CURRICULUM VITAE
Mr. Mudassar Iqbal
Company SCC Specialized Contracting Company.
Saudi Arabia.
KSA +966 563722914,0580847249
Pk +923466874940
Email : mudassarfazil@yahoo.com
Profession : Construction Manager/Site Engineer Civil.
Nationality : Pakistani.
Date of Birth : 05.12.1973.
Qualification : Diploma of Associate Engineer Civil.
Computer Proficiency : MS Office , Auto Cad.
Iqama Status : Transferable.
Languages Known : English, Arbaic,Urdu.
Driving licence : Have a valid Saudi driving licence.
Key Experience: :
Total 20 years in management and execution construction like .
Petro Chemical Refinery projects, High rise buildings/Tower,Commercial .
Complexes,Infrastructure,Sub Station,Cement Factory,Ferilizer Plant,Road work.
(KSA=08 years+ Qatar=01Years +UAE=01Years+Pakistan=10 years)
Key Responsibilities:
*Track record exceeding goals, earning high stakeholder/client satisfaction rating.
*Knowledge of resource utilization and control.
*Good operational planning and time management skills.
*Manage the projects simultaneously without compromising on standards and quality.
*Ability to ensure standards and specifications are met.
*Ability to work with colleagues to deliver project and operational performance.
*Sound knowledge of construction practices and standards.
*Deep involvement in addressing Construction methodology, Method Statements,
Project Quality Plan, Safety Plan, Schedules and Compliance with Project objectives.
*Organize, direct and efficiently use all resources, including subcontractors and suppliers,
delivering the highest standard of workmanship and value for money.
Job Profile:
1. Employer : SCC Specialized Contracting Company (Working )
. Client : Hykel Omrani
. Project : Le Meridien 5.Star Hotel Olaya (Riyadh).
. Designation : Construction Manager (Sep,2013 -Till date).
. Responsibilities : Cordinating with clients,consultants and subcontractors for timely.
. : Completion of works.Controlling quality,progress,cost and safety of.
. : Structural, architectural,infrastructure and MEP coordination. Strictly.
. : Fallow upup of Snagging and handing over of project.Ensuring the works
. : carried out as per the project specifications and contracts.Advising .
. : departments for design changes and variations for cost savings. .
. : Training subordinates.
2. Employer Arabia Bemco Contracting Company.
Client : MOI/DAR.
Project : SANG.(Saudi National Guard Housing Project)Al-Qaseem
Designation : QC.Engineer ( March, 2013 to Septamber,2013)
1
Responsibilities : Make the Inspection for Precasting Items Like Wall Panel,Stair at.
. Premco Precast Factory Production at Riyadh Precast Factory
and. . release for Qaseem Project. .
:
3. Employer Descon Engineering Lamited.
Client : Rass Gass/JGC.
Project : Burzan Gass and Chemical Refinery
Designation : Area In Charge ( November 2011 to October,2012 )
Responsibilities : Manage the Construction of Tank Foundation Dike Wall RCC Frame. .
. : Structure Vessel Foundation and Padestal U/G Tanks/Cable Trenches
. : Under Ground Piping Pits Pipe line sand beding U-Ditch Cable.Road .
. : Duct Bank Earth Work Paving. Prepare method statements and MRO .
: Coordinating with Mech,Electrical,Piping,Equipment Teams for the
. : Final hand to client.
4. Employer : KCC KIL JAN KANG.
Client : DEC.
Project : PP-11(1750MW) Power Project By Dhuruma Electricity Company.
Designation : Area Incharge Civil ( Feb,2011 to Oct,2011)
Responsibilities : TR Compund at 07 Location Fire Wall Transformer Foundation Pipe
Support Fnce.Excavation for U/G Piping Precast Cable Trench
concrete cover Duct Bank RCC Paving U/G
Pits Drain Chanel Road Work Pipe Support Precasting of Manhole and
Cable trench Cover Electrical Structural and mechanical coordination.
5. Employer : Descon Engineering Lamited.
Client : Engro Fertilizer Lamited Pakistan
Project : Envin1.3 Ammonia Urea Single Train Fertilizer Plant Dharki Sind Pak.
Designation : Deputy Manager Civil ( May 2008 to Feb,2011)
Responsibilities : Area Completion U/G Piping Cable Trench Duct Bank RCC Paving U/G
. Pits Drain Chanel Road Work Pipe Support Precasting of Manhole and
. Cable trench Cover Electrical Structural and mechanical coordination, .
. Safety of works,Preparing snaglists & Final acceptance of all works.
6. Employer : IJM Gulf Lamited
Client : Alghurair Gega
Project : 33-Story World Trade Center and Platinum Square 5 Star Hotel DHA-11
Designation : Deputy Construction Manager (May,2007 to Nov. 2008)
Responsibilities Execution of civil structural works for project, Checking bar bending
schedule,Material Management, manpower deployment,
progress monitoring, Raising technical queries.
7. Employer : SBG PCM(Division)
Client : SABIC
Project#1 : JUPC Jubail Petro Chemical Refinery.
