RESUME
PARAMJIT SINGH
Resume
DATE OF BIRTH 11th
December 1968
NATIONALITY Malaysian
CONTACT NO. +6019-3143417
EMAIL paramjit68@gmail.com
EDUCATION AND QUALIFICATIONS: BEng (Honours) Electrical & Electronic Engineering
First Class Honours Degree - University of
Sunderland, United Kingdom.
Diploma in Electrical & Electronic Engineering-
First Class Diploma - Workers Institute of
Technology, Malaysia.
PROFESSIONAL REGISTRATIONS: Engineering Council, UK (EC) – International
Professional Engineer - IntPE (UK)
European Federation of National Engineering
Associations (FEANI) - European Engineer (Eur
Ing)
Engineering Council, UK (EC) - Chartered Engineer
(CEng)
Board of Engineers Malaysia (BEM) - Professional
Engineer (PEng)
PROFESSIONAL AFFILIATION: Institute of Engineering & Technology, UK (IET) –
Member
Institute of Engineers Malaysia (IEM) - Corporate
Member
Malaysian Energy Professional Association (MEPA)-
Member
TRAINING Basic Offshore Safety and Emergency Training
(BOSET)
Power Quality – Voltage Dips, Harmonics and Surge
Protection by CPD, Singapore
Data Center Design by Emerson, Kuala Lumpur
Lightning Surge Protection System by IEM, PJ.
Generator Design and Implementation at Volvo,
Swedan.
Elevator Design Training at Hitachi, Tokyo, Japan.
HV Switchgear Training at MGE, Grenoble, France.
UPS Design Technology Training at France
Closed Toll System Mitsubishi Heavy Industries Ltd ,
Japan held at Kuala Lumpur from 16th
August 1987 to
15th
November 1988
Electrical & Mechanical Equipment &
7887cf7c-7a45-48ff-8dc2-26412d9785cc-160217072835.doc
29 January 2016
RESUME
PARAMJIT SINGH
Resume
Instrumentations - ESA Jurutera Perunding held at
Ipoh from 1st
April 1988 to 1st
May 1988.
Tunnel Operation and Operation and Maintenance
level. - Hyundai, Ltd. Korea conducted at Tunnel -
From 16th
May 1988 and 31st
August 1988.
COMPUTER SKILLS Microsoft Office, Microsoft Project, Primavera,
Adobe, SKM and Electrical Distribution, ETAP
and Transmission System Analysis and Design
Program (EDSA)
KEY EXPERIENCE
28 years of extensive in Project Management & Engineering Consultancy in various fields including
offshore and onshore engineering, Residential Development, Energy Efficiency, commercial building,
housing, infrastructure, facilities, defence, toll collection system, data centers, printing plants, water
plants, educational institution, commercial and industrial plants specialising in Mechanical & Electrical
Enhgineering.
PROFESSIONAL EXPERIENCE
February 2008 – May 2015
Ranhill Bersekutu Sdn Bhd
Deputy Discipline Director
Role : Perform as Deputy Discipline Director in Charge, authorised by the Discipline Director to act in the role on
behalf of the company with 80 reporting engineering and technical staff. Responsible to the Discipline Director for
department’s overall performance on the administration and project management with respect to technical quality
and profitability.
Responsible for the execution of all disciplines of the project and day-to-day management of the project totalling
RM1.5 Billion in Malaysia and abroad for the coordination of the work with programming, human resource planning
and cost control.
Provide overall management of the department, manage human resources department, Finance department,
establish the design team and office, develop the project plan and its execution, provide contract administration,
contractual, and commercial interface with client, ensure follow-upon any audit or design review findings, ensure
that the quality records are maintained, prepare close-out report, presentation to clients and strategic business
development division.
Involve in detailed engineering design, preparing concepts, reports and carry out the engineering for design
development, contract documentation and contract administration by conducting various discussions with Client,
equipment specialist, operational personals, production capacity, reliability, efficiency and functionality of the
proposed project. Develop sense of perception backed with daily entries, which alarms on upon changes in
material, errors in setting out, discrepancies in drawings, weather conditions, method of working, alterations or
accidents in order to initiate immediate solution and rectification.
Projects Involvement:
• 275/132/33kV Power reticulation for 2360 acres at Medini Mixed Development Nusajaya.
• Somerset Puteri Harbour, Nusajaya, Johor for Nusajaya Consolidated Sdn Bhd - Services Apartment and
Retail.
Page 2
RESUME
PARAMJIT SINGH
Resume
• 39-Storey Commercial Building (Certified Gold for BCA and GBI), MSC Status, Menara Binjai, Jalan Binjai,
Kuala Lumpur for Khor Joo Saik Sdn Bhd.
• Twins at Damansara Heights Kuala Lumpur for Panareno Sdn Bhd - Iconic Twins 36 storeys luxury
residential units.
• Suria Stoner, Kuala Lumpur for Regalside Development Sdn Bhd - 2 Luxury Residential blocks each 24 &
25 Floors.
• PNB Darby Park Service Apartments & Commercial Development for Permodalan Nasional Berhad at
Jalan Binjai Kuala Lumpur - 39 storey of 350 units, 4 storey Retail and Banquet Hall.
• Marina Doha Residential Tower, Doha, Qatar for Al-Sraiya Holding Group - 20-storey Residential Tower.
• Marina Doha Office Tower, Doha, Qatar for Al-Sraiya Holding Group - 25-storey Office Tower.
• Space Station consisting of 13 Blocks of 20 storey High-end Condominiums in Hydrabad India.
• Master Planning for proposed Mixed Development at Danga Bay and Nusajaya for Iskandar Waterfront
Development, Johor Bahru for Iskandar Coast Sdn Bhd
• Pusat Berita Bersepadu, Angkasapuri consisting Broadcasting studio and other facilities for Radio
Televisyen Malaysia (RTM)
• Mixed-Use 60 storey tower development on Lot 149, Jalan Ampang, Kuala Lumpur City Center for Aurora
Tower at KLCC Sdn Bhd ( A wholly owned subsidiary of Sunrise Berhad).
• Project Manager for Sime Darby Sports Center over 600acres at Labu, Negeri Sembilan.
• Residential D evelopment in Tajura Libya.
• Proposed Development Motor Sport Complex and Mixed Development on PTD 4354, Mukim Tanjung
Kupang & Ptd 199636 Mukim Pulai, Daerah Johor Bahru, Johor Darul Takzim for Fastrack Iskandar Sdn
Bhd
• Proposed Mixed Development containing Residential, Commercial and Retail on Part Lot 61 (Lot 27),
Jalan Ampang, Seksyen 45, Wilayah Persekutuan Kuala Lumpu for Intan Sekitar Sdn. Bhd.
• Privatisation of Damansara - Shah Alam Elevated Highway (DASH)
• TEEGA@CS2 - Mixed Development at on PTD 166956 (Lot CS2), Puteri Harbour, Nusajaya, Mukim Pulai,
Daerah Johor Bahru, Johor Darul Takzim for Sunrise Bhd containing the following;
a) 2 Blocks of 41 storey Service Apartment Tower with 706 Units with ‘Skypark’ at Level 33
b) 1 Block of 41 storey Service Apartment Tower with 556 Units with 26 storey Office Tower and
‘Skypark’ at Level 33
c) 1 Block of 5 storey Carpark Podium with 3 storey Service Apartment containing 30 Units and
‘Environmental Deck’ at Podium Roof Level
d) 1 Block of 2 storey Retail space
• Proposed Aquaint Danga Residences, 4 Blocks of 40 storeys, 818 Units of Serviced Apartments, Retail
and Facilities on part of Lot PTB 22055, (Parcel F1-F), Danga Bay, Persiaran Abu Bakar Sultan, Mukim
Bandar Johor Bahru, Johor Darul Takzim Untuk for Para Impiana Sdn Bhd
• Menara Binjai Renovation for British High Commission.
