SENIOR PLANNING ENGR./ PROJECT CONTROL SPECIALIST
ALFREDO B. CONING
Home Address:
9 Junifer Street (B9, L10)
Jubilation Home Village - West
Bgy Zapote, Binan City, Laguna
Philippines 4024
H/P No.: +63 916 777 8397
e-mail address: alfred_coning@yahoo.com
PERSONAL BACKGROUND
NATIONALITY : FILIPINO
DATE OF BIRTH : 01 APRIL 1956
MARITAL STATUS : MARRIED
PASSPORT NUMBER : XX0704274 Valid until Mar 2016
EDUCATIONAL BACKGROUND
BACHELOR OF SCIENCE IN CIVIL ENGINEERING [B.S.C.E.], 1978 - (Phil. PRC LIC. # 0019323)
BACHELOR OF SCIENCE IN SANITARY ENGINEERING (B.S.S.E.), 1979
NATIONAL UNIVERSITY, MANILA, PHILIPPINES
CAREER SUMMARY
Working experience of more than twenty five years (25) years in the engineering, construction and project
management. The work includes field supervision, planning, scheduling & cost control, estimating, project
management, operations, and site co-ordination of projects with scope on heavy civil/structural engineering,
electro-mechanical works and vessel conversion works for both onshore and offshore phases of work. The
scope covers stages from engineering, procurement, construction, testing & pre-commissioning,
commissioning and start-up of the Project.
• Projects were fabrication of onshore/offshore oil and gas platforms, tanker conversion & refurbishment into
floating production storage & offloading vessels (FSO/FPSO), fabrication/heavy lifting of topside modules &
turret, pipe laying of various diameter, gas and oil site plant facilities, water injection plants, refinery
modernization projects, airports and various civil engineering structures.
• Supervised technical teams from tendering/estimating, planning, project monitoring, costing, construction,
project controls and management, project progress evaluation, project commercial close outs and claims.
• Has worked (Middle East, North Africa, Hong Kong, US, Singapore, Malaysia & Korea and Nigeria) with most of
the biggest and refutable private and government organizations around the world.
• Career has progressed from cadet engineer, estimator, planner, project supervisor, operation center head,
resident engineer/project superintendent, site representative, senior planning engineer, project controls head and
has handled project controls/estimating/cost and project planning department of projects.
• Has dealt with various contract types such as EPC Lump sum Turnkey, Lump sum and Unit Rates, Reimbursable
for various civil, gas, oil & water related projects.
CV_Alfred_Coning2014
2 OF 12
SUMMARY OF PROFESSIONAL WORK EXPERIENCE:
INCLUSIVE
DATES
COMPANY/CLIENT/PROJECT/LOCATION POSITION HELD
5Mar12 to Present SHELL DEVELOPMENT COMPANY of NIGERIA
(Seconded by NES Global)
Forcados Yokri Integration Project - FYIP
Shell MOA, Warri, Delta Estates
Nigeria
Snr. Planning Engr.
05Jul05 to Oct11 EXXON MOBIL DEVELOPMENT COMPANY
(Seconded by Air – Energi International)
Critical Crude Pipeline & Rehab Project - CCPRP
AOR Offshore Compression Facilities
Offshore Nigeria
East Area Projects - EPC1A
AOR Offshore Compression Facilities
Offshore Nigeria
East Area Projects - EPC4A
AOR Revamp & Retrofit of Existing Wellhead Facilities
Fabrication and Offshore HUC
Port Harcourt & Offshore Nigeria
Project Control Specialist
Offshore HUC Snr Planning
Engineer
Planning/Schedule/Cost
Specialist
Jul/03 to 04Jul05 MALAYSIA SHIPYARD & ENGINEERING
(Seconded by PMC Management & Consultants)
Shipbuilding & Conversion Department
1)ExxonMobil/Nigerian National Petroleum Co.
YOHO Development Project FSO
SBM - Vessel Conversion of N’kossa into FSO
2)Malaysia International Shipping Corp. (MISC)
FSO South Angsi ‘A’ Project
Refurbishment & Conversion of MT Bertina into FSO
3)2200/3000 Derrick Pipelay Barge Project
Tender
Crest Petroleum Bhd
4)Single Buoy Mooring/ M.I.S.C. JV
FPSO Kikeh Project for Murphy Oil
Refurbishment & Conversion of MT Atlas into FPSO
MSE Shipyard, Pasir Gudang, Johor, Malaysia
Senior Planning Engineer
Feb/02 to Mar/03 MODEC International LLC
(Seconded by Brunel International SEA Ltd)
Chad Offshore Modec Integrated Team
ESSO Chad Offshore Oil & Gas Facilities FSO
Project
1)Vessel Conversion of MT Companion into FSO Kome Kribi
2)Vessel Conversion of MT Sahara into FPSO Enterprise
Jurong Shipyard Pte Ltd, Tuas, Singapore
Project Control
Engineer/Consultant
Aug/01 to Feb/02 FOSTER WHEELER Eastern Pte Ltd
(Seconded by Kingsforce Management / Consultants)
ExxonMobil Site Integration Pipelines Project
Civil, Structural, Piping & Multi-Mechanical Works
Jurong Island & Jurong, Singapore
Senior Planning Engineer
Sep/00 to Aug/01 HIAP SENG Engineering Limited
Shell Seraya-2 Project
Equipment Dress-up & Multi-Mechanical Works
Jurong Island, Singapore
Project Control Head
CV_Alfred_Coning2014
3 OF 12
June/00 to Sep/00 SIME SembCorp Engineering Sdn Bhd
Planning / Proposals Department
Offshore Oil & Gas Platform Projects
Pasir Gudang, Johor, West Malaysia
Planning Engineer -
Commissioning
Sept/99 to
June/00
KELLOGG Overseas Corp. – CHIYODA Corp. J.V.
Singapore Olefins Project (SOP)
Jurong Island, Singapore
Planning / Scheduling Engr.
Mar/99 to Aug/99 SUMATEC Corporation Sdn. Bhd.
(Seconded by AZDAMAN Sdn Bhd)
MTBE- Propane Dehydrogenation Project
Gebeng, Kuantan, Malaysia
Planning & Cost Control Engr.
Dec/97 to Feb/99 SIME SembCorp Engineering Sdn. Bhd.
(Seconded by AZDAMAN Sdn. Bhd.)
ESSO Production Malaysia Inc. – (EPMI)
Lawit ‘A’ Offshore Gas Compression Modules
Offshore Terenganu, West Malaysia
Offshore Planning Engr.
Dec/96 to Dec/97 NANAM FATT Corporation Sdn. Bhd.
(Seconde by AZDAMAN Sdn Bhd.)
Kuala Lumpur International Airport
MAS – Engineering Support Facilities
Sepang, Malaysia
Planning Engr. / Cost
Estimator
May/96 – Dec/96 F F CRUZ & Company
Engineering & Construction Division
Philippines
Project Operations Head
(OPCEN)
Oct/93 to May/96 AIRPORT AUTHORITY-Hong Kong
Government of Hong Kong, Projects Division
New Chek Lap Kok International Airport
Wanchai, Hong Kong
Planning Engineer I
Jan/93 to Sep/93 KUMAGAI Gumi Hong Kong Limited
HQ – Construction & Tendering Department
Tsimshatsui, Kowloon, Hong Kong
Senior Planning &
Programming Engr.
Jan/92 to Dec/92 Atlantic, Gulf & Pacific Company, Inc. (AG&P)
Seconded to:
MOBIL Oil Hong Kong Limited
New Tsing Yi Fuels Terminal Project
Tsing Yi Island, Hong Kong
Planning (Commissioning)
Engr.
1989 to 1991 Atlantic, Gulf & Pacific Company, Inc. (AG&P)
Seconded to:
Marubeni Corporation UK PLC
Great Man Made River Project
Sarir/Tazerbo, Libya, North Africa
Operations Head / Site
Representative
1988 to 1989 Atlantic, Gulf & Pacific Company, Inc. (AG&P)
Steel & Marine Structures Group (SMSG)
Cominco Alaska (USA) Red Dog Project
BMFY, Bauan, Batangas, Philippines
Planning/ Scheduling
Supervisor
CV_Alfred_Coning2014
4 OF 12
1986 to 1988 Atlantic, Gulf & Pacific Company, Inc. (AG&P)
