SlideShare a Scribd company logo
1 of 6
Khoirul A’mal Mohd Hanafiah
Senior Piping Engineer
QualificationsQualifications
Education
• Bachelor of Mechanical Engineering Degree (Hons)
• Diploma of Mechnical Engineering
BEM Registration Number: 53139A
Software / Other Skills
Ms Office, Lotus SmartSuite (MS Word, Excel, PowerPoint, Lotus 123,
Word Pro), AutoCad, Caesar II & AutoPipe
Languages : Malay and English
AMEC Foster Wheeler (M)AMEC Foster Wheeler (M)
Senior Piping Engineer (April 2014 – March 2016)
Provision of Wash Water System for Crude Oil Heater at Petron
Refinery Port Dickson
• Responsible as Lead Piping Engineer. Preparing details engineering
package and reviewing project drawings.
Basic Design Engineering Package (BDEP) and Detailed Design
Package for Shell STAR Project
• Responsible as Senior Piping Engineer. Conducting basic design
engineering study and preparing project cost estimatimation.
Assisting lead engineer in preparing engineering documents and
reviewing project drawings.
Basic Design Engineering Package (BDEP) Shell Bagan Luar
Gantry Upgrading
• Responsible as Lead Piping Engineer. Conducting basic design
engineering study and preparing project cost estimatimation.
Leading in overall plant layout review and optimization. Preparing
engineering and design basis as well as feeding overall project final
report.
Basic for Design (BfD) Shell Bagan Luar Gantry Upgrading
• Responsible as Lead Piping Engineer. Conducting feasibility study
and preparing project cost estimation. Leading in preliminary layout
study. Feeding overall project final report.
Page 1 of 5 Aug. 2016
SummarySummary
Fourteen (14) years experience in oil and
gas engineering design as well as
modification of petrochemical plants offshore
and onshore. The nature of activities
includes:
• Lead Discipline in project execution.
• Guiding subordinate in preparing
engineering document and having enough
information to execute the project
• Preparation of engineering deliverables
such as specification, data sheet, design
calculations and material take off
• Modelling, running and compiling piping
stress analysis
• Reviewing engineering drawing to meet
client expectation in sense of engineering
quality and safety align with international
and local code and standard requirements.
• Liaison with the client, vendor and others
discipline to collect information required
• Monitor and maintaining of quality control
for the document and drawing produced
• Conduct site visit verification and
preparation of the report
• Attending meeting with client or inter
discipline whenever required i.e. design
review and HAZOP study
• Assists in the project manhours estimation
for proposed projects
Khoirul A’mal Mohd Hanafiah
Senior Piping Engineer
Product Pipeline Replacement Project (SMDS)
• Resposible as Senior Piping Engineer. Review and checking project documents and drawings and reporting
to Lead Piping.
NGC Beachfield Condensate Storage and Compressor Facility Project (National Gas Company of Trinidad and
Tobago Limited)
• Resposible as Senior Piping Engineer. Producing project engineering documents and reporting to Lead
Piping.
Provision of Enginering Design For Installation of New Test Separator at PM323 East Belumut Platform (SKE)
• Resposible as Lead Piping Engineer. Conducting technical review and preparing techinal report, attending
project interface meeting with client, vendor and interdisipline. Review and checking project documents as well as
monitoring project progress.
Provision Of As-Built Red Line Mark-Up of P&IDs MDPP, MDLQ, MDA, MDB, MDC, MDD and JKA (CPOC)
• Resposible as Lead Piping Engineer cum Project Manager. Managing the project team and progress
monitoring. Conducting technical review and preparing techinal report, attending project interface meeting with client
and interdisipline. Review and checking project documents.
Wood Group Mustang