Designation : Site Engineer(Nov,2002 to April,2006)
Responsibilities : Execution of structural works for Road X-ing Sution Station,Pipe Rack
Equipment Foundation Pipe Line Trench leveling Center Line Marking
As-built Survey Report Preparing for the Under Ground Services Like
Fire Water Pipe Line Duct Bank Road X-Ing.
8. Employer : Descon Engineering Lamited.
Client : Parco/JGC
Project : Parco Oil Refinery PK,Gasco new train-2 Refinery Ruwais UAE.
Designation : Civil Surveyor(July,1998 to March,2001)
Responsibilities : Layout/Surveying/Execution of structural works for Road X-ing Sution
Station,Pipe Rack Equipment Foundation Pipe Line Trench leveling
Center Line Marking As-built Survey Report Preparing for the Under
Ground Services Like Fire Water Pipe Line Duct Bank Road X-Ing.
9. Employer : Habib Rafiq PVT Lamited.
Client : FJFC
Project : Fauji Jorden Furtilizer Complex Bin Qasim Karachi PK.
Designation : Civil Surveyor(Oct,1996 to July,1998)
2
Responsibilities : Layout/Surveying/Execution of Cooling Tower Sab-Station structural
works for Road X-ing Sution Station,Pipe Rack Equipment Foundation
Pipe Line Trench leveling Center Line Marking As-built Survey Report
Preparing for the Under Ground Services Like Fire Water Pipe Line
Duct Bank Road X-Ing.
10. Employer : Hanbo Genral and Steel Company.
Client : Provencial High Way Project Department.
Project : PHP#6 Baseema Surab Road 116KM Single Carrage way.
Designation : Survey Engineer(March,1995 to October,1996)
Responsibilities : Settingout Surveying/Control Point Fixing/Curve Layout PC/PT Super
Elevation/Taking X-Section,Fixing Toe Point,Marking For the Layer
Elevation.
11. Employer : Alliance Consultant Engineering.
Client : Lakki Cement.
Project : Lakki Cement Plant Pezu Line A&B 2000+2000=4000Ton/Day.
Designation : Surveyor(May,1994 to March,1995)
Responsibilities : Inspection for Strctural work Embaded Parts Nutt Bolt,Settingout
Surveying.
12. Employer : IJM IGA (Australia Malysia)Joint Venture.
Client : Wapda Sanghar Sind PK..
Project : LBOD-Stage-1 Centeral Sanghar Draining System..
Designation : Sub-Engineer(January,1993 to Dec,1993)
Responsibilities : Bridge /Culvert/Drain Layout Marking,Settingout Surveying.
3

MCV

  • 1.
    CURRICULUM VITAE Mr. MudassarIqbal Company SCC Specialized Contracting Company. Saudi Arabia. KSA +966 563722914,0580847249 Pk +923466874940 Email : mudassarfazil@yahoo.com Profession : Construction Manager/Site Engineer Civil. Nationality : Pakistani. Date of Birth : 05.12.1973. Qualification : Diploma of Associate Engineer Civil. Computer Proficiency : MS Office , Auto Cad. Iqama Status : Transferable. Languages Known : English, Arbaic,Urdu. Driving licence : Have a valid Saudi driving licence. Key Experience: : Total 20 years in management and execution construction like . Petro Chemical Refinery projects, High rise buildings/Tower,Commercial . Complexes,Infrastructure,Sub Station,Cement Factory,Ferilizer Plant,Road work. (KSA=08 years+ Qatar=01Years +UAE=01Years+Pakistan=10 years) Key Responsibilities: *Track record exceeding goals, earning high stakeholder/client satisfaction rating. *Knowledge of resource utilization and control. *Good operational planning and time management skills. *Manage the projects simultaneously without compromising on standards and quality. *Ability to ensure standards and specifications are met. *Ability to work with colleagues to deliver project and operational performance. *Sound knowledge of construction practices and standards. *Deep involvement in addressing Construction methodology, Method Statements, Project Quality Plan, Safety Plan, Schedules and Compliance with Project objectives. *Organize, direct and efficiently use all resources, including subcontractors and suppliers, delivering the highest standard of workmanship and value for money. Job Profile: 1. Employer : SCC Specialized Contracting Company (Working ) . Client : Hykel Omrani . Project : Le Meridien 5.Star Hotel Olaya (Riyadh). . Designation : Construction Manager (Sep,2013 -Till date). . Responsibilities : Cordinating with clients,consultants and subcontractors for timely. . : Completion of works.Controlling quality,progress,cost and safety of. . : Structural, architectural,infrastructure and MEP coordination. Strictly. . : Fallow upup of Snagging and handing over of project.Ensuring the works . : carried out as per the project specifications and contracts.Advising . . : departments for design changes and variations for cost savings. . . : Training subordinates. 2. Employer Arabia Bemco Contracting Company. Client : MOI/DAR. Project : SANG.(Saudi National Guard Housing Project)Al-Qaseem Designation : QC.Engineer ( March, 2013 to Septamber,2013) 1
  • 2.