• Aeropod Mixed Development (Commercial, Retail & Residential), Phnom Penh, Cambodia for Lion Group.
• Mixed Development on Lot 132, Lot 73 dan Lot 368, Mukim Bandar Kuala Lumpur, Jalan Bangsar, Kuala
Lumpur for Setia Federal Hill Sdn Bhd (SP Setia Bhd)
• Upgrading of Transformers (33kV - 6.6kV) at Sungai Selangor Water Supply Scheme Phase II Stage 1.
Page 3
RESUME
PARAMJIT SINGH
Resume
• Proposed relocation of Royal Malaysian Airforce Base at Sungai Besi for Ministry of Defence Malaysia
• Proposed Demolition and Reconstruction of Hotel Building on PT 14, Bandar Padang Mat Sirat, Mukim
Kedawang, Daerah Langkawi, Kedah Darul Aman Untuk Tetuan Tadmax Sdn Bhd (Nadias Inn).
• Proposed Commercial Development at Lakehill Resort & Aptec City Mukim Plentong, Johor Bahru.
• 275kV DC T-Off From Segari – Ayer Tawar to Vale Iron Ore Plant & 275kV DC Lilo From Segari – Ayer
Tawar to PMU Pantai Remis 275kV Switching Station for Vale.
November 2002 – February 2008
Ranhill Worley Parson Sdn Bhd
Lead Engineer
• Design the systems within the offshore and onshore petrochemical facilities involving Oil and Gas.
• Responsible to provide the Basic, Conceptual, Front End Engineering Design (FEED) and Detailed engineering
design for electrical equipment of offshore and onshore oil and gas and petrochemical facilities.
• Establish electrical design basis for requirements to be adopted for detailed design for a particular project, as
well as scope of work document for fabrication, installation, hook-up and commissioning.
• Responsible for preparation of submission documents including philosophy, specifications, reports and
calculations
• Responsible for provision of engineering check and review on all detailed design documents and drawings
such as single line diagrams, wiring and schematic diagrams, electrical layout drawings, electrical
installation details, cable schedules, material take-off (MTO) and data sheets.
• Consolidate preliminary design data from equipment vendors, as well as site visits and field verification on
existing systems for system tie-ins.
• Coordinate electrical requirement and engineering review/ check on documents and drawings i.e. P&ID, PFD,
UFD, Equipment Layout etc. produced by other disciplines in order to ensure correct interfacing.
Project highlights include the following:
Kumang Cluster Development Project for Petronas Carigali Sdn Bhd (FEED & Detailed Design)
Phase 1 consists of F9, Kumang and Kanowit fields development. It comprises a Central Production
Platform (CPP) in Kanowit field (KAKG-A), drilling platforms for F9 (F9JT-A) with a subsea well, Kumang
(KUJT-A) and the Kanowit subsea wells (KASS-A) fields. Design for Offshore Electrical Services for Central
Processing Platform and three Satellite Drilling Platforms.
The works carried during the FEED & Detailed Design are as follows;
Electrical Specifications and Data Sheet: AC Uninterruptible Supply (UPS), MV Switchgear, LV Switchgear and
Distribution Board, Busduct, Power Transformer (Cast Resin), Variable Speed Drive, Soft Starter, HV/LV Motors,
Marine Navigational Aids, Packaged Equipment, Power Cables / Fibre Optic Cables, LV Motors, Integrated Motor
Control System (IMCS) and Electrical Network Monitoring Centre (ENMC)
Electrical Studies: Power Generation, AC Short Circuit, Load Flow and Motor Starting Analysis, Harmonic
Distortion, Transient Analysis, Protection Coordination, Lightning and Surge Protection and Heat Tracing Systems
Electrical Calculations: Power Cable and Busduct Sizing Calculation, Lighting Calculation, AC UPS and Battery
Sizing Calculation and Load List Calculation
Electrical Reports : Short Circuit Analysis, Load Analysis, Load Flow Analysis, Major Equipment Design and
Navigational Aids System
Electrical Design : Motor / Switchgear, Single Line Diagram, Cable Schedule (Power/Control), Small Power &
Lighting Layout and Earthing Layout
Page 4
RESUME
PARAMJIT SINGH
Resume
Umm Shaif Gas Injection Facilities for ADMA- OPCO (FEED & Detailed Design)
Front End Engineering Design (FEED) and Detail Design for Electrical Services at Compression Platform, Collector
Separator Platform and Accommodation Platform for Umm Shaif Gas Injection Facilities (USGIF) project which
represents the first phase of a major re-development of the Umm Shaif Field. USGIF facilities comprising two new
platforms (Compression Platform CP-1 and Umm Shaif Accommodation Platform UAP) receives, dehydrate and
reinject 219 BSCF per annum (annualised average 600 MMSCFD) of Khuff gas (and/ or associated gas) into the
Umm Shaif Arab C and D reservoirs in order to maintain and enhance existing oil production. Khuff gas will be
produced (and reinjected to the Arab C and D reservoirs) on three existing wellhead towers (WHTs) US251, US272
and US290, all of which will need significant brown-fields tie-in work.
The works carried during the Detailed Design are as follows;
Philosophies : Electrical Design and Control, Emergency Power, Electrical Protection, Earthing, Lighting and Low
Voltage Power services, Cable Selection and Routing, Selection of Electrical Equipment in Hazardous Area and
Electrical Equipment Installation and Handling.
Specifications and Data Sheet: AC Uninterruptible Supply (UPS), MV Switchgear, LV Switchgear and Distribution
Board, Busduct, Power Transformer (Cast Resin), Marine Navigational Aids, Packaged Equipment, Power
Cables / Fibre Optic Cables, HV Subsea Cable, Variable Speed Drive, Soft Starter, HV/LV Motors, Integrated Motor
Control System (IMCS) and Electrical Network Monitoring Centre (ENMC)
Studies: Power Generation, AC Short Circuit, Load Flow and Motor Starting Analysis, Harmonic Distortion,
Transient Analysis, Protection Coordination, Lightning and Surge Protection and Heat Tracing Systems
Calculations: Power Cable and Busduct Sizing Calculation, Transformer Sizing, Emergency Deisel Generator
Sizing, Lighting Calculation, AC & DC UPS and Battery Sizing Calculation and Load List Calculation
Reports : Short Circuit Analysis, Load Analysis, Load Flow Analysis, Major Equipment Design and Navigational
Aids System
Design : Motor / Switchgear, Single Line Diagram, Cable Schedule (Power/Control), Small Power & Lighting
Layout and Earthing Layout.
Salman Project (Detailed Design)
The Salman project comprises of the existing Salman field and the new Dalan field.
The Salman field consists of eight existing bridge linked platforms. The project caters for the implementation of two
new platforms within the Salman field.
The Dalan field at the moment consists of a wellhead platform. The project scope caters for the implementation of
six new platforms including HV power generation and a LQ.
Implementation of a complete load management system for the two power generation plants (Salman and Dalan).
Responsible for the preparation of specifications, the total engineering and design, value engineering, bid analysis,
load analysis, the short circuit calculations, motor starting calculations, protection coordination analysis, complete
hook-up design for the equipment. Construction support activities during fabrication.
Murphy Sarawak Oil Company Ltd.
Bintulu Onshore Receiving Facilities and Tank Farm Conceptual Design.
PETRODAR Operating Company
Detailed Design Subcontractor to Ranhill Engineers and Constructors Sdn Bhd for Engineering, Procurement,
Construction and Commissioning of Melut Basin Oil Development Project (Upstream) Package A - Al-Jabalayn
Central Processing Facilities and Palouge Field Processing Facilities
ExxonMobil Exploration and Production Malaysia Inc.