Senior Piping Engineer (Sept 2012 – April 2014)
Provision Of Puteri Infill Drilling Project (PCSB)
• Resposible as Lead Piping Engineer. Conducting technical review and preparing techinal report, attending
project interface meeting with client, vendor and interdisipline. Review and checking project documents and drawings
as well as monitoring project progress.
Provision Of BOC-BOD Pipeline Repair/Replacement Evaluation Project (Talisman Malaysia Limited)
• Resposible as Lead Piping Engineer. Conducting technical review and preparing techinal report, attending project
interface meeting with client, vendor and interdisipline. Review and checking project documents as well as monitoring
project progress.
BARDEGG-2 and Baronia EOR Development (PCSB)
• Responsible in assisting Project Lead to conduct piping integrity study on existing facilities, preparing technical report
and preliminary MTO, reviewing interdiscipline documents and drawings.
PETROFAC Enginering Services (RNZ – PES)
Senior Piping Engineer (April 2011 - August 2012)
Refurbishment, Life Extension and Upgrading or the West Desaru MOPU (PETROFAC)
• Responsible in preparing the Piping Technical Specifications, reviewing piping isometric drawings, piping plans, pipe
support drawings, equipment layout as well as conducting technical bid evaluation. Also monitoring vendor working
progress for valve refurbishment activity.
Engineering Services for Angsi C15 & C16 Infill Drilling Project (PCSB)
Page 2 of 5 Aug. 2016
Khoirul A’mal Mohd Hanafiah
Senior Piping Engineer
Engineering Services for Angsi C&E Infill Drilling Project (PCSB)
Basic Design for Bekok A Infill Drilling Project (PCSB)
• Resposible as Piping Project Lead for project execution. Conducting technical review for all piping produced documents
and drawings, attending project interface meeting with client, vendor and interdisipline. Review and checking project
documents and drawings as well as monitoring and reporting project progress to Project Manager.
RNZ Integrated (M) Sdn Bhd Miri, Sarawak
Mechanical/Piping Engineer (Feb 2006 - March 2011)
Provision Of Miri Design Office (MDO) Services For Petronas Carigali Sdn Bhd - Sarawak/Sabah Operations
Project Involved:
• Shell As-Built 2009 for M1, M3, F6, F23, E11, LIF and BIF
• BADP-E Remote Monitoring System
• Detail Design Engineering For SKO Pl-076 (BODP-C To BOP-A) Oil Pipeline Replacement Project
• Engineering Services For BADP-E Re-Visit 2
• Improvement Of Utility / Instrument Gas System at TKQ-A and BOK-A
• Detail Design Scope Of Work For FIP 9761 Improvement Of Liquid Drain For S-100 At BNJT-D
• Detail Design Scope Of Work For FIP 9770 : To Install PCV At TKK-A Suction Header (Tukau Field)
• WLDP-B Wells Tie-In (WL-18 & WL-20) And Commingling Of Well Flows At WL-4
• Detail Design Scope Of Work For Backdrafting Of Baronia & Temana FIPs
• Basic Design SOW for Balingian Line Re-Routing For Gas Supply Improvement to MLNG
• Design and Engineering Service for Domestic Workover Campaign - TKJT- C
• Pre-Design of Fire Water System Extended to BNP-B and BNDP-B
• Design and Engineering Service for Domestic Workover Campaign - TKJT-D
• Engineering Services For BADP-E Re-Visit
• Provision Of Bokor Re-Development Phase 2 BODP-B Revisit Conceptual And Detail Engineering Design
• Re-routing Of Wells A1S And A1L Flowlines at SMK-A For Petronas Carigali Sdn Bhd-Sarawak Operations (PCSB-SKO)
• Provision Of Engineering Design For Rejuvenation Of Utility / Instrument Air System For Petronas Carigali – Sarawak
• Detail Design Scope Of Work For WEMCO (V-401) Discharge Modification MCOT
• Detailed Design for Sump & Drain System Modification at BODP-A, BOP-A & BOK-A
• MCOT Temporary Effluent Line Tie-in Project.
• Detail Design for Instrument Gas Scrubber S-700 Replacement at BNJT-C
• Post-Shutdown Modification for SMV-AA Vent to Flare Project
• Conceptual Design for SMQ-A Living Quaters
