SlideShare a Scribd company logo
CURRICULUM VITAE
Mr. Mudassar Iqbal
Company SCC Specialized Contracting Company.
Saudi Arabia.
KSA +966 563722914,0580847249
Pk +923466874940
Email : mudassarfazil@yahoo.com
Profession : Construction Manager/Site Engineer Civil.
Nationality : Pakistani.
Date of Birth : 05.12.1973.
Qualification : Diploma of Associate Engineer Civil.
Computer Proficiency : MS Office , Auto Cad.
Iqama Status : Transferable.
Languages Known : English, Arbaic,Urdu.
Driving licence : Have a valid Saudi driving licence.
Key Experience: :
Total 20 years in management and execution construction like .
Petro Chemical Refinery projects, High rise buildings/Tower,Commercial .
Complexes,Infrastructure,Sub Station,Cement Factory,Ferilizer Plant,Road work.
(KSA=08 years+ Qatar=01Years +UAE=01Years+Pakistan=10 years)
Key Responsibilities:
*Track record exceeding goals, earning high stakeholder/client satisfaction rating.
*Knowledge of resource utilization and control.
*Good operational planning and time management skills.
*Manage the projects simultaneously without compromising on standards and quality.
*Ability to ensure standards and specifications are met.
*Ability to work with colleagues to deliver project and operational performance.
*Sound knowledge of construction practices and standards.
*Deep involvement in addressing Construction methodology, Method Statements,
Project Quality Plan, Safety Plan, Schedules and Compliance with Project objectives.
*Organize, direct and efficiently use all resources, including subcontractors and suppliers,
delivering the highest standard of workmanship and value for money.
Job Profile:
1. Employer : SCC Specialized Contracting Company (Working )
. Client : Hykel Omrani
. Project : Le Meridien 5.Star Hotel Olaya (Riyadh).
. Designation : Construction Manager (Sep,2013 -Till date).
. Responsibilities : Cordinating with clients,consultants and subcontractors for timely.
. : Completion of works.Controlling quality,progress,cost and safety of.
. : Structural, architectural,infrastructure and MEP coordination. Strictly.
. : Fallow upup of Snagging and handing over of project.Ensuring the works
. : carried out as per the project specifications and contracts.Advising .
. : departments for design changes and variations for cost savings. .
. : Training subordinates.
2. Employer Arabia Bemco Contracting Company.
Client : MOI/DAR.
Project : SANG.(Saudi National Guard Housing Project)Al-Qaseem
Designation : QC.Engineer ( March, 2013 to Septamber,2013)
1
Responsibilities : Make the Inspection for Precasting Items Like Wall Panel,Stair at.
. Premco Precast Factory Production at Riyadh Precast Factory
and. . release for Qaseem Project. .
:
3. Employer Descon Engineering Lamited.
Client : Rass Gass/JGC.
Project : Burzan Gass and Chemical Refinery
Designation : Area In Charge ( November 2011 to October,2012 )
Responsibilities : Manage the Construction of Tank Foundation Dike Wall RCC Frame. .
. : Structure Vessel Foundation and Padestal U/G Tanks/Cable Trenches
. : Under Ground Piping Pits Pipe line sand beding U-Ditch Cable.Road .
. : Duct Bank Earth Work Paving. Prepare method statements and MRO .
: Coordinating with Mech,Electrical,Piping,Equipment Teams for the
. : Final hand to client.
4. Employer : KCC KIL JAN KANG.
Client : DEC.
Project : PP-11(1750MW) Power Project By Dhuruma Electricity Company.
Designation : Area Incharge Civil ( Feb,2011 to Oct,2011)
Responsibilities : TR Compund at 07 Location Fire Wall Transformer Foundation Pipe
