Architect
Foundation in Natural &
Built Environment
January 2015
Ar. SW Lee
EXCLUSIVE
Detached Unit
favourite design
Roles & Responsibilities
of an Architect
SW Lee Architect
his company
Company Profile: SW Lee Architect
Interviewee Profile: SW Lee
Roles & Responsibility
Projects Involved
Project #1: Detached Unit
Project #2: Mini Convention Centre
Differences between Two Projects
Reflection
Ar.Lee formed his
own company - S W
Lee Architect with a
new approach which
i s t o d e v e l o p a
company which can
stay ahead in design,
suit the contextual
environment, and
based on a unique
c o n c e p t . H e
p e r s o n a l l y h a n d
picked his staffs with
a g o o d c r e a t i v e
q u a l i t y a n d
c o m m i t m e n t . H i s
company started out
with a team of 8
members and started
up a small office in
Taman Bukit Emas.
Content
SW Lee ArchitectCOMPANY
PROFILE
1
2
3
4
5
7
8
10
page | 1
Ar. SW Lee
Ar. Lee had been working for 25 years as an architect. He studied architecture in the
National University of Singapore (NUS) in 1982 and finished his masters in 1988. He then
worked as an architect for 4 years in Singapore. After 4 years of working experience in
Singapore, he started a partnership company in Seremban named Architect Saujana.
Finally, in year 1995, he started his own company named SW Lee Architect.
INTERVIEWEE
PROFILE
He have his own way of dealing with
different clients,. He is flexible in his
approach especially to those who are
extra fussy. Some of the clients do not
know what they want so it’s his
responsible to lead and advice them.
What keeps him going on his journey
as an architect was the satisfaction when
each project was completed and it is
appreciated by the clients. He will be
motivated to do better every single time
to fulfill the client’s requirements.
NEVER
say die
&
NEVER
give up
“
”
page | 2
Basically, an architect fulfill the
requirements of every clients based on the
types of projects offered. He will have to
come out with various conceptual design
sketches and put them into drawings for
submission and construction. In addition,
he will also have to help in preparing many
tender documents and work alongside with
contractors. During construction, he is
responsible to supervise the works on site
and check whether the works are done
accordingly to their drawings as well as
solving every problem that arise during
construction. He is also authorized to issue
the Certificate of Compliance and
Completion ( CCC ) when the building is
completed.
Roles & Responsibilities
S o m e o f t h e c o m m o n
problems faced are technical
problems that arise during
construction period for example
errors in the joints, the building
was not built accordingly to the
plan provided.
page | 3
Projects
Involved
He is in charge of various projects ranging
from the smallest to the slightly bigger ones
namely residential buildings, commercial
buildings, industrial buildings, educational
buildings and many more.
For the residential building, he was employed
to design bungalows, housing areas, semi-
detached units and detached units.
On the other hand, he had designed shop lots,
hotels and shopping malls which falls under
the category of commercial buildings.
For the industrial building, he was employed to
design a factory at Port Klang as well as
schools which are educational buildings.
He is also involved in many other projects for
example, hospitals, community blocks and etc.
page | 4
Residential Building
Commercial Building
Industrial Building
Educational Building
Hospital
One of his favourite project designing a
resort style detached unit. The design process
for the detached unit begins with analyzing the
site which includes a few main aspects
namely topography, microclimate, visual study
and character of the site. Then, a brief will be
given by the client and he will have to plan
accordingly to the client’s requirements. For
this project, he was requested to design a
resort style detached unit which blends the
inside and outside. The client also requested
that the detached unit must have good
ventilation , shade and comfort.
A conceptual design will be proposed
after combining all the ideas and
requirements of the client. After having an
overall idea of the design, he then draw out
the building using computer aided
software’s like AutoCAD and Sketchup.
A budget for the detached unit will be
establish as soon as the plans are ready.
He will get advices from other profession
about the building which includes the
suitability of design, and the estimated cost
and time of construction.
Detached UnitPROJECT
#1
page | 5
After the client has approved the outcome
of the design, it will be send to the local
authorities for approval. After the approval,
construction is able to start. During
construction, regular site visits are needed to
ensure the project is running on time and to the
building specifications as well as resolving any
problems that arise during the construction
period.
The legal and contractual procedures for
all the projects are quite the same which is to
prepare an award letter and a contractor
document to the successful contractor as it will
spell out all the terms and conditions for the
contractors to finish their work. Submission of
progressive reports on the progress of the
construction to local authorities are also
needed to keep them updated at anytime.
Next, he will propose the design to the
client for approval by using plans, sketched
and models. He will also answer every
question that the clients asked and make
changes if there is any.
page | 6
There are some problems met
during construction of this detached
unit. First is the retaining wall issues
because it is connected to the
neighbouring wall. In order to solve
this problem , they need to do it
carefully so the retaining wall will not
affect the neighbour’s existing wall.

