1. Study, review (as Consultant) or prepare (as Contractor) Shop Drawings according to Design.
2. Coordination and prepare Composite drawing for all activities.
3. Follow up the construction (as Consultant) or construct (as Contractor) the Surveying works for all activities.
4. Quantities survey for excavations & backfilling by computer programs.
Autodesk Land Desktop program
AutoCAD AutoCAD Civil3D
TERRAMODEL Surfer program
Microsoft windows Microsoft Office
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
Senior surveyor ragab atta c.v
1. 1 | P a g e
CURRICULUM VITE
PERSONAL INFORMATION
Name: Ragab Atta Ragab
Nationality: Egyptian
Current address: Benha / Emam st. no16
Tel.no :+201066010539
E.mail : ragab_ata@yahoo.com
Date of birth : 08/06/1973
Marital status : Married
Military status : Finished
Education : Zagazig University
B.SC. Sciences (math & computer dep.)
Languages: -Arabic (mother tongue)
-English (good)
SKILLS
1. Study, review (as Consultant) or prepare (as Contractor) Shop Drawings
according to Design.
2. Coordination and prepare Composite drawing for all activities.
3. Follow up the construction (as Consultant) or construct (as Contractor)
the Surveying works for all activities.
4. Quantities survey for excavations & backfilling by computer programs.
Autodesk Land Desktop program
AutoCAD AutoCAD Civil3D
TERRAMODEL Surfer program
Microsoft windows Microsoft Office
2. 2 | P a g e
Experiences
September 2014 – up to now:
ACE Arab Consulting Engineers
"Moharram.Bakhoum"
Project: Marassi
Sidi AbdE l-Rahman Resort Community,
Mediterranean-North Coast, EGYPT
Owner:
Emaar Misr for Development S.A.E
PROJECT MANAGER:
Turner International Middle East
Position: Senior Survey Consultant
Project description:
INFRASTRUCTURE : Roads, IRRIGATION Network,
SEWERAGE Network, STORM Network, TLECOM Network,
WATER Network, LIGHTING &Medium Voltage& Low
Voltage Network.
Desalination Plant.
Sewage Treatment Plant
Lift Stations.
PUMP Stations.
Landscapes.
Superstructure
3. 3 | P a g e
October 2013 - August 2014
(ARCHIRODON for Construction (Overseas) Co. S.A)
Position: Chief surveyor
Project: Tripoli Harbour Breakwater Reconstruction Project
The project includes the reconstruction, completion and maintenance of
4,700m long North-West Rubble Breakwater and the reconstruction and extension of
main harbour road.
The main items of work comprise:
- Construction of a rubble-mound-extend berm in front of the existing breakwater,
including the roundhead together with the associated armoring, consisting of rock and
pre-cast concrete cubes.
- Construction of a new primary armor layer of Acropode units together with the
associated secondary armoring of rock on the slope.
- Construction of an open canal filled with rock behind the existing parapet structure.
- Reconstruction and strengthening of the parapet structure.
- Reconstruction and extension of the main road and services behind the breakwater.
- Construction of the planned sewerage outfall through the breakwater.
Major quantities:
- Concrete : 360,000 m3
- Reinforcement : 7,000 mt
- Sheet piles : 16,000 m2
- Rocks : 630,000 m3
- Precast concrete armour units : 15,692 nos.
- Precast concrete Accropode units: 16,592 nos.
- Asphalt : 10,479 m2
4. 4 | P a g e
July 2012 – October 2013
ASECfor Engineering and Management
Project:
A lot of cement companies in Egypt
•Building Materials Industries Company. (2011 - 2016)
• El-Nahda Cement Company. (2011 - 2016)
• South Valley Cement Company. (2008 - 2016)
•Misr Cement Company "Qena". (2002 - 2016)
•Misr BeniSuef Cement Company. (2002 - 2016)
•Helwan Portland Cement Company. (2000 - 2016)
• Sinai White Cement Company. (2001 - 2013)
• Sinai Cement Company. (2001 - 2016)
Position: Chief surveyor
DUTIES:
we use the latest technology to perform the kiln hot alignment while
the kiln is in normal operation such as
• Precise rollers and tyres diameters measuring device.
