Name: Aung Thu
Major: Civil engineering
Supervisor: Dr. tai shuangliang
 Owner: The tomorrow company, inc
 Home office: Lexington, Kentucky
 Years in business: twelve
 Product and service line: health and exercise
equipment, apparel and accessories for active senior
citizens
 Projects: several in the southern united state
 Budget: 28$ million
 Project delivery system: design build
Introduction
The principle of design building aims to create an environment that
can make the visitors feel relax and able to experience the amazing
display of the goods inside the center and get attracted to them. As it is
sales and distribution center, the building design, the environment
outside the building and room arrangement inside will need to nit and
tide and clean to make the visitors feel comfortable and attract the
more visitors or customers. The following factors will be considered
during the design building
 Relating to the area where the building will be built, the new building
will need to have a suitable design on how tall it will be and how it will
take place. This will be decided during the design process.
 Plan of after sign the contract with the design build. This will include
1.Design
2.Construction
 Plan and schedule
 Budget
Discussion
 What is the true driver of this project
Time, Market share, return on investment and Ego or
other criteria
Ans: I would say time and return on investment.
 Are the vision and mission statements valid? Do they
drive the program?
Ans: yes
What would you change about the case to better fit your
personal vision, mission or fundamental values?
Ans: As this is mutually dependent business plan or
project( the sellers and buyers are dependence) , I will
always try to keep in touch with the buyers by visiting to
their places and listen to what they complain and always try
to fix weaknesses in company and always try to meet their
requirements.
Assignment
 Statement of interest in participating in the selection process
Scope of work in anticipated in the building design of architectural, design of
all building electrical, mechanical and bumping systems; estimation of project
construction cost; interior design services, landscaping and furniture
equipments.
 Experience in this type of facility or similar operations
 Make the profile of the projects which have similar operations with this project
that have been completed since the company was founded till date.
 Team work
 Show them that the company has been cooperating with so many companies.
 Preconstruction services
 Planning a construction project before the actual construction begins is
known as preconstruction services.
 Make the plan mainly intent to the owner’s objectives.
 Post construction services
 The end of construction is not the end of our relationship. We continue to
serve our project owners in many ways to make sure every aspect of the project
meets their expectations and so that our post construction service as the
bridge to our project.
 Estimation for land areas, building areas, building
height and others
 20 acres land
 55000 square meters( building area)
 14.5 meters( three story with 4 meters high of
underground car parking mainly for the employees
and VIP visitors)
 Car parking beside the building
 Park with water pump beside the building for the
visitors to take rest
 Conclusions:
 The method used in this project is design build
method and design build method mainly based on the
owner conceptual plan. The company made the detail
of the project after the owner ideas have be raised. So
the possibility of the project to be successfully agreed
by the owner is high.
 Reference
 Project management for construction by Dr. Tai
shuangliang
 ww.Google.com

More Related Content

What's hot

Ozan odev 11
Ozan odev 11Ozan odev 11
Ozan odev 11Ozan Srn
 
How to choose a mobile development contractor
How to choose a mobile development contractorHow to choose a mobile development contractor
How to choose a mobile development contractorSimbirSoft
 
Centerline Company Profile
Centerline Company ProfileCenterline Company Profile
Centerline Company ProfileMariel Rosario
 
10737203 10201912272487472 145810096_n
10737203 10201912272487472 145810096_n10737203 10201912272487472 145810096_n
10737203 10201912272487472 145810096_nIRFAANYADUN
 
Zdesign Company Overview
Zdesign Company OverviewZdesign Company Overview
Zdesign Company OverviewZ Design
 
Interior design chennai
Interior design chennaiInterior design chennai
Interior design chennaiVikek Kalra
 
Gurgaon architects
Gurgaon architectsGurgaon architects
Gurgaon architectsVikek Kalra
 

What's hot (11)

Ozan odev 11
Ozan odev 11Ozan odev 11
Ozan odev 11
 
How to choose a mobile development contractor
How to choose a mobile development contractorHow to choose a mobile development contractor
How to choose a mobile development contractor
 
Centerline Company Profile
Centerline Company ProfileCenterline Company Profile
Centerline Company Profile
 
Drgorad
DrgoradDrgorad
Drgorad
 
10737203 10201912272487472 145810096_n
10737203 10201912272487472 145810096_n10737203 10201912272487472 145810096_n
10737203 10201912272487472 145810096_n
 
Zdesign Company Overview
Zdesign Company OverviewZdesign Company Overview
Zdesign Company Overview
 
Interior design chennai
Interior design chennaiInterior design chennai
Interior design chennai
 
Gurgaon architects
Gurgaon architectsGurgaon architects
Gurgaon architects
 
Nikhath Parveen Resume
Nikhath Parveen ResumeNikhath Parveen Resume
Nikhath Parveen Resume
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Outsideentry
OutsideentryOutsideentry
Outsideentry
 

Similar to The tomorrow company power point by aung thu

Ici magazine final
Ici magazine finalIci magazine final
Ici magazine finalJian Leo
 
