Resume Of Mazlan Alias
summary of experience
Over 35 years experiences in oil and gas industries, achieving/delivered the
companies aspirations during project’s development and execution phases with
special attention to HSE, QA/QC and Project Deliverable within time frame and
Project Cost in various stages of project engineering and onshore/offshore
constructions, transportation/installation (T&I) of offshore facilities/structures, the
works comprises- the installations of subsea pipelines/risers/PLEM/SPM, mooring
tower, gravity base structure (GBS),CPP topsides ,well heads and tension legs
jackets and Petrochemical Plant for major oil and gas companies ,both in Malaysia
and abroad, as Project Engineer ,Client’s Representative, Project Manager and the
most recent designation was General Manager of Offshore Package, undertakes the
projects from the start to completion date in harsh environment. Experienced in
dealing both with technical and contractual issues in various contract environments
such as EPCI’s, EPC’s , lump sum, reimbursable and cost plus. Proficient in project
management skills which includes, for example, development of project execution
plans, contracting strategies, contracts, bid evaluation and developing various
construction procedures of the above tasks. Also, experienced in implementation of
‘Shell Standard Approach’ of problems solving known as IPOP’s-Implementation
Project On Papers prior commencement of works.
Name:
Home Address:
Email address:
Date of birth:
Age:
Nationality:
Mazlan Alias
B-0-7 Ampang 971,
Jalan Ritchie Off Jalan Ampang,
55000 Kuala Lumpur,
Malaysia.
017-316 6135(mobile phone)
mazlan__alias971@yahoo.com
23 February 1957
59 years old
Malaysian
1
Education: Sekolah Menengah Tuanku Abdul Rahman Ipoh, Perak
Qualifications:
1974 – 1976
1976 – 1980
A level
Poole Technical College
Bsc (Hons) Mechanical Engineering
University of Leeds, Leeds UK
1980-1992
Position-Staff
1992-1994
Position-Contract
1995-1998
Position-Contract
1998 -2003
Position-Contract
2003 – 2005
Position-Contract
2005-2008
Position-Contract
2008 – 2010
Position-Direct hire
Sarawak Shell Bhd
Offshore Const. Engineer
Titan Petrochemical Plant,Pasir Gudang
Snr. Package Project Engineer-Export/Import Terminal.
Esso Production Malaysia(EPMI) /JCM,Kertih
Snr Project Engineer–Onshore/Offshore pipelines
construction and installation.
OPI/Brunei Shell Berhad-Development of New Facilities
AMPA/AMCA 9,Champion Field for Brunei Shell.
Offshore/pipeline Construction Supt on DLB264.
Sarawak Shell Berhad (EPA-T-ECB),Miri
Offshore pipeline/decommissioning work-Cat-1
Operation-DLB 264,323 And K-1
Company Site Representative(CSR)
(Re-entered Shell after resignation)
Petronas/Petrodar Operating Co(Sudan)-Construction of
Onshore Pipelines and Pump Stations, from South of
Sudan to Export Terminal(Port Of Sudan).
Snr Project Engineer.
Petronas Carigali-PTTEPI Operating Company Sdn
Bhd,MMHE -Construction of Tension Jacket
Legs(8legged),Living Quarter(LQ),Load Out of CPP and
Pre-Commissioning Of CPP At JDA Field.
Company Site Representative (CSR).
2
2010 – 2011
Position-Contract
2011-2015
Position-Direct Hire
2013(July)-2015
Position-contract
2015(March)-Sept 2015
Petronas Carigali/Technip/MMHE (Turkemenistan) Sdn
Bhd, Kinyaly Yard,Turkemenistan-Construction Of
Gravity Base Structure(GBS)
Snr Offshore Construction/ Transportation And
Installation(T&I) Engineer
Kebabangan Petroleum Operating Company(KPOC)
(A joint venture between Petronas, Shell And Conoco
Phillips)
CSR On Board DLB264 for Offshore Pipelines
Installation /T&I of 130km twin pipelines(24in/14in)
Exxon Mobil/Hafar Neptune- Mobil Cepu, Banyu Urip
Field.Offshore Of Surabaya.Indonesia.
Project Manager/OCS On Board Hafar Neptune Barge
For Offshore Pipelines Installation.
SK-EC (Nghi Son Refinery& Petrochemical Complex
Project (NSRP), Thanh Hoa Province, Hanoi, Vietnam-
Marine Construction and Pipelines(48in Twin Pipelines
And FiberOptic,SPM/PLEM Installation). And Line Pipes
Transportation.
General Manager/Company Site Representative (CSR)
On Board Hyundai Barge(HD 2500)
3
Experiences Recorded –
Summary