• Guntong ‘F’ Satellite Platform Development Engineering Project
Page 5
RESUME
PARAMJIT SINGH
Resume
• Bid Proposal for Guntong ‘F’ Satellite Platform Development Engineering Project
Gas District Cooling Sdn Bhd
• Tender Support to Ranhill Engineers and Constructors Sdn Bhd for Engineering, Procurement,
Construction and Commissioning of Putrajaya Precinct 1 Cogeneration Plant/ DCS Annex
• Tender Support to Ranhill Engineers and Constructors Sdn Bhd for Engineering, Procurement,
Construction and Commissioning of Putrajaya Precinct 5 District Cooling Plant
Pakistani Petroleum
• Tender Support to Ranhill Engineers and Constructors Sdn Bhd for Engineering, Procurement,
Construction and Commissioning of ADHI LPG/NGL Plant II
Malaysian Shipyard Engineering Sdn Bhd
• Proposal Engineering for Small Field Development Project
Iranian Offshore Oil Company (IOOC)
• Bid Proposal for Conceptual Design, FEED and Detailed Design of Siri ‘C’ and ‘D” Oil Fields Development
Project.
NAOC - Nigeria
• Tender support to DAEWOO for Engineering, Procurement, Construction and Commissioning of IDU Field
Gas Recovery and Plant Revamping Phase 2 Project.
Aug 1999 – Oct 2002
Ilham Consult Sdn Bhd
Head of Department
Perform as Project Director in Charge authorised by the Managing Director to act in the role on behalf of the
company. Responsible to the Managing Director for company’s overall performance on the administration, project
with respect to technical quality and profitability.
Responsible for the execution of all disciplines of the project and day-to-day management of the project and for the
coordination of the work with programming, human resource planning and cost control.
Provide overall management of the Mechanical & Electrical department, manage human resources department,
Finance department, establish the design team and office, develop the project plan and its execution, provide
contract administration, contractual, and commercial interface with client, ensure follow-upon any audit or design
review findings, ensure that the quality records are maintained, prepare close-out report, presentation to clients and
strategic business development division.
• Senior Project Manager – Home Affairs Ministry - Ibu Pejabat Polis Daerah, Dang Wangi, Kuala Lumpur 12
storey Administration Block and 20 storey Apartment Block.
• Senior Project Manager - Universiti Utara Malaysia - Development of Academic Block and Lecture Hall at
Malaysian North University (Universiti Utara Malaysia), Sintok, Kedah Darul Aman.
• Senior Project Manager - MIMOS Berhad - MIMOS Internet Building comprising Four Office Floors and
Two Basements at Technology Park Malaysia (Taman Teknologi Malaysia), Bukit Jalil, Kuala Lumpur.
• Senior Project Manager - MIMOS Berhad - Data Center Facilities for Nationwide Jaring Node at Kota
Kinabalu, Kuching, Johor Baru, Kuantan, Kulim High Technology Park, Alor Setar, Ipoh, Melaka, Seremban,
Kuala Lumpur, Kuala Terengganu and Kota Bharu.
• Senior Project Manager - Plaza Pontian (Hotel & Commercial Center) -
Page 6
RESUME
PARAMJIT SINGH
Resume
• Senior Project Manager - Grand Saga Sdn Bhd - The Proposed Upgrading Of Existing Manual Toll
Collection System At Lebuhraya Cheras-Kajang And Additional Twelve (12) Lanes Of Manual Toll Collection
System At Batu 9 Toll Plaza And Toll Surveillance System For Grand Saga Construction Sdn Bhd
• Senior Project Manager - University of Nottingham - University of Notingham City Campus at Wisma
MISC, No. 2, Jalan Conlay, Kuala Lumpur.
• Senior Project Manager - Sin Chew Daily - Newsprint Factory at Lot 50 & 51, Section 13, Petaling
Jaya, for Sin Chew Media Services.
• Senior Design Engineer - Ministry of Education, Malaysia - Design, Build and Complete Muadzam Shah
Polytechnic at Pahang Darul Makmur.
• Senior Project Manager - Tenaga Nasional Berhad - TNB Building, Fifteen (15) Storey of Office Building,
at Lot 1973, Jalan Yahya Awal, Johor Bahru, Johor Darul Takzim.
• Senior Design Engineer – Ministry of Defence, Malaysia - Design, Build and Complete 51st
Regiment
Camp, Royal Artillery (Artileri Diraja), Gemas, Negeri Sembilan.
• Senior Engineer - Perbadanan Kemajuan Negeri Selangor - PLUS Toll Plaza Kota Damansara Closed
Circuit Toll Collection System and Fibre Optic Highway Telecommunication system for Proposed Kota
Damansara Toll Plaza.
• Senior Engineer - Jabatan Penjara Malaysia - Kluang Prison Complex, Kluang, Johor Darul Takzim.
Sept 1991-May 1998
Ranhill-Fluor Daniel Sdn Bhd / Ranhill Bersekutu Sdn Bhd
Senior Designer / Engineering Assistant
Involved in Electrical design for Oil & Gas and Petrochemical Plants.
Projects Involved :
• Malaysian Refinery Conversion Project - (Shell Refining Co. (FOM) Bhd)
- Layout of lighting, power and telephone cables for temporary construction office.
- Single line diagram, Schematic diagram, Block diagram, Summary of Electrical and Telephone cables,
Cable lists, Installation details off Electrical and Telephone for temporary construction office.
- Layout of lighting and earthing for tank farm area, Refinery lamp posts layout and street lighting layout.
- Single Line diagram, Block diagram, Cable, route disconnection, Lamp Post details and MTO for Tank Farm
and Street Lighting.
• Shell Middle Distillate Synthesis, Bintulu, - Sarawak (JGC (M) Sdn Bhd)
- Layout of lighting and earthing for tank farm area (c. 100, c. 200 & c. 400)
- Block diagram for lighting and power outlet, instrument feeder for tank farm area.
- Cable sizing for lighting and earthing for tank farm area.
- Summary of electrical engineering, list of cables, cable no. and size, cable drum schedule for the above
installation.
- Checking installation details of lighting, power and earthing provided by client.
• Henkel Fatty Alcohol Project, Telok Panglima Garang, Banting, Selangor (Henkel Rika (M) Sdn Bhd
- Layout of temporary facility for construction office lighting, power and telephone systems.
- Layout of lighting, power and telephone systems for MCC/control building, change house and sub-station.
- Schematic diagram, single line diagram, connection diagram for electrical and telephone system.
- Calculation and sizing of electrical and telephone cables.
Page 7
RESUME
PARAMJIT SINGH
Resume
- MTO for the above installation.
- Develop specification for electrical and telephone system for the above installation.
• Malaysian Carbon Unit 1 Expansion Project, Port Dickson, Negri Sembilan (Malaysia Carbon Sdn Bhd)
- Site supervision for all electrical installation system (lighting, power, motor, control panels/switchboards) for
the above installation.
- Assist in testing and commissioning for all electrical system such as lighting, power, motor, switchboards) for
the above installation.
• Esso/JGC No. 2 Powerformer Project, Port Dickson, Negeri Sembilan (Esso Malaysia Berhad)
- Layout of lighting, receptacle and earthing for process building.
- Layout of power and earthing for process building.
- Schematic diagram, block diagram and single lines diagram for lighting and power system.
- MTO for the above installation.
- Installation detail of lighting, power and earthing
• Modification of Glycol Unit No. F11 4F23 - (Sarawak Shell Berhad)
- Layout of lighting, power and earthing
- Installation details layout and lighting, power and earthing.
- MTO for the above installation.
- Schematic diagram, single line diagram tie-in to existing installation.
Ranhill Bersekutu Sdn Bhd
Involved in various type of local and overseas sophisticated projects such as industrial plants, high rise buildings,
mixed development, hotels, satellite station, highways, water pumping station, prison complex, resorts and air craft
barrier.