Secondly, the swimming pool in the centre of the detached unit is a heavy structure which
cannot be connected to the other structure of the building. It will make the whole structure fall
apart due to its weight. Since it is a heavy structure, it should be built independently and not
tied back to the back of the main building structure. So, it won’t affect the main building if
there is any crack or sink.
This project takes around 2 to 3 years’ time to complete it.
Mini
Convention Centre
PROJECT
#2
The inspiration of design
concepts is implemented
from company’s
philosophy which stresses
on creativity in the
designs and also come
out with daring and bold
ideas. He said that we
should think out of box
and be creative in order to
get an attractive design.
The second projects which he was quite
satisfied with was the mini convention centre
which is still under the process of approval.
The chosen site for the mini convention
centre is located at Taman Seremban which is
surrounded by a commercial area with many
shop lots. It was designed with 49 units of
hotel rooms, a commercial block at the ground
floor, an event hall for functions to be held and
a mini theatre.
Site Location:
page | 7
For the detached unit, the site is chosen by the client beforehand. The client then look
for an architect ,which is me, to visit and analyze the site for further design process. As for
the convention centre, the site was no chosen. In fact, after I have been employed by the
client, I have to search for a site that is suitable for the construction of the convention centre
in consideration of the location, the needs of the community at that particular area, then
analyze a few chosen site and propose to the client. The client will then select from the few
sites that I have chosen through visitations to the sites and through my analysis.
Differences and
contrast between the
two projects
For the detached unit, I just need to
fulfill a small number of clients, for
example, the family members of that
particular detached unit as I just have to
fulfill their requirements. On the other
hand, for the convention centre, I have to
fulfill a large number of people, not just
the client but also the community.
Therefore, I will have to put the
requirements of the client and the
requirements of the community at that
area in consideration as the convention
centre is built for the community, not just
the client.
Landscape is one of the most important component for the detached unit where I have to
design and think where and how the landscapes of the house should be like. For example,
for this detached unit, there is an open space right in the middle of the house , which is the
grand living. I have designed an indoor landscape as one of the requirements of this project
is to blend the inside and outside.There are just minor consideration of landscapes for the
convention centre as the open areas should be car parking areas. There are just a small
area of landscape compared to the detached unit.
page | 8
Well, it’s obvious that the work load of the convention centre is far more heavier than the
detached unit as there are more details to be considered.
The budget for the detached unit is low and more flexible compared to the convention
centre as it is a private property with no business intention. The detached unit is their home so
the client are willing to pay more provided it is necessary to make their home a better place to
live in. As for the convention centre, the budget is higher as it is five times bigger than the
detached unit. Besides, it is a business based project so the budget is restricted as most of
the clients involved are business minded and will not consider to pay more if there is really not
necessary.
The legal process of the detached unit is slightly shorter compared to the convention
centre as the convention centre is a much bigger project which will have a bigger impact on
the community. Therefore, the process will take about 3 to 4 years for approval as the local
authorities will have to look very deeply in it.
page | 9
Madeline Liew Zhi Qi
Reflection
page | 10
Lee Yet Yee
Law Jia XinLim Woo Leon Lee Lin Hui
Koo Jian Xiang
Prepared by:
Throughout the process of interviewing the architect, we were able to have an in-depth
understanding of what an architect do in the construction industry. In addition, we
gained more knowledge on the roles and responsibilities of an architect which helped
us to have a clearer picture of what we are going to do in the future as an architect. We
also learned more about the design process of a building which will be a guideline for
us when designing any types of buildings.
Besides gaining more knowledge of architecture, we were inspired by looking at the
different projects done by our interviewee and his passion towards architecture had
motivated us to strive harder in becoming a successful architect in the future just like
him. We also gained some useful tips on how to deal with different clients in the future
which is an important skill for us.
In the process of making the magazine, we learned how to cooperate with different
type of personality and find the best solution to produce a good magazine. We also
learned how to interpret information from the conversation which is an important
aspect for us in our future studies.
Last but not least,
we learned how to
accept different
o p i n i o n s f r o m
each of our team
m e m b e r. T h i s
really helped us to
i m p r o v e o u r
interpersonal skill
a n d w e w e r e
h a p p y t h a t
everything went
out well till the end
of the project with
much satisfaction.
FNBE | January 2015 Intake | Introduction to the Construction Industry | Project 1B
Lee Yet Yee | Madeline Liew Zhi Qi | Law Jia Xin | Lim Woo Leon | Lee Lin Hui | Koo Jian Xiang
His target of being an architect is to leave behind a legacy as he will not be
around forever but there is something that was left behind to remember of.

More Related Content

What's hot

Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice Ar. Mukunda K.S
 
Professional Practice for Architecture II
Professional Practice for Architecture IIProfessional Practice for Architecture II
Professional Practice for Architecture IIAr. Mukunda K.S
 
Architectural Professional Practice - Ethics
Architectural Professional Practice - EthicsArchitectural Professional Practice - Ethics
Architectural Professional Practice - EthicsGalala University
 
Architectural Professional Practice - Introduction
Architectural Professional Practice - IntroductionArchitectural Professional Practice - Introduction
Architectural Professional Practice - IntroductionGalala University
 
Pages from Aspire Magazine Vol 9
Pages from Aspire Magazine Vol 9Pages from Aspire Magazine Vol 9
Pages from Aspire Magazine Vol 9Kelly Zimmer
 
Anurag Yadav, B.Voc Interior Design 1st Year ( Residential Design Portfolio)
Anurag Yadav, B.Voc Interior Design 1st Year ( Residential Design Portfolio)Anurag Yadav, B.Voc Interior Design 1st Year ( Residential Design Portfolio)
Anurag Yadav, B.Voc Interior Design 1st Year ( Residential Design Portfolio)dezyneecole
 