International Group
Engineering & Estimating Department
Makati City, Metro Manila, Philippines
Civil Supervisor/ Civil
Engineer III
1982 to 1986 AGAP Arabia Limited & AG&P Co. of Manila, Inc.
ARAMCO-Berri Gas Spheroiding Facilities Project
ARAMCO-Ras Tanura Refinery Modernization Proj.
ARAMCO-Gas & Oil Site Plant Modification Project
H. Q. Engineering & Estimating Department
Kingdom of Saudi Arabia
Positions held:
Resident Engineer
Civil Supervisor
Field Engineer
Scheduling / Cost Engr.
Senior Estimator
1979 to 1982 Atlantic, Gulf & Pacific Company, Inc. (AG&P)
Construction Group
Engineering & Estimating Department
Makati City, Metro Manila, Philippines
Senior Field Engineer / Senior
Estimator
1978 to 1979 Ministry of Public Works – Phil. Government
Flood Control & Drainage Division
Bonifacio Drive, Manila, Philippines
Jr. Civil Field Engr.
1977 to 1978 Atlantic, Gulf & Pacific Company, Inc. (AG&P)
Construction Group
Manila, Philippines
C. E. Aide / Draftsman
(Apprenticeship)
MAJOR DUTIES & RESPONSIBILITIES:
2013 – to Present : Senior Planning Engineer
Shell Petroleum Development Co. Of Nigeria
(Thru NES Global Talent)
Forcados Yokri Integrated Project
Warri, Delta Estate, NIGERIA
• Responsible for the planning, scheduling, progress monitoring, reporting and planning
coordination with the project.
• Attend meetings and various discussions including technical coordination.
2005 - 2012 : OFFSHORE HUC Snr Planner/Project Control Specialist
Exxon Mobil Development Company
East Area Projects – EPC1A / EPC4A / CCPRP
Offshore Compression Facilities/Revamp & Retrofit
EPC4A – Revamp & Retrofit of 4 Existing Production Platforms & 10 Wellhead Platforms /
CCPRP - Critical Crude & Pipeline Rehabilitation Project
• During the Fabrication Phase - Responsible for developing the Master Fabrication Schedules
and Planning Packages for 14 Platforms. Issue the schedule as a guide to Fabrication
Contractor. Check and accept the Contractor’s schedule for implementation. Review, check and
comments to Contractor’s progress reports including site visits and progress assessment at the
Yard. Custodian of the Master Control Schedule updates and issuance to the EM PMT.
• Prepare various EM reports; weekly, monthly and various graphics presentations.
• Attending project planning meetings and discussions.
• Report directly to the Project Controls Lead.
• During the Offshore HUC Phase – Assist in developing the Jobcards and encode any revisions,
additional scope and change orders from all disciplines. Produce import files of the final
CV_Alfred_Coning2014
5 OF 12
Jobcard to Primavera (P3) on each Platforms by priorities. Develop the Control HUC
Schedules and planning & scheduling parameters based from the Jobcards and progress
monitoring methods. Initiate on-screen review/presentation of the HUC Schedule and Jobcards
with HUC Coordinator, Superintendents and Contractor’s HUC Lead prior to issuance for
implementation and for final endorsement by the Project Manager.
• Conduct Jobcards orientation/training to Contractor’s Planner including re-alignment review of
Contractor’s schedule to the Master Control HUC schedule.
• Attending the Daily Toolbox meeting including participation to various safety meetings,
trainings and participate in JSA review.
• Responsible for the preparation of the Daily and Weekly Progress Reports prior to submission
to the submission to the HUC Coordinator. This includes various planning presentations and
Shutdown schedule preparation.
• Review, analyze and comments to Contractor’s daily update reports of the Jobcards and the
HUC schedule. Conduct man-hour review including the daily timesheets reports and insure the
correct input to the Jobcards.
• Initiate daily planning and progress meeting with EM HUC Lead, Discipline Superintendents and
Supervisors. Issue the updated Control Schedule with progress analyzes and recommendations
to delays and schedule improvement.
• Participate in the Interface and shutdown meeting/discussion with the MPN Operations Team
and incorporate the Jobcards to be carried out by the MPN Maintenance Contractor during
shutdown.
• Offshore rotation of 4 weeks with a back to back of another Planner for 4 weeks.
• Attending the EM daily coordination teleconference call.
• Responsible for the weekly update of EM Overall Master Control schedule for both Fabrication
and HUC activities and issue to the Project Control Head.
• Report directly to the HUC Coordination.
EPC1A – GN Compression Platform (18,100 MT)
• Conduct site visit to Samsung in South Korea during the Fabrication Stage of the Platform.
Attending various planning and scheduling meeting while at the Yard.
• Same as in the above during the Hook-up and commissioning phase of the project.
2003 - 2005 : SENIOR PLANNING / OPERATIONS ENGINEER
Malaysia Marine & Heavy Engineering Sdn Bhd
(Thru PMC Management & Consultants)
1) SBM – FSO Yoho Refurbishment & Conversion Project
For Mobil Producing Nigeria Unlimited
2) MISC FPSO South Angsi’A’ Project
MSE Shipyard, Pasir Gudang, Johor, Malaysia
3) 2200/3000 Derrick Pipelay Barge Project Tender
MSE Shipyard, Pasir Gudang, Johor, Malaysia
4) Various Tender Planning for Proposed Projects
• Responsible for the preparation of Planning Packages & procedures using P3ec, implementation and
project control for the above project. The scope includes man-hour estimation, progress monitoring,
schedule revisions, site planning and co-ordination with the Clients on project controls and planning
issues. Preparation of final Close-out report.
• Responsible for the preparation Project Execution Plan including construction strategy, project
organization, engineering and procurement schemes as well as preparation of project presentation
packages being presented to the Client by the Senior Manager- Operations.
CV_Alfred_Coning2014
6 OF 12
• Responsible for the planning of Yard allocation layout for the block and module movement including
timing for the usage of MSE Dry-dock, Fabrication shops and Workshops.
• Assistance in the initial set-up of the project from engineering, procurement and construction phases as
well as coordination with the Client and Consultants.
• Reports directly to the Senior Manager, Operation .
2002 – 2003 : PROJECT CONTROL ENGINEER / CONSULTANT
MODEC International LLC
(Thru Brunel (SEA) International Consultants)
ESSO Chad Offshore Development Project
1) Conversion of MT Companion into FSO
2) Conversion of MT Sahara into FPSO
Jurong Shipyard Pte Ltd, SINGAPORE
• Responsible for preparing project estimates / budgets, assist preparation & issuance of various site
instructions, estimating/quantity surveys, review/evaluate & agree and approve quoted proposals of
the main Contractor, Jurong Shipyard Private Limited, as well as negotiating final price, issuance of