Projects Involved :
• Utusan Melayu – Press Printing factory
1. Electrical HV and LV, 2000kVA Generator set, 2000kVA (11-0.415kV) Onan Type Transformer, Telephone
& PABX, Fibre Optic Local Area Network, Master Antenna System, Public Address, CCTV and security
system for office building for Utusan Melayu (Malaysia) Bhd at Wangsa Maju, Kuala Lumpur.
2. Electrical HV and LV, 2000kVA Generator set, 2000kVA & 2500kVA (22-0.415kV) Cast Resin Type
Transformer, 5000A Copper Busduct, 5000A Surge Suppressor, 5th
, 7th
& 11th
Harmonic Filters, Low Noise
Earthing, Telephone & PABX, Fibre Optic, Master Antenna System, Public Address, CCTV and Building
Automation & Security System at Newspaper Printing Factory for Utusan Melayu (Malaysia) Bhd, at Bandar
Baru Bangi, Selangor.
• EPZ Danang, Vietnam - Electrical HV & LV recticulation and Telephone Infra Structural at Export Processing
Zone Danang Vietnam for Malaysian South South Cooperation.
• Clean Water Pumping Station using PLC, Variable Speed Controller Starters, SCADA control for Bekalan Air
Johor Bahru, Peringkat II Parit Raja dan Macap Fasa II.
• Concept design and solar system for Sentul Raya Housing and Commercial Centre, Kuala Lumpur.
• Electrical and Infra-structural for Samaworld Theme Park, Genting Highland.
Page 8
RESUME
PARAMJIT SINGH
Resume
• Electrical HV & LV, Generator Set, Telephone & PABX, CCTV, Audio Visual System, Building Automation
System, Public Address, Master Antenna System and Fireman Intercom for Hotel and Commercial Centre at
Duty Free Complex, Johor Bahru.
• Electrical LV, Generator Set, Telephone & PABX, UPS, Public Address, Master Antenna System, Security
System for Sungai Buloh Prison Complex and Staff Quarters.
• Electrical LV, Generator Set, Telephone & PABX, Audio Visual System, Master Antenna System, Public
Address and Swimming Poll for Rebak Marina Resort Langkawi.
• Electrical LV, Generator Set, Telephone & PABX, Audio Visual System for High Rise Apartment at Bukit
Saujana Mixed Development Johor Bahru.
• Electrical LV, Generator Set, Telephone & PABX Hotel Bed Side Panel, Master Antenna System, Public
Address and Swimming Poll for Pelangi Beach Resort, Langkawi.
• Electrical LV, Generator Set, Telephone & Keyphone, Toll equipment, Street Lighting, High Mast and Fibre
Optic Communication cable at Ladang Bertam Toll Plaza and Interchange.
• Electrical HV & LV, Earthing & Grounding System, Lightning Protection System, Low Noise Earthing, Generator
set, Telephone & PABX, UPS, Public Address and Security System at Measat Satellite Control Station at
Gunung Raya Langkawi for Binariang.
• Electrical HV & LV, Earthing & Grounding System, Lightning Protection System, Telephone & PABX, Public
Address and Security System at Tan Chong Motor Assemblies Plant, Danang, Vietnam.
• Electrical LV, Generator set, Telephone & Keyphone, Toll Equipment, Street Lighting, High Mast and Fiber
Optic Communication System at North South Expressway Central Link and KLIA Expressway Toll Plaza,
Interchange and Rest & Service Area.
• Electrical LV, Generator Set, Telephone & Keyphone at Puchong Landfill and Sanitary Selangor.
• Electrical HV & LV, 750kVA Generator set, 1500kVA (22-0.415kV) Cast Resin Type Transformer, Telephone &
PABX, Master Antenna System, Public Address, CCTV, Building Automation & Security System for 40 storey
office and Apartment Building for Martego.
• Air Craft Barrier System at Royal Malaysian Airforce Base at Labuan, Kuantan and Penang.
Mar 1991- Sept 1991
Carsem (M) Sdn Bhd
Technical Assistant
Involved in operation and maintenance of mechanical, electrical & electronic in Motorola Opto Coupler (Dome &
SO-8) final test department.
Dec 1988 – Mar 1991
Projek Lebuhraya Utara Selatan
Technician
Involved in construction, operation and maintenance of mechanical, electrical & electronic equipment’s at Ipoh-
Changkat Jering Toll Expressway
Job Description :
Meru Menora Tunnel
Page 9
RESUME
PARAMJIT SINGH
Resume
Tunnel Power System
- 11kV incoming supply from TNB (Ring Circuit)
- Minimum oil circuit breaker (MOCB) switch gear
- 315kVA Power Transformer (11kV/415V)
- 400kVA Transformer (11kV/415V)
- 1000kVA Standby Generator set
- Air Circuit breaker (ACB)
- Uninterruptible power supply (UPS)
- DC tripping unit
- Monitoring console (mimic panel)
Tunnel Lighting System
- Fluorescent and high pressure sodium lamp (SON) 400W
- Photosensor and photocamera controlled dimmers
- High frequency (HF) ballast
- DC amplifiers
- Monitoring console (mimic panel)
Tunnel 1 Ventilation System
- Programmable logic controller (PLC)
- Carbon monoxide and dust sensor and monitors
- Air speed and direction transmitter
- Axial flow fan
Tunnel 2 Ventilation System
- PC based control system
- 16 channel opto-isolated D/I board (PCLD-782)
- 16 channel relay output board (PCLD-785)
- 14 bit AD/DA card
- RAM/ROM disk card
- Amplifier/multiplexer board
- Hard-wire bypass
- Industrial Personnel Computer (IPC)
- Carbon monoxide and dust sensor and monitors
- Air speed and direction transmitter
- Axial flow fan
Fire Fighting System
- Carbon dioxide extinguishing system
- Gas ionization type smoke detector
- Thermo-mechanical type heat detector
- NOVAL control unit
Page 10
RESUME
PARAMJIT SINGH
Resume
- Booster pump (60Hp) star-delta starter
- Jockey pump (3kW) direct on line starter
Emergency Telephone System
- Emergency call boxes at Tunnel
- Public address (PA) system at control room
Water Treatment Plant
- Capacity of 1.25m2/hr
- Dynasand filtrations
- Chemical flocculation
- Chlorination
- Water softening
Overhead Crane
- EOT crane
- Capacity of 3 tons
- With hoist and cross motor
Air-Conditioning System
- Single package cooling system (thermostat controlled) 76,000 btu/hr
- Split system 18,000 btu/hr
- Room air conditioning system 10,000 btu/hr
Toll System
Toll Plaza & Lane Equipments
- Assist Technical Executive and Technical Assistant in routine maintenance and trouble shooting of Plaza
Computer System and Lane Equipment.
Office
Filing System
- Assist in implementing for record management system and other routine duties.
Local Information Centre
Operation
- Supervise mainline events such as break down and accidents
- Supervise PLUS RONDA activities on mainline
- Preparing reports of daily events on highway
- Expressway lane closure programme
- Toll plaza status reports
- Emergency safety procedures
Page 11
RESUME
PARAMJIT SINGH
Resume
Aug 1987 – Nov 1988
Malaysian Highway Authority (Lembaga Lebuhraya Malaysia)
Jr. Technician
Involved with the designing and planning team on implementation of the first Closed Toll Collection System
Assisted in all operation and maintenance of mechanical, electrical & electronic equipment’s along Ipoh – Changkat
Jering Toll Expressway.
