SlideShare a Scribd company logo
1 of 4
Download to read offline
∴
CV
Key Technical Personnel
1 of 4
Ghassan Hamati∴, Construction Manager
CURRICULUM VITAE
Name: Ghassan Hamati
Designation: Construction Manager
Nationality:
Religion :
Lebanese
Christian Orthodox
Date of birth:
Contacts :
January 6, 1967
ghassanhamati@gmail.com
Mobile : +96171199566/ +971566779708
Education: BE in Civil Engineering, 2007, AIUC California
TS3 in Civil Engineering, 1990, Lebanon
BT3 in Architecture, 1987, Lebanon.
Seminar for Leadership, Management & Art of Communication, November
2006, CCC Abu Dhabi.
Safety training courses, 2007, AGIPKCO.
Petrofac E learning for field project management, performance
management, time management.
IOSH Managing Safely.
CAREER SUMMARY:
 Thirteen Years of professional experience in Oil & Gas in EPC projects as Construction
Management.
 Managing projects during all phases of construction.
 Monitoring project (KPI) key performance indicators.
 Managing customer relations and communications.
SKILLS:
 Managed the complete process of construction.
 Coordinating, controlling and monitoring all sub-contractors' activities on site.
 Recommending ways of improving the use of staff, materials, equipment and other resources.
 Extensive knowledge of building legislation and regulations.
 Up to date with the latest developments and technologies in the construction industry.
 Practical construction knowledge and be able to work from drawings.
 Good at logistics, planning and problem-solving.
 Well developed analytical, excellent leadership skills and ability to build teams, resolve conflict,
motivate and develop subordinates.
 High levels of motivation and the ability to work well in a team environment.
 Computer knowledge gained through business and personal applications; Classic programs
Windows 7, Microsoft Office (Word, Excel, and Power Point), and MS Project (beginner).
 Languages: Arabic, English, French, Spanish .
∴
CV
Key Technical Personnel
2 of 4
Ghassan Hamati∴, Construction Manager
 Excellent leadership skills and ability to build teams, resolve conflict, motivate and develop
subordinates.
 Planning, organizing, monitoring and if necessary take corrective action on projects.
 A comprehensive knowledge and understanding of related company management systems.
 React quickly and effectively when dealing with challenging situations.
 Can control multiple construction disciplines simultaneously.
 Excellent decision-making skills and the ability to prioritize and plan effectively.
 Problem solving abilities, able to identify, assess, evaluate and resolve complex issues.
 Beneficial mentor and good focal point for graduates at site.
 Implement safe and timely completion of projects.
 Detailed experience in all building related activities i.e. structural steel and concrete, finishing,
flooring, roofing, cladding, walls, partitions, plumbing, false ceiling , electrical equipment for
substations, fire and gas, lighting, HVAC, water proofing, painting, plastering, doors and
windows, louvers, roll-up doors and decoration.
 Supervised concrete works for precast yard and cast in situ, mainly for plant foundations.
 Monitored installation of refractory insulation, fireproofing, grouting, roads, sewer manholes,
PPC culverts, GRE and GRP pipe laying, backfilling and testing. I was also responsible for
structural steel activities i.e. bending, cutting, Structural Steel fabrication, painting, erection
works and transportation.
 Responsible for reviewing contract documentation to ensure thorough understanding of relevant
contract requirements, while liaising with planning and budgeting engineers.
 Supervised the sub-contractors’ daily activities, led the construction weekly progress meetings
and attended monthly management meetings with client and sub-contractor.
 Responsible to implement company HSE policy at site and maintain a zero LTI record in the areas
under my supervision. And I developed my skills throughout the training courses with AGIPKCO
and Petrofac i.e. Safe system of work, Risk assessment, Confined space entry, Lifting
operations, accident investigation and reporting, Petrofac golden rules, Permit to Work system,
Republic Of Kazakhstan HSE knowledge (Blue Book).
 Handled turnkey projects such as banks, libraries, hotels, residential buildings, industrial
buildings and oil and gas facilities.
 Brownfield experience for 2.5 years.
 Extensive exposure to: ASME/ASTM/NFPA/IFC/SNIP/IEC/ATEX/API/ACI/BS/GOST/RoK STND.
CAREER HISTORY:
Petrofac International Ltd (May 2007 - to date)
South Island manager
Project 1- Upper Zakum 750 Islands EPC2 project 3.7 Billion USD, South Island value 639 million, ZADCO Abu
Dhabi
∴
CV
Key Technical Personnel
3 of 4
Ghassan Hamati∴, Construction Manager
 The UZ750 project is an offshore field development projects is being constructed on 4 artificial
islands. The project comprises engineering, procurement, modules and buildings fabrication,
transportation, construction and commissioning of island surface facilities (EPC-2) on four