Change Orders, various Cost Reports for the ESSO Offshore Conversion Project for the COMIT Chad
Offshore Development Project.
• Responsible for the preparation and control of CTRs based from estimated and actual man-hours.
• Responsible for the preparation and implementation project schedules including controls, progress
monitoring, management reporting and meetings with the Shipyard.
• Report directly to the Contract / Admin Manager.
August ’01 to Febryary 02 : PLANNING ENGINEER
FOSTER WHEELER EASTERN PTE LTD
(Thru Kingsforce Management Consultants)
ExxonMobil Site Integration of Pipelines Project
Jurong Island and Jurong, SINGAPORE
• Responsible for the planning, scheduling, progress monitoring, material issuance / control and
estimating including various co-ordination with Sub-contractors for the SIP project covering six sub-
contract packages for ExxonMobil Plants and Refineries within the Jurong Island and Jurong mainland.
• Responsible for the preparation and control of CTRs based from estimated and actual man-hours of
Foster Wheeler employees and its sub-contractors.
• Report directly to the Project Manager.
September ’00 to August ‘01 : PROJECT CONTROL HEAD
HIAP SENG ENGINEERING LIMITED
SHELL SERAYA-2 PROJECT, SINGAPORE
• Responsible for the planning, scheduling, monitoring and cost control including estimating and various
coordination with the Project Management Team/Client for the Multi-mechanical Works and Equipment
Dress-up contracts for the Shell Seraya-2 Project.
• Report directly to the General Manager, Projects.
June ’00 to September : PLANNING/ COST ENGINEER - COMMISSIONING
SIME SEMBCORP ENGINEERING SDN BHD
OFFSHORE OIL & GAS PROJECTS - MALAYSIA
Currently assigned in the Planning & Proposals Department of the Company with homebase &
fabrication yard located in Pasir Gudang, Johor, Malaysia. My responsibilities includes planning and
preparation of schedules covering engineering, procurement, fabrication, hook-up & commissioning for
the offshore oil & gas platforms using Artemis 7000, Primavera & Workpack/Jobcards (for offshore HUC
CV_Alfred_Coning2014
7 OF 12
works) softwares. Also involves in the estimating, writing various method statements as well as
commissioning execution plans for the proposed projects for bidding.
• Responsible for the planning, scheduling and monitoring of PETRONAS/EPMI – Angsi-A Development
Project (4 modules + bridge) which is currently being undertaken by the Company. My works includes
preparation of job cards for the offshore hook-up & commissioning stage of the project.
• Completed the bidding proposal of the Helang Central Processing Platform (Integrated Platform) for the
NIPPON Exploration (Malaysia) Sdn Bhd.
Sep ’99 to June ‘00 : PLANNING/SCHEDULING ENGINEER
KELLOGG – CHIYODA CORPORATION J.V.
SINGAPORE OLEFINS PROJECT
The scope includes engineering, procurement and construction of the Singapore Olefins project covering
utilities, cogeneration, gasification, offsites (tankage & jetty) and process packages.
• Responsible for the planning, scheduling using P3 Ver. 3.0 and monitoring of OSBL – Utilities,
Cogeneration and Gasification areas including preparation of various planning works & monitoring
reports.
Feb ’99 to Sep ‘99 : PLANNING/COST CONTROL ENGINEER
SUMATEC CORPORATION SDN BHD
MTBE – PROPANE DEHYDROGENATION PROJECT
MECHANICAL & PIPING INSTALLATION, Malaysia
The project covers fabrication and erection of 55,000 lm of piping with various sizes, installation of
about 300 units of static & rotating equipment and vessels, pre-commissioning as well as assistance to
commissioning and start-up of the plant. [One of the tallest vessel/column(106m) erected in this
project.
• Responsible for the planning, scheduling using P3 and preparation of planning packages including
various planning & progress monitoring procedures.
• Prepares daily site reports and weekly progress evaluation, quantity take-off and monitoring of the
project. Prepare the weekly and monthly reports. Emphasizes the importance of accurate field reporting
to all site supervisors.
• Prepares various correspondences & technical queries to Client with relevant to planning and contracts.
• Attend meetings and various discussions including technical coordination.
December ’97 to March ’99 : HUC PLANNING/COST ENGINEER (HU & Commissioning)
SIME SEMBAWANG / ESSO PRODUCTION MALAYSIA (EPMI)
LAWIT ‘A’ – OFFSHORE GAS COMPRESSION FACILITIES
The project covers the engineering, procurement, construction, pre-commissioning, load-out/sea-
fastening, offshore hook-up and commissioning including start-up assistance of two gas compression
modules [about 1600MT each] for EPMI.
• While onshore, responsible for the weekly and monthly progress reporting including attending progress
meeting and planning coordination with EPMI.
• While offshore, responsible for developing the Planning Packages for the Offshore Hook-up and
Commissioning as well as preparation of detailed offshore shutdown schedules.
• Responsible for the preparation of work packs/job cards which includes detailed works operation, man-
hours, manpower, materials, equipment, consumables, etc. and implement the system during the
offshore hook-up and commissioning phase in Lawit Offshore Gasfield.
• Conducts the daily tracking of progress and follow-up of materials, equipment/tools and consumables
including coordination with SSE Head office, EPMI personnel and Vendor’s Representatives.
• Responsible for the preparation of comprehensive daily reports as well as weekly and monthly progress
reports.
• Administer various project variation notices and change orders including cost estimates and final pricing
proposals.
• Administer the commissioning and start-up assistance to EPMI including closing out of cost.
• Participate in various meetings and discussions related to onshore pre-commissioning, offshore hook-up
& commissioning (HUC), offshore plant shutdowns & tie-ins.
CV_Alfred_Coning2014
8 OF 12
• Prepare and submit comprehensive Project Close-out Report of the project.
December ’96 to December ‘97 : PLANNER / PROJECT CONTROL ENGINEER
KUALA LUMPUR INTERNATIONAL AIRPORT - SEPANG
MAS ENGINEERING SUPPORT FACILITIES
• Responsible for planning and preparation of Works Programme using Primavera Project Planner
software for the MAS Engineering Support Facilities Project located at Kuala Lumpur International
Airport at Sepang, Malaysia.
• Responsible for the site planning / scheduling as well as progress monitoring.
• Responsible for the preparation of weekly and monthly progress reports for the client.
• Assist in the preparation of cost forecasts and monthly financial reports.
• Prepares internal weekly management report and submit to the Project Director.
• Participate in the weekly progress meeting with the client.