Toll System (Toll Plaza)
- Toll monitoring console
- Master communication unit
- Central data processing unit central
- Central printing
- Monitoring console terminal
- Uninterruptible power supply (UPS)
- Automatic vehicle classification unit
- Axle and wheel detector
- Optical vehicle detector (OVD)
- Toll collector terminal (TCT)
- Over height vehicle detector
- Toll fare indicator
- Computer system
- Software and hardware
Meru Menora Tunnel:
- Programmable Logic Control (PLC)
- Programming and designing control circuits for electrical and electronic devices
- 11kV Power Supply
- Ring main circuit
- MOCB, ACB & MCC circuit breakers
- 400kVA transformers and generator
- Photo camera controlled dimmer
- Air Conditioning system
- P.A. system
- Overhead crane
Page 12

Resume Paramjit Singh PM 1

  • 1.
    RESUME PARAMJIT SINGH Resume DATE OFBIRTH 11th December 1968 NATIONALITY Malaysian CONTACT NO. +6019-3143417 EMAIL paramjit68@gmail.com EDUCATION AND QUALIFICATIONS: BEng (Honours) Electrical & Electronic Engineering First Class Honours Degree - University of Sunderland, United Kingdom. Diploma in Electrical & Electronic Engineering- First Class Diploma - Workers Institute of Technology, Malaysia. PROFESSIONAL REGISTRATIONS: Engineering Council, UK (EC) – International Professional Engineer - IntPE (UK) European Federation of National Engineering Associations (FEANI) - European Engineer (Eur Ing) Engineering Council, UK (EC) - Chartered Engineer (CEng) Board of Engineers Malaysia (BEM) - Professional Engineer (PEng) PROFESSIONAL AFFILIATION: Institute of Engineering & Technology, UK (IET) – Member Institute of Engineers Malaysia (IEM) - Corporate Member Malaysian Energy Professional Association (MEPA)- Member TRAINING Basic Offshore Safety and Emergency Training (BOSET) Power Quality – Voltage Dips, Harmonics and Surge Protection by CPD, Singapore Data Center Design by Emerson, Kuala Lumpur Lightning Surge Protection System by IEM, PJ. Generator Design and Implementation at Volvo, Swedan. Elevator Design Training at Hitachi, Tokyo, Japan. HV Switchgear Training at MGE, Grenoble, France. UPS Design Technology Training at France Closed Toll System Mitsubishi Heavy Industries Ltd , Japan held at Kuala Lumpur from 16th August 1987 to 15th November 1988 Electrical & Mechanical Equipment & 7887cf7c-7a45-48ff-8dc2-26412d9785cc-160217072835.doc 29 January 2016
  • 2.
    RESUME PARAMJIT SINGH Resume Instrumentations -ESA Jurutera Perunding held at Ipoh from 1st April 1988 to 1st May 1988. Tunnel Operation and Operation and Maintenance level. - Hyundai, Ltd. Korea conducted at Tunnel - From 16th May 1988 and 31st August 1988. COMPUTER SKILLS Microsoft Office, Microsoft Project, Primavera, Adobe, SKM and Electrical Distribution, ETAP and Transmission System Analysis and Design Program (EDSA) KEY EXPERIENCE 28 years of extensive in Project Management & Engineering Consultancy in various fields including offshore and onshore engineering, Residential Development, Energy Efficiency, commercial building, housing, infrastructure, facilities, defence, toll collection system, data centers, printing plants, water plants, educational institution, commercial and industrial plants specialising in Mechanical & Electrical Enhgineering. PROFESSIONAL EXPERIENCE February 2008 – May 2015 Ranhill Bersekutu Sdn Bhd Deputy Discipline Director Role : Perform as Deputy Discipline Director in Charge, authorised by the Discipline Director to act in the role on behalf of the company with 80 reporting engineering and technical staff. Responsible to the Discipline Director for department’s overall performance on the administration and project management with respect to technical quality and profitability. Responsible for the execution of all disciplines of the project and day-to-day management of the project totalling RM1.5 Billion in Malaysia and abroad for the coordination of the work with programming, human resource planning and cost control. Provide overall management of the department, manage human resources department, Finance department, establish the design team and office, develop the project plan and its execution, provide contract administration, contractual, and commercial interface with client, ensure follow-upon any audit or design review findings, ensure that the quality records are maintained, prepare close-out report, presentation to clients and strategic business development division. Involve in detailed engineering design, preparing concepts, reports and carry out the engineering for design development, contract documentation and contract administration by conducting various discussions with Client, equipment specialist, operational personals, production capacity, reliability, efficiency and functionality of the proposed project. Develop sense of perception backed with daily entries, which alarms on upon changes in material, errors in setting out, discrepancies in drawings, weather conditions, method of working, alterations or accidents in order to initiate immediate solution and rectification. Projects Involvement: • 275/132/33kV Power reticulation for 2360 acres at Medini Mixed Development Nusajaya. • Somerset Puteri Harbour, Nusajaya, Johor for Nusajaya Consolidated Sdn Bhd - Services Apartment and Retail. Page 2
  • 3.
    RESUME PARAMJIT SINGH Resume • 39-StoreyCommercial Building (Certified Gold for BCA and GBI), MSC Status, Menara Binjai, Jalan Binjai, Kuala Lumpur for Khor Joo Saik Sdn Bhd. • Twins at Damansara Heights Kuala Lumpur for Panareno Sdn Bhd - Iconic Twins 36 storeys luxury residential units. • Suria Stoner, Kuala Lumpur for Regalside Development Sdn Bhd - 2 Luxury Residential blocks each 24 & 25 Floors. • PNB Darby Park Service Apartments & Commercial Development for Permodalan Nasional Berhad at Jalan Binjai Kuala Lumpur - 39 storey of 350 units, 4 storey Retail and Banquet Hall. • Marina Doha Residential Tower, Doha, Qatar for Al-Sraiya Holding Group - 20-storey Residential Tower. • Marina Doha Office Tower, Doha, Qatar for Al-Sraiya Holding Group - 25-storey Office Tower. • Space Station consisting of 13 Blocks of 20 storey High-end Condominiums in Hydrabad India. • Master Planning for proposed Mixed Development at Danga Bay and Nusajaya for Iskandar Waterfront Development, Johor Bahru for Iskandar Coast Sdn Bhd • Pusat Berita Bersepadu, Angkasapuri consisting Broadcasting studio and other facilities for Radio Televisyen Malaysia (RTM) • Mixed-Use 60 storey tower development on Lot 149, Jalan Ampang, Kuala Lumpur City Center for Aurora Tower at KLCC Sdn Bhd ( A wholly owned subsidiary of Sunrise Berhad). • Project Manager for Sime Darby Sports Center over 600acres at Labu, Negeri Sembilan. • Residential D evelopment in Tajura Libya. • Proposed Development Motor Sport Complex and Mixed Development on PTD 4354, Mukim Tanjung Kupang & Ptd 199636 Mukim Pulai, Daerah Johor Bahru, Johor Darul Takzim for Fastrack Iskandar Sdn Bhd • Proposed Mixed Development containing Residential, Commercial and Retail on Part Lot 61 (Lot 27), Jalan Ampang, Seksyen 45, Wilayah Persekutuan Kuala Lumpu for Intan Sekitar Sdn. Bhd. • Privatisation of Damansara - Shah Alam Elevated Highway (DASH) • TEEGA@CS2 - Mixed Development at on PTD 166956 (Lot CS2), Puteri Harbour, Nusajaya, Mukim Pulai, Daerah Johor Bahru, Johor Darul Takzim for Sunrise Bhd containing the following; a) 2 Blocks of 41 storey Service Apartment Tower with 706 Units with ‘Skypark’ at Level 33 b) 1 Block of 41 storey Service Apartment Tower with 556 Units with 26 storey Office Tower and ‘Skypark’ at Level 33 c) 1 Block of 5 storey Carpark Podium with 3 storey Service Apartment containing 30 Units and ‘Environmental Deck’ at Podium Roof Level d) 1 Block of 2 storey Retail space • Proposed Aquaint Danga Residences, 4 Blocks of 40 storeys, 818 Units of Serviced Apartments, Retail and Facilities on part of Lot PTB 22055, (Parcel F1-F), Danga Bay, Persiaran Abu Bakar Sultan, Mukim Bandar Johor Bahru, Johor Darul Takzim Untuk for Para Impiana Sdn Bhd • Menara Binjai Renovation for British High Commission. • Aeropod Mixed Development (Commercial, Retail & Residential), Phnom Penh, Cambodia for Lion Group. • Mixed Development on Lot 132, Lot 73 dan Lot 368, Mukim Bandar Kuala Lumpur, Jalan Bangsar, Kuala Lumpur for Setia Federal Hill Sdn Bhd (SP Setia Bhd) • Upgrading of Transformers (33kV - 6.6kV) at Sungai Selangor Water Supply Scheme Phase II Stage 1. Page 3
  • 4.