artificial islands. Specifically, this will include cluster manifolds, crude oil process facilities,
water injection and gas lift, oil export pumps, power generation and associated utilities.
 Following up the temporary facilities on the 4 Islands.
Area construction manager.
Project 2 - El Merk Field - Central Processing facilities (CPF), 2.3 Billion USD, Groupment Berkine/
Sonatrach Anadarko Association, Algeria
 Central Processing Facility in the Berkine region, processing hydrocarbons initially from Block
208, operated by the Sonatrach/Anadarko Association, & from the unitized EMK field located on
a portion of both Block 208 & the Sonatrach/ConocoPhillips operated Block 405a. Capacities are
2 trains x 65,000 BPD (each) Oil/Condensate, 1 train x 600 MMSCFD NGL recovery, 155,000BPD
Water Injection, 500 MMSCFD Gas Injection; Export (Nominal Peak): Oil 90,000 BPD; Condensate
42,000 BPD; LPG 65,000 BPD
 Process Systems: Inlet Facilities (3 Nos Slug catchers), Oil treatment (Separation, Desalting,
Stabilization & Condensate Recovery), Associated and Boost Gas Compression, Gas Dehydration
(Molecular Sieve desiccant), NGL Recovery & Fractionation unit of High Propane and Butane
recovery (Cryogenic Turbo Expander & Fractionation), Residue and Injection Gas Compression,
Oil/Gas/Condensate Storage, Re-run and Export Facilities
 Utility Systems: Water Treatment facilities, Fuel Gas facilities, Hot Oil Systems, Flare and Relief
facilities (7 Flares), Instrument Air, Nitrogen Generation and Distribution facilities, Oily water
Treatment facilities, Control and safeguarding system
 Civil works for equipment, pipe-rack and building foundations
 Full scale buildings construction, steel structure erection and installation.
 Underground utilities networks (Oily Water, Sanitary Water, Potable Water, Fire Water, Storm
Drainage, Street lighting …) installation
 Roads, gates and battery limits/fences activities
 HVAC, E,I&T, F&G installations for 19 buildings and 22 shelters for mechanical equipments
Project 3 - Kashagan Experimental Phase - Oil & Gas processing facilities EPCM (Phase I and II), 2.5
Billion USD, Agip Kazakhstan North Caspian Operating Company (AGIP KCO), Kazakhstan
 E, P & CM of phase I: Oil Processing Facilities (2 trains each 165,000 BPD), Gas Processing
Facilities (2 Trains each 250 MMSCFD), Sulphur Processing Facilities (2 Trains each 1900 TPD);
and phase II E&P of Oil processing facilities for 165,000 Bpd along with related off-sites &
utilities
 Construction of series of buildings including: Warehouse (2 nos), E&I Workshop / Mechanical
Workshop / Temporary Refuge (2 nos), Central Control Building, Fire Station, Main Gate House,
Change room, Laboratory, Emergency substation, step-down transformer yard.
 Installation of the underground utilities networks (Oily Water, Sanitary Water, Potable Water,
Fire Water, Storm Drainage, Street lighting …)
 Roads, gates and battery limits/fences installation
 Nominated as a SRP (Safety responsible person) for the KIB area. Authorized to sign the PTW in
the same area as an approving authority.
Consolidated Contractor Company (April 2004 - April 2007)
- November 1992 up to March 1993 Civil supervisor: Pipeline Messila project.
Superintendent (April 2004 - April 2007)
Project 1 - Fabrication yard & refinery, 100 Million USD, Alba field Phase 1,2,3 Marathon / Bechtel,
Equatorial Guinea
∴
CV
Key Technical Personnel
4 of 4
Ghassan Hamati∴, Construction Manager
Project 2 – Warehouse, Revamp & expansion project, 50 Million USD, Ampco Marathon, Equatorial
Guinea
Project 3 - Isomerization &refinery revamp project, 150 Million USD, Oman Refinery Company, Oman
 Supervision of concrete works for precast yard and cast in situe foundations with their grouting
 Monitoring of refractory insulation and fireproofing
 Roads, sewer manholes, PPC culverts activities
 GRE and GRP pipe laying, backfilling and testing
 Structural steel activities including bending, cutting, fabrication, painting, transportation and
erection
PAC International & other Companies (1985 - 2004)
Site Manager
 Palacio Africa & villas Udeac, Equatorial Guinea 2001-2004
Site Manager (1985-2001)
Supervision of concrete pouring, structural steel erection, flooring, roofing, walls, partitions, plumbing,
false ceiling, electrical, HVAC, water proofing, painting, plastering, doors and windows, louvers, roll-up
doors & decoration... for turnkey projects such as banks, libraries, hotels, residential buildings and
villas:
 Movenpick, Beirut, 2000-2001
 Rose Center, Broummana, 2000-2001
 Imperium Residence, Broummana, 1999- 2000
 Banque Du Liban Headquarters, Beirut, 1998 - 1999
 Hotel Du Roy, Beirut, 1997 - 1998
 Villa Sambar, Koleiat, 1996
 Librairie Antoine, Beirut, 1994 – 1996
 Mar Elias Building, Beirut, 1993 - 1994
 Nawfal Publishers, Beirut, 1991 - 1992
 Fransabank (9 branches), all over Lebanon, 1990 - 1991
 Fransabank Building, Metn, 1988 - 1990
 Villa Nicholacis, Ghbele, 1987 - 1988
 Association Des Banques, Beirut, 1987 - 1988
 Sofrace Insurance, Beirut, 1986 - 1987
 Residence Nicholacis, Jeita, 1985

