomorrow company power point by aung thuThe tomorrow company power point by aung thu
The tomorrow company power point by aung thu
 
Design Brief Fundamentals
Design Brief FundamentalsDesign Brief Fundamentals
Design Brief Fundamentals
 
ICI_P2_MAGAZINE
ICI_P2_MAGAZINEICI_P2_MAGAZINE
ICI_P2_MAGAZINE
 
Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...
Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...
Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...
 
Defining and documenting a project
Defining and documenting a projectDefining and documenting a project
Defining and documenting a project
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1
 
DPS Hi End Manufacturing Brochure
DPS Hi End Manufacturing BrochureDPS Hi End Manufacturing Brochure
DPS Hi End Manufacturing Brochure
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project Proposal
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
 
The Bespoke Building System (BeBS) Project CharterProject Detail.docx
The Bespoke Building System (BeBS) Project CharterProject Detail.docxThe Bespoke Building System (BeBS) Project CharterProject Detail.docx
The Bespoke Building System (BeBS) Project CharterProject Detail.docx
 
Primavera Project Management P6 Course Session 1
Primavera Project Management P6 Course Session 1Primavera Project Management P6 Course Session 1
Primavera Project Management P6 Course Session 1
 
Company profile tw landscaping
Company profile tw landscapingCompany profile tw landscaping
Company profile tw landscaping
 
Final ici 1
Final ici 1Final ici 1
Final ici 1
 
Professional_practice_coa
Professional_practice_coaProfessional_practice_coa
Professional_practice_coa
 
Professional_practice_I.pptx
Professional_practice_I.pptxProfessional_practice_I.pptx
Professional_practice_I.pptx
 
Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020
 

More from Jian Leo

Arch design studio 2 module outline
Arch design studio 2 module outlineArch design studio 2 module outline
Arch design studio 2 module outlineJian Leo
 
Module outline bm
Module outline bmModule outline bm
Module outline bmJian Leo
 
Arch design studio 1 module outline
Arch design studio 1 module outlineArch design studio 1 module outline
Arch design studio 1 module outlineJian Leo
 
Design communication [arc 1713] module outline - march 2016
Design communication [arc 1713]   module outline - march 2016Design communication [arc 1713]   module outline - march 2016
Design communication [arc 1713] module outline - march 2016Jian Leo
 
Precedent studies project 1 brief
Precedent studies project 1 briefPrecedent studies project 1 brief
Precedent studies project 1 briefJian Leo
 
Assessment
AssessmentAssessment
AssessmentJian Leo
 
Short film concept
Short film conceptShort film concept
Short film conceptJian Leo
 
Story of jean
Story of jeanStory of jean
Story of jeanJian Leo
 
Asuna’s university life
Asuna’s university lifeAsuna’s university life
Asuna’s university lifeJian Leo
 
Social psychology journal
Social psychology journalSocial psychology journal
Social psychology journalJian Leo
 
Design project two a brief
Design project two a briefDesign project two a brief
Design project two a briefJian Leo
 
Design project one full brief
Design project one full   briefDesign project one full   brief
Design project one full briefJian Leo
 
Maths survey form
Maths survey formMaths survey form
Maths survey formJian Leo
 
Maths final report
Maths final reportMaths final report
Maths final reportJian Leo
 
Maths exercise
Maths exerciseMaths exercise
Maths exerciseJian Leo
 
Exercise 1 area and volume
Exercise 1   area and volumeExercise 1   area and volume
Exercise 1 area and volumeJian Leo
 
Maths quadrilateral presentation
Maths quadrilateral presentationMaths quadrilateral presentation
Maths quadrilateral presentationJian Leo
 
Epc business integrated final report
Epc business integrated final reportEpc business integrated final report
Epc business integrated final reportJian Leo
 
English compare and contrast essay
English compare and contrast essay English compare and contrast essay
English compare and contrast essay Jian Leo
 

More from Jian Leo (20)

Arch design studio 2 module outline
Arch design studio 2 module outlineArch design studio 2 module outline
Arch design studio 2 module outline
 
Module outline bm
Module outline bmModule outline bm
Module outline bm
 
Arch design studio 1 module outline
Arch design studio 1 module outlineArch design studio 1 module outline
Arch design studio 1 module outline
 
Design communication [arc 1713] module outline - march 2016
Design communication [arc 1713]   module outline - march 2016Design communication [arc 1713]   module outline - march 2016
Design communication [arc 1713] module outline - march 2016
 
Precedent studies project 1 brief
Precedent studies project 1 briefPrecedent studies project 1 brief
Precedent studies project 1 brief
 