Ici magazine final final
Ici magazine final finalIci magazine final final
Ici magazine final finalLin Hui
 
Ici magazine (architect)
Ici magazine (architect)Ici magazine (architect)
Ici magazine (architect)Madeline Liew
 
Module 1 kqb ktu qbank
Module 1   kqb ktu qbankModule 1   kqb ktu qbank
Module 1 kqb ktu qbankTamil Mani
 
Raistec PMC (PPT)
Raistec PMC (PPT)Raistec PMC (PPT)
Raistec PMC (PPT)Rajesh Rai
 
Report on Marketing Plan for Sustainable Eco Ideas, Designs, Architectures & ...
Report on Marketing Plan for Sustainable Eco Ideas, Designs, Architectures & ...Report on Marketing Plan for Sustainable Eco Ideas, Designs, Architectures & ...
Report on Marketing Plan for Sustainable Eco Ideas, Designs, Architectures & ...Md. Abdur Rakib
 
Rainbow Developers Profile
Rainbow Developers ProfileRainbow Developers Profile
Rainbow Developers ProfileMansoor Chandio
 
Ici final project
Ici final projectIci final project
Ici final projectkiraly93
 
ICI final project.docx
ICI final project.docxICI final project.docx
ICI final project.docxgabchin29
 
Ici project2
Ici project2 Ici project2
Ici project2 Le Roy
 
Ici project2 (1)
Ici project2  (1)Ici project2  (1)
Ici project2 (1)WadeLim
 
Rainbow Developers With Blue Background
Rainbow  Developers With  Blue  BackgroundRainbow  Developers With  Blue  Background
Rainbow Developers With Blue Backgroundguest470ea8
 
Rainbow Developers With Blue Background
Rainbow  Developers With  Blue  BackgroundRainbow  Developers With  Blue  Background
Rainbow Developers With Blue BackgroundMansoor Chandio
 
Symbiotic Architects & Associates
Symbiotic Architects & AssociatesSymbiotic Architects & Associates
Symbiotic Architects & AssociatesJewel Barua
 
2. Organization of the Architect‘s office.pptx
2. Organization of the Architect‘s office.pptx2. Organization of the Architect‘s office.pptx
2. Organization of the Architect‘s office.pptxMussemaAbdurazak
 
FNBE0814 ICI PROJECT2 INTERVIEW
FNBE0814 ICI PROJECT2 INTERVIEWFNBE0814 ICI PROJECT2 INTERVIEW
FNBE0814 ICI PROJECT2 INTERVIEWyangkanglim
 

Similar to The tomorrow company power point by aung thu (20)

Ici magazine final
Ici magazine finalIci magazine final
Ici magazine final
 
Ici magazine final final
Ici magazine final finalIci magazine final final
Ici magazine final final
 
Ici magazine final final
 Ici magazine final final Ici magazine final final
Ici magazine final final
 
Ici magazine (architect)
Ici magazine (architect)Ici magazine (architect)
Ici magazine (architect)
 
Module 1 kqb ktu qbank
Module 1   kqb ktu qbankModule 1   kqb ktu qbank
Module 1 kqb ktu qbank
 
Raistec PMC (PPT)
Raistec PMC (PPT)Raistec PMC (PPT)
Raistec PMC (PPT)
 
ARTSCAPE_Introduction
ARTSCAPE_IntroductionARTSCAPE_Introduction
ARTSCAPE_Introduction
 
Report on Marketing Plan for Sustainable Eco Ideas, Designs, Architectures & ...
Report on Marketing Plan for Sustainable Eco Ideas, Designs, Architectures & ...Report on Marketing Plan for Sustainable Eco Ideas, Designs, Architectures & ...
Report on Marketing Plan for Sustainable Eco Ideas, Designs, Architectures & ...
 
Rainbow Developers Profile
Rainbow Developers ProfileRainbow Developers Profile
Rainbow Developers Profile
 
Rainbow Developers
Rainbow  DevelopersRainbow  Developers
Rainbow Developers
 
Ici final project
Ici final projectIci final project
Ici final project
 
ICI final project.docx
ICI final project.docxICI final project.docx
ICI final project.docx
 
Ici project2
Ici project2 Ici project2
Ici project2
 
Ici project2 (1)
Ici project2  (1)Ici project2  (1)
Ici project2 (1)
 
Rainbow Developers With Blue Background
Rainbow  Developers With  Blue  BackgroundRainbow  Developers With  Blue  Background
Rainbow Developers With Blue Background
 
Rainbow Developers With Blue Background
Rainbow  Developers With  Blue  BackgroundRainbow  Developers With  Blue  Background
Rainbow Developers With Blue Background
 
Symbiotic Architects & Associates
Symbiotic Architects & AssociatesSymbiotic Architects & Associates
Symbiotic Architects & Associates
 