More Related Content

What's hot (20)

Ugeshan Naidoo1
Ugeshan Naidoo1Ugeshan Naidoo1
Ugeshan Naidoo1
 
Siemer_June 2016_updated
Siemer_June 2016_updatedSiemer_June 2016_updated
Siemer_June 2016_updated
 
Mohab Samoil_Resume
Mohab Samoil_ResumeMohab Samoil_Resume
Mohab Samoil_Resume
 
PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RR
 
CV
CVCV
CV
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
Prakash cv update
Prakash cv updatePrakash cv update
Prakash cv update
 
MCV
MCVMCV
MCV
 
Resume
ResumeResume
Resume
 
BACHIR CHAKAR CV (7-4-2015)
BACHIR CHAKAR CV (7-4-2015)BACHIR CHAKAR CV (7-4-2015)
BACHIR CHAKAR CV (7-4-2015)
 
LT David OBrien
LT David OBrienLT David OBrien
LT David OBrien
 
Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1
 
Cv mohamed al-jabri - 2018
Cv   mohamed al-jabri - 2018Cv   mohamed al-jabri - 2018
Cv mohamed al-jabri - 2018
 
Cv mohamed al-jabri - 2018
Cv   mohamed al-jabri - 2018Cv   mohamed al-jabri - 2018
Cv mohamed al-jabri - 2018
 
CV Osama Hamad_Aug 2016
CV Osama Hamad_Aug 2016CV Osama Hamad_Aug 2016
CV Osama Hamad_Aug 2016
 
Sean Cody - Resume
Sean Cody - ResumeSean Cody - Resume
Sean Cody - Resume
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 

Viewers also liked

tee เเปลงสีฟัน
tee เเปลงสีฟันtee เเปลงสีฟัน
tee เเปลงสีฟันMoment Qrn
 
магдат бабаканов+автозапчасти+идея
магдат бабаканов+автозапчасти+идеямагдат бабаканов+автозапчасти+идея
магдат бабаканов+автозапчасти+идеяМагдат Бабаканов
 