Inse 62301 Project Management Development Plan Presentation Group#20
Inse 62301   Project Management Development Plan Presentation   Group#20Inse 62301   Project Management Development Plan Presentation   Group#20
Inse 62301 Project Management Development Plan Presentation Group#20Sherif Hafez
 
Where an Architect stands in society.
Where an Architect stands in society.Where an Architect stands in society.
Where an Architect stands in society.Rahul Bajaj
 
Architectural competitions
Architectural  competitionsArchitectural  competitions
Architectural competitionszehbamp
 
Lessons in Project Management - 3 - Project Scoping and Contracting
Lessons in Project Management - 3 - Project Scoping and ContractingLessons in Project Management - 3 - Project Scoping and Contracting
Lessons in Project Management - 3 - Project Scoping and ContractingHabermann Frank
 

What's hot (16)

Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice
 
General Contractor Miami
General Contractor MiamiGeneral Contractor Miami
General Contractor Miami
 
Professional Practice for Architecture II
Professional Practice for Architecture IIProfessional Practice for Architecture II
Professional Practice for Architecture II
 
Matrix207
Matrix207Matrix207
Matrix207
 
The Architecture Profession
The Architecture ProfessionThe Architecture Profession
The Architecture Profession
 
Architectural Professional Practice - Ethics
Architectural Professional Practice - EthicsArchitectural Professional Practice - Ethics
Architectural Professional Practice - Ethics
 
SPA Professional Practice II
SPA Professional Practice IISPA Professional Practice II
SPA Professional Practice II
 
1 introduction arch_practice
1 introduction arch_practice1 introduction arch_practice
1 introduction arch_practice
 
Architectural Professional Practice - Introduction
Architectural Professional Practice - IntroductionArchitectural Professional Practice - Introduction
Architectural Professional Practice - Introduction
 
Pages from Aspire Magazine Vol 9
Pages from Aspire Magazine Vol 9Pages from Aspire Magazine Vol 9
Pages from Aspire Magazine Vol 9
 
Anurag Yadav, B.Voc Interior Design 1st Year ( Residential Design Portfolio)
Anurag Yadav, B.Voc Interior Design 1st Year ( Residential Design Portfolio)Anurag Yadav, B.Voc Interior Design 1st Year ( Residential Design Portfolio)
Anurag Yadav, B.Voc Interior Design 1st Year ( Residential Design Portfolio)
 
Inse 62301 Project Management Development Plan Presentation Group#20
Inse 62301   Project Management Development Plan Presentation   Group#20Inse 62301   Project Management Development Plan Presentation   Group#20
Inse 62301 Project Management Development Plan Presentation Group#20
 
Where an Architect stands in society.
Where an Architect stands in society.Where an Architect stands in society.
Where an Architect stands in society.
 
Earthern buildings
Earthern buildingsEarthern buildings
Earthern buildings
 
Architectural competitions
Architectural  competitionsArchitectural  competitions
Architectural competitions
 
Lessons in Project Management - 3 - Project Scoping and Contracting
Lessons in Project Management - 3 - Project Scoping and ContractingLessons in Project Management - 3 - Project Scoping and Contracting
Lessons in Project Management - 3 - Project Scoping and Contracting
 

Viewers also liked

LOUIE M. BUSTRIA- CIVIL ENGINEER
LOUIE M. BUSTRIA- CIVIL ENGINEERLOUIE M. BUSTRIA- CIVIL ENGINEER
LOUIE M. BUSTRIA- CIVIL ENGINEERLOUIE BUSTRIA
 
1987 Philippine Constitution
1987 Philippine Constitution1987 Philippine Constitution
1987 Philippine Constitutionmacol1390
 
Professional Education: An Interactive Quiz
Professional Education: An Interactive QuizProfessional Education: An Interactive Quiz
Professional Education: An Interactive QuizKharelle Mae Naduma
 
Licensure examination for teachers
Licensure examination for teachersLicensure examination for teachers
Licensure examination for teachersMina Olario
 
Csc reviewer
Csc reviewerCsc reviewer
Csc reviewerAilen Ala
 
Philippines civil-service-professional-reviewer-120728101340-phpapp01
Philippines civil-service-professional-reviewer-120728101340-phpapp01Philippines civil-service-professional-reviewer-120728101340-phpapp01
Philippines civil-service-professional-reviewer-120728101340-phpapp01alainquintos
 
Vocabulary for civil service tests manteshwer
Vocabulary for civil service tests   manteshwerVocabulary for civil service tests   manteshwer
Vocabulary for civil service tests manteshwervomitlaunch
 
Civil Service Eligibility Review Class (Overview)
Civil Service Eligibility Review Class (Overview)Civil Service Eligibility Review Class (Overview)
Civil Service Eligibility Review Class (Overview)Maam Lumanglas
 
Esp 3 2nd pt 2014 2015
Esp 3 2nd pt 2014 2015Esp 3 2nd pt 2014 2015
Esp 3 2nd pt 2014 2015Kate Castaños
 
