1. Construction Manager
Paolo AGUZZI CV Project Construction Superintendent
.
Born in Senigallia (AN) Italy on 13/02/1961 Italian nationality. E-mail: axpaolo@hotmail.com Resident in Singapore. Phone +65 8525 4344.
BSc. Diploma degree in Mechanical Engineering (ITIS Ancona / Italy 1982) plus more than 30 years’ oil & gas plant and pipeline construction experience
including brownfield, offshore, FPSO/FPU and remote locations.
Responsible and accountable to manage the execution of FEED, EPCC of Engineering Projects. Strong experience in Piping and Machinery, with a good
range of experience in E&I and Civil. Strong skills to manage contractors and teams. Medium PMT/PMS experience. Able to manage various engineering
disciplines such as: piping, stating/rotating equipment, vessels, civil and structural. Review and final approval of engineering documents. Involved in several
shutdowns of LNG trains and block’s facilities including C2,C3,C4,C5+, oil production, overcoming many obstacles by coordinating/planning between the
various works parties involved allowing for safe and timely executed shutdowns at site. FPSO/FPU Large topside construction projects, modules,
turbomachinery.
Experience: Construction Manager 6 years – Operation Manager 1 year - Interface Manager 1 year - Project Engineer 3 years – Project Construction
Superintendent 9 years - Project Construction Supervisor 10 years. Languages: Italian - English (Fluent). References at www.linkedin.com.
Certificates: HUET 2H Helipad, ISS Sea survival, IOSH Managing Safely, BOISET Survival Training, Medical Certificate, H2S/BA, ATEX Inspection &
Maintenance Practices, PTW(s), AGI, ISI, JSA.
Career Summary
01/16-present: Multiconsult Asia - PMS for Sembcorp Marine (Singapore)—Senior Project Consultant Turbopackages – Interface Manager
• FPSO Pioneiro de Libra OOGTK – GTG LM2500 PLUS G4 SAC Dual Fuel and GE Electric Generator. Centrifugal Compressor BCL 305/A and 2BCL 307/B Main Compressors.
Centrifugal Compressor BCL 306/C Reinjection Compressors.
04/10-12/15: Petrochina (Indonesia)—Project Construction Superintendent – A. Construction Manager - Shutdown Leader
• Jabung Shutdown 2014 # BCD-4 LP EPC Project – BGP # BCD-414 Jabung Shutdown 2011 # BGP-NGF-CPS-WB-SWB-(Jabung Block Sumatra) several minor projects.# WB-SB
Early permanent facilities and gathering pipelines. # BGP Mercury Removal Unit EPCC BCD-355 MRU # BCD-466 Third Towers/Membrane bank, Condensate Stripper Overhead
Compressor # BCD-476 Lean Amine Trim Cooler System Installation # BCD-479 SWB/WB/SB Assoc Gas to JII # BCD-485 GTG-D for BGP # 14-1317 FPU GTC upgrade # 14-0004
FPU Propane Condenser Replacement # 14-1318 WB-SB Non Asso Gas Early Permanent Fac. # 14-1322 Jabung Flare Gas Metering # Talisman / Jambi Merang Condensate
Facilities Sharing: Phase 1 & 2: Permanent tanks, Shipping pumps, Metering stations # BCD-487 Fiber Optic Cable BGP-NEB -10 Area # BCD-495-CA : WB/SB Gathering Pipeline.
07/03-04/10: Ras Gas (Qatar) – Project Engineer- Lead Construction Supervisor
• PMT support member for mega-trains 6&7 GE Frame 9 # Minor EPCC projects # Al Khoor School Conversion RasGas / QatarGas Community # Hook-up High
COD Project # Shutdown Trains1&2 GE Frame 7 Turbo Compressors overhauling – Inlet Slug catcher # Shutdown Train3 (Seawater Loop Upgrade) # LNG Loading Facility upgrade
Berth 1 # Locker Room # Lab Upgrade # NOB New Office Building # CFST Centre For Safety Training # IWM Industrial Waste Management Facilities Upgrade. # Logistic support
and PTW for produced water well injection revamping and work over campaign.