대신리포트_모닝미팅_160302
대신리포트_모닝미팅_160302대신리포트_모닝미팅_160302
대신리포트_모닝미팅_160302DaishinSecurities
 
Biologia Marcelo Ventura
Biologia   Marcelo VenturaBiologia   Marcelo Ventura
Biologia Marcelo VenturaPré-Enem Seduc
 
Uma introdução ao estudo da História
Uma introdução ao estudo da HistóriaUma introdução ao estudo da História
Uma introdução ao estudo da HistóriaValderiVini
 
Steps in constructing an orthographic drawing
Steps in constructing an orthographic drawingSteps in constructing an orthographic drawing
Steps in constructing an orthographic drawingRodolfo Aquino
 
Minisito_Durex_Lancellotti_Invernizzi
Minisito_Durex_Lancellotti_InvernizziMinisito_Durex_Lancellotti_Invernizzi
Minisito_Durex_Lancellotti_InvernizziRoberto Lancellotti
 
Tarea de innovacion 7 actividad 2016
Tarea de innovacion 7 actividad 2016Tarea de innovacion 7 actividad 2016
Tarea de innovacion 7 actividad 2016monica ramirez
 
TSUNGAI Group instroduction
TSUNGAI Group instroductionTSUNGAI Group instroduction
TSUNGAI Group instroductionAlex Wu
 
Interview, body language and compensation negotiation skills 2016
Interview, body language and compensation negotiation skills 2016Interview, body language and compensation negotiation skills 2016
Interview, body language and compensation negotiation skills 2016Gerardo Seeliger
 
осенний утренник
осенний утренникосенний утренник
осенний утренникvirtualtaganrog
 
день древонасаждения. м.в. стасюк.
день древонасаждения. м.в. стасюк.день древонасаждения. м.в. стасюк.
день древонасаждения. м.в. стасюк.virtualtaganrog
 
встречаем весну безопасно.
встречаем весну безопасно.встречаем весну безопасно.
встречаем весну безопасно.virtualtaganrog
 

Viewers also liked (20)

tee เเปลงสีฟัน
tee เเปลงสีฟันtee เเปลงสีฟัน
tee เเปลงสีฟัน
 
магдат бабаканов+автозапчасти+идея
магдат бабаканов+автозапчасти+идеямагдат бабаканов+автозапчасти+идея
магдат бабаканов+автозапчасти+идея
 
대신리포트_모닝미팅_160302
대신리포트_모닝미팅_160302대신리포트_모닝미팅_160302
대신리포트_모닝미팅_160302
 
Biologia Marcelo Ventura
Biologia   Marcelo VenturaBiologia   Marcelo Ventura
Biologia Marcelo Ventura
 
Power tics
Power ticsPower tics
Power tics
 
Uma introdução ao estudo da História
Uma introdução ao estudo da HistóriaUma introdução ao estudo da História
Uma introdução ao estudo da História
 
Roma
RomaRoma
Roma
 
Steps in constructing an orthographic drawing
Steps in constructing an orthographic drawingSteps in constructing an orthographic drawing
Steps in constructing an orthographic drawing
 
ALITALIA
ALITALIAALITALIA
ALITALIA
 
Minisito_Durex_Lancellotti_Invernizzi
Minisito_Durex_Lancellotti_InvernizziMinisito_Durex_Lancellotti_Invernizzi
Minisito_Durex_Lancellotti_Invernizzi
 
Tarea de innovacion 7 actividad 2016
Tarea de innovacion 7 actividad 2016Tarea de innovacion 7 actividad 2016
Tarea de innovacion 7 actividad 2016
 
TSUNGAI Group instroduction
TSUNGAI Group instroductionTSUNGAI Group instroduction
TSUNGAI Group instroduction
 
Storytelling - Raccontare l'azienda coi social media
Storytelling - Raccontare l'azienda coi social mediaStorytelling - Raccontare l'azienda coi social media
Storytelling - Raccontare l'azienda coi social media
 