RNZ Integrated (M) Sdn Bhd Kuala Lumpur
Mechanical/Piping Engineer (Apr 2002 - Jan 2006)
Detailed Design Engineering for Bunga Tulip-A Development Project (Talisman Malaysia Limited)
• Responsible in preparing the Mechanical/Piping Technical Specifications, reviewing piping isometric drawings, piping
plans, pipe support drawings, equipment layout as well as responsible in stress modelling and analyzing the piping
Page 3 of 5 Aug. 2016
Khoirul A’mal Mohd Hanafiah
Senior Piping Engineer
flexibilities especially on the determination of the support locations by comparing the allowable nozzle load at each
nodal points of the model. Also preparing the reports, analyzing the computer output and support design.
Baram South Development Project (Chemical Injection Skid) (PCSB)
• Responsible in technical coordination of the project especially on the Mechanical & Piping areas such as preparation
the equipment layout drawing, safety equipment, project scope of work and material take-off.
Tukau Fields - OPM & As Built Project (Sarawak Operation) (PCSB)
• Responsible in technical coordination of the project especially on the Mechanical & Piping areas such as preparation
the equipment layout drawing, safety equipment project scope of work and material take-off.
ANDR-A As-Built Project (PCSB)
• Responsible in project coordination for the overall As Built project for ANDR-A under HUC Contract with Vastalux for
Petronas Carigali Sdn Bhd
EPCC of Putrajaya Precinct 5 District Cooling Plant Project - Chilled Water Distribution Pipeline Package (HL Engineering
Sdn Bhd)
• Involved in analyzing the return and supply pressure at each pipelines branch in order to determine the differential
pressure, velocities, pipe sizes and prepare documentations. Responsible in preparation of vent and drain valve sizing
calculation for the above mentioned project.
Seconded to Sime Sembcorp Engineering Sdn Bhd for ANGSI Project for Petronas Carigali Sdn Bhd (PCSB)
• Preparation of isometric shopdrawings for Cellar Deck South, Cellar Derk North, Module 4,5 and 6 and Sump Deck area
• Prepared pipe support detail drawings for all module as per vendors requirement as PETRONAS pipe support
specification
Responsibilities:
• Offshore site visit
• Responsible in reviewing piping isometric drawings, piping plans, pipe support drawings, equipment layout as well as
responsible in stress modeling and analyzing the piping flexibilities especially on the determination of the support
locations by comparing the allowable nozzle load at each nodal points of the model. Also preparing the reports,
analyzing the computer output and support design
• Responsible in technical coordination of the project especially on the Mechanical & Piping areas such as preparation
the equipment layout drawing, safety equipment
• Prepared pipe support detail drawings for all module as per vendors requirement as PETRONAS pipe support
specification
Page 4 of 5 Aug. 2016
Khoirul A’mal Mohd Hanafiah
Senior Piping Engineer
ContactContact
Address:
No. 34, Jalan Aman Abadi U17/50,
Tmn. Aman Putri, Seksyen U17,
40160 Shah Alam,
Selangor D.E.
H/P number:
013-3314737
Email:
k_rol_amal@yahoo.com
RefereesReferees
Ir. Aminuddin Yusoff
Director of Operation – Upstream Devision
Amec Foster Wheeler (M) Sdn. Bhd.
amyusoff@gmail.com
012-366 6917
Ir. Mat Zaini Surip
Piping Manager
Petrofac Engineering Services (RNZ-PES)
Page 5 of 5 Aug. 2016
Khoirul A’mal Mohd Hanafiah
Senior Piping Engineer
ContactContact
Address:
No. 34, Jalan Aman Abadi U17/50,
Tmn. Aman Putri, Seksyen U17,
40160 Shah Alam,
Selangor D.E.
H/P number:
013-3314737
Email:
k_rol_amal@yahoo.com
RefereesReferees
Ir. Aminuddin Yusoff
Director of Operation – Upstream Devision
Amec Foster Wheeler (M) Sdn. Bhd.
amyusoff@gmail.com
012-366 6917
Ir. Mat Zaini Surip
Piping Manager
Petrofac Engineering Services (RNZ-PES)
Page 5 of 5 Aug. 2016