K to 12 LAPG ENGLISH 3 Grammar Reviewer
K to 12 LAPG ENGLISH 3 Grammar ReviewerK to 12 LAPG ENGLISH 3 Grammar Reviewer
K to 12 LAPG ENGLISH 3 Grammar ReviewerLiGhT ArOhL
 
D R A W I N G I N S T R U M E N T S, M A T E R I A L S,And E Q U I P M E N...
D R A W I N G  I N S T R U M E N T S,  M A T E R I A L S,And  E Q U I P M E N...D R A W I N G  I N S T R U M E N T S,  M A T E R I A L S,And  E Q U I P M E N...
D R A W I N G I N S T R U M E N T S, M A T E R I A L S,And E Q U I P M E N...D.d. Lhiin
 
LET Practice test in Professional Education-Instructional Materials
LET Practice test in Professional Education-Instructional MaterialsLET Practice test in Professional Education-Instructional Materials
LET Practice test in Professional Education-Instructional MaterialsUniversity of Santo Tomas
 
LET sample questions - professional education set 1
LET sample questions - professional education set 1LET sample questions - professional education set 1
LET sample questions - professional education set 1John John Bartolome
 
Summative Tes in Mathematics for Grade III (K-12 Curriculum)
Summative Tes in Mathematics for Grade III (K-12 Curriculum)Summative Tes in Mathematics for Grade III (K-12 Curriculum)
Summative Tes in Mathematics for Grade III (K-12 Curriculum)Marites Limpin
 
K to 12 LAPG ENGLISH 3 Language Reviewer
K to 12 LAPG ENGLISH 3 Language ReviewerK to 12 LAPG ENGLISH 3 Language Reviewer
K to 12 LAPG ENGLISH 3 Language ReviewerLiGhT ArOhL
 
LICENSURE EXAM FOR TEACHERS
LICENSURE EXAM FOR TEACHERSLICENSURE EXAM FOR TEACHERS
LICENSURE EXAM FOR TEACHERSslrcsanpablo
 
K TO 12 GRADE 3 Unit Test in ENGLISH
K TO 12 GRADE 3 Unit Test in ENGLISHK TO 12 GRADE 3 Unit Test in ENGLISH
K TO 12 GRADE 3 Unit Test in ENGLISHLiGhT ArOhL
 
LET Practice test in Professional Education-principles and strategies in teac...
LET Practice test in Professional Education-principles and strategies in teac...LET Practice test in Professional Education-principles and strategies in teac...
LET Practice test in Professional Education-principles and strategies in teac...University of Santo Tomas
 

Viewers also liked (20)

LOUIE M. BUSTRIA- CIVIL ENGINEER
LOUIE M. BUSTRIA- CIVIL ENGINEERLOUIE M. BUSTRIA- CIVIL ENGINEER
LOUIE M. BUSTRIA- CIVIL ENGINEER
 
1987 Philippine Constitution
1987 Philippine Constitution1987 Philippine Constitution
1987 Philippine Constitution
 
Professional Education: An Interactive Quiz
Professional Education: An Interactive QuizProfessional Education: An Interactive Quiz
Professional Education: An Interactive Quiz
 
Licensure examination for teachers
Licensure examination for teachersLicensure examination for teachers
Licensure examination for teachers
 
ACH 121 Lecture 01 (Arch. Industry )
ACH 121 Lecture 01 (Arch. Industry )ACH 121 Lecture 01 (Arch. Industry )
ACH 121 Lecture 01 (Arch. Industry )
 
PI100 1st exam reviewer
PI100 1st exam reviewerPI100 1st exam reviewer
PI100 1st exam reviewer
 
Csc reviewer
Csc reviewerCsc reviewer
Csc reviewer
 
Philippines civil-service-professional-reviewer-120728101340-phpapp01
Philippines civil-service-professional-reviewer-120728101340-phpapp01Philippines civil-service-professional-reviewer-120728101340-phpapp01
Philippines civil-service-professional-reviewer-120728101340-phpapp01
 
Vocabulary for civil service tests manteshwer
Vocabulary for civil service tests   manteshwerVocabulary for civil service tests   manteshwer
Vocabulary for civil service tests manteshwer
 
Civil Service Eligibility Review Class (Overview)
Civil Service Eligibility Review Class (Overview)Civil Service Eligibility Review Class (Overview)
Civil Service Eligibility Review Class (Overview)
 
Esp 3 2nd pt 2014 2015
Esp 3 2nd pt 2014 2015Esp 3 2nd pt 2014 2015
Esp 3 2nd pt 2014 2015
 
K to 12 LAPG ENGLISH 3 Grammar Reviewer
K to 12 LAPG ENGLISH 3 Grammar ReviewerK to 12 LAPG ENGLISH 3 Grammar Reviewer
K to 12 LAPG ENGLISH 3 Grammar Reviewer
 
D R A W I N G I N S T R U M E N T S, M A T E R I A L S,And E Q U I P M E N...
D R A W I N G  I N S T R U M E N T S,  M A T E R I A L S,And  E Q U I P M E N...D R A W I N G  I N S T R U M E N T S,  M A T E R I A L S,And  E Q U I P M E N...
D R A W I N G I N S T R U M E N T S, M A T E R I A L S,And E Q U I P M E N...
 