GomSpace introduktion
GomSpace introduktionGomSpace introduktion
GomSpace introduktion
 
Interview, body language and compensation negotiation skills 2016
Interview, body language and compensation negotiation skills 2016Interview, body language and compensation negotiation skills 2016
Interview, body language and compensation negotiation skills 2016
 
La Magia delle Parole
La Magia delle ParoleLa Magia delle Parole
La Magia delle Parole
 
Orthographic drawing
Orthographic drawingOrthographic drawing
Orthographic drawing
 
осенний утренник
осенний утренникосенний утренник
осенний утренник
 
день древонасаждения. м.в. стасюк.
день древонасаждения. м.в. стасюк.день древонасаждения. м.в. стасюк.
день древонасаждения. м.в. стасюк.
 
встречаем весну безопасно.
встречаем весну безопасно.встречаем весну безопасно.
встречаем весну безопасно.
 

Similar to Ghassan Hamati CV April 2016 (20)

SimonBaarde_CV2016
SimonBaarde_CV2016SimonBaarde_CV2016
SimonBaarde_CV2016
 
William Adams CV_N1_Jan 2016
William Adams CV_N1_Jan 2016William Adams CV_N1_Jan 2016
William Adams CV_N1_Jan 2016
 
Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014
 
23 09-2014u3
23 09-2014u323 09-2014u3
23 09-2014u3
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
Cv kanysh komyshev_21_12_2018
Cv kanysh komyshev_21_12_2018Cv kanysh komyshev_21_12_2018
Cv kanysh komyshev_21_12_2018
 
MY CV2
MY CV2MY CV2
MY CV2
 
CV Updated
CV UpdatedCV Updated
CV Updated
 
cv1
cv1cv1
cv1
 
Yasser Hatem CV
Yasser Hatem CVYasser Hatem CV
Yasser Hatem CV
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
k.Ramakkannu cv 06 jan2016
k.Ramakkannu cv 06 jan2016k.Ramakkannu cv 06 jan2016
k.Ramakkannu cv 06 jan2016
 
Mahmoud Al Khouli_CV2015
Mahmoud Al Khouli_CV2015Mahmoud Al Khouli_CV2015
Mahmoud Al Khouli_CV2015
 
Satyavir-Resume_01
Satyavir-Resume_01Satyavir-Resume_01
Satyavir-Resume_01
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 