More Related Content

What's hot (20)

CeeVee-13th January 2017_update
CeeVee-13th January 2017_updateCeeVee-13th January 2017_update
CeeVee-13th January 2017_update
 
MNFirdaus Resume
MNFirdaus ResumeMNFirdaus Resume
MNFirdaus Resume
 
Resume of Hariom
Resume of HariomResume of Hariom
Resume of Hariom
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
Hernandez Priscila_C and I_20161005
Hernandez  Priscila_C and I_20161005Hernandez  Priscila_C and I_20161005
Hernandez Priscila_C and I_20161005
 
Sagar_cv
Sagar_cv Sagar_cv
Sagar_cv
 
balaji cv
balaji cvbalaji cv
balaji cv
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
JakeA_resume Oct14
JakeA_resume Oct14JakeA_resume Oct14
JakeA_resume Oct14
 
CV - HV-1
CV - HV-1CV - HV-1
CV - HV-1
 
Resume Acc
Resume AccResume Acc
Resume Acc
 
Mohamad Seth Farabi - Resume
Mohamad Seth Farabi - ResumeMohamad Seth Farabi - Resume
Mohamad Seth Farabi - Resume
 
Dec14CV
Dec14CVDec14CV
Dec14CV
 
Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
 
CV _Rajasekhar- Project Management
CV _Rajasekhar- Project ManagementCV _Rajasekhar- Project Management
CV _Rajasekhar- Project Management
 
Bill resume
Bill resumeBill resume
Bill resume
 
K Horner_RESUME_20161103
K Horner_RESUME_20161103K Horner_RESUME_20161103
K Horner_RESUME_20161103
 
Prashant Wani1
Prashant Wani1Prashant Wani1
Prashant Wani1
 

Viewers also liked

Ashish kalra CV_Congo
Ashish kalra CV_CongoAshish kalra CV_Congo
Ashish kalra CV_CongoAshish Kalra
 
Vijay_Sr Piping Designer(PDS&SP3D)
Vijay_Sr Piping Designer(PDS&SP3D)Vijay_Sr Piping Designer(PDS&SP3D)
Vijay_Sr Piping Designer(PDS&SP3D)Vijay Gupta
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah
 
CV SCGupta Nov 15-1
CV SCGupta Nov 15-1CV SCGupta Nov 15-1
CV SCGupta Nov 15-1Suresh Gupta
 
Riyaz Shaikh_2+yr_Process Engineer
Riyaz Shaikh_2+yr_Process EngineerRiyaz Shaikh_2+yr_Process Engineer
Riyaz Shaikh_2+yr_Process EngineerRiyaz Shaikh
 

Viewers also liked (8)

Ashish kalra CV_Congo
Ashish kalra CV_CongoAshish kalra CV_Congo
Ashish kalra CV_Congo
 
exp cv
exp cvexp cv
exp cv
 
Vijay_Sr Piping Designer(PDS&SP3D)
Vijay_Sr Piping Designer(PDS&SP3D)Vijay_Sr Piping Designer(PDS&SP3D)
Vijay_Sr Piping Designer(PDS&SP3D)
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CV
 
CV SCGupta Nov 15-1
CV SCGupta Nov 15-1CV SCGupta Nov 15-1
CV SCGupta Nov 15-1
 
Design Engineer .
Design Engineer .Design Engineer .
Design Engineer .
 
CV_SKJHA
CV_SKJHACV_SKJHA
CV_SKJHA
 
Riyaz Shaikh_2+yr_Process Engineer
Riyaz Shaikh_2+yr_Process EngineerRiyaz Shaikh_2+yr_Process Engineer
Riyaz Shaikh_2+yr_Process Engineer
 

Similar to Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016

Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
 
Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016Abi Joseph
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designerbharath kumar
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerNazrul Mokhtar
 
CV of Feri Noviardi (Mechanical)
CV of Feri Noviardi (Mechanical)CV of Feri Noviardi (Mechanical)
CV of Feri Noviardi (Mechanical)FERI NOVIARDI
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project managementDr. Pramod Deshpande
 
Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 
S S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXP
S S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXPS S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXP
S S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXPs s n prasad akshintala
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli
 
RESUME Updated - with photo
RESUME Updated - with photoRESUME Updated - with photo
RESUME Updated - with photoronnie luneta
 

Similar to Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016 (20)

Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designer
 
Ukeje CV
Ukeje CVUkeje CV
Ukeje CV
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping Designer
 
Ramanuja CV-
Ramanuja CV-Ramanuja CV-
Ramanuja CV-
 
CV of Feri Noviardi (Mechanical)
CV of Feri Noviardi (Mechanical)CV of Feri Noviardi (Mechanical)
CV of Feri Noviardi (Mechanical)
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
 
Mvcv v10
Mvcv v10Mvcv v10
Mvcv v10
 
Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
S S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXP
S S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXPS S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXP
S S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXP
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli Resume
 
SUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CVSUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CV
 
RESUME Updated - with photo
RESUME Updated - with photoRESUME Updated - with photo
RESUME Updated - with photo
 

Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016

  • 1. Khoirul A’mal Mohd Hanafiah Senior Piping Engineer QualificationsQualifications Education • Bachelor of Mechanical Engineering Degree (Hons) • Diploma of Mechnical Engineering BEM Registration Number: 53139A Software / Other Skills Ms Office, Lotus SmartSuite (MS Word, Excel, PowerPoint, Lotus 123, Word Pro), AutoCad, Caesar II & AutoPipe Languages : Malay and English AMEC Foster Wheeler (M)AMEC Foster Wheeler (M) Senior Piping Engineer (April 2014 – March 2016) Provision of Wash Water System for Crude Oil Heater at Petron Refinery Port Dickson • Responsible as Lead Piping Engineer. Preparing details engineering package and reviewing project drawings. Basic Design Engineering Package (BDEP) and Detailed Design Package for Shell STAR Project • Responsible as Senior Piping Engineer. Conducting basic design engineering study and preparing project cost estimatimation. Assisting lead engineer in preparing engineering documents and reviewing project drawings. Basic Design Engineering Package (BDEP) Shell Bagan Luar Gantry Upgrading • Responsible as Lead Piping Engineer. Conducting basic design engineering study and preparing project cost estimatimation. Leading in overall plant layout review and optimization. Preparing engineering and design basis as well as feeding overall project final report. Basic for Design (BfD) Shell Bagan Luar Gantry Upgrading • Responsible as Lead Piping Engineer. Conducting feasibility study and preparing project cost estimation. Leading in preliminary layout study. Feeding overall project final report. Page 1 of 5 Aug. 2016 SummarySummary Fourteen (14) years experience in oil and gas engineering design as well as modification of petrochemical plants offshore and onshore. The nature of activities includes: • Lead Discipline in project execution. • Guiding subordinate in preparing engineering document and having enough information to execute the project • Preparation of engineering deliverables such as specification, data sheet, design calculations and material take off • Modelling, running and compiling piping stress analysis • Reviewing engineering drawing to meet client expectation in sense of engineering quality and safety align with international and local code and standard requirements. • Liaison with the client, vendor and others discipline to collect information required • Monitor and maintaining of quality control for the document and drawing produced • Conduct site visit verification and preparation of the report • Attending meeting with client or inter discipline whenever required i.e. design review and HAZOP study • Assists in the project manhours estimation for proposed projects