LET Practice test in Professional Education-Instructional Materials
LET Practice test in Professional Education-Instructional MaterialsLET Practice test in Professional Education-Instructional Materials
LET Practice test in Professional Education-Instructional Materials
 
LET sample questions - professional education set 1
LET sample questions - professional education set 1LET sample questions - professional education set 1
LET sample questions - professional education set 1
 
Summative Tes in Mathematics for Grade III (K-12 Curriculum)
Summative Tes in Mathematics for Grade III (K-12 Curriculum)Summative Tes in Mathematics for Grade III (K-12 Curriculum)
Summative Tes in Mathematics for Grade III (K-12 Curriculum)
 
K to 12 LAPG ENGLISH 3 Language Reviewer
K to 12 LAPG ENGLISH 3 Language ReviewerK to 12 LAPG ENGLISH 3 Language Reviewer
K to 12 LAPG ENGLISH 3 Language Reviewer
 
LICENSURE EXAM FOR TEACHERS
LICENSURE EXAM FOR TEACHERSLICENSURE EXAM FOR TEACHERS
LICENSURE EXAM FOR TEACHERS
 
K TO 12 GRADE 3 Unit Test in ENGLISH
K TO 12 GRADE 3 Unit Test in ENGLISHK TO 12 GRADE 3 Unit Test in ENGLISH
K TO 12 GRADE 3 Unit Test in ENGLISH
 
LET Practice test in Professional Education-principles and strategies in teac...
LET Practice test in Professional Education-principles and strategies in teac...LET Practice test in Professional Education-principles and strategies in teac...
LET Practice test in Professional Education-principles and strategies in teac...
 

Similar to Ici magazine final final

The tomorrow company power point by aung thu
The tomorrow company power point by aung thuThe tomorrow company power point by aung thu
The tomorrow company power point by aung thuSAIFULLAH MAHMUD
 
ICI_P2_MAGAZINE
ICI_P2_MAGAZINEICI_P2_MAGAZINE
ICI_P2_MAGAZINEMao Hua
 
Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...
Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...
Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...Virtu Institute
 
Defining and documenting a project
Defining and documenting a projectDefining and documenting a project
Defining and documenting a projectJing Fan Koh
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1zerospaces_
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project ProposalJo Balucanag - Bitonio
 
DPS Hi End Manufacturing Brochure
DPS Hi End Manufacturing BrochureDPS Hi End Manufacturing Brochure
DPS Hi End Manufacturing Brochureannmarie1964
 
Primavera Project Management P6 Course Session 1
Primavera Project Management P6 Course Session 1Primavera Project Management P6 Course Session 1
Primavera Project Management P6 Course Session 1Mohamed Adel
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryAkshika Mahanama
 
Professional_practice_coa
Professional_practice_coaProfessional_practice_coa
Professional_practice_coaYogesh Bhardwaj
 
Professional_practice_I.pptx
Professional_practice_I.pptxProfessional_practice_I.pptx
Professional_practice_I.pptxYogesh Bhardwaj
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020MTAF
 
Know the project kickoff meeting and project execution plan
Know the project kickoff meeting and project execution planKnow the project kickoff meeting and project execution plan
Know the project kickoff meeting and project execution planNI BT
 
Company profile tw landscaping
Company profile tw landscapingCompany profile tw landscaping
Company profile tw landscapingTeck Wei
 
The Bespoke Building System (BeBS) Project CharterProject Detail.docx
The Bespoke Building System (BeBS) Project CharterProject Detail.docxThe Bespoke Building System (BeBS) Project CharterProject Detail.docx
The Bespoke Building System (BeBS) Project CharterProject Detail.docxmehek4
 

Similar to Ici magazine final final (20)

ARTSCAPE_Introduction
ARTSCAPE_IntroductionARTSCAPE_Introduction
ARTSCAPE_Introduction
 
The tomorrow company power point by aung thu
The tomorrow company power point by aung thuThe tomorrow company power point by aung thu
The tomorrow company power point by aung thu
 
Design Brief Fundamentals
Design Brief FundamentalsDesign Brief Fundamentals
Design Brief Fundamentals
 
ICI_P2_MAGAZINE
ICI_P2_MAGAZINEICI_P2_MAGAZINE
ICI_P2_MAGAZINE
 
Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...
Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...
Lecture 1 - An Introduction to Commercial-Institutional Interiors - VDIS10009...
 
Defining and documenting a project
Defining and documenting a projectDefining and documenting a project
Defining and documenting a project
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project Proposal
 
DPS Hi End Manufacturing Brochure
DPS Hi End Manufacturing BrochureDPS Hi End Manufacturing Brochure
DPS Hi End Manufacturing Brochure
 
Primavera Project Management P6 Course Session 1
Primavera Project Management P6 Course Session 1Primavera Project Management P6 Course Session 1
Primavera Project Management P6 Course Session 1
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
 
Professional_practice_coa
Professional_practice_coaProfessional_practice_coa
Professional_practice_coa
 
Professional_practice_I.pptx
Professional_practice_I.pptxProfessional_practice_I.pptx
Professional_practice_I.pptx
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020
 
pre-design phase
pre-design phasepre-design phase
pre-design phase
 
Project Management Demo
Project Management DemoProject Management Demo
Project Management Demo
 
Know the project kickoff meeting and project execution plan
Know the project kickoff meeting and project execution planKnow the project kickoff meeting and project execution plan
Know the project kickoff meeting and project execution plan
 