06/02-07/03: Mideast Constructors – (Qatar)--Construction Manager
EPCC, NGL 4 Dukhan - Qatar Petroleum
02/02-05/02: Snamprogetti – (Qatar)) – Hydrotest Leader
• NGL 4 Mesaieed - Qatar Petroleum
04/01-02/02: Enereco (Qatar) – Project Engineer
• Team member of FEED for Tank farm & Multiproduct Berth Qatar Petroleum)
01/01-04/01: Bonatti Libyan Branch – (Libya) – Job-Site Coordinator
• Wafa / Sabrata 16”+32” pipelines. Pre-bid Site survey.
03/99-01/01: GE Nuovo Pignone – (Singapore) – Construction Superintendent
• FPSO P37, EPC Turbo generators, Turbo compressors Modules LM2500+Toshiba 25 MG/ BCL406+BCL458N (BR-Petrobras) # FPU P40, EPC Turbo generators, Turbo compressor
Modules LM2500 plus+Toshiba 28 MG/ BCL406+BCL458N (BR-Petrobras)
03/97-02/99: ABB Soimi – (Nigeria) – Operation/Construction Manager
• Oturogu Heater exchanger - Ughelli Vessel - Egwa rehabilitation - Flow lines repairs. SHELL # EPC, HP Fuel gas facilities project # Well hook-up Ebegoro 12 Mbede 22/23. NAOC
(ENI-AGIP) # Gas supply to NNPC and SPDC estates. Warri Nigerian Gas Co. Ltd # Thermal Insulation Call-off contract Ob/Ob NAOC (ENI-AGIP) # EPC, Mbede gas lift project.
NAOC (ENI-AGIP) # Platform upgrade Clough Creek. NAOC (ENI-AGIP) # EPC, N-LNG Gas Supply Project Ob/Ob. NAOC (ENI-AGIP)
02/96-02/97 : EMIT (Sudan) – Projec Constructiont Superintendent.
• EPC, 70 water yards – Khartoum Omdurman Jezira Provinces (Cooperation Project from Italian Government)
02/95-01/96 : C.M.I. - (Italy) Construction Manager
• EPC, Gas Compression Module for Platform N’Kossa ELF Pointe Noire Congo at Rosetti Shipyard / Ravenna (Italy)
05/94-01/95: Renco – (Nigeria) - SAP Specialist
• Material SAP Codification at ENI-AGIP - NAOC warehouse - Port Harcourt- (NIGERIA)
01/94-04/94: Renco - (Kazakhstan) Construction Supervisor
• Heavy steel structures for AGIP KCO new building -- Almaty (KAZAKHSTAN)
12/87-11/93: ENI-Agip Spa SNOR – (Italy) Construction Supervisor – (Platform Chief for offshore jobs)
• Several revamping /upgrades of offshore platforms: Amelia, PCWA –PCWT, Barbara F ( Adriatic Sea ) # Hook-up offshore platform Brenda / Barbara G ( Adriatic Sea ) # Low
pressure ring with reciproc. Compressor (Waukesha / Nuovo Pignone CK 206 2HE) offshore platform Garibaldi T # Revamping and compression gas plant, centrifugal compressors
(ABB / Nuovo Pignone BCL 406) -Falconara- (AN) # Compressors upgrade of NGL plant -Ravenna mare (Waukesha/NP Reciprocating Compressor CK 206 2HE) - (RA) # Hook-up
cluster C1 e pipeline 14” gas lift plant Minerbio (BO) and gas plant Pomposa (FE) # Revamping gas plant Minerbio (BO)
03/85-11/87: ENI-Snamprogetti – (Italy) Construction Supervisor (Pipeline/Piping)
• 36” Pipeline 95 Km and lifting station for industrial area service Alta Irpinia. Calitri (AV) # 8” Pipeline 22 Km Tricarico-Grassano-Grottole. Tricarico (MT)
10/83-03/85: Co.Imp – (Italy) Autocad 1 Draftsman Delivery of piping Isometric drawings and MTO