Support Fnce.Excavation for U/G Piping Precast Cable Trench
concrete cover Duct Bank RCC Paving U/G
Pits Drain Chanel Road Work Pipe Support Precasting of Manhole and
Cable trench Cover Electrical Structural and mechanical coordination.
5. Employer : Descon Engineering Lamited.
Client : Engro Fertilizer Lamited Pakistan
Project : Envin1.3 Ammonia Urea Single Train Fertilizer Plant Dharki Sind Pak.
Designation : Deputy Manager Civil ( May 2008 to Feb,2011)
Responsibilities : Area Completion U/G Piping Cable Trench Duct Bank RCC Paving U/G
. Pits Drain Chanel Road Work Pipe Support Precasting of Manhole and
. Cable trench Cover Electrical Structural and mechanical coordination, .
. Safety of works,Preparing snaglists & Final acceptance of all works.
6. Employer : IJM Gulf Lamited
Client : Alghurair Gega
Project : 33-Story World Trade Center and Platinum Square 5 Star Hotel DHA-11
Designation : Deputy Construction Manager (May,2007 to Nov. 2008)
Responsibilities Execution of civil structural works for project, Checking bar bending
schedule,Material Management, manpower deployment,
progress monitoring, Raising technical queries.
7. Employer : SBG PCM(Division)
Client : SABIC
Project#1 : JUPC Jubail Petro Chemical Refinery.
Designation : Site Engineer(Nov,2002 to April,2006)
Responsibilities : Execution of structural works for Road X-ing Sution Station,Pipe Rack
Equipment Foundation Pipe Line Trench leveling Center Line Marking
As-built Survey Report Preparing for the Under Ground Services Like
Fire Water Pipe Line Duct Bank Road X-Ing.
8. Employer : Descon Engineering Lamited.
Client : Parco/JGC
Project : Parco Oil Refinery PK,Gasco new train-2 Refinery Ruwais UAE.
Designation : Civil Surveyor(July,1998 to March,2001)
Responsibilities : Layout/Surveying/Execution of structural works for Road X-ing Sution
Station,Pipe Rack Equipment Foundation Pipe Line Trench leveling
Center Line Marking As-built Survey Report Preparing for the Under
Ground Services Like Fire Water Pipe Line Duct Bank Road X-Ing.
9. Employer : Habib Rafiq PVT Lamited.
Client : FJFC
Project : Fauji Jorden Furtilizer Complex Bin Qasim Karachi PK.
Designation : Civil Surveyor(Oct,1996 to July,1998)
2
Responsibilities : Layout/Surveying/Execution of Cooling Tower Sab-Station structural
works for Road X-ing Sution Station,Pipe Rack Equipment Foundation
Pipe Line Trench leveling Center Line Marking As-built Survey Report
Preparing for the Under Ground Services Like Fire Water Pipe Line
Duct Bank Road X-Ing.
10. Employer : Hanbo Genral and Steel Company.
Client : Provencial High Way Project Department.
Project : PHP#6 Baseema Surab Road 116KM Single Carrage way.
Designation : Survey Engineer(March,1995 to October,1996)
Responsibilities : Settingout Surveying/Control Point Fixing/Curve Layout PC/PT Super
Elevation/Taking X-Section,Fixing Toe Point,Marking For the Layer
Elevation.
11. Employer : Alliance Consultant Engineering.
Client : Lakki Cement.
Project : Lakki Cement Plant Pezu Line A&B 2000+2000=4000Ton/Day.
Designation : Surveyor(May,1994 to March,1995)
Responsibilities : Inspection for Strctural work Embaded Parts Nutt Bolt,Settingout
Surveying.
12. Employer : IJM IGA (Australia Malysia)Joint Venture.
Client : Wapda Sanghar Sind PK..
Project : LBOD-Stage-1 Centeral Sanghar Draining System..
Designation : Sub-Engineer(January,1993 to Dec,1993)
Responsibilities : Bridge /Culvert/Drain Layout Marking,Settingout Surveying.
3