• Latest and most accurate total station –Trimble 5601 DR
• Accurate mini prisms and 360 prisms
Roller and tyres grinding restores their original cylindrical shapes and
hence improve the area contact between them rollers and tyres grinding
when carried out with the kiln hot alignment gives the best results and
maximize their lifetimes ASEC uses specially designed machines for
grinding:
• Rollers surfaces
• Tyres surfaces
• Tyres thrust face
5. 5 | P a g e
November 2011 – May 2012
(Besix-Orascom JV, Egypt)
Project:
El-Ain El sokhna Supercritical power plant
Consultant:
• PGESCO
• ENGINEERING AND CONSULTANTS (A & A)
Owner:
East Delta Electricity Production Company (EDEPC)
Position: Quantity surveyor
DUTIES:
• Prepare site layout & surveying work.
• The scope of civil works includes the construction of 3 pipelines
totaling a length of approximately 5.1 km
• Prepare shop drawing.
• Controlling execution of work:
(Formwork, excavations, and backfilling)
• Make a surveying in each area.
• Issue inspection and test plan.
• Helping the site team and in preparing work procedure and
method statement.
6. 6 | P a g e
November 2010 – November 2011
(ARCHIRODON for Construction (Overseas) Co. S.A)
Project: Damietta cycle power plant 500mw.
Consultant: Power Generation Engineering and Services Company
PGESCo
Owner:
East Delta Electricity Production Company (EDEPC)
• 4 Gas Turbine (500 MW).
• Piles .
• Civil .
• Infra Structure.
Position :Surveyor
DUTIES:
• Prepare site layout & surveying work.
• Prepare shop drawing.
• Controlling execution of work:
(Formwork, excavations, and backfilling)
• Make a surveying in each area.
• Issue inspection and test plan.
• Helping the site team and in preparing work procedure and
method statement.
7. 7 | P a g e
May 2010 – November 2010
(ARCHIRODON for Construction (Overseas) Co. S.A)
Project:
El-Ain El sokhna Supercritical power plant
(Piling works)
Consultant:
• PGESCO
• ENGINEERING AND CONSULTANTS (A & A)
• Owner:
• East Delta Electricity Production Company (EDEPC)
Position :Surveyor
DUTIES:
• Prepare site layout & surveying work.
• Prepare shop drawing.
• Controlling execution of work:
(Formwork, excavations, and backfilling)
• Make a surveying in each area.
• Issue inspection and test plan.
• Helping the site team and in preparing work procedure and
method statement.
8. 8 | P a g e
May 2009 – April 2010:
El- Nasr Building &Construction Company" EGYCO "
Project:
Ibney Betak project
Consultant:
Office Dr. Saadawi Consulting, Engineering
Owner:
Development Authority (Beni Suef - New Minya)
Project description:
• Create the lift station
• Create 46 through the different lengths of 1 kilometer to 5
kilometers in rocky ground
• Create internal structure (sewage and water supply)
Position :Survey Senior
DUTIES:
• Prepare site layout & surveying work.
• Prepare shop drawing.
• Controlling execution of work:
(Formwork, excavations, and backfilling)
• Make a surveying in each area.
• Issue inspection and test plan.
• Helping the site team and in preparing work procedure and
method statement.
9. 9 | P a g e
September 2007 – March 2009:
(ARCHIRODON for Construction (Overseas) Co.S.A)
(Archirodon Arab Contractor- JV)
Project:
New container terminal and Quay wall Damietta port Egypt
Consultant:
• HPC Hamburg Port Consulting
• SELLHORN INGENIEURGESELLSCHAFT
Owner:
Damietta international ports S.A.E.
Project description:
• Quay wall for 1400m length with 38m height
• Container terminal area (280000 m2
)
• Administration and amenities buildings and utilities
Position :Surveyor
DUTIES:
• Prepare site layout & surveying work.
• Prepare shop drawing.
• Controlling execution of work:
(Formwork, excavations, and backfilling)
• Make a surveying in each area.
• Issue inspection and test plan.
• Helping the site team and in preparing work procedure and
method statement.
10. 10 | P a g e
April 2005 – May 2007:
Industrial and Engineering Projects Company
Project:
Constructing of village at (Sahl-Eltena)
Consultant:
Development of Sinai instrument
Owner:
Ministry of irrigation
Project description:
• Constructing village on 240,000 m2 includes 350 cabins
• Constructing a main building for its village
• Constructing its services (roads & pipe lines & elevated tank…etc.)