Sarawak Shell Bhd Achieved a company target for completing the minor
fabrication/construction of structure and piping
modification of CPP and well head platforms of Shell’s
assets.
Task involved and achievement,
 Reviewed the fabrication design and construction
methods within applicable engineering codes.
 Reviewed the execution plan and developed
mitigation plan.
 Developed scope of work for contractor to submit
the bid
 Management project review reporting and approval
 Reviewed the work plan and methodology.
TitanPetrochemical
Plant,Pasir Gudang,Malaysia
Achieved the completion of work within specified time
frame without having LTI and maintaining the quality
of work within the approved QA/QC plans
The work of the above tasks are summarized –the
construction of export and import jetty and the
construction of above ground pipelines, includes
mechanical/piping work package, installation of loading
Arms, package pre-commissioning and system start up
and work handed over/completion dossier.
Esso Production Malaysia
Inc (EPMI) / JCM.
Achieved for the assigned task, completing the work
within project schedule without major construction
delays and maintaining LTI record in construction and
installation of 18in pipeline (offshore and onshore tie-
in) for sludge catcher project for gas processing plant
for Petronas.
Task involved,
 Developed Implementation Project on Paper,
Ensuring all risks are addressed and implemented.
 Developed project scope of work and construction
procedures
 Developed safety plan and enforcement.
4
Experiences Recorded –
Summary
 Reviewed procurement plan and delivery schedule
 Reviewed and developed master schedule in line
with project deliverable plans.
 Reviewed hydro testing method in line to HSE’s
requirement.
OPI/Brunei Shell Bhd Achieved in delivering project schedule without LTI
during transportation and installation (T&I) and
construction and installation of CPP and Pipelines, 6
lagged Jacket/Risers /Connecting Bridge of AMPA9 and
AMCA9 at Champion Field-Brunei Shell.
Task involved,
 Developing of construction/installation procedures.
 Safety review and enforcement.
 Schedule review and mitigation
 Barge movement and Marines support
management
 Progress reporting and developing an action plans.
 Developed hydro testing plan for pipeline in
accordance to Client’s guide line.
Sarawak Shell
Berhad(SSB),Miri,Sarawak,
Malaysia
Achieved the target date of project delivery of offshore
construction and installation of 18in pipeline in
compliance with Company’s requirement, covering
HSE, QA/QC, Management Of Changed (MOC) and
Marines Support Management.
Task involved,
 Monitored/coordinate the Transportation Line pipes
schedule.
 Trouble shooting on automatic welding
performance.
 Anchor pattern developing and barge/marine
support management.
 Progress reporting and recommendation.
 Monitoring approved engineering calculation
5
Experiences Recorded –
Summary
sheets/data/drawings/method of statement of pipe lay
barge.
Petronas/Petrodar
Operating Co.Sudan
Achieved the construction/installation of 1700km
onshore pipelines and construction of pump
Stations (6 pump stations), Employed for Melut Oil
Development Project (Pump Stations/Pipeline) block3
and 7.
Task responsibility and achievement.
 Assigned to project management team,
undertaking constructability review, covering HSE,
construction’s developing work’s procedures,
manpower planning QA/QC management and
procurement delivery/logistics plans.
 Reviewed and comments on sub-contractors
construction and installation plans to meet the tight
contract project schedule.
 Reviewed an interface plan with other packaged
contractors in line with first oil date target.
 Reviewed the equipment vendors delivery plans,
this includes the transportation and logistics plans.
there are Sulzer Pumps, Wartsila Diesel Engine
Driver, Atlas Copco Compressors, Bono Heater,
Rolls Royce Gen-set and others equipment.
 Undertaking weekly project progress review and
management reporting, highlighting potential
construction delay in advance, this includes,
developing a recovery/catching up plan.
Petronas Carigali-PTTEPI
Operating Company