• Prepare various construction method statements and finally the Project Close-out Report.
June ‘ 96 to November ’96 : PROJECT OPERATIONS HEAD
FF CRUZ & COMPANY - Philippines
ENGINEERING AND CONSTRUCTION DEPARTMENT
• Responsible for the formulation, preparation and implementation of planning and scheduling, project
monitoring & cost controls procedures.
• Supervises and handles Cost Estimators, Quantity Surveyors and Planning Engineers for the Operations
Department of the Company.
• Logistical supports including deploying of adequate resources to various projects.
• Handles preparation of bid proposals for both technical and commercial including various construction
method statements.
Oct ‘93 to May ‘96 : PLANNING ENGINEER I
AIRPORT AUTHORITY – GOV’T OF HONG KONG
THE NEW CHEK LAP KOK INTERNATIONAL AIRPORT
• Part of the Team responsible for the initial planning including construction methodology and preparation
of schedule using P3 for the following works for the New Hong Kong Airport at Chek Lap Kok;
- Airfield Works including runways, taxiways, taxilanes, apron pavements, apron and runway
lighting system, high mast lighting system, access roads and other air side structures,
- Aviation Fuel System including Jet A-1 Fuel Tank Farm and its related structures.
- Offshore Aviation Fuel Receipt Facilities at Sha Chau Island.
- Commercial Facilities such as Airport Hotel and Aircraft Base Maintenance,
• Task Force member responsible for the assessment of pre-qualifications and tender documents
submissions of various Designs and Works contract packages.
• Conduct coordination meetings with various design consultants and review / comments to their
submissions including tender drawings and bill of quantities.
• Participate in various planning and coordination meetings with the Design Consultants and Works
Contractors.
• Responsible for the review, comments and approval of Works programme including various planning
documents submitted by various Contractors.
• Responsible for the review, comments and accept the design progress reports submitted by the
Consultants for the various Design Contracts.
• Site planning works including allocation of temporary roads, utilities, works areas for Contractors and
various construction support facilities.
• Responsible for the review, comments and accept the construction progress reports submitted by the
Contractors for the various Works Contracts.
• Prepare weekly and monthly management reports and submit to the Airport Authority’s Planning and
Scheduling Divisional Manager.
Jan ’93 to Oct ’93 : SENIOR PLANNING & PROGRAMMING ENGINEER
KUMAGAI GUMI [HONG KONG] LIMITED
HEAD OFFICE - TENDERING DEPARTMENT
CV_Alfred_Coning2014
9 OF 12
• Responsible for the initial planning and programming, using P3, for tendered projects of various civil
and electro-mechanical projects in Hong Kong and China.
• Preparation of Works Programme and planning packages of the following awarded Contracts under the
Hong Kong Highways Department;
- West Kowloon Expressway and MTR Railway Station Project
- North Lantau Expressway and MTR Railway Station & Tunnel Project
- Ma Wan Bridge and Viaduct Project
• Assist for the preparation of various construction methods.
• Attend meeting with the Client’s Project Management Team.
Jan ’92 to Dec ’92 : PLANNING/COST & COMMISSIONING ENGINEER
MOBIL OIL [HONG KONG] LIMITED
NEW TSING YI FUELS TERMINAL PROJECT
Part of the Venture Team that composed the following groups; engineering, computer phase-in, turnover, start-
up and operations. The TEAM was responsible for the commissioning and start-up of the New Terminal Facility
that includes; fuels storage and handling system, lube blending and packaging facilities and plant utilities.
Venture Team was also responsible for the demolition of the Old Fuel Terminal located in the same island.
• Report directly to the Turnover Manager and functionally responsible for the planning and developing the
VENTURE schedules using ‘Primavera Project Planner.
• Initiate schedule meetings with the Venture Team managers.
• Prepares detailed commissioning and start-up schedule for the HRWS, ATLR, FCS, Lube Blending Filling and
Utilities System.
• Responsible for the progress monitoring and evaluation of the project.
• Task force member for the assessment and verification of project completion and readiness for the initial
operation.
• Site inspections and prepare final checklist required prior to commissioning and start-up. Submit the document to
the Start-Up Manager for final rectification.
• Participate in various meetings and discussions.
1989 to 1991 : OPERATIONS HEAD/SITE REPRESENTATIVE
MARUBENI CORPORATION
GREAT MAN-MADE RIVER PROJECT - LIBYA
Sarir/Tazerbo, Libya, GSPAJ, North Africa
The scope covers the installation and commissioning of 62 submersible wellpumps and motors with a depth from
150m to 400m below ground located at the Libyan Sahara desert for GMMR Libya.
• Responsible for the logistical support of the project.
• Responsible for planning and scheduling using P3, project monitoring & controls as well as basic engineering
works.
• Conducts planning sessions with project superintendents, field supervisors and sub-contractors.
• Participate in meetings and discussions at staff level.
• Administers all site sub-contractors.
1988 to 1989 : PLANNING & SCHEDULING SUPERVISOR
THE RALPH M. PARSONS COMPANY, USA
LEAD & ZINC MINING MODULES ASSEMBLY
The scope covers fabrication/assembly, installation of equipment/vessels, testing & pre-commissioning and load-
out/seafastening of 11 modules for the modular mining project in Alaska, USA.
• Part of the Team that attended project clarification/kick-off at R. M. Parsons & Company, Pasadena, California
U.S.A. Initiates planning and prepares schedules of fabrication, erection and assembly of modules using
Primavera Project Planner.
• Handles and supervises the planning and scheduling team responsible for the progress monitoring and schedule
updating works during the fabrication stage in the Philippines.
• Conducts site planning sessions with the project superintendents and field supervisors.
• Participate in the Weekly Progress meeting.
1986 to 1988 : CIVIL SUPERVISOR / ESTIMATING ENGINEER III
CV_Alfred_Coning2014
10 OF 12
ATLANTIC, GULF & PACIFIC CO. OF MANILA INC. [AG&P]
AG&P Engineering Center
Engineering and Estimating Department
• Part of the Team of selected engineers who developed and modified the AG&P standard construction system for
the computerization of estimating using IBM Based MC2, Interactive Cost Estimating System (ICES).
• Use ICES in estimating various domestic and overseas projects.
• Various engineering works including basic designs, preparation of structural steel shop drawings, etc.
• Involve in the planning & engineering works for the fabrication / pre-commissioning of 120 men Living Quarters,