    Responsibilities : Makethe Inspection for Precasting Items Like Wall Panel,Stair at. . Premco Precast Factory Production at Riyadh Precast Factory and. . release for Qaseem Project. . : 3. Employer Descon Engineering Lamited. Client : Rass Gass/JGC. Project : Burzan Gass and Chemical Refinery Designation : Area In Charge ( November 2011 to October,2012 ) Responsibilities : Manage the Construction of Tank Foundation Dike Wall RCC Frame. . . : Structure Vessel Foundation and Padestal U/G Tanks/Cable Trenches . : Under Ground Piping Pits Pipe line sand beding U-Ditch Cable.Road . . : Duct Bank Earth Work Paving. Prepare method statements and MRO . : Coordinating with Mech,Electrical,Piping,Equipment Teams for the . : Final hand to client. 4. Employer : KCC KIL JAN KANG. Client : DEC. Project : PP-11(1750MW) Power Project By Dhuruma Electricity Company. Designation : Area Incharge Civil ( Feb,2011 to Oct,2011) Responsibilities : TR Compund at 07 Location Fire Wall Transformer Foundation Pipe Support Fnce.Excavation for U/G Piping Precast Cable Trench concrete cover Duct Bank RCC Paving U/G Pits Drain Chanel Road Work Pipe Support Precasting of Manhole and Cable trench Cover Electrical Structural and mechanical coordination. 5. Employer : Descon Engineering Lamited. Client : Engro Fertilizer Lamited Pakistan Project : Envin1.3 Ammonia Urea Single Train Fertilizer Plant Dharki Sind Pak. Designation : Deputy Manager Civil ( May 2008 to Feb,2011) Responsibilities : Area Completion U/G Piping Cable Trench Duct Bank RCC Paving U/G . Pits Drain Chanel Road Work Pipe Support Precasting of Manhole and . Cable trench Cover Electrical Structural and mechanical coordination, . . Safety of works,Preparing snaglists & Final acceptance of all works. 6. Employer : IJM Gulf Lamited Client : Alghurair Gega Project : 33-Story World Trade Center and Platinum Square 5 Star Hotel DHA-11 Designation : Deputy Construction Manager (May,2007 to Nov. 2008) Responsibilities Execution of civil structural works for project, Checking bar bending schedule,Material Management, manpower deployment, progress monitoring, Raising technical queries. 7. Employer : SBG PCM(Division) Client : SABIC Project#1 : JUPC Jubail Petro Chemical Refinery. Designation : Site Engineer(Nov,2002 to April,2006) Responsibilities : Execution of structural works for Road X-ing Sution Station,Pipe Rack Equipment Foundation Pipe Line Trench leveling Center Line Marking As-built Survey Report Preparing for the Under Ground Services Like Fire Water Pipe Line Duct Bank Road X-Ing. 8. Employer : Descon Engineering Lamited. Client : Parco/JGC Project : Parco Oil Refinery PK,Gasco new train-2 Refinery Ruwais UAE. Designation : Civil Surveyor(July,1998 to March,2001) Responsibilities : Layout/Surveying/Execution of structural works for Road X-ing Sution Station,Pipe Rack Equipment Foundation Pipe Line Trench leveling Center Line Marking As-built Survey Report Preparing for the Under Ground Services Like Fire Water Pipe Line Duct Bank Road X-Ing. 9. Employer : Habib Rafiq PVT Lamited. Client : FJFC Project : Fauji Jorden Furtilizer Complex Bin Qasim Karachi PK. Designation : Civil Surveyor(Oct,1996 to July,1998) 2
  • 3.
    Responsibilities : Layout/Surveying/Executionof Cooling Tower Sab-Station structural works for Road X-ing Sution Station,Pipe Rack Equipment Foundation Pipe Line Trench leveling Center Line Marking As-built Survey Report Preparing for the Under Ground Services Like Fire Water Pipe Line Duct Bank Road X-Ing. 10. Employer : Hanbo Genral and Steel Company. Client : Provencial High Way Project Department. Project : PHP#6 Baseema Surab Road 116KM Single Carrage way. Designation : Survey Engineer(March,1995 to October,1996) Responsibilities : Settingout Surveying/Control Point Fixing/Curve Layout PC/PT Super Elevation/Taking X-Section,Fixing Toe Point,Marking For the Layer Elevation. 11. Employer : Alliance Consultant Engineering. Client : Lakki Cement. Project : Lakki Cement Plant Pezu Line A&B 2000+2000=4000Ton/Day. Designation : Surveyor(May,1994 to March,1995) Responsibilities : Inspection for Strctural work Embaded Parts Nutt Bolt,Settingout Surveying. 12. Employer : IJM IGA (Australia Malysia)Joint Venture. Client : Wapda Sanghar Sind PK.. Project : LBOD-Stage-1 Centeral Sanghar Draining System.. Designation : Sub-Engineer(January,1993 to Dec,1993) Responsibilities : Bridge /Culvert/Drain Layout Marking,Settingout Surveying. 3