(CPOC)-A joint venture
between Carigali and
Thailand Petroleum Co.
Achieved the deliverable plans date of the construction
and installation schedule of 8 legged tension jacket,
140 pax of Living Quarter (LQ), WH Platform, Load out
and Pre-Commissioning of CPP modules at JDA field.
Task involved as CSR,
 Reviewed site construction/fabrication
constructability plans by each of contractors, the
construction site spread in three (3) deference
locations, MMHE, Sime Sembawang and Pulau
6
Experiences Recorded –
Summary
Indah.
 Reviewed load out engineering sheets and
methodology equipment deployments, undertaken
by load out contractor/ALE.
 Coordinate with engineering team in all phases of
IFC’s drawing, vendors’ specification and codes in
line with project specifications .Includes the
developing the MOC(management of change)if any
issue arises on engineering and construction
discrepancy.
 And reviewed the pre-commissioning plan by HUC
contractor for CPP.
Petronas Carigali
(Turkemenistan)/MMHE/
Technip.
As Snr Offshore Construction/T&I Engineer, the
primary task is delivering the schedule of construction,
out fittings, load out, sail away and field installation
and pre-commissioning of GBS.
The GBS was designed by Arup/Technip and the
installation party is by Technip Houston.
Task involved as Snr Offshore Construction/T&I.
 Reviewed Construction/Fabrication submitted by
each trade of contractor.
 Reviewed manpower loading chart to reflect the
contractor’s schedule plan, include the recovery
plan if the progress of the work slipped away.
 Enforcing HSE management plan at various level of
trades/subcontractors.
 Reviewed and comment load out plan/procedures,
includes the equipment preparation/testing.
 Reviewed the ballast pumps installation, testing
and functional test, the pumps are used to
ballast/de-ballast the GBS during transportation
and installation at field.
Kebabangan Petroleum
Operating Company
(KPOC)-A joint ventures
between Petronas Carigali,
Shell and Conoco Phillips.
Achieved the target completion date of installation twin
24in/14in pipelines, 130km at Sabah water, water
depth of about 600 feet. My primary task as CSR on
board of DLB 264 barge are outlined below,
 Coordinate with engineering/survey teams on the
engineering inputs on proposed pipe lay activities.
7
Experiences Recorded –
Summary
 Reviewed the suitability/engineering inputs of the
barge for the work include the stringer/pipeline
rollers setting.
 Reviewed and approved the pipelines hydro test
and testing plans.
Exxon Mobil/Hafar Neptune-
Mobil Cepu, Banyu Urip-
Project Manager Pipeline
and Mooring tower.
A primary task as Project Manager of shallow water
pipeline and mooring installation work of EPCI
contract, the length of pipe line is37km, diameter of
pipe 22in and water depth is approximately 35m. This
is some task brief as outlined below,
 Managing and provide direction to project team in
engineering, procurement, construction and
installation teams on scope of work planned ,this is
included, among others, The HSE, project
deliverable, QA/QC, barge and marine supports and
other project management issue such as
contracting management.
 Developed project/construction procedures/method
of statement and interaction with client for their
approvals very tough indeed.
 Local Authority submission/approval plans.
 Managed the Barge movement and Marine supports
in maintaining the progress of work (pipe lay).
Nghi Son Refinery&
Petrochemical Complex
Project(NSRP),Thanh Hoa
Province, Hanoi, Vietnam.
(A joint venture between
Kuwait
Investment/JGS/Chiyoda/S
KEC and Petro Vietnam).
This is an EPCC contract, the task as General Manager,
amongst others (other than above brief),mainly
involved in contract management and project control
and delegating the engineering, construction and
installation matters/issues to each department
managers.
Project Brief And Achievement.
 Completed 48in shallow water twin pipelines.
 Completed installation of SPM’s and PLEM’s
 Completed Fiber Optic installation and completed
onshore tie-in and hydro testing/ preservation of
pipelines.
The End Of My Resume.
8