Utility Deck & Baanpot Central processing platform for Union Oil of Thailand.
• Involve in the planning & engineering works for the fabrication / pre-commissioning of BPD Offshore Complex –
South Bassien, Phase 2 Topsides for Snamprogetti SPA, Italy.
1984 to 1986 : RESIDENT ENGINEER
AGAP ARABIA LIMITED (AGAP)
Arabian American Oil Company (ARAMCO)
BERRI SPHEROIDING FACILITIES PROJECT
The scope covers revamp and upgrading of the existing gas and oil site plant located in Abu Ali Island, Saudi
Arabia.
• Handles and supervises the Operation Center [OPCEN] including logistical supports for the project.
• Review and comments to technical drawing & reports, works schedules, cost and material reports as well as
weekly & monthly progress reports.
• Recommend corrective action to the Project Manager where unfavorable trends and cost overruns were reported
against the budget.
• Responsible for the requisition of construction materials and equipment, consumable and conduct follow-up to
the main Operations Center.
• Coordinate with the Equipment Supervisor for adequate scheduling, maintenance and deployment of construction
equipment.
• Conduct site meetings with project superintendents and supervisors at site level.
• Coordinate with ARAMCO regarding technical and contractual issues.
• Participate in the Weekly and Monthly Progress meeting with the Client.
1983 to 1984 : PLANNING & SCHEDULING ENGINEER
AGAP ARABIA LIMITED (AGAP)
Arabian American Oil Company (ARAMCO)
RAS TANURA REFINERY MODERNIZATION PROJECT
Offplot and Related Onplot Facilities
The scope covers the demolition and relocation of the existing asphalt plant, upgrading and modernization of
piping, mechanical and instrumentation system including various tie-ins to additional refinery train.
• Coordination with the Consultant’s Planner for the development of overall project schedule.
• Prepare weekly and monthly manpower, equipment and quantity tracking reports.
• Responsible in making recovery forecast schedule in cases of delays and recommend corrective analysis to
improve the existing schedule.
• Participate in the Weekly Coordination meeting with the customer.
1982 to 1983 : PLANNING / COST ENGINEER
AGAP ARABIA LIMITED (AGAP)
ABQAIQ G.O.S.P. 2 PLANT MODERNIZATION PROJECT
• Prepare the overall project schedule with the assistance of ARAMCO/BROWN & ROOT Planner.
• Prepare weekly schedules and conduct daily updating.
• Establish cost coding system per work items and charging of field construction costs.
• Prepare weekly and monthly cost reports.
• Monitor actual cost and compare against budget.
1979 to 1982 : SENIOR FIELD ENGINEER / ESTIMATOR
ATLANTIC, GULF & PACIFIC CO. OF MANILA INC. [AG&P].
AG&P Head Office-Construction Group
• Engineering and estimating of various local and overseas tender projects.
• Read and interpret plans, specifications and other tender documents.
CV_Alfred_Coning2014
11 OF 12
• Prepare quantity take-off and establish total man-hours per work items.
• Develop the overall project schedule.
• Prepare manpower and equipment schedules.
• Prepare material, labor, equipment, consumable and overhead costs.
• Prepare the pricing summary and cash-flow analysis.
• Assist in the preparation of technical and commercial proposal.
• Assigned to various awarded projects of the Company as Senior Field Engineer.
1978 to 1979 : JR CIVIL FIELD ENGINEER
MINISTRY OF PUBLIC WORKS
Flood Control and Drainage Division
• Plan and design temporary facilities and initiate revisions to engineering drawings.
• Conduct survey works and dimensional controls in accordance with the drawing.
• Assist the Supervisor in the daily work planning and scheduling.
• Supervise and check the works if conforms to drawings and specifications of the project.
• Prepare trouble reports for any engineering problems that affect the schedule and costs.
• Responsible for the inspections of all works falling within the flood control and drainage category.
• Prepare reports to FCDD Chief regarding work deficiencies found.
• Prepare and submit the daily field operations report (FOR).
1977 to 1978 : ENGINEERING AIDE/ DRAFTSMAN
ATLANTIC, GULF & PACIFIC CO. OF MANILA INC. [AG&P]
Construction Group
As working student prior to graduation:
• Assist site planning of works, determine manpower and equipment requirements and material requisitions for the
high-rise Hotel Project.
• Assist the engineer on the RC works of the project and see to it that it conforms to the construction drawings
and specifications.
• Prepare miscellaneous drafting works.
CONTINUING EDUCATION, SEMINARS AND TRAINING:
1) Pneumatic Instrumentation Course, AG&P - 1981
2) Supervisory Training Seminar, AG&P - 1984
3) IBM Job Analysis System Training, JAS/34, AG&P - 1986
4) Interactive Costs Estimating System Training [ICES], AG&P - 1986/87
5) Put It In writing Seminar, AG&P - 1987
6) Primavera Project Planner (P3) Training Course, AG&P - 1988
7) Introduction to Airport Operations, Airport Authority Hong Kong - Oct. ’95
8) Core Supervisory Training Programme, Airport Authority Hong Kong - Nov. ‘95
9) Offshore Safety Orientation & Sea Survival Course By OTS, Pasir Gudang, Malaysia – March 1998
10) Offshore Job Safety Analysis Course By ESSO Production (Malaysia) Inc. – April 1998
11) AMS Real Time Projects & Jobcards System Training Course – SSE, Malaysia – May 1998
12) Open Plan Professional Training Course – Seraya Shell Singapore – October 2000.
13) Offshore Safety & Sea Survival Training conducted by CONSIST- September 2005
14) Helicopter Underwater Escape Training conducted by CONSIST – September 2005
15) 2009 Leadership in Safety Workshop, MPN – NJVDP – November 2009
16) Mockingbird Online Seminar, EMDC – December 2009
17) Water Survival & Swing Rope Training incl. HUET – M&O Blisston – January 2010
PROFESSIONAL & PERSONAL REFERENCES:
Mr. Steven Day, Construction Manager Exxon Mobil Development Company
E-mail: steven.m.day@exxonmobil .com Tel. No. (+62) 8111 337 542
Mr. Terence Dowd, Planning Manager Bechtel International (HK) Limited
E-mail: terence.dowd@bechtelinternational .com Tel. No. (852) 2829 6725 (Hong Kong)
Mr. Leon Pace, Project Manager Exxon Mobil Development Company
CV_Alfred_Coning2014
12 OF 12
E-mail: león.w.pace@exxonmobil .com Tel 1-832- 867 6098 (USA)
Mr. Steve Hindmarsh, Construction Lead Exxon Mobil Development Company
E-mail: steve.e.hindmarsh@exxonmobil .com Tel +234 805 551 3788 (Nigeria)
Mrs. Edna Encarnacion, General Manager Azdaman Sdn Berhad Consultants
E-mail: azdaman@global .com Tel No. +60122680918 (Malaysia)
ACKNOWLEDGEMENT:
I hereby certify that the foregoing information are true and correct to the best of my knowledge.
_________________________________
Alfredo B. Coning
Senior Planning/Project Control Engineer