More Related Content

What's hot

Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015
shahmeer memon
 
Civil engineer strategic
Civil engineer strategicCivil engineer strategic
Civil engineer strategic
ssuser351e58
 
Engr.riyaz cv 02 11-15-2
Engr.riyaz cv 02 11-15-2Engr.riyaz cv 02 11-15-2
Engr.riyaz cv 02 11-15-2
Riyazuddin1985
 
Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)Aftab Ahmad Sahi
 
Civil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando VillarojoCivil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando VillarojoFernando Villarojo
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)AHMED SAKR
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNshaat Hafez
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015Ahmed Yehia
 
20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil EngineerBinu Babu
 
Khan Sardar New C.V.DOC
Khan Sardar New C.V.DOCKhan Sardar New C.V.DOC
Khan Sardar New C.V.DOCKhan Sardar
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWAhmed Senosy
 

What's hot (20)

Revised Resume
Revised ResumeRevised Resume
Revised Resume
 
Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015
 
Shahmeer Resume2-3
Shahmeer Resume2-3Shahmeer Resume2-3
Shahmeer Resume2-3
 
Civil engineer strategic
Civil engineer strategicCivil engineer strategic
Civil engineer strategic
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
CV
CVCV
CV
 
Engr.riyaz cv 02 11-15-2
Engr.riyaz cv 02 11-15-2Engr.riyaz cv 02 11-15-2
Engr.riyaz cv 02 11-15-2
 
MEP Manager CV)
MEP Manager CV)MEP Manager CV)
MEP Manager CV)
 
Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)
 
CV-Padmanabh
CV-PadmanabhCV-Padmanabh
CV-Padmanabh
 
Civil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando VillarojoCivil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando Villarojo
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORS
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015
 
20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer
 
Khan Sardar New C.V.DOC
Khan Sardar New C.V.DOCKhan Sardar New C.V.DOC
Khan Sardar New C.V.DOC
 
Ahmd Mahmoud c.v
Ahmd Mahmoud c.vAhmd Mahmoud c.v
Ahmd Mahmoud c.v
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 

Similar to MCV

RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-NewManish Sabane
 
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLranganathan shankar
 
Akhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docAkhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).doc
ShahbazAhmad953994
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjay Sankar
 
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017Shaukat Mahmood Khan
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016Subhash Dhiman
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)amr mahrous
 

Similar to MCV (20)

Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
shoukat buildings and Roads -
shoukat buildings and Roads -shoukat buildings and Roads -
shoukat buildings and Roads -
 
CV Updated
CV UpdatedCV Updated
CV Updated
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CL
 
Akhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docAkhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).doc
 
ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
 
NEMER- CV - 16
NEMER- CV - 16NEMER- CV - 16
NEMER- CV - 16
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ Engineer
 