Ghassan Hamati CV April 2016

  • 1. ∴ CV Key Technical Personnel 1 of 4 Ghassan Hamati∴, Construction Manager CURRICULUM VITAE Name: Ghassan Hamati Designation: Construction Manager Nationality: Religion : Lebanese Christian Orthodox Date of birth: Contacts : January 6, 1967 ghassanhamati@gmail.com Mobile : +96171199566/ +971566779708 Education: BE in Civil Engineering, 2007, AIUC California TS3 in Civil Engineering, 1990, Lebanon BT3 in Architecture, 1987, Lebanon. Seminar for Leadership, Management & Art of Communication, November 2006, CCC Abu Dhabi. Safety training courses, 2007, AGIPKCO. Petrofac E learning for field project management, performance management, time management. IOSH Managing Safely. CAREER SUMMARY:  Thirteen Years of professional experience in Oil & Gas in EPC projects as Construction Management.  Managing projects during all phases of construction.  Monitoring project (KPI) key performance indicators.  Managing customer relations and communications. SKILLS:  Managed the complete process of construction.  Coordinating, controlling and monitoring all sub-contractors' activities on site.  Recommending ways of improving the use of staff, materials, equipment and other resources.  Extensive knowledge of building legislation and regulations.  Up to date with the latest developments and technologies in the construction industry.  Practical construction knowledge and be able to work from drawings.  Good at logistics, planning and problem-solving.  Well developed analytical, excellent leadership skills and ability to build teams, resolve conflict, motivate and develop subordinates.  High levels of motivation and the ability to work well in a team environment.  Computer knowledge gained through business and personal applications; Classic programs Windows 7, Microsoft Office (Word, Excel, and Power Point), and MS Project (beginner).  Languages: Arabic, English, French, Spanish .
  • 2. ∴ CV Key Technical Personnel 2 of 4 Ghassan Hamati∴, Construction Manager  Excellent leadership skills and ability to build teams, resolve conflict, motivate and develop subordinates.  Planning, organizing, monitoring and if necessary take corrective action on projects.  A comprehensive knowledge and understanding of related company management systems.  React quickly and effectively when dealing with challenging situations.  Can control multiple construction disciplines simultaneously.  Excellent decision-making skills and the ability to prioritize and plan effectively.  Problem solving abilities, able to identify, assess, evaluate and resolve complex issues.  Beneficial mentor and good focal point for graduates at site.  Implement safe and timely completion of projects.  Detailed experience in all building related activities i.e. structural steel and concrete, finishing, flooring, roofing, cladding, walls, partitions, plumbing, false ceiling , electrical equipment for substations, fire and gas, lighting, HVAC, water proofing, painting, plastering, doors and windows, louvers, roll-up doors and decoration.  Supervised concrete works for precast yard and cast in situ, mainly for plant foundations.  Monitored installation of refractory insulation, fireproofing, grouting, roads, sewer manholes, PPC culverts, GRE and GRP pipe laying, backfilling and testing. I was also responsible for structural steel activities i.e. bending, cutting, Structural Steel fabrication, painting, erection works and transportation.  Responsible for reviewing contract documentation to ensure thorough understanding of relevant contract requirements, while liaising with planning and budgeting engineers.  Supervised the sub-contractors’ daily activities, led the construction weekly progress meetings and attended monthly management meetings with client and sub-contractor.  Responsible to implement company HSE policy at site and maintain a zero LTI record in the areas under my supervision. And I developed my skills throughout the training courses with AGIPKCO and Petrofac i.e. Safe system of work, Risk assessment, Confined space entry, Lifting operations, accident investigation and reporting, Petrofac golden rules, Permit to Work system, Republic Of Kazakhstan HSE knowledge (Blue Book).  Handled turnkey projects such as banks, libraries, hotels, residential buildings, industrial buildings and oil and gas facilities.  Brownfield experience for 2.5 years.  Extensive exposure to: ASME/ASTM/NFPA/IFC/SNIP/IEC/ATEX/API/ACI/BS/GOST/RoK STND. CAREER HISTORY: Petrofac International Ltd (May 2007 - to date) South Island manager Project 1- Upper Zakum 750 Islands EPC2 project 3.7 Billion USD, South Island value 639 million, ZADCO Abu Dhabi