More Related Content

What's hot (20)

DCG_CV
DCG_CVDCG_CV
DCG_CV
 
Nishanth N
Nishanth NNishanth N
Nishanth N
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)
 
Resume Ajmel August 2016
Resume Ajmel August 2016Resume Ajmel August 2016
Resume Ajmel August 2016
 
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
 
Esteban Raganit_2016
Esteban Raganit_2016Esteban Raganit_2016
Esteban Raganit_2016
 
Update - CV[2 e] - --AIS
Update - CV[2 e] - --AISUpdate - CV[2 e] - --AIS
Update - CV[2 e] - --AIS
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
Leslie Lopena_CV
Leslie Lopena_CVLeslie Lopena_CV
Leslie Lopena_CV
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
Dimick, Glen Resume_Summary_July 2016
Dimick, Glen Resume_Summary_July 2016Dimick, Glen Resume_Summary_July 2016
Dimick, Glen Resume_Summary_July 2016
 
CVPLAING
CVPLAINGCVPLAING
CVPLAING
 
Survey Engr
Survey EngrSurvey Engr
Survey Engr
 
CV at 2015 Aug
CV at 2015 AugCV at 2015 Aug
CV at 2015 Aug
 
NIZAM ENTERPRISE profile (1)
NIZAM ENTERPRISE profile (1)NIZAM ENTERPRISE profile (1)
NIZAM ENTERPRISE profile (1)
 
Portfolio
PortfolioPortfolio
Portfolio
 

Similar to CV_Alfred_Coning2014

RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527Rob Smith
 
ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017Alvin Chen
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
CV Carl Irlam 30-09-2015
CV Carl Irlam 30-09-2015 CV Carl Irlam 30-09-2015
CV Carl Irlam 30-09-2015 irlam carl
 
Jamie Morien CV FEB 2016
Jamie Morien CV FEB 2016Jamie Morien CV FEB 2016
Jamie Morien CV FEB 2016Jamie Morien
 
CV_2015_David_Darr
CV_2015_David_DarrCV_2015_David_Darr
CV_2015_David_DarrDavid Darr
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)John Adams
 

Similar to CV_Alfred_Coning2014 (20)

RESUME-RDP
RESUME-RDPRESUME-RDP
RESUME-RDP
 
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527
 
SBCV2016
SBCV2016SBCV2016
SBCV2016
 
CV
CVCV
CV
 
CeeVee-10th January 2017_update
CeeVee-10th January 2017_updateCeeVee-10th January 2017_update
CeeVee-10th January 2017_update
 
ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
Akin Akinsipe CV.doc
Akin Akinsipe CV.docAkin Akinsipe CV.doc
Akin Akinsipe CV.doc
 
Ramanuja CV-
Ramanuja CV-Ramanuja CV-
Ramanuja CV-
 
CV Bonnell - March 2015
CV Bonnell - March 2015CV Bonnell - March 2015
CV Bonnell - March 2015
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
CeeVee-13th January 2017_update
CeeVee-13th January 2017_updateCeeVee-13th January 2017_update
CeeVee-13th January 2017_update
 
Ravi's CV
Ravi's CVRavi's CV
Ravi's CV
 
CV Carl Irlam 30-09-2015
CV Carl Irlam 30-09-2015 CV Carl Irlam 30-09-2015
CV Carl Irlam 30-09-2015
 
Jamie Morien CV FEB 2016
Jamie Morien CV FEB 2016Jamie Morien CV FEB 2016
Jamie Morien CV FEB 2016
 
CV_2015_David_Darr
CV_2015_David_DarrCV_2015_David_Darr
CV_2015_David_Darr
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
Sats Ganesh_
Sats Ganesh_Sats Ganesh_
Sats Ganesh_
 