CV
CVCV
CV
 
CV
CVCV
CV
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
 
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 

MCV

  • 1. CURRICULUM VITAE Mr. Mudassar Iqbal Company SCC Specialized Contracting Company. Saudi Arabia. KSA +966 563722914,0580847249 Pk +923466874940 Email : mudassarfazil@yahoo.com Profession : Construction Manager/Site Engineer Civil. Nationality : Pakistani. Date of Birth : 05.12.1973. Qualification : Diploma of Associate Engineer Civil. Computer Proficiency : MS Office , Auto Cad. Iqama Status : Transferable. Languages Known : English, Arbaic,Urdu. Driving licence : Have a valid Saudi driving licence. Key Experience: : Total 20 years in management and execution construction like . Petro Chemical Refinery projects, High rise buildings/Tower,Commercial . Complexes,Infrastructure,Sub Station,Cement Factory,Ferilizer Plant,Road work. (KSA=08 years+ Qatar=01Years +UAE=01Years+Pakistan=10 years) Key Responsibilities: *Track record exceeding goals, earning high stakeholder/client satisfaction rating. *Knowledge of resource utilization and control. *Good operational planning and time management skills. *Manage the projects simultaneously without compromising on standards and quality. *Ability to ensure standards and specifications are met. *Ability to work with colleagues to deliver project and operational performance. *Sound knowledge of construction practices and standards. *Deep involvement in addressing Construction methodology, Method Statements, Project Quality Plan, Safety Plan, Schedules and Compliance with Project objectives. *Organize, direct and efficiently use all resources, including subcontractors and suppliers, delivering the highest standard of workmanship and value for money. Job Profile: 1. Employer : SCC Specialized Contracting Company (Working ) . Client : Hykel Omrani . Project : Le Meridien 5.Star Hotel Olaya (Riyadh). . Designation : Construction Manager (Sep,2013 -Till date). . Responsibilities : Cordinating with clients,consultants and subcontractors for timely. . : Completion of works.Controlling quality,progress,cost and safety of. . : Structural, architectural,infrastructure and MEP coordination. Strictly. . : Fallow upup of Snagging and handing over of project.Ensuring the works . : carried out as per the project specifications and contracts.Advising . . : departments for design changes and variations for cost savings. . . : Training subordinates. 2. Employer Arabia Bemco Contracting Company. Client : MOI/DAR. Project : SANG.(Saudi National Guard Housing Project)Al-Qaseem Designation : QC.Engineer ( March, 2013 to Septamber,2013) 1
  • 2. Responsibilities : Make the Inspection for Precasting Items Like Wall Panel,Stair at. . Premco Precast Factory Production at Riyadh Precast Factory and. . release for Qaseem Project. . : 3. Employer Descon Engineering Lamited. Client : Rass Gass/JGC. Project : Burzan Gass and Chemical Refinery Designation : Area In Charge ( November 2011 to October,2012 ) Responsibilities : Manage the Construction of Tank Foundation Dike Wall RCC Frame. . . : Structure Vessel Foundation and Padestal U/G Tanks/Cable Trenches . : Under Ground Piping Pits Pipe line sand beding U-Ditch Cable.Road . . : Duct Bank Earth Work Paving. Prepare method statements and MRO . : Coordinating with Mech,Electrical,Piping,Equipment Teams for the . : Final hand to client. 4. Employer : KCC KIL JAN KANG. Client : DEC. Project : PP-11(1750MW) Power Project By Dhuruma Electricity Company. Designation : Area Incharge Civil ( Feb,2011 to Oct,2011) Responsibilities : TR Compund at 07 Location Fire Wall Transformer Foundation Pipe Support Fnce.Excavation for U/G Piping Precast Cable Trench concrete cover Duct Bank RCC Paving U/G Pits Drain Chanel Road Work Pipe Support Precasting of Manhole and Cable trench Cover Electrical Structural and mechanical coordination. 5. Employer : Descon Engineering Lamited. Client : Engro Fertilizer Lamited Pakistan Project : Envin1.3 Ammonia Urea Single Train Fertilizer Plant Dharki Sind Pak. Designation : Deputy Manager Civil ( May 2008 to Feb,2011) Responsibilities : Area Completion U/G Piping Cable Trench Duct Bank RCC Paving U/G . Pits Drain Chanel Road Work Pipe Support Precasting of Manhole and . Cable trench Cover Electrical Structural and mechanical coordination, . . Safety of works,Preparing snaglists & Final acceptance of all works. 6. Employer : IJM Gulf Lamited Client : Alghurair Gega Project : 33-Story World Trade Center and Platinum Square 5 Star Hotel DHA-11 Designation : Deputy Construction Manager (May,2007 to Nov. 2008) Responsibilities Execution of civil structural works for project, Checking bar bending schedule,Material Management, manpower deployment, progress monitoring, Raising technical queries. 7. Employer : SBG PCM(Division) Client : SABIC Project#1 : JUPC Jubail Petro Chemical Refinery. Designation : Site Engineer(Nov,2002 to April,2006) Responsibilities : Execution of structural works for Road X-ing Sution Station,Pipe Rack Equipment Foundation Pipe Line Trench leveling Center Line Marking As-built Survey Report Preparing for the Under Ground Services Like Fire Water Pipe Line Duct Bank Road X-Ing. 8. Employer : Descon Engineering Lamited. Client : Parco/JGC Project : Parco Oil Refinery PK,Gasco new train-2 Refinery Ruwais UAE. Designation : Civil Surveyor(July,1998 to March,2001) Responsibilities : Layout/Surveying/Execution of structural works for Road X-ing Sution Station,Pipe Rack Equipment Foundation Pipe Line Trench leveling Center Line Marking As-built Survey Report Preparing for the Under Ground Services Like Fire Water Pipe Line Duct Bank Road X-Ing. 9. Employer : Habib Rafiq PVT Lamited. Client : FJFC Project : Fauji Jorden Furtilizer Complex Bin Qasim Karachi PK. Designation : Civil Surveyor(Oct,1996 to July,1998) 2
  • 3. Responsibilities : Layout/Surveying/Execution of Cooling Tower Sab-Station structural works for Road X-ing Sution Station,Pipe Rack Equipment Foundation Pipe Line Trench leveling Center Line Marking As-built Survey Report Preparing for the Under Ground Services Like Fire Water Pipe Line Duct Bank Road X-Ing. 10. Employer : Hanbo Genral and Steel Company. Client : Provencial High Way Project Department. Project : PHP#6 Baseema Surab Road 116KM Single Carrage way. Designation : Survey Engineer(March,1995 to October,1996) Responsibilities : Settingout Surveying/Control Point Fixing/Curve Layout PC/PT Super Elevation/Taking X-Section,Fixing Toe Point,Marking For the Layer Elevation. 11. Employer : Alliance Consultant Engineering. Client : Lakki Cement. Project : Lakki Cement Plant Pezu Line A&B 2000+2000=4000Ton/Day. Designation : Surveyor(May,1994 to March,1995) Responsibilities : Inspection for Strctural work Embaded Parts Nutt Bolt,Settingout Surveying. 12. Employer : IJM IGA (Australia Malysia)Joint Venture. Client : Wapda Sanghar Sind PK.. Project : LBOD-Stage-1 Centeral Sanghar Draining System.. Designation : Sub-Engineer(January,1993 to Dec,1993) Responsibilities : Bridge /Culvert/Drain Layout Marking,Settingout Surveying. 3