More Related Content

What's hot

Resume q.surveyor - amanat ali (updated)
Resume   q.surveyor - amanat ali (updated)Resume   q.surveyor - amanat ali (updated)
Resume q.surveyor - amanat ali (updated)
Amanat ali
 
Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13
iain_cameron
 
Gagandeepgrover 21 dec 2019
Gagandeepgrover 21 dec 2019Gagandeepgrover 21 dec 2019
Gagandeepgrover 21 dec 2019
Gagan Grover
 
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaPankaj Kisnadwala
 
Rajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekar ramamurthy
 
Paul Brown - CV - LI - Sep 2016
Paul Brown - CV - LI - Sep 2016Paul Brown - CV - LI - Sep 2016
Paul Brown - CV - LI - Sep 2016Paul Brown
 

What's hot (20)

Resume Jamilatul Adawiah Rev.6
Resume Jamilatul Adawiah Rev.6Resume Jamilatul Adawiah Rev.6
Resume Jamilatul Adawiah Rev.6
 
Mohammed Nafea CV.DOC
Mohammed Nafea CV.DOCMohammed Nafea CV.DOC
Mohammed Nafea CV.DOC
 
John Scrowston CV v11
John Scrowston CV v11John Scrowston CV v11
John Scrowston CV v11
 
Cv Presentation
Cv PresentationCv Presentation
Cv Presentation
 
CV - Fakruddin R01
CV - Fakruddin  R01CV - Fakruddin  R01
CV - Fakruddin R01
 
CV
CVCV
CV
 
Resume q.surveyor - amanat ali (updated)
Resume   q.surveyor - amanat ali (updated)Resume   q.surveyor - amanat ali (updated)
Resume q.surveyor - amanat ali (updated)
 
Sanjeev Barwal
Sanjeev BarwalSanjeev Barwal
Sanjeev Barwal
 
Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13
 
Gagandeepgrover 21 dec 2019
Gagandeepgrover 21 dec 2019Gagandeepgrover 21 dec 2019
Gagandeepgrover 21 dec 2019
 
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
 
MuraliCV
MuraliCVMuraliCV
MuraliCV
 
Muller Mats Werner - CV May, 2016
Muller Mats Werner - CV May, 2016Muller Mats Werner - CV May, 2016
Muller Mats Werner - CV May, 2016
 
Resume Ajmel August 2016
Resume Ajmel August 2016Resume Ajmel August 2016
Resume Ajmel August 2016
 
CV CBK 2015 N
CV CBK 2015 NCV CBK 2015 N
CV CBK 2015 N
 
CV Giovanni FRISO-Nov2015
CV Giovanni FRISO-Nov2015CV Giovanni FRISO-Nov2015
CV Giovanni FRISO-Nov2015
 
Rajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.Designer
 
Paul Brown - CV - LI - Sep 2016
Paul Brown - CV - LI - Sep 2016Paul Brown - CV - LI - Sep 2016
Paul Brown - CV - LI - Sep 2016
 