RESUME
RESUMERESUME
RESUME
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 

CV_Alfred_Coning2014

  • 1. CV_Alfred_Coning2014 1 OF 12 SENIOR PLANNING ENGR./ PROJECT CONTROL SPECIALIST ALFREDO B. CONING Home Address: 9 Junifer Street (B9, L10) Jubilation Home Village - West Bgy Zapote, Binan City, Laguna Philippines 4024 H/P No.: +63 916 777 8397 e-mail address: alfred_coning@yahoo.com PERSONAL BACKGROUND NATIONALITY : FILIPINO DATE OF BIRTH : 01 APRIL 1956 MARITAL STATUS : MARRIED PASSPORT NUMBER : XX0704274 Valid until Mar 2016 EDUCATIONAL BACKGROUND BACHELOR OF SCIENCE IN CIVIL ENGINEERING [B.S.C.E.], 1978 - (Phil. PRC LIC. # 0019323) BACHELOR OF SCIENCE IN SANITARY ENGINEERING (B.S.S.E.), 1979 NATIONAL UNIVERSITY, MANILA, PHILIPPINES CAREER SUMMARY Working experience of more than twenty five years (25) years in the engineering, construction and project management. The work includes field supervision, planning, scheduling & cost control, estimating, project management, operations, and site co-ordination of projects with scope on heavy civil/structural engineering, electro-mechanical works and vessel conversion works for both onshore and offshore phases of work. The scope covers stages from engineering, procurement, construction, testing & pre-commissioning, commissioning and start-up of the Project. • Projects were fabrication of onshore/offshore oil and gas platforms, tanker conversion & refurbishment into floating production storage & offloading vessels (FSO/FPSO), fabrication/heavy lifting of topside modules & turret, pipe laying of various diameter, gas and oil site plant facilities, water injection plants, refinery modernization projects, airports and various civil engineering structures. • Supervised technical teams from tendering/estimating, planning, project monitoring, costing, construction, project controls and management, project progress evaluation, project commercial close outs and claims. • Has worked (Middle East, North Africa, Hong Kong, US, Singapore, Malaysia & Korea and Nigeria) with most of the biggest and refutable private and government organizations around the world. • Career has progressed from cadet engineer, estimator, planner, project supervisor, operation center head, resident engineer/project superintendent, site representative, senior planning engineer, project controls head and has handled project controls/estimating/cost and project planning department of projects. • Has dealt with various contract types such as EPC Lump sum Turnkey, Lump sum and Unit Rates, Reimbursable for various civil, gas, oil & water related projects.
  • 2. CV_Alfred_Coning2014 2 OF 12 SUMMARY OF PROFESSIONAL WORK EXPERIENCE: INCLUSIVE DATES COMPANY/CLIENT/PROJECT/LOCATION POSITION HELD 5Mar12 to Present SHELL DEVELOPMENT COMPANY of NIGERIA (Seconded by NES Global) Forcados Yokri Integration Project - FYIP Shell MOA, Warri, Delta Estates Nigeria Snr. Planning Engr. 05Jul05 to Oct11 EXXON MOBIL DEVELOPMENT COMPANY (Seconded by Air – Energi International) Critical Crude Pipeline & Rehab Project - CCPRP AOR Offshore Compression Facilities Offshore Nigeria East Area Projects - EPC1A AOR Offshore Compression Facilities Offshore Nigeria East Area Projects - EPC4A AOR Revamp & Retrofit of Existing Wellhead Facilities Fabrication and Offshore HUC Port Harcourt & Offshore Nigeria Project Control Specialist Offshore HUC Snr Planning Engineer Planning/Schedule/Cost Specialist Jul/03 to 04Jul05 MALAYSIA SHIPYARD & ENGINEERING (Seconded by PMC Management & Consultants) Shipbuilding & Conversion Department 1)ExxonMobil/Nigerian National Petroleum Co. YOHO Development Project FSO SBM - Vessel Conversion of N’kossa into FSO 2)Malaysia International Shipping Corp. (MISC) FSO South Angsi ‘A’ Project Refurbishment & Conversion of MT Bertina into FSO 3)2200/3000 Derrick Pipelay Barge Project Tender Crest Petroleum Bhd 4)Single Buoy Mooring/ M.I.S.C. JV FPSO Kikeh Project for Murphy Oil Refurbishment & Conversion of MT Atlas into FPSO MSE Shipyard, Pasir Gudang, Johor, Malaysia Senior Planning Engineer Feb/02 to Mar/03 MODEC International LLC (Seconded by Brunel International SEA Ltd) Chad Offshore Modec Integrated Team ESSO Chad Offshore Oil & Gas Facilities FSO Project 1)Vessel Conversion of MT Companion into FSO Kome Kribi 2)Vessel Conversion of MT Sahara into FPSO Enterprise Jurong Shipyard Pte Ltd, Tuas, Singapore Project Control Engineer/Consultant Aug/01 to Feb/02 FOSTER WHEELER Eastern Pte Ltd (Seconded by Kingsforce Management / Consultants) ExxonMobil Site Integration Pipelines Project Civil, Structural, Piping & Multi-Mechanical Works Jurong Island & Jurong, Singapore Senior Planning Engineer Sep/00 to Aug/01 HIAP SENG Engineering Limited Shell Seraya-2 Project Equipment Dress-up & Multi-Mechanical Works Jurong Island, Singapore Project Control Head
  • 3. CV_Alfred_Coning2014 3 OF 12 June/00 to Sep/00 SIME SembCorp Engineering Sdn Bhd Planning / Proposals Department Offshore Oil & Gas Platform Projects Pasir Gudang, Johor, West Malaysia Planning Engineer - Commissioning Sept/99 to June/00 KELLOGG Overseas Corp. – CHIYODA Corp. J.V. Singapore Olefins Project (SOP) Jurong Island, Singapore Planning / Scheduling Engr. Mar/99 to Aug/99 SUMATEC Corporation Sdn. Bhd. (Seconded by AZDAMAN Sdn Bhd) MTBE- Propane Dehydrogenation Project Gebeng, Kuantan, Malaysia Planning & Cost Control Engr. Dec/97 to Feb/99 SIME SembCorp Engineering Sdn. Bhd. (Seconded by AZDAMAN Sdn. Bhd.) ESSO Production Malaysia Inc. – (EPMI) Lawit ‘A’ Offshore Gas Compression Modules Offshore Terenganu, West Malaysia Offshore Planning Engr. Dec/96 to Dec/97 NANAM FATT Corporation Sdn. Bhd. (Seconde by AZDAMAN Sdn Bhd.) Kuala Lumpur International Airport MAS – Engineering Support Facilities Sepang, Malaysia Planning Engr. / Cost Estimator May/96 – Dec/96 F F CRUZ & Company Engineering & Construction Division Philippines Project Operations Head (OPCEN) Oct/93 to May/96 AIRPORT AUTHORITY-Hong Kong Government of Hong Kong, Projects Division New Chek Lap Kok International Airport Wanchai, Hong Kong Planning Engineer I Jan/93 to Sep/93 KUMAGAI Gumi Hong Kong Limited HQ – Construction & Tendering Department Tsimshatsui, Kowloon, Hong Kong Senior Planning & Programming Engr. Jan/92 to Dec/92 Atlantic, Gulf & Pacific Company, Inc. (AG&P) Seconded to: MOBIL Oil Hong Kong Limited New Tsing Yi Fuels Terminal Project Tsing Yi Island, Hong Kong Planning (Commissioning) Engr. 1989 to 1991 Atlantic, Gulf & Pacific Company, Inc. (AG&P) Seconded to: Marubeni Corporation UK PLC Great Man Made River Project Sarir/Tazerbo, Libya, North Africa Operations Head / Site Representative 1988 to 1989 Atlantic, Gulf & Pacific Company, Inc. (AG&P) Steel & Marine Structures Group (SMSG) Cominco Alaska (USA) Red Dog Project BMFY, Bauan, Batangas, Philippines Planning/ Scheduling Supervisor