2. Organization of the Architect‘s office.pptx
2. Organization of the Architect‘s office.pptx2. Organization of the Architect‘s office.pptx
2. Organization of the Architect‘s office.pptx
 
Ici
IciIci
Ici
 
FNBE0814 ICI PROJECT2 INTERVIEW
FNBE0814 ICI PROJECT2 INTERVIEWFNBE0814 ICI PROJECT2 INTERVIEW
FNBE0814 ICI PROJECT2 INTERVIEW
 

More from SAIFULLAH MAHMUD

More from SAIFULLAH MAHMUD (17)

Wind effects on structures
Wind effects on structuresWind effects on structures
Wind effects on structures
 
Wind Analysis of Structure
Wind Analysis of StructureWind Analysis of Structure
Wind Analysis of Structure
 
Coriolis effect
Coriolis effectCoriolis effect
Coriolis effect
 
structural concepts and systems
structural concepts and systemsstructural concepts and systems
structural concepts and systems
 
Shear Forces
Shear ForcesShear Forces
Shear Forces
 
Quebec disaster
Quebec disasterQuebec disaster
Quebec disaster
 
Structural Concept of Trusses
Structural Concept of TrussesStructural Concept of Trusses
Structural Concept of Trusses
 
Bridge Structure
Bridge StructureBridge Structure
Bridge Structure
 
Concept bending l163330114
Concept bending l163330114Concept bending l163330114
Concept bending l163330114
 
Group presentation 101 firefighting
Group presentation 101 firefightingGroup presentation 101 firefighting
Group presentation 101 firefighting
 
Dream House
Dream HouseDream House
Dream House
 
Project ppt riverside condo
Project ppt riverside condoProject ppt riverside condo
Project ppt riverside condo
 
Evans investment inc
Evans investment incEvans investment inc
Evans investment inc
 
satellite campus
satellite campussatellite campus
satellite campus
 
Bicentennial ibrary
Bicentennial ibrary Bicentennial ibrary
Bicentennial ibrary
 
early morning retirement center
early morning retirement centerearly morning retirement center
early morning retirement center
 
composite member bamboo steel
 composite member bamboo steel composite member bamboo steel
composite member bamboo steel
 

Recently uploaded

power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 

Recently uploaded (20)

power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 

The tomorrow company power point by aung thu

  • 1. Name: Aung Thu Major: Civil engineering Supervisor: Dr. tai shuangliang
  • 2.  Owner: The tomorrow company, inc  Home office: Lexington, Kentucky  Years in business: twelve  Product and service line: health and exercise equipment, apparel and accessories for active senior citizens  Projects: several in the southern united state  Budget: 28$ million  Project delivery system: design build
  • 3. Introduction The principle of design building aims to create an environment that can make the visitors feel relax and able to experience the amazing display of the goods inside the center and get attracted to them. As it is sales and distribution center, the building design, the environment outside the building and room arrangement inside will need to nit and tide and clean to make the visitors feel comfortable and attract the more visitors or customers. The following factors will be considered during the design building  Relating to the area where the building will be built, the new building will need to have a suitable design on how tall it will be and how it will take place. This will be decided during the design process.  Plan of after sign the contract with the design build. This will include 1.Design 2.Construction  Plan and schedule  Budget
  • 4. Discussion  What is the true driver of this project Time, Market share, return on investment and Ego or other criteria Ans: I would say time and return on investment.  Are the vision and mission statements valid? Do they drive the program? Ans: yes What would you change about the case to better fit your personal vision, mission or fundamental values? Ans: As this is mutually dependent business plan or project( the sellers and buyers are dependence) , I will always try to keep in touch with the buyers by visiting to their places and listen to what they complain and always try to fix weaknesses in company and always try to meet their requirements.
  • 5. Assignment  Statement of interest in participating in the selection process Scope of work in anticipated in the building design of architectural, design of all building electrical, mechanical and bumping systems; estimation of project construction cost; interior design services, landscaping and furniture equipments.  Experience in this type of facility or similar operations  Make the profile of the projects which have similar operations with this project that have been completed since the company was founded till date.  Team work  Show them that the company has been cooperating with so many companies.  Preconstruction services  Planning a construction project before the actual construction begins is known as preconstruction services.  Make the plan mainly intent to the owner’s objectives.  Post construction services  The end of construction is not the end of our relationship. We continue to serve our project owners in many ways to make sure every aspect of the project meets their expectations and so that our post construction service as the bridge to our project.
  • 6.  Estimation for land areas, building areas, building height and others  20 acres land  55000 square meters( building area)  14.5 meters( three story with 4 meters high of underground car parking mainly for the employees and VIP visitors)  Car parking beside the building  Park with water pump beside the building for the visitors to take rest
  • 7.
  • 8.
  • 9.  Conclusions:  The method used in this project is design build method and design build method mainly based on the owner conceptual plan. The company made the detail of the project after the owner ideas have be raised. So the possibility of the project to be successfully agreed by the owner is high.  Reference  Project management for construction by Dr. Tai shuangliang  ww.Google.com