Samih.CV docx
Samih.CV docxSamih.CV docx
Samih.CV docx
 
CURRICULUM_VITAE_Y 2015
CURRICULUM_VITAE_Y 2015CURRICULUM_VITAE_Y 2015
CURRICULUM_VITAE_Y 2015
 

Viewers also liked

Curriculum Vitae.Ola.2017-Newest
Curriculum Vitae.Ola.2017-NewestCurriculum Vitae.Ola.2017-Newest
Curriculum Vitae.Ola.2017-NewestOla Ataya
 
El conflicto y los equipos de trabajo
El conflicto y los equipos de trabajoEl conflicto y los equipos de trabajo
El conflicto y los equipos de trabajo
Valeria Valdez Godina
 
Matriz de datos
Matriz de datosMatriz de datos
Matriz de datos
maguarbe
 
The Art of Persuasion
The Art of PersuasionThe Art of Persuasion
The Art of Persuasion
James Cullen
 
Búsqueda en base de datos
Búsqueda en base de datosBúsqueda en base de datos
Búsqueda en base de datos
maguarbe
 
Lamark (1)
Lamark (1)Lamark (1)
Lamark (1)
Pepa Flores
 

Viewers also liked (7)

Mikano Diary 2016
Mikano Diary 2016Mikano Diary 2016
Mikano Diary 2016
 
Curriculum Vitae.Ola.2017-Newest
Curriculum Vitae.Ola.2017-NewestCurriculum Vitae.Ola.2017-Newest
Curriculum Vitae.Ola.2017-Newest
 
El conflicto y los equipos de trabajo
El conflicto y los equipos de trabajoEl conflicto y los equipos de trabajo
El conflicto y los equipos de trabajo
 
Matriz de datos
Matriz de datosMatriz de datos
Matriz de datos
 
The Art of Persuasion
The Art of PersuasionThe Art of Persuasion
The Art of Persuasion
 
Búsqueda en base de datos
Búsqueda en base de datosBúsqueda en base de datos
Búsqueda en base de datos
 
Lamark (1)
Lamark (1)Lamark (1)
Lamark (1)
 

Similar to resume-Sept 2016 Mazlan Alias

Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Mohamed Mustafa
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
Mohamad Safarudin
 
Project Superintendent Mandar
Project Superintendent MandarProject Superintendent Mandar
Project Superintendent MandarMandar Sawant
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)Ahmed Youssef
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
Mohamad Safarudin
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CVzetiengg
 
Curriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerCurriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerDermawan Lumban Gaol
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_gobinath gobinath
 
Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS
 

Similar to resume-Sept 2016 Mazlan Alias (20)

Ang kwang Wee_CV-Hertel
Ang kwang Wee_CV-HertelAng kwang Wee_CV-Hertel
Ang kwang Wee_CV-Hertel
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
Ang kwang Wee_CV Sep 2016
Ang kwang Wee_CV Sep 2016Ang kwang Wee_CV Sep 2016
Ang kwang Wee_CV Sep 2016
 
CV_Romeo_2016Latest
CV_Romeo_2016LatestCV_Romeo_2016Latest
CV_Romeo_2016Latest
 
Ramanuja CV-
Ramanuja CV-Ramanuja CV-
Ramanuja CV-
 
Project Superintendent Mandar
Project Superintendent MandarProject Superintendent Mandar
Project Superintendent Mandar
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CV
 
Curriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerCurriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project Manager
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Psm Cv Presentation 3 2012
Psm Cv Presentation 3  2012Psm Cv Presentation 3  2012
Psm Cv Presentation 3 2012
 
joy S resume
joy S resumejoy S resume
joy S resume
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_
 
Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS CV Rev 1
Yeoh KS CV Rev 1
 
RAMESH_Resume
RAMESH_ResumeRAMESH_Resume
RAMESH_Resume
 
Resume Murali 1
Resume Murali 1 Resume Murali 1
Resume Murali 1
 

resume-Sept 2016 Mazlan Alias

  • 1. Resume Of Mazlan Alias summary of experience Over 35 years experiences in oil and gas industries, achieving/delivered the companies aspirations during project’s development and execution phases with special attention to HSE, QA/QC and Project Deliverable within time frame and Project Cost in various stages of project engineering and onshore/offshore constructions, transportation/installation (T&I) of offshore facilities/structures, the works comprises- the installations of subsea pipelines/risers/PLEM/SPM, mooring tower, gravity base structure (GBS),CPP topsides ,well heads and tension legs jackets and Petrochemical Plant for major oil and gas companies ,both in Malaysia and abroad, as Project Engineer ,Client’s Representative, Project Manager and the most recent designation was General Manager of Offshore Package, undertakes the projects from the start to completion date in harsh environment. Experienced in dealing both with technical and contractual issues in various contract environments such as EPCI’s, EPC’s , lump sum, reimbursable and cost plus. Proficient in project management skills which includes, for example, development of project execution plans, contracting strategies, contracts, bid evaluation and developing various construction procedures of the above tasks. Also, experienced in implementation of ‘Shell Standard Approach’ of problems solving known as IPOP’s-Implementation Project On Papers prior commencement of works. Name: Home Address: Email address: Date of birth: Age: Nationality: Mazlan Alias B-0-7 Ampang 971, Jalan Ritchie Off Jalan Ampang, 55000 Kuala Lumpur, Malaysia. 017-316 6135(mobile phone) mazlan__alias971@yahoo.com 23 February 1957 59 years old Malaysian 1
  • 2. Education: Sekolah Menengah Tuanku Abdul Rahman Ipoh, Perak Qualifications: 1974 – 1976 1976 – 1980 A level Poole Technical College Bsc (Hons) Mechanical Engineering University of Leeds, Leeds UK 1980-1992 Position-Staff 1992-1994 Position-Contract 1995-1998 Position-Contract 1998 -2003 Position-Contract 2003 – 2005 Position-Contract 2005-2008 Position-Contract 2008 – 2010 Position-Direct hire Sarawak Shell Bhd Offshore Const. Engineer Titan Petrochemical Plant,Pasir Gudang Snr. Package Project Engineer-Export/Import Terminal. Esso Production Malaysia(EPMI) /JCM,Kertih Snr Project Engineer–Onshore/Offshore pipelines construction and installation. OPI/Brunei Shell Berhad-Development of New Facilities AMPA/AMCA 9,Champion Field for Brunei Shell. Offshore/pipeline Construction Supt on DLB264. Sarawak Shell Berhad (EPA-T-ECB),Miri Offshore pipeline/decommissioning work-Cat-1 Operation-DLB 264,323 And K-1 Company Site Representative(CSR) (Re-entered Shell after resignation) Petronas/Petrodar Operating Co(Sudan)-Construction of Onshore Pipelines and Pump Stations, from South of Sudan to Export Terminal(Port Of Sudan). Snr Project Engineer. Petronas Carigali-PTTEPI Operating Company Sdn Bhd,MMHE -Construction of Tension Jacket Legs(8legged),Living Quarter(LQ),Load Out of CPP and Pre-Commissioning Of CPP At JDA Field. Company Site Representative (CSR). 2
  • 3. 2010 – 2011 Position-Contract 2011-2015 Position-Direct Hire 2013(July)-2015 Position-contract 2015(March)-Sept 2015 Petronas Carigali/Technip/MMHE (Turkemenistan) Sdn Bhd, Kinyaly Yard,Turkemenistan-Construction Of Gravity Base Structure(GBS) Snr Offshore Construction/ Transportation And Installation(T&I) Engineer Kebabangan Petroleum Operating Company(KPOC) (A joint venture between Petronas, Shell And Conoco Phillips) CSR On Board DLB264 for Offshore Pipelines Installation /T&I of 130km twin pipelines(24in/14in) Exxon Mobil/Hafar Neptune- Mobil Cepu, Banyu Urip Field.Offshore Of Surabaya.Indonesia. Project Manager/OCS On Board Hafar Neptune Barge For Offshore Pipelines Installation. SK-EC (Nghi Son Refinery& Petrochemical Complex Project (NSRP), Thanh Hoa Province, Hanoi, Vietnam- Marine Construction and Pipelines(48in Twin Pipelines And FiberOptic,SPM/PLEM Installation). And Line Pipes Transportation. General Manager/Company Site Representative (CSR) On Board Hyundai Barge(HD 2500) 3