Company profile tw landscaping
Company profile tw landscapingCompany profile tw landscaping
Company profile tw landscaping
 
Final ici 1
Final ici 1Final ici 1
Final ici 1
 
The Bespoke Building System (BeBS) Project CharterProject Detail.docx
The Bespoke Building System (BeBS) Project CharterProject Detail.docxThe Bespoke Building System (BeBS) Project CharterProject Detail.docx
The Bespoke Building System (BeBS) Project CharterProject Detail.docx
 

More from Lin Hui

Financial Management
Financial ManagementFinancial Management
Financial ManagementLin Hui
 
Building Economics Presentation
Building Economics PresentationBuilding Economics Presentation
Building Economics PresentationLin Hui
 
Building Economics Report
Building Economics Report Building Economics Report
Building Economics Report Lin Hui
 
PP2 - Seminar Presentation
PP2 - Seminar Presentation PP2 - Seminar Presentation
PP2 - Seminar Presentation Lin Hui
 
PP2 - Group Assignment
PP2 - Group AssignmentPP2 - Group Assignment
PP2 - Group AssignmentLin Hui
 
Measurement 4 presentation
Measurement 4 presentationMeasurement 4 presentation
Measurement 4 presentationLin Hui
 
Assignment - software application for qs
Assignment - software application for qs Assignment - software application for qs
Assignment - software application for qs Lin Hui
 
Software application report
Software application report Software application report
Software application report Lin Hui
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1Lin Hui
 
Estimating
Estimating Estimating
Estimating Lin Hui
 
Management science
Management scienceManagement science
Management scienceLin Hui
 
Biodiversity Presentation - Conservation on Tapir
Biodiversity Presentation - Conservation on Tapir  Biodiversity Presentation - Conservation on Tapir
Biodiversity Presentation - Conservation on Tapir Lin Hui
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2 Lin Hui
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systemsLin Hui
 
Water treatment-for-domestic-water-supply - Report
Water treatment-for-domestic-water-supply - ReportWater treatment-for-domestic-water-supply - Report
Water treatment-for-domestic-water-supply - ReportLin Hui
 
Bs1 assignment semester 2016 august
Bs1 assignment   semester 2016 augustBs1 assignment   semester 2016 august
Bs1 assignment semester 2016 augustLin Hui
 
Water treatment-for-domestic-water-supply - Slides
Water treatment-for-domestic-water-supply - Slides Water treatment-for-domestic-water-supply - Slides
Water treatment-for-domestic-water-supply - Slides Lin Hui
 
M2 project assignment aug 2016
M2 project assignment aug 2016M2 project assignment aug 2016
M2 project assignment aug 2016Lin Hui
 
Ipoh railway station - Scientific Poster
Ipoh railway station - Scientific Poster Ipoh railway station - Scientific Poster
Ipoh railway station - Scientific Poster Lin Hui
 
Ms ct-bm
Ms ct-bmMs ct-bm
Ms ct-bmLin Hui
 

More from Lin Hui (20)

Financial Management
Financial ManagementFinancial Management
Financial Management
 
Building Economics Presentation
Building Economics PresentationBuilding Economics Presentation
Building Economics Presentation
 
Building Economics Report
Building Economics Report Building Economics Report
Building Economics Report
 
PP2 - Seminar Presentation
PP2 - Seminar Presentation PP2 - Seminar Presentation
PP2 - Seminar Presentation
 
PP2 - Group Assignment
PP2 - Group AssignmentPP2 - Group Assignment
PP2 - Group Assignment
 
Measurement 4 presentation
Measurement 4 presentationMeasurement 4 presentation
Measurement 4 presentation
 
Assignment - software application for qs
Assignment - software application for qs Assignment - software application for qs
Assignment - software application for qs
 
Software application report
Software application report Software application report
Software application report
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Estimating
Estimating Estimating
Estimating
 
Management science
Management scienceManagement science
Management science
 
Biodiversity Presentation - Conservation on Tapir
Biodiversity Presentation - Conservation on Tapir  Biodiversity Presentation - Conservation on Tapir
Biodiversity Presentation - Conservation on Tapir
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systems
 
Water treatment-for-domestic-water-supply - Report
Water treatment-for-domestic-water-supply - ReportWater treatment-for-domestic-water-supply - Report
Water treatment-for-domestic-water-supply - Report
 
Bs1 assignment semester 2016 august
Bs1 assignment   semester 2016 augustBs1 assignment   semester 2016 august
Bs1 assignment semester 2016 august
 
Water treatment-for-domestic-water-supply - Slides
Water treatment-for-domestic-water-supply - Slides Water treatment-for-domestic-water-supply - Slides
Water treatment-for-domestic-water-supply - Slides
 
M2 project assignment aug 2016
M2 project assignment aug 2016M2 project assignment aug 2016
M2 project assignment aug 2016
 
Ipoh railway station - Scientific Poster
Ipoh railway station - Scientific Poster Ipoh railway station - Scientific Poster
Ipoh railway station - Scientific Poster
 
Ms ct-bm
Ms ct-bmMs ct-bm
Ms ct-bm
 

Recently uploaded

CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...henrik385807
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024eCommerce Institute
 
Motivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdfMotivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdfakankshagupta7348026
 