Position :Surveyor
DUTIES:
• Prepare site layout & surveying work.
• Prepare shop drawing.
• Controlling execution of work:
(Formwork, excavations, and backfilling) Make a
surveying in each area.
• Controlling assembling of pipelines and its joints.
• Issue inspection and tests of pipelines and elevated tank.
• Helping the site team and supervisor in preparing work
procedure and method statement.
• Make a restrict and invoice with main contractor
and subcontractor.
11. 11 | P a g e
January 2004 – February 2005:
(El salam-Misr for trading and contracting)
Project:
Livestock terminal handing facility &infra structure
Consultant:
Sabbour for consultants
Owner:
Sokhna port development co. (SPDC)
Project description:
• Live stock terminal area (206080 m2)
.
• Two roads (walk way & paving road).
• Cover areas by steel structure.
• Make water trough and footer trough for live stock terminal.
Position :Chief Surveyor
DUTIES:
• Make leveling for area for live stock terminal
• Issue inspection for leveling and compaction test.
• Maintain document register in connection with quality records.
• Make leveling for two roads (walk way & paving road).
• Helping the site team in preparing work procedure and method
statement.
• Make a restrict and invoice with main contractor
and subcontractor.
12. 12 | P a g e
January 2002 – December 2003:
(ARCHIRODON for Construction (Overseas) Co. S.A)
Project:
Port Said East Container Terminal
Consultant:
Posford Duvivier Haskoning, Pacer, U.K
Owner:
Suez Canal Container Terminal S.A.E
Project description:
• Container terminal area (400000 m2
)
• Administration and amenities buildings
• Concrete paving blocks (360000 m2
)
• Sand cement under concrete paving block.
Position :Surveyor
DUTIES:
• Prepare site layout & surveying work.
• Prepare shop drawing.
• Controlling execution of work:
(Form work, excavations, backfilling
• Make a surveying in each area.
• Issue inspection and test plan.
• Helping the site team and in preparing work procedure and
method statement.
• Make a restrict and invoice with main contractor
and subcontractor.
13. 13 | P a g e
October 2000 – December 2001:
ELMansoura Petroleum Company
Project:
Preparing the sites and its roads of drilling for natural gas
Owner:
EL Mansoura Petroleum Company
Project description:
• Yard of drilling of ten sites (180000 m2
)
• Roads service for this yards (50.0 km)
• Backfilling of coarse aggregate with thick (40 cm)
• Pipe lines services.
Position :Surveyor
DUTIES:
• Prepare site layout & surveying work.
• Make site leveling of areas and backfilling of it by coarse
aggregate to prepare it for drilling.
• Make a surveying in each area and roads.
• Issue inspection and surveying check.
• Helping the site team in preparing work procedure and method
statement.
• Make a restrict and invoice with main contractor
and subcontractor.
14. 14 | P a g e
May 1999 – September 2000:
General Co. For Land Reclamation,Dev. & Recon.
Project:
Intakes 3&5&7 in El-Salam Canal
Consultant:
Development of Sinai instrument
Owner:
Ministry of Irrigation
Project description:
• 3 pump stations
• Main Pipes lines & sub main Pipes lines for El-Salam canal
• Roads and excavations& backfilling work’s
Position :Surveyor
DUTIES:
• Prepare shop drawing.
• Controlling execution of work:
• (Form work, excavations, backfilling)
• Controlling assembling of pipelines and its joints.
• Issue inspection and tests of pipelines and elevated tank.
• Supervising for roads (cut &fill) and pipe lines connected with
intakes.
• Make coarse agg. For roads with thick. (30.0 cm)
15. 15 | P a g e
February 1998 – April 1999:
Heliopolis Co. for Housing and Dev.
Project:
Group of resident building
Owner:
Heliopolis Company for Housing and Development
Project description:
• Group of resident building
• Infrastructure of resident building
• Make a landscape of resident building
Position :Surveyor
DUTIES:
• Prepare site layout & surveying work.
• Controlling execution of work:
(Form wok, excavations, backfilling)
• Supervising of group of resident building.
• Supervising of Road service of its group and green area
with parking.
• Helping the site team in preparing work procedure and method
statement.
• Make invoice with main contractor.