  • 2. Khoirul A’mal Mohd Hanafiah Senior Piping Engineer Product Pipeline Replacement Project (SMDS) • Resposible as Senior Piping Engineer. Review and checking project documents and drawings and reporting to Lead Piping. NGC Beachfield Condensate Storage and Compressor Facility Project (National Gas Company of Trinidad and Tobago Limited) • Resposible as Senior Piping Engineer. Producing project engineering documents and reporting to Lead Piping. Provision of Enginering Design For Installation of New Test Separator at PM323 East Belumut Platform (SKE) • Resposible as Lead Piping Engineer. Conducting technical review and preparing techinal report, attending project interface meeting with client, vendor and interdisipline. Review and checking project documents as well as monitoring project progress. Provision Of As-Built Red Line Mark-Up of P&IDs MDPP, MDLQ, MDA, MDB, MDC, MDD and JKA (CPOC) • Resposible as Lead Piping Engineer cum Project Manager. Managing the project team and progress monitoring. Conducting technical review and preparing techinal report, attending project interface meeting with client and interdisipline. Review and checking project documents. Wood Group Mustang Senior Piping Engineer (Sept 2012 – April 2014) Provision Of Puteri Infill Drilling Project (PCSB) • Resposible as Lead Piping Engineer. Conducting technical review and preparing techinal report, attending project interface meeting with client, vendor and interdisipline. Review and checking project documents and drawings as well as monitoring project progress. Provision Of BOC-BOD Pipeline Repair/Replacement Evaluation Project (Talisman Malaysia Limited) • Resposible as Lead Piping Engineer. Conducting technical review and preparing techinal report, attending project interface meeting with client, vendor and interdisipline. Review and checking project documents as well as monitoring project progress. BARDEGG-2 and Baronia EOR Development (PCSB) • Responsible in assisting Project Lead to conduct piping integrity study on existing facilities, preparing technical report and preliminary MTO, reviewing interdiscipline documents and drawings. PETROFAC Enginering Services (RNZ – PES) Senior Piping Engineer (April 2011 - August 2012) Refurbishment, Life Extension and Upgrading or the West Desaru MOPU (PETROFAC) • Responsible in preparing the Piping Technical Specifications, reviewing piping isometric drawings, piping plans, pipe support drawings, equipment layout as well as conducting technical bid evaluation. Also monitoring vendor working progress for valve refurbishment activity. Engineering Services for Angsi C15 & C16 Infill Drilling Project (PCSB) Page 2 of 5 Aug. 2016
  • 3. Khoirul A’mal Mohd Hanafiah Senior Piping Engineer Engineering Services for Angsi C&E Infill Drilling Project (PCSB) Basic Design for Bekok A Infill Drilling Project (PCSB) • Resposible as Piping Project Lead for project execution. Conducting technical review for all piping produced documents and drawings, attending project interface meeting with client, vendor and interdisipline. Review and checking project documents and drawings as well as monitoring and reporting project progress to Project Manager. RNZ Integrated (M) Sdn Bhd Miri, Sarawak Mechanical/Piping Engineer (Feb 2006 - March 2011) Provision Of Miri Design Office (MDO) Services For Petronas Carigali Sdn Bhd - Sarawak/Sabah Operations Project Involved: • Shell As-Built 2009 for M1, M3, F6, F23, E11, LIF and BIF • BADP-E Remote Monitoring System • Detail Design Engineering For SKO Pl-076 (BODP-C To BOP-A) Oil Pipeline Replacement Project • Engineering Services For BADP-E Re-Visit 2 • Improvement Of Utility / Instrument Gas System at TKQ-A and BOK-A • Detail Design Scope Of Work For FIP 9761 Improvement Of Liquid Drain For S-100 At BNJT-D • Detail Design Scope Of Work For FIP 9770 : To Install PCV At TKK-A Suction Header (Tukau Field) • WLDP-B Wells Tie-In (WL-18 & WL-20) And Commingling Of Well Flows At WL-4 • Detail Design Scope Of Work For Backdrafting Of Baronia & Temana FIPs • Basic Design SOW for Balingian Line Re-Routing For Gas Supply Improvement to MLNG • Design and Engineering Service for Domestic Workover Campaign - TKJT- C • Pre-Design of Fire Water System Extended to BNP-B and BNDP-B • Design and Engineering Service for Domestic Workover Campaign - TKJT-D • Engineering Services For BADP-E Re-Visit • Provision Of Bokor Re-Development Phase 2 BODP-B Revisit Conceptual And Detail Engineering Design • Re-routing Of Wells A1S And A1L Flowlines at SMK-A For Petronas Carigali Sdn Bhd-Sarawak Operations (PCSB-SKO) • Provision Of Engineering Design For Rejuvenation Of Utility / Instrument Air System For Petronas Carigali – Sarawak • Detail Design Scope