    RESUME PARAMJIT SINGH Resume • Proposedrelocation of Royal Malaysian Airforce Base at Sungai Besi for Ministry of Defence Malaysia • Proposed Demolition and Reconstruction of Hotel Building on PT 14, Bandar Padang Mat Sirat, Mukim Kedawang, Daerah Langkawi, Kedah Darul Aman Untuk Tetuan Tadmax Sdn Bhd (Nadias Inn). • Proposed Commercial Development at Lakehill Resort & Aptec City Mukim Plentong, Johor Bahru. • 275kV DC T-Off From Segari – Ayer Tawar to Vale Iron Ore Plant & 275kV DC Lilo From Segari – Ayer Tawar to PMU Pantai Remis 275kV Switching Station for Vale. November 2002 – February 2008 Ranhill Worley Parson Sdn Bhd Lead Engineer • Design the systems within the offshore and onshore petrochemical facilities involving Oil and Gas. • Responsible to provide the Basic, Conceptual, Front End Engineering Design (FEED) and Detailed engineering design for electrical equipment of offshore and onshore oil and gas and petrochemical facilities. • Establish electrical design basis for requirements to be adopted for detailed design for a particular project, as well as scope of work document for fabrication, installation, hook-up and commissioning. • Responsible for preparation of submission documents including philosophy, specifications, reports and calculations • Responsible for provision of engineering check and review on all detailed design documents and drawings such as single line diagrams, wiring and schematic diagrams, electrical layout drawings, electrical installation details, cable schedules, material take-off (MTO) and data sheets. • Consolidate preliminary design data from equipment vendors, as well as site visits and field verification on existing systems for system tie-ins. • Coordinate electrical requirement and engineering review/ check on documents and drawings i.e. P&ID, PFD, UFD, Equipment Layout etc. produced by other disciplines in order to ensure correct interfacing. Project highlights include the following: Kumang Cluster Development Project for Petronas Carigali Sdn Bhd (FEED & Detailed Design) Phase 1 consists of F9, Kumang and Kanowit fields development. It comprises a Central Production Platform (CPP) in Kanowit field (KAKG-A), drilling platforms for F9 (F9JT-A) with a subsea well, Kumang (KUJT-A) and the Kanowit subsea wells (KASS-A) fields. Design for Offshore Electrical Services for Central Processing Platform and three Satellite Drilling Platforms. The works carried during the FEED & Detailed Design are as follows; Electrical Specifications and Data Sheet: AC Uninterruptible Supply (UPS), MV Switchgear, LV Switchgear and Distribution Board, Busduct, Power Transformer (Cast Resin), Variable Speed Drive, Soft Starter, HV/LV Motors, Marine Navigational Aids, Packaged Equipment, Power Cables / Fibre Optic Cables, LV Motors, Integrated Motor Control System (IMCS) and Electrical Network Monitoring Centre (ENMC) Electrical Studies: Power Generation, AC Short Circuit, Load Flow and Motor Starting Analysis, Harmonic Distortion, Transient Analysis, Protection Coordination, Lightning and Surge Protection and Heat Tracing Systems Electrical Calculations: Power Cable and Busduct Sizing Calculation, Lighting Calculation, AC UPS and Battery Sizing Calculation and Load List Calculation Electrical Reports : Short Circuit Analysis, Load Analysis, Load Flow Analysis, Major Equipment Design and Navigational Aids System Electrical Design : Motor / Switchgear, Single Line Diagram, Cable Schedule (Power/Control), Small Power & Lighting Layout and Earthing Layout Page 4
  • 5.
    RESUME PARAMJIT SINGH Resume Umm ShaifGas Injection Facilities for ADMA- OPCO (FEED & Detailed Design) Front End Engineering Design (FEED) and Detail Design for Electrical Services at Compression Platform, Collector Separator Platform and Accommodation Platform for Umm Shaif Gas Injection Facilities (USGIF) project which represents the first phase of a major re-development of the Umm Shaif Field. USGIF facilities comprising two new platforms (Compression Platform CP-1 and Umm Shaif Accommodation Platform UAP) receives, dehydrate and reinject 219 BSCF per annum (annualised average 600 MMSCFD) of Khuff gas (and/ or associated gas) into the Umm Shaif Arab C and D reservoirs in order to maintain and enhance existing oil production. Khuff gas will be produced (and reinjected to the Arab C and D reservoirs) on three existing wellhead towers (WHTs) US251, US272 and US290, all of which will need significant brown-fields tie-in work. The works carried during the Detailed Design are as follows; Philosophies : Electrical Design and Control, Emergency Power, Electrical Protection, Earthing, Lighting and Low Voltage Power services, Cable Selection and Routing, Selection of Electrical Equipment in Hazardous Area and Electrical Equipment Installation and Handling. Specifications and Data Sheet: AC Uninterruptible Supply (UPS), MV Switchgear, LV Switchgear and Distribution Board, Busduct, Power Transformer (Cast Resin), Marine Navigational Aids, Packaged Equipment, Power Cables / Fibre Optic Cables, HV Subsea Cable, Variable Speed Drive, Soft Starter, HV/LV Motors, Integrated Motor Control System (IMCS) and Electrical Network Monitoring Centre (ENMC) Studies: Power Generation, AC Short Circuit, Load Flow and Motor Starting Analysis, Harmonic Distortion, Transient Analysis, Protection Coordination, Lightning and Surge Protection and Heat Tracing Systems Calculations: Power Cable and Busduct Sizing Calculation, Transformer Sizing, Emergency Deisel Generator Sizing, Lighting Calculation, AC & DC UPS and Battery Sizing Calculation and Load List Calculation Reports : Short Circuit Analysis, Load Analysis, Load Flow Analysis, Major Equipment Design and Navigational Aids System Design : Motor / Switchgear, Single Line Diagram, Cable Schedule (Power/Control), Small Power & Lighting Layout and Earthing Layout. Salman Project (Detailed Design) The Salman project comprises of the existing Salman field and the new Dalan field. The Salman field consists of eight existing bridge linked platforms. The project caters for the implementation of two new platforms within the Salman field. The Dalan field at the moment consists of a wellhead platform. The project scope caters for the implementation of six new platforms including HV power generation and a LQ. Implementation of a complete load management system for the two power generation plants (Salman and Dalan). Responsible for the preparation of specifications, the total engineering and design, value engineering, bid analysis, load analysis, the short circuit calculations, motor starting calculations, protection coordination analysis, complete hook-up design for the equipment. Construction support activities during fabrication. Murphy Sarawak Oil Company Ltd. Bintulu Onshore Receiving Facilities and Tank Farm Conceptual Design. PETRODAR Operating Company Detailed Design Subcontractor to Ranhill Engineers and Constructors Sdn Bhd for Engineering, Procurement, Construction and Commissioning of Melut Basin Oil Development Project (Upstream) Package A - Al-Jabalayn Central Processing Facilities and Palouge Field Processing Facilities ExxonMobil Exploration and Production Malaysia Inc. • Guntong ‘F’ Satellite Platform Development Engineering Project Page 5
  • 6.