  • 3. ∴ CV Key Technical Personnel 3 of 4 Ghassan Hamati∴, Construction Manager  The UZ750 project is an offshore field development projects is being constructed on 4 artificial islands. The project comprises engineering, procurement, modules and buildings fabrication, transportation, construction and commissioning of island surface facilities (EPC-2) on four artificial islands. Specifically, this will include cluster manifolds, crude oil process facilities, water injection and gas lift, oil export pumps, power generation and associated utilities.  Following up the temporary facilities on the 4 Islands. Area construction manager. Project 2 - El Merk Field - Central Processing facilities (CPF), 2.3 Billion USD, Groupment Berkine/ Sonatrach Anadarko Association, Algeria  Central Processing Facility in the Berkine region, processing hydrocarbons initially from Block 208, operated by the Sonatrach/Anadarko Association, & from the unitized EMK field located on a portion of both Block 208 & the Sonatrach/ConocoPhillips operated Block 405a. Capacities are 2 trains x 65,000 BPD (each) Oil/Condensate, 1 train x 600 MMSCFD NGL recovery, 155,000BPD Water Injection, 500 MMSCFD Gas Injection; Export (Nominal Peak): Oil 90,000 BPD; Condensate 42,000 BPD; LPG 65,000 BPD  Process Systems: Inlet Facilities (3 Nos Slug catchers), Oil treatment (Separation, Desalting, Stabilization & Condensate Recovery), Associated and Boost Gas Compression, Gas Dehydration (Molecular Sieve desiccant), NGL Recovery & Fractionation unit of High Propane and Butane recovery (Cryogenic Turbo Expander & Fractionation), Residue and Injection Gas Compression, Oil/Gas/Condensate Storage, Re-run and Export Facilities  Utility Systems: Water Treatment facilities, Fuel Gas facilities, Hot Oil Systems, Flare and Relief facilities (7 Flares), Instrument Air, Nitrogen Generation and Distribution facilities, Oily water Treatment facilities, Control and safeguarding system  Civil works for equipment, pipe-rack and building foundations  Full scale buildings construction, steel structure erection and installation.  Underground utilities networks (Oily Water, Sanitary Water, Potable Water, Fire Water, Storm Drainage, Street lighting …) installation  Roads, gates and battery limits/fences activities  HVAC, E,I&T, F&G installations for 19 buildings and 22 shelters for mechanical equipments Project 3 - Kashagan Experimental Phase - Oil & Gas processing facilities EPCM (Phase I and II), 2.5 Billion USD, Agip Kazakhstan North Caspian Operating Company (AGIP KCO), Kazakhstan  E, P & CM of phase I: Oil Processing Facilities (2 trains each 165,000 BPD), Gas Processing Facilities (2 Trains each 250 MMSCFD), Sulphur Processing Facilities (2 Trains each 1900 TPD); and phase II E&P of Oil processing facilities for 165,000 Bpd along with related off-sites & utilities  Construction of series of buildings including: Warehouse (2 nos), E&I Workshop / Mechanical Workshop / Temporary Refuge (2 nos), Central Control Building, Fire Station, Main Gate House, Change room, Laboratory, Emergency substation, step-down transformer yard.  Installation of the underground utilities networks (Oily Water, Sanitary Water, Potable Water, Fire Water, Storm Drainage, Street lighting …)  Roads, gates and battery limits/fences installation  Nominated as a SRP (Safety responsible person) for the KIB area. Authorized to sign the PTW in the same area as an approving authority. Consolidated Contractor Company (April 2004 - April 2007) - November 1992 up to March 1993 Civil supervisor: Pipeline Messila project. Superintendent (April 2004 - April 2007) Project 1 - Fabrication yard & refinery, 100 Million USD, Alba field Phase 1,2,3 Marathon / Bechtel, Equatorial Guinea
  • 4. ∴ CV Key Technical Personnel 4 of 4 Ghassan Hamati∴, Construction Manager Project 2 – Warehouse, Revamp & expansion project, 50 Million USD, Ampco Marathon, Equatorial Guinea Project 3 - Isomerization &refinery revamp project, 150 Million USD, Oman Refinery Company, Oman  Supervision of concrete works for precast yard and cast in situe foundations with their grouting  Monitoring of refractory insulation and fireproofing  Roads, sewer manholes, PPC culverts activities  GRE and GRP pipe laying, backfilling and testing  Structural steel activities including bending, cutting, fabrication, painting, transportation and erection PAC International & other Companies (1985 - 2004) Site Manager  Palacio Africa & villas Udeac, Equatorial Guinea 2001-2004 Site Manager (1985-2001) Supervision of concrete pouring, structural steel erection, flooring, roofing, walls, partitions, plumbing, false ceiling, electrical, HVAC, water proofing, painting, plastering, doors and windows, louvers, roll-up doors & decoration... for turnkey projects such as banks, libraries, hotels, residential buildings and villas:  Movenpick, Beirut, 2000-2001  Rose Center, Broummana, 2000-2001  Imperium Residence, Broummana, 1999- 2000  Banque Du Liban Headquarters, Beirut, 1998 - 1999  Hotel Du Roy, Beirut, 1997 - 1998  Villa Sambar, Koleiat, 1996  Librairie Antoine, Beirut, 1994 – 1996  Mar Elias Building, Beirut, 1993 - 1994  Nawfal Publishers, Beirut, 1991 - 1992  Fransabank (9 branches), all over Lebanon, 1990 - 1991  Fransabank Building, Metn, 1988 - 1990  Villa Nicholacis, Ghbele, 1987 - 1988  Association Des Banques, Beirut, 1987 - 1988  Sofrace Insurance, Beirut, 1986 - 1987  Residence Nicholacis, Jeita, 1985