  • 4. CV_Alfred_Coning2014 4 OF 12 1986 to 1988 Atlantic, Gulf & Pacific Company, Inc. (AG&P) International Group Engineering & Estimating Department Makati City, Metro Manila, Philippines Civil Supervisor/ Civil Engineer III 1982 to 1986 AGAP Arabia Limited & AG&P Co. of Manila, Inc. ARAMCO-Berri Gas Spheroiding Facilities Project ARAMCO-Ras Tanura Refinery Modernization Proj. ARAMCO-Gas & Oil Site Plant Modification Project H. Q. Engineering & Estimating Department Kingdom of Saudi Arabia Positions held: Resident Engineer Civil Supervisor Field Engineer Scheduling / Cost Engr. Senior Estimator 1979 to 1982 Atlantic, Gulf & Pacific Company, Inc. (AG&P) Construction Group Engineering & Estimating Department Makati City, Metro Manila, Philippines Senior Field Engineer / Senior Estimator 1978 to 1979 Ministry of Public Works – Phil. Government Flood Control & Drainage Division Bonifacio Drive, Manila, Philippines Jr. Civil Field Engr. 1977 to 1978 Atlantic, Gulf & Pacific Company, Inc. (AG&P) Construction Group Manila, Philippines C. E. Aide / Draftsman (Apprenticeship) MAJOR DUTIES & RESPONSIBILITIES: 2013 – to Present : Senior Planning Engineer Shell Petroleum Development Co. Of Nigeria (Thru NES Global Talent) Forcados Yokri Integrated Project Warri, Delta Estate, NIGERIA • Responsible for the planning, scheduling, progress monitoring, reporting and planning coordination with the project. • Attend meetings and various discussions including technical coordination. 2005 - 2012 : OFFSHORE HUC Snr Planner/Project Control Specialist Exxon Mobil Development Company East Area Projects – EPC1A / EPC4A / CCPRP Offshore Compression Facilities/Revamp & Retrofit EPC4A – Revamp & Retrofit of 4 Existing Production Platforms & 10 Wellhead Platforms / CCPRP - Critical Crude & Pipeline Rehabilitation Project • During the Fabrication Phase - Responsible for developing the Master Fabrication Schedules and Planning Packages for 14 Platforms. Issue the schedule as a guide to Fabrication Contractor. Check and accept the Contractor’s schedule for implementation. Review, check and comments to Contractor’s progress reports including site visits and progress assessment at the Yard. Custodian of the Master Control Schedule updates and issuance to the EM PMT. • Prepare various EM reports; weekly, monthly and various graphics presentations. • Attending project planning meetings and discussions. • Report directly to the Project Controls Lead. • During the Offshore HUC Phase – Assist in developing the Jobcards and encode any revisions, additional scope and change orders from all disciplines. Produce import files of the final
  • 5. CV_Alfred_Coning2014 5 OF 12 Jobcard to Primavera (P3) on each Platforms by priorities. Develop the Control HUC Schedules and planning & scheduling parameters based from the Jobcards and progress monitoring methods. Initiate on-screen review/presentation of the HUC Schedule and Jobcards with HUC Coordinator, Superintendents and Contractor’s HUC Lead prior to issuance for implementation and for final endorsement by the Project Manager. • Conduct Jobcards orientation/training to Contractor’s Planner including re-alignment review of Contractor’s schedule to the Master Control HUC schedule. • Attending the Daily Toolbox meeting including participation to various safety meetings, trainings and participate in JSA review. • Responsible for the preparation of the Daily and Weekly Progress Reports prior to submission to the submission to the HUC Coordinator. This includes various planning presentations and Shutdown schedule preparation. • Review, analyze and comments to Contractor’s daily update reports of the Jobcards and the HUC schedule. Conduct man-hour review including the daily timesheets reports and insure the correct input to the Jobcards. • Initiate daily planning and progress meeting with EM HUC Lead, Discipline Superintendents and Supervisors. Issue the updated Control Schedule with progress analyzes and recommendations to delays and schedule improvement. • Participate in the Interface and shutdown meeting/discussion with the MPN Operations Team and incorporate the Jobcards to be carried out by the MPN Maintenance Contractor during shutdown. • Offshore rotation of 4 weeks with a back to back of another Planner for 4 weeks. • Attending the EM daily coordination teleconference call. • Responsible for the weekly update of EM Overall Master Control schedule for both Fabrication and HUC activities and issue to the Project Control Head. • Report directly to the HUC Coordination. EPC1A – GN Compression Platform (18,100 MT) • Conduct site visit to Samsung in South Korea during the Fabrication Stage of the Platform. Attending various planning and scheduling meeting while at the Yard. • Same as in the above during the Hook-up and commissioning phase of the project. 2003 - 2005 : SENIOR PLANNING / OPERATIONS ENGINEER Malaysia Marine & Heavy Engineering Sdn Bhd (Thru PMC Management & Consultants) 1) SBM – FSO Yoho Refurbishment & Conversion Project For Mobil Producing Nigeria Unlimited 2) MISC FPSO South Angsi’A’ Project MSE Shipyard, Pasir Gudang, Johor, Malaysia 3) 2200/3000 Derrick Pipelay Barge Project Tender MSE Shipyard, Pasir Gudang, Johor, Malaysia 4) Various Tender Planning for Proposed Projects • Responsible for the preparation of Planning Packages & procedures using P3ec, implementation and project control for the above project. The scope includes man-hour estimation, progress monitoring, schedule revisions, site planning and co-ordination with the Clients on project controls and planning issues. Preparation of final Close-out report. • Responsible for the preparation Project Execution Plan including construction strategy, project organization, engineering and procurement schemes as well as preparation of project presentation packages being presented to the Client by the Senior Manager- Operations.
  • 6. CV_Alfred_Coning2014 6 OF 12 • Responsible for the planning of Yard allocation layout for the block and module movement including timing for the usage of MSE Dry-dock, Fabrication shops and Workshops. • Assistance in the initial set-up of the project from engineering, procurement and construction phases as well as coordination with the Client and Consultants. • Reports directly to the Senior