    RESUME PARAMJIT SINGH Resume • BidProposal for Guntong ‘F’ Satellite Platform Development Engineering Project Gas District Cooling Sdn Bhd • Tender Support to Ranhill Engineers and Constructors Sdn Bhd for Engineering, Procurement, Construction and Commissioning of Putrajaya Precinct 1 Cogeneration Plant/ DCS Annex • Tender Support to Ranhill Engineers and Constructors Sdn Bhd for Engineering, Procurement, Construction and Commissioning of Putrajaya Precinct 5 District Cooling Plant Pakistani Petroleum • Tender Support to Ranhill Engineers and Constructors Sdn Bhd for Engineering, Procurement, Construction and Commissioning of ADHI LPG/NGL Plant II Malaysian Shipyard Engineering Sdn Bhd • Proposal Engineering for Small Field Development Project Iranian Offshore Oil Company (IOOC) • Bid Proposal for Conceptual Design, FEED and Detailed Design of Siri ‘C’ and ‘D” Oil Fields Development Project. NAOC - Nigeria • Tender support to DAEWOO for Engineering, Procurement, Construction and Commissioning of IDU Field Gas Recovery and Plant Revamping Phase 2 Project. Aug 1999 – Oct 2002 Ilham Consult Sdn Bhd Head of Department Perform as Project Director in Charge authorised by the Managing Director to act in the role on behalf of the company. Responsible to the Managing Director for company’s overall performance on the administration, project with respect to technical quality and profitability. Responsible for the execution of all disciplines of the project and day-to-day management of the project and for the coordination of the work with programming, human resource planning and cost control. Provide overall management of the Mechanical & Electrical department, manage human resources department, Finance department, establish the design team and office, develop the project plan and its execution, provide contract administration, contractual, and commercial interface with client, ensure follow-upon any audit or design review findings, ensure that the quality records are maintained, prepare close-out report, presentation to clients and strategic business development division. • Senior Project Manager – Home Affairs Ministry - Ibu Pejabat Polis Daerah, Dang Wangi, Kuala Lumpur 12 storey Administration Block and 20 storey Apartment Block. • Senior Project Manager - Universiti Utara Malaysia - Development of Academic Block and Lecture Hall at Malaysian North University (Universiti Utara Malaysia), Sintok, Kedah Darul Aman. • Senior Project Manager - MIMOS Berhad - MIMOS Internet Building comprising Four Office Floors and Two Basements at Technology Park Malaysia (Taman Teknologi Malaysia), Bukit Jalil, Kuala Lumpur. • Senior Project Manager - MIMOS Berhad - Data Center Facilities for Nationwide Jaring Node at Kota Kinabalu, Kuching, Johor Baru, Kuantan, Kulim High Technology Park, Alor Setar, Ipoh, Melaka, Seremban, Kuala Lumpur, Kuala Terengganu and Kota Bharu. • Senior Project Manager - Plaza Pontian (Hotel & Commercial Center) - Page 6
  • 7.
    RESUME PARAMJIT SINGH Resume • SeniorProject Manager - Grand Saga Sdn Bhd - The Proposed Upgrading Of Existing Manual Toll Collection System At Lebuhraya Cheras-Kajang And Additional Twelve (12) Lanes Of Manual Toll Collection System At Batu 9 Toll Plaza And Toll Surveillance System For Grand Saga Construction Sdn Bhd • Senior Project Manager - University of Nottingham - University of Notingham City Campus at Wisma MISC, No. 2, Jalan Conlay, Kuala Lumpur. • Senior Project Manager - Sin Chew Daily - Newsprint Factory at Lot 50 & 51, Section 13, Petaling Jaya, for Sin Chew Media Services. • Senior Design Engineer - Ministry of Education, Malaysia - Design, Build and Complete Muadzam Shah Polytechnic at Pahang Darul Makmur. • Senior Project Manager - Tenaga Nasional Berhad - TNB Building, Fifteen (15) Storey of Office Building, at Lot 1973, Jalan Yahya Awal, Johor Bahru, Johor Darul Takzim. • Senior Design Engineer – Ministry of Defence, Malaysia - Design, Build and Complete 51st Regiment Camp, Royal Artillery (Artileri Diraja), Gemas, Negeri Sembilan. • Senior Engineer - Perbadanan Kemajuan Negeri Selangor - PLUS Toll Plaza Kota Damansara Closed Circuit Toll Collection System and Fibre Optic Highway Telecommunication system for Proposed Kota Damansara Toll Plaza. • Senior Engineer - Jabatan Penjara Malaysia - Kluang Prison Complex, Kluang, Johor Darul Takzim. Sept 1991-May 1998 Ranhill-Fluor Daniel Sdn Bhd / Ranhill Bersekutu Sdn Bhd Senior Designer / Engineering Assistant Involved in Electrical design for Oil & Gas and Petrochemical Plants. Projects Involved : • Malaysian Refinery Conversion Project - (Shell Refining Co. (FOM) Bhd) - Layout of lighting, power and telephone cables for temporary construction office. - Single line diagram, Schematic diagram, Block diagram, Summary of Electrical and Telephone cables, Cable lists, Installation details off Electrical and Telephone for temporary construction office. - Layout of lighting and earthing for tank farm area, Refinery lamp posts layout and street lighting layout. - Single Line diagram, Block diagram, Cable, route disconnection, Lamp Post details and MTO for Tank Farm and Street Lighting. • Shell Middle Distillate Synthesis, Bintulu, - Sarawak (JGC (M) Sdn Bhd) - Layout of lighting and earthing for tank farm area (c. 100, c. 200 & c. 400) - Block diagram for lighting and power outlet, instrument feeder for tank farm area. - Cable sizing for lighting and earthing for tank farm area. - Summary of electrical engineering, list of cables, cable no. and size, cable drum schedule for the above installation. - Checking installation details of lighting, power and earthing provided by client. • Henkel Fatty Alcohol Project, Telok Panglima Garang, Banting, Selangor (Henkel Rika (M) Sdn Bhd - Layout of temporary facility for construction office lighting, power and telephone systems. - Layout of lighting, power and telephone systems for MCC/control building, change house and sub-station. - Schematic diagram, single line diagram, connection diagram for electrical and telephone system. - Calculation and sizing of electrical and telephone cables. Page 7
  • 8.
    RESUME PARAMJIT SINGH Resume - MTOfor the above installation. - Develop specification for electrical and telephone system for the above installation. • Malaysian Carbon Unit 1 Expansion Project, Port Dickson, Negri Sembilan (Malaysia Carbon Sdn Bhd) - Site supervision for all electrical installation system (lighting, power, motor, control panels/switchboards) for the above installation. - Assist in testing and commissioning for all electrical system such as lighting, power, motor, switchboards) for the above installation. • Esso/JGC No. 2 Powerformer Project, Port Dickson, Negeri Sembilan (Esso Malaysia Berhad) - Layout of lighting, receptacle and earthing for process building. - Layout of power and earthing for process building. - Schematic diagram, block diagram and single lines diagram for lighting and power system. - MTO for the above installation. - Installation detail of lighting, power and earthing • Modification of Glycol Unit No. F11 4F23 - (Sarawak Shell Berhad) - Layout of lighting, power and earthing - Installation details layout and lighting, power and earthing. - MTO for the above installation. - Schematic diagram, single line diagram tie-in to existing installation. Ranhill Bersekutu Sdn Bhd Involved in various type of local and overseas sophisticated projects such as industrial plants, high rise buildings, mixed development, hotels, satellite station, highways, water pumping station, prison complex, resorts and air craft barrier. Projects Involved : • Utusan Melayu – Press Printing factory 1. Electrical HV and LV, 2000kVA Generator set, 2000kVA (11-0.415kV) Onan Type Transformer, Telephone & PABX, Fibre Optic Local Area Network, Master Antenna System, Public Address, CCTV and security system for office building for Utusan Melayu (Malaysia) Bhd at Wangsa Maju, Kuala Lumpur. 2. Electrical HV and LV, 2000kVA Generator set, 2000kVA & 2500kVA (22-0.415kV) Cast Resin Type Transformer, 5000A Copper Busduct, 5000A Surge Suppressor, 5th , 7th & 11th Harmonic Filters, Low Noise Earthing, Telephone & PABX, Fibre Optic, Master Antenna System, Public Address, CCTV and Building Automation & Security System at Newspaper Printing Factory for Utusan Melayu (Malaysia) Bhd, at Bandar Baru Bangi, Selangor. • EPZ Danang, Vietnam - Electrical HV & LV recticulation and Telephone Infra Structural at Export Processing Zone Danang Vietnam for Malaysian South South Cooperation. • Clean Water Pumping Station using PLC, Variable Speed Controller Starters, SCADA control for Bekalan Air Johor Bahru, Peringkat II Parit Raja dan Macap Fasa II. • Concept design and solar system for Sentul Raya Housing and Commercial Centre, Kuala Lumpur. • Electrical and Infra-structural for Samaworld Theme Park, Genting Highland. Page 8
  • 9.