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...NETWAYS
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024eCommerce Institute
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Krijn Poppe
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfhenrik385807
 
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
SBFT Tool Competition 2024 - CPS-UAV Test Case Generation Track
SBFT Tool Competition 2024 - CPS-UAV Test Case Generation TrackSBFT Tool Competition 2024 - CPS-UAV Test Case Generation Track
SBFT Tool Competition 2024 - CPS-UAV Test Case Generation TrackSebastiano Panichella
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSebastiano Panichella
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AITatiana Gurgel
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxFamilyWorshipCenterD
 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Salam Al-Karadaghi
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSebastiano Panichella
 
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
LANDMARKS  AND MONUMENTS IN NIGERIA.pptxLANDMARKS  AND MONUMENTS IN NIGERIA.pptx
LANDMARKS AND MONUMENTS IN NIGERIA.pptxBasil Achie
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝soniya singh
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...NETWAYS
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...NETWAYS
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )Pooja Nehwal
 

Recently uploaded (20)

CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024
 
Motivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdfMotivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdf
 
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
 
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
 
SBFT Tool Competition 2024 - CPS-UAV Test Case Generation Track
SBFT Tool Competition 2024 - CPS-UAV Test Case Generation TrackSBFT Tool Competition 2024 - CPS-UAV Test Case Generation Track
SBFT Tool Competition 2024 - CPS-UAV Test Case Generation Track
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AI
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation Track
 
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
LANDMARKS  AND MONUMENTS IN NIGERIA.pptxLANDMARKS  AND MONUMENTS IN NIGERIA.pptx
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
 