Assessment
AssessmentAssessment
Assessment
 
Short film concept
Short film conceptShort film concept
Short film concept
 
Story of jean
Story of jeanStory of jean
Story of jean
 
Asuna’s university life
Asuna’s university lifeAsuna’s university life
Asuna’s university life
 
Social psychology journal
Social psychology journalSocial psychology journal
Social psychology journal
 
Dpj brief
Dpj briefDpj brief
Dpj brief
 
Design project two a brief
Design project two a briefDesign project two a brief
Design project two a brief
 
Design project one full brief
Design project one full   briefDesign project one full   brief
Design project one full brief
 
Maths survey form
Maths survey formMaths survey form
Maths survey form
 
Maths final report
Maths final reportMaths final report
Maths final report
 
Maths exercise
Maths exerciseMaths exercise
Maths exercise
 
Exercise 1 area and volume
Exercise 1   area and volumeExercise 1   area and volume
Exercise 1 area and volume
 
Maths quadrilateral presentation
Maths quadrilateral presentationMaths quadrilateral presentation
Maths quadrilateral presentation
 
Epc business integrated final report
Epc business integrated final reportEpc business integrated final report
Epc business integrated final report
 
English compare and contrast essay
English compare and contrast essay English compare and contrast essay
English compare and contrast essay
 