  • 4. Experiences Recorded – Summary Sarawak Shell Bhd Achieved a company target for completing the minor fabrication/construction of structure and piping modification of CPP and well head platforms of Shell’s assets. Task involved and achievement,  Reviewed the fabrication design and construction methods within applicable engineering codes.  Reviewed the execution plan and developed mitigation plan.  Developed scope of work for contractor to submit the bid  Management project review reporting and approval  Reviewed the work plan and methodology. TitanPetrochemical Plant,Pasir Gudang,Malaysia Achieved the completion of work within specified time frame without having LTI and maintaining the quality of work within the approved QA/QC plans The work of the above tasks are summarized –the construction of export and import jetty and the construction of above ground pipelines, includes mechanical/piping work package, installation of loading Arms, package pre-commissioning and system start up and work handed over/completion dossier. Esso Production Malaysia Inc (EPMI) / JCM. Achieved for the assigned task, completing the work within project schedule without major construction delays and maintaining LTI record in construction and installation of 18in pipeline (offshore and onshore tie- in) for sludge catcher project for gas processing plant for Petronas. Task involved,  Developed Implementation Project on Paper, Ensuring all risks are addressed and implemented.  Developed project scope of work and construction procedures  Developed safety plan and enforcement. 4
  • 5. Experiences Recorded – Summary  Reviewed procurement plan and delivery schedule  Reviewed and developed master schedule in line with project deliverable plans.  Reviewed hydro testing method in line to HSE’s requirement. OPI/Brunei Shell Bhd Achieved in delivering project schedule without LTI during transportation and installation (T&I) and construction and installation of CPP and Pipelines, 6 lagged Jacket/Risers /Connecting Bridge of AMPA9 and AMCA9 at Champion Field-Brunei Shell. Task involved,  Developing of construction/installation procedures.  Safety review and enforcement.  Schedule review and mitigation  Barge movement and Marines support management  Progress reporting and developing an action plans.  Developed hydro testing plan for pipeline in accordance to Client’s guide line. Sarawak Shell Berhad(SSB),Miri,Sarawak, Malaysia Achieved the target date of project delivery of offshore construction and installation of 18in pipeline in compliance with Company’s requirement, covering HSE, QA/QC, Management Of Changed (MOC) and Marines Support Management. Task involved,  Monitored/coordinate the Transportation Line pipes schedule.  Trouble shooting on automatic welding performance.  Anchor pattern developing and barge/marine support management.  Progress reporting and recommendation.  Monitoring approved engineering calculation 5
  • 6. Experiences Recorded – Summary sheets/data/drawings/method of statement of pipe lay barge. Petronas/Petrodar Operating Co.Sudan Achieved the construction/installation of 1700km onshore pipelines and construction of pump Stations (6 pump stations), Employed for Melut Oil Development Project (Pump Stations/Pipeline) block3 and 7. Task responsibility and achievement.  Assigned to project management team, undertaking constructability review, covering HSE, construction’s developing work’s procedures, manpower planning QA/QC management and procurement delivery/logistics plans.  Reviewed and comments on sub-contractors construction and installation plans to meet the tight contract project schedule.  Reviewed an interface plan with other packaged contractors in line with first oil date target.  Reviewed the equipment vendors delivery plans, this includes the transportation and logistics plans. there are Sulzer Pumps, Wartsila Diesel Engine Driver, Atlas Copco Compressors, Bono Heater, Rolls Royce Gen-set and others equipment.  Undertaking weekly project progress review and management reporting, highlighting potential construction delay in advance, this includes, developing a recovery/catching up plan. Petronas Carigali-PTTEPI Operating Company (CPOC)-A joint venture between Carigali and Thailand Petroleum Co. Achieved the deliverable plans date of the construction and installation schedule of 8 legged tension jacket, 140 pax of Living Quarter (LQ), WH Platform, Load out and Pre-Commissioning of CPP modules at JDA field. Task involved as CSR,  Reviewed site construction/fabrication constructability plans by each of contractors, the construction site spread in three (3) deference locations, MMHE, Sime Sembawang and Pulau 6