Of Work For WEMCO (V-401) Discharge Modification MCOT • Detailed Design for Sump & Drain System Modification at BODP-A, BOP-A & BOK-A • MCOT Temporary Effluent Line Tie-in Project. • Detail Design for Instrument Gas Scrubber S-700 Replacement at BNJT-C • Post-Shutdown Modification for SMV-AA Vent to Flare Project • Conceptual Design for SMQ-A Living Quaters RNZ Integrated (M) Sdn Bhd Kuala Lumpur Mechanical/Piping Engineer (Apr 2002 - Jan 2006) Detailed Design Engineering for Bunga Tulip-A Development Project (Talisman Malaysia Limited) • Responsible in preparing the Mechanical/Piping Technical Specifications, reviewing piping isometric drawings, piping plans, pipe support drawings, equipment layout as well as responsible in stress modelling and analyzing the piping Page 3 of 5 Aug. 2016
  • 4. Khoirul A’mal Mohd Hanafiah Senior Piping Engineer flexibilities especially on the determination of the support locations by comparing the allowable nozzle load at each nodal points of the model. Also preparing the reports, analyzing the computer output and support design. Baram South Development Project (Chemical Injection Skid) (PCSB) • Responsible in technical coordination of the project especially on the Mechanical & Piping areas such as preparation the equipment layout drawing, safety equipment, project scope of work and material take-off. Tukau Fields - OPM & As Built Project (Sarawak Operation) (PCSB) • Responsible in technical coordination of the project especially on the Mechanical & Piping areas such as preparation the equipment layout drawing, safety equipment project scope of work and material take-off. ANDR-A As-Built Project (PCSB) • Responsible in project coordination for the overall As Built project for ANDR-A under HUC Contract with Vastalux for Petronas Carigali Sdn Bhd EPCC of Putrajaya Precinct 5 District Cooling Plant Project - Chilled Water Distribution Pipeline Package (HL Engineering Sdn Bhd) • Involved in analyzing the return and supply pressure at each pipelines branch in order to determine the differential pressure, velocities, pipe sizes and prepare documentations. Responsible in preparation of vent and drain valve sizing calculation for the above mentioned project. Seconded to Sime Sembcorp Engineering Sdn Bhd for ANGSI Project for Petronas Carigali Sdn Bhd (PCSB) • Preparation of isometric shopdrawings for Cellar Deck South, Cellar Derk North, Module 4,5 and 6 and Sump Deck area • Prepared pipe support detail drawings for all module as per vendors requirement as PETRONAS pipe support specification Responsibilities: • Offshore site visit • Responsible in reviewing piping isometric drawings, piping plans, pipe support drawings, equipment layout as well as responsible in stress modeling and analyzing the piping flexibilities especially on the determination of the support locations by comparing the allowable nozzle load at each nodal points of the model. Also preparing the reports, analyzing the computer output and support design • Responsible in technical coordination of the project especially on the Mechanical & Piping areas such as preparation the equipment layout drawing, safety equipment • Prepared pipe support detail drawings for all module as per vendors requirement as PETRONAS pipe support specification Page 4 of 5 Aug. 2016
  • 5. Khoirul A’mal Mohd Hanafiah Senior Piping Engineer ContactContact Address: No. 34, Jalan Aman Abadi U17/50, Tmn. Aman Putri, Seksyen U17, 40160 Shah Alam, Selangor D.E. H/P number: 013-3314737 Email: k_rol_amal@yahoo.com RefereesReferees Ir. Aminuddin Yusoff Director of Operation – Upstream Devision Amec Foster Wheeler (M) Sdn. Bhd. amyusoff@gmail.com 012-366 6917 Ir. Mat Zaini Surip Piping Manager Petrofac Engineering Services (RNZ-PES) Page 5 of 5 Aug. 2016
  • 6. Khoirul A’mal Mohd Hanafiah Senior Piping Engineer ContactContact Address: No. 34, Jalan Aman Abadi U17/50, Tmn. Aman Putri, Seksyen U17, 40160 Shah Alam, Selangor D.E. H/P number: 013-3314737 Email: k_rol_amal@yahoo.com RefereesReferees Ir. Aminuddin Yusoff Director of Operation – Upstream Devision Amec Foster Wheeler (M) Sdn. Bhd. amyusoff@gmail.com 012-366 6917 Ir. Mat Zaini Surip Piping Manager Petrofac Engineering Services (RNZ-PES) Page 5 of 5 Aug. 2016