    RESUME PARAMJIT SINGH Resume • ElectricalHV & LV, Generator Set, Telephone & PABX, CCTV, Audio Visual System, Building Automation System, Public Address, Master Antenna System and Fireman Intercom for Hotel and Commercial Centre at Duty Free Complex, Johor Bahru. • Electrical LV, Generator Set, Telephone & PABX, UPS, Public Address, Master Antenna System, Security System for Sungai Buloh Prison Complex and Staff Quarters. • Electrical LV, Generator Set, Telephone & PABX, Audio Visual System, Master Antenna System, Public Address and Swimming Poll for Rebak Marina Resort Langkawi. • Electrical LV, Generator Set, Telephone & PABX, Audio Visual System for High Rise Apartment at Bukit Saujana Mixed Development Johor Bahru. • Electrical LV, Generator Set, Telephone & PABX Hotel Bed Side Panel, Master Antenna System, Public Address and Swimming Poll for Pelangi Beach Resort, Langkawi. • Electrical LV, Generator Set, Telephone & Keyphone, Toll equipment, Street Lighting, High Mast and Fibre Optic Communication cable at Ladang Bertam Toll Plaza and Interchange. • Electrical HV & LV, Earthing & Grounding System, Lightning Protection System, Low Noise Earthing, Generator set, Telephone & PABX, UPS, Public Address and Security System at Measat Satellite Control Station at Gunung Raya Langkawi for Binariang. • Electrical HV & LV, Earthing & Grounding System, Lightning Protection System, Telephone & PABX, Public Address and Security System at Tan Chong Motor Assemblies Plant, Danang, Vietnam. • Electrical LV, Generator set, Telephone & Keyphone, Toll Equipment, Street Lighting, High Mast and Fiber Optic Communication System at North South Expressway Central Link and KLIA Expressway Toll Plaza, Interchange and Rest & Service Area. • Electrical LV, Generator Set, Telephone & Keyphone at Puchong Landfill and Sanitary Selangor. • Electrical HV & LV, 750kVA Generator set, 1500kVA (22-0.415kV) Cast Resin Type Transformer, Telephone & PABX, Master Antenna System, Public Address, CCTV, Building Automation & Security System for 40 storey office and Apartment Building for Martego. • Air Craft Barrier System at Royal Malaysian Airforce Base at Labuan, Kuantan and Penang. Mar 1991- Sept 1991 Carsem (M) Sdn Bhd Technical Assistant Involved in operation and maintenance of mechanical, electrical & electronic in Motorola Opto Coupler (Dome & SO-8) final test department. Dec 1988 – Mar 1991 Projek Lebuhraya Utara Selatan Technician Involved in construction, operation and maintenance of mechanical, electrical & electronic equipment’s at Ipoh- Changkat Jering Toll Expressway Job Description : Meru Menora Tunnel Page 9
  • 10.
    RESUME PARAMJIT SINGH Resume Tunnel PowerSystem - 11kV incoming supply from TNB (Ring Circuit) - Minimum oil circuit breaker (MOCB) switch gear - 315kVA Power Transformer (11kV/415V) - 400kVA Transformer (11kV/415V) - 1000kVA Standby Generator set - Air Circuit breaker (ACB) - Uninterruptible power supply (UPS) - DC tripping unit - Monitoring console (mimic panel) Tunnel Lighting System - Fluorescent and high pressure sodium lamp (SON) 400W - Photosensor and photocamera controlled dimmers - High frequency (HF) ballast - DC amplifiers - Monitoring console (mimic panel) Tunnel 1 Ventilation System - Programmable logic controller (PLC) - Carbon monoxide and dust sensor and monitors - Air speed and direction transmitter - Axial flow fan Tunnel 2 Ventilation System - PC based control system - 16 channel opto-isolated D/I board (PCLD-782) - 16 channel relay output board (PCLD-785) - 14 bit AD/DA card - RAM/ROM disk card - Amplifier/multiplexer board - Hard-wire bypass - Industrial Personnel Computer (IPC) - Carbon monoxide and dust sensor and monitors - Air speed and direction transmitter - Axial flow fan Fire Fighting System - Carbon dioxide extinguishing system - Gas ionization type smoke detector - Thermo-mechanical type heat detector - NOVAL control unit Page 10
  • 11.
    RESUME PARAMJIT SINGH Resume - Boosterpump (60Hp) star-delta starter - Jockey pump (3kW) direct on line starter Emergency Telephone System - Emergency call boxes at Tunnel - Public address (PA) system at control room Water Treatment Plant - Capacity of 1.25m2/hr - Dynasand filtrations - Chemical flocculation - Chlorination - Water softening Overhead Crane - EOT crane - Capacity of 3 tons - With hoist and cross motor Air-Conditioning System - Single package cooling system (thermostat controlled) 76,000 btu/hr - Split system 18,000 btu/hr - Room air conditioning system 10,000 btu/hr Toll System Toll Plaza & Lane Equipments - Assist Technical Executive and Technical Assistant in routine maintenance and trouble shooting of Plaza Computer System and Lane Equipment. Office Filing System - Assist in implementing for record management system and other routine duties. Local Information Centre Operation - Supervise mainline events such as break down and accidents - Supervise PLUS RONDA activities on mainline - Preparing reports of daily events on highway - Expressway lane closure programme - Toll plaza status reports - Emergency safety procedures Page 11
  • 12.
    RESUME PARAMJIT SINGH Resume Aug 1987– Nov 1988 Malaysian Highway Authority (Lembaga Lebuhraya Malaysia) Jr. Technician Involved with the designing and planning team on implementation of the first Closed Toll Collection System Assisted in all operation and maintenance of mechanical, electrical & electronic equipment’s along Ipoh – Changkat Jering Toll Expressway. Toll System (Toll Plaza) - Toll monitoring console - Master communication unit - Central data processing unit central - Central printing - Monitoring console terminal - Uninterruptible power supply (UPS) - Automatic vehicle classification unit - Axle and wheel detector - Optical vehicle detector (OVD) - Toll collector terminal (TCT) - Over height vehicle detector - Toll fare indicator - Computer system - Software and hardware Meru Menora Tunnel: - Programmable Logic Control (PLC) - Programming and designing control circuits for electrical and electronic devices - 11kV Power Supply - Ring main circuit - MOCB, ACB & MCC circuit breakers - 400kVA transformers and generator - Photo camera controlled dimmer - Air Conditioning system - P.A. system - Overhead crane Page 12