Ici magazine final final

  • 1. Architect Foundation in Natural & Built Environment January 2015 Ar. SW Lee EXCLUSIVE Detached Unit favourite design Roles & Responsibilities of an Architect SW Lee Architect his company
  • 2. Company Profile: SW Lee Architect Interviewee Profile: SW Lee Roles & Responsibility Projects Involved Project #1: Detached Unit Project #2: Mini Convention Centre Differences between Two Projects Reflection Ar.Lee formed his own company - S W Lee Architect with a new approach which i s t o d e v e l o p a company which can stay ahead in design, suit the contextual environment, and based on a unique c o n c e p t . H e p e r s o n a l l y h a n d picked his staffs with a g o o d c r e a t i v e q u a l i t y a n d c o m m i t m e n t . H i s company started out with a team of 8 members and started up a small office in Taman Bukit Emas. Content SW Lee ArchitectCOMPANY PROFILE 1 2 3 4 5 7 8 10 page | 1
  • 3. Ar. SW Lee Ar. Lee had been working for 25 years as an architect. He studied architecture in the National University of Singapore (NUS) in 1982 and finished his masters in 1988. He then worked as an architect for 4 years in Singapore. After 4 years of working experience in Singapore, he started a partnership company in Seremban named Architect Saujana. Finally, in year 1995, he started his own company named SW Lee Architect. INTERVIEWEE PROFILE He have his own way of dealing with different clients,. He is flexible in his approach especially to those who are extra fussy. Some of the clients do not know what they want so it’s his responsible to lead and advice them. What keeps him going on his journey as an architect was the satisfaction when each project was completed and it is appreciated by the clients. He will be motivated to do better every single time to fulfill the client’s requirements. NEVER say die & NEVER give up “ ” page | 2
  • 4. Basically, an architect fulfill the requirements of every clients based on the types of projects offered. He will have to come out with various conceptual design sketches and put them into drawings for submission and construction. In addition, he will also have to help in preparing many tender documents and work alongside with contractors. During construction, he is responsible to supervise the works on site and check whether the works are done accordingly to their drawings as well as solving every problem that arise during construction. He is also authorized to issue the Certificate of Compliance and Completion ( CCC ) when the building is completed. Roles & Responsibilities S o m e o f t h e c o m m o n problems faced are technical problems that arise during construction period for example errors in the joints, the building was not built accordingly to the plan provided. page | 3
  • 5. Projects Involved He is in charge of various projects ranging from the smallest to the slightly bigger ones namely residential buildings, commercial buildings, industrial buildings, educational buildings and many more. For the residential building, he was employed to design bungalows, housing areas, semi- detached units and detached units. On the other hand, he had designed shop lots, hotels and shopping malls which falls under the category of commercial buildings. For the industrial building, he was employed to design a factory at Port Klang as well as schools which are educational buildings. He is also involved in many other projects for example, hospitals, community blocks and etc. page | 4 Residential Building Commercial Building Industrial Building Educational Building Hospital
  • 6. One of his favourite project designing a resort style detached unit. The design process for the detached unit begins with analyzing the site which includes a few main aspects namely topography, microclimate, visual study and character of the site. Then, a brief will be given by the client and he will have to plan accordingly to the client’s requirements. For this project, he was requested to design a resort style detached unit which blends the inside and outside. The client also requested that the detached unit must have good ventilation , shade and comfort. A conceptual design will be proposed after combining all the ideas and requirements of the client. After having an overall idea of the design, he then draw out the building using computer aided software’s like AutoCAD and Sketchup. A budget for the detached unit will be establish as soon as the plans are ready. He will get advices from other profession about the building which includes the suitability of design, and the estimated cost and time of construction. Detached UnitPROJECT #1 page | 5
  • 7. After the client has approved the outcome of the design, it will be send to the local authorities for approval. After the approval, construction is able to start. During construction, regular site visits are needed to ensure the project is running on time and to the building specifications as well as resolving any problems that arise during the construction period. The legal and contractual procedures for all the projects are quite the same which is to prepare an award letter and a contractor document to the successful contractor as it will spell out all the terms and conditions for the contractors to finish their work. Submission of progressive reports on the progress of the construction to local authorities are also needed to keep them updated at anytime. Next, he will propose the design to the client for approval by using plans, sketched and models. He will also answer every question that the clients asked and make changes if there is any. page | 6 There are some problems met during construction of this detached unit. First is the retaining wall issues because it is connected to the neighbouring wall. In order to solve this problem , they need to do it carefully so the retaining wall will not affect the neighbour’s existing wall.
 Secondly, the swimming pool in the centre of the detached unit is a heavy structure which cannot be connected to the other structure of the building. It will make the whole structure fall apart due to its weight. Since it is a heavy structure, it should be built independently and not tied back to the back of the main building structure. So, it won’t affect the main building if there is any crack or sink. This project takes around 2 to 3 years’ time to complete it.
  • 8. Mini Convention Centre PROJECT #2 The inspiration of design concepts is implemented from company’s philosophy which stresses on creativity in the designs and also come out with daring and bold ideas. He said that we should think out of box and be creative in order to get an attractive design. The second projects which he was quite satisfied with was the mini convention centre which is still under the process of approval. The chosen site for the mini convention centre is located at Taman Seremban which is surrounded by a commercial area with many shop lots. It was designed with 49 units of hotel rooms, a commercial block at the ground floor, an event hall for functions to be held and a mini theatre. Site Location: page | 7
  • 9. For the detached unit, the site is chosen by the client beforehand. The client then look for an architect ,which is me, to visit and analyze the site for further design process. As for the convention centre, the site was no chosen. In fact, after I have been employed by the client, I have to search for a site that is suitable for the construction of the convention centre in consideration of the location, the needs of the community at that particular area, then analyze a few chosen site and propose to the client. The client will then select from the few sites that I have chosen through visitations to the sites and through my analysis. Differences and contrast between the two projects For the detached unit, I just need to fulfill a small number of clients, for example, the family members of that particular detached unit as I just have to fulfill their requirements. On the other hand, for the convention centre, I have to fulfill a large number of people, not just the client but also the community. Therefore, I will have to put the requirements of the client and the requirements of the community at that area in consideration as the convention centre is built for the community, not just the client. Landscape is one of the most important component for the detached unit where I have to design and think where and how the landscapes of the house should be like. For example, for this detached unit, there is an open space right in the middle of the house , which is the grand living. I have designed an indoor landscape as one of the requirements of this project is to blend the inside and outside.There are just minor consideration of landscapes for the convention centre as the open areas should be car parking areas. There are just a small area of landscape compared to the detached unit. page | 8
  • 10. Well, it’s obvious that the work load of the convention centre is far more heavier than the detached unit as there are more details to be considered. The budget for the detached unit is low and more flexible compared to the convention centre as it is a private property with no business intention. The detached unit is their home so the client are willing to pay more provided it is necessary to make their home a better place to live in. As for the convention centre, the budget is higher as it is five times bigger than the detached unit. Besides, it is a business based project so the budget is restricted as most of the clients involved are business minded and will not consider to pay more if there is really not necessary. The legal process of the detached unit is slightly shorter compared to the convention centre as the convention centre is a much bigger project which will have a bigger impact on the community. Therefore, the process will take about 3 to 4 years for approval as the local authorities will have to look very deeply in it. page | 9
  • 11. Madeline Liew Zhi Qi Reflection page | 10 Lee Yet Yee Law Jia XinLim Woo Leon Lee Lin Hui Koo Jian Xiang Prepared by: Throughout the process of interviewing the architect, we were able to have an in-depth understanding of what an architect do in the construction industry. In addition, we gained more knowledge on the roles and responsibilities of an architect which helped us to have a clearer picture of what we are going to do in the future as an architect. We also learned more about the design process of a building which will be a guideline for us when designing any types of buildings. Besides gaining more knowledge of architecture, we were inspired by looking at the different projects done by our interviewee and his passion towards architecture had motivated us to strive harder in becoming a successful architect in the future just like him. We also gained some useful tips on how to deal with different clients in the future which is an important skill for us. In the process of making the magazine, we learned how to cooperate with different type of personality and find the best solution to produce a good magazine. We also learned how to interpret information from the conversation which is an important aspect for us in our future studies. Last but not least, we learned how to accept different o p i n i o n s f r o m each of our team m e m b e r. T h i s really helped us to i m p r o v e o u r interpersonal skill a n d w e w e r e h a p p y t h a t everything went out well till the end of the project with much satisfaction.
  • 12. FNBE | January 2015 Intake | Introduction to the Construction Industry | Project 1B Lee Yet Yee | Madeline Liew Zhi Qi | Law Jia Xin | Lim Woo Leon | Lee Lin Hui | Koo Jian Xiang His target of being an architect is to leave behind a legacy as he will not be around forever but there is something that was left behind to remember of.