  • 7. Experiences Recorded – Summary Indah.  Reviewed load out engineering sheets and methodology equipment deployments, undertaken by load out contractor/ALE.  Coordinate with engineering team in all phases of IFC’s drawing, vendors’ specification and codes in line with project specifications .Includes the developing the MOC(management of change)if any issue arises on engineering and construction discrepancy.  And reviewed the pre-commissioning plan by HUC contractor for CPP. Petronas Carigali (Turkemenistan)/MMHE/ Technip. As Snr Offshore Construction/T&I Engineer, the primary task is delivering the schedule of construction, out fittings, load out, sail away and field installation and pre-commissioning of GBS. The GBS was designed by Arup/Technip and the installation party is by Technip Houston. Task involved as Snr Offshore Construction/T&I.  Reviewed Construction/Fabrication submitted by each trade of contractor.  Reviewed manpower loading chart to reflect the contractor’s schedule plan, include the recovery plan if the progress of the work slipped away.  Enforcing HSE management plan at various level of trades/subcontractors.  Reviewed and comment load out plan/procedures, includes the equipment preparation/testing.  Reviewed the ballast pumps installation, testing and functional test, the pumps are used to ballast/de-ballast the GBS during transportation and installation at field. Kebabangan Petroleum Operating Company (KPOC)-A joint ventures between Petronas Carigali, Shell and Conoco Phillips. Achieved the target completion date of installation twin 24in/14in pipelines, 130km at Sabah water, water depth of about 600 feet. My primary task as CSR on board of DLB 264 barge are outlined below,  Coordinate with engineering/survey teams on the engineering inputs on proposed pipe lay activities. 7
  • 8. Experiences Recorded – Summary  Reviewed the suitability/engineering inputs of the barge for the work include the stringer/pipeline rollers setting.  Reviewed and approved the pipelines hydro test and testing plans. Exxon Mobil/Hafar Neptune- Mobil Cepu, Banyu Urip- Project Manager Pipeline and Mooring tower. A primary task as Project Manager of shallow water pipeline and mooring installation work of EPCI contract, the length of pipe line is37km, diameter of pipe 22in and water depth is approximately 35m. This is some task brief as outlined below,  Managing and provide direction to project team in engineering, procurement, construction and installation teams on scope of work planned ,this is included, among others, The HSE, project deliverable, QA/QC, barge and marine supports and other project management issue such as contracting management.  Developed project/construction procedures/method of statement and interaction with client for their approvals very tough indeed.  Local Authority submission/approval plans.  Managed the Barge movement and Marine supports in maintaining the progress of work (pipe lay). Nghi Son Refinery& Petrochemical Complex Project(NSRP),Thanh Hoa Province, Hanoi, Vietnam. (A joint venture between Kuwait Investment/JGS/Chiyoda/S KEC and Petro Vietnam). This is an EPCC contract, the task as General Manager, amongst others (other than above brief),mainly involved in contract management and project control and delegating the engineering, construction and installation matters/issues to each department managers. Project Brief And Achievement.  Completed 48in shallow water twin pipelines.  Completed installation of SPM’s and PLEM’s  Completed Fiber Optic installation and completed onshore tie-in and hydro testing/ preservation of pipelines. The End Of My Resume. 8