Ici magazine final

  • 1. Architect Foundation in Natural & Built Environment January 2015 Ar. SW Lee EXCLUSIVE Detached Unit favourite design Role & Responsibility of an Architect SW Lee Architect his company
  • 2. Company Profile: SW Lee Architect Interviewee Profile: SW Lee Roles & Responsibility Projects Involved Project #1: Detached Unit Project #2: Mini Convention Centre Differences between Two Projects Ar.Lee formed his own company - S W Lee Architect with a new approach which i s t o d e v e l o p a company which can stay ahead in design, suit the contextual environment, and based on a unique c o n c e p t . H e p e r s o n a l l y h a n d picked his staffs with a g o o d c r e a t i v e q u a l i t y a n d c o m m i t m e n t . H i s company started out with a team of 8 members and started up a small office in Taman Bukit Emas. Content SW Lee ArchitectCOMPANY PROFILE 1 2 3 4 5 7 8 page | 1
  • 3. Ar. SW Lee Ar. Lee had been working for 25 years as an architect. He studied architecture in the National University of Singapore (NUS) in 1982 and finished his masters in 1988. He then worked as an architect for 4 years in Singapore. After 4 years of working experience in Singapore, he started a partnership company in Seremban named Architect Saujana. Finally, in year 1995, he started his own company named SW Lee Architect. INTERVIEWEE PROFILE He have his own way of dealing with different clients,. He is flexible in his approach especially to those who are extra fussy. Some of the clients do not know what they want so it’s his responsible to lead and advice them. What keeps him going on his journey as an architect was the satisfaction when each project was completed and it is appreciated by the clients. He will be motivated to do better every single time to fulfill the client’s requirements. NEVER say die & NEVER give up “ ” page | 2
  • 4. Basically, an architect fulfill the requirements of every clients based on the types of projects offered. He will have to come out with various conceptual design sketches and put them into drawings for submission and construction. In addition, he will also have to help in preparing many tender documents and work alongside with contractors. During construction, he is responsible to supervise the works on site and check whether the works are done accordingly to their drawings as well as solving every problem that arise during construction. He is also authorized to issue the Certificate of Compliance and Completion ( CCC ) when the building is completed. Roles & Responsibility S o m e o f t h e c o m m o n problems faced are technical problems that arise during construction period for example errors in the joints, the building was not built accordingly to the plan provided. page | 3
  • 5. Projects Involved He is in charge of various projects ranging from the smallest to the slightly bigger ones namely residential buildings, commercial buildings, industrial buildings, educational buildings and many more. For the residential building, he was employed to design bungalows, housing areas, semi- detached units and detached units. On the other hand, he had designed shop lots, hotels and shopping malls which falls under the category of commercial buildings. For the industrial building, he was employed to design a factory at Port Klang as well as schools which are educational buildings. He is also involved in many other projects for example, hospitals, community blocks and etc. page | 4 Residential Building Commercial Building Industrial Building Educational Building Hospital
  • 6. One of his favourite project designing a resort style detached unit. The design process for the detached unit begins with analyzing the site which includes a few main aspects namely topography, microclimate, visual study and character of the site. Then, a brief will be given by the client and he will have to plan accordingly to the client’s requirements. For this project, he was requested to design a resort style detached unit which blends the inside and outside. The client also requested that the detached unit must have good ventilation , shade and comfort. A conceptual design will be proposed after combining all the ideas and requirements of the client. After having an overall idea of the design, he then draw out the building using computer aided software’s like AutoCAD and Sketchup. A budget for the detached unit will be establish as soon as the plans are ready. He will get advices from other profession about the building which includes the suitability of design, and the estimated cost and time of construction. Detached UnitPROJECT #1 page | 5
  • 7. After the client has approved the outcome of the design, it will be send to the local authorities for approval. After the approval, construction is able to start. During construction, regular site visits are needed to ensure the project is running on time and to the building specifications as well as resolving any problems that arise during the construction period. The legal and contractual procedures for all the projects are quite the same which is to prepare an award letter and a contractor document to the successful contractor as it will spell out all the terms and conditions for the contractors to finish their work. Submission of progressive reports on the progress of the construction to local authorities are also needed to keep them updated at anytime. Next, he will propose the design to the client for approval by using plans, sketched and models. He will also answer every question that the clients asked and make changes if there is any. page | 6 There are some problems met during construction of this detached unit. First is the retaining wall issues because it is connected to the neighbouring wall. In order to solve this problem , they need to do it carefully so the retaining wall will not affect the neighbour’s existing wall.
 Secondly, the swimming pool in the centre of the detached unit is a heavy structure which cannot be connected to the other structure of the building. It will make the whole structure fall apart due to its weight. Since it is a heavy structure, it should be built independently and not tied back to the back of the main building structure. So, it won’t affect the main building if there is any crack or sink. This project takes around 2 to 3 years’ time to complete it.
  • 8. Mini Convention Centre PROJECT #2 The inspiration of design concepts is implemented from company’s philosophy which stresses on creativity in the designs and also come out with daring and bold ideas. He said that we should think out of box and be creative in order to get an attractive design. The second projects which he was quite satisfied with was the mini convention centre which is still under the process of approval. The chosen site for the mini convention centre is located at Taman Seremban which is surrounded by a commercial area with many shop lots. It was designed with 49 units of hotel rooms, a commercial block at the ground floor, an event hall for functions to be held and a mini theatre. page | 7 Site Location:
  • 9. For the detached unit, the site is chosen by the client beforehand. The client then look for an architect ,which is me, to visit and analyze the site for further design process. As for the convention centre, the site was no chosen. In fact, after I have been employed by the client, I have to search for a site that is suitable for the construction of the convention centre in consideration of the location, the needs of the community at that particular area, then analyze a few chosen site and propose to the client. The client will then select from the few sites that I have chosen through visitations to the sites and through my analysis. Differences and contrast between the two projects For the detached unit, I just need to fulfill a small number of clients, for example, the family members of that particular detached unit as I just have to fulfill their requirements. On the other hand, for the convention centre, I have to fulfill a large number of people, not just the client but also the community. Therefore, I will have to put the requirements of the client and the requirements of the community at that area in consideration as the convention centre is built for the community, not just the client. Landscape is one of the most important component for the detached unit where I have to design and think where and how the landscapes of the house should be like. For example, for this detached unit, there is an open space right in the middle of the house , which is the grand living. I have designed an indoor landscape as one of the requirements of this project is to blend the inside and outside.There are just minor consideration of landscapes for the convention centre as the open areas should be car parking areas. There are just a small area of landscape compared to the detached unit. page | 8
  • 10. Well, it’s obvious that the work load of the convention centre is far more heavier than the detached unit as there are more details to be considered. The budget for the detached unit is low and more flexible compared to the convention centre as it is a private property with no business intention. The detached unit is their home so the client are willing to pay more provided it is necessary to make their home a better place to live in. As for the convention centre, the budget is higher as it is five times bigger than the detached unit. Besides, it is a business based project so the budget is restricted as most of the clients involved are business minded and will not consider to pay more if there is really not necessary. The legal process of the detached unit is slightly shorter compared to the convention centre as the convention centre is a much bigger project which will have a bigger impact on the community. Therefore, the process will take about 3 to 4 years for approval as the local authorities will have to look very deeply in it. page | 9
  • 11. FNBE | January 2015 Intake | Introduction to the Construction Industry | Project 1B Lee Yet Yee | Madeline Liew Zhi Qi | Law Jia Xin | Lim Woo Leon | Lee Lin Hui | Koo Jian Xiang His target of being an architect is to leave behind a legacy as he will not be around forever but there is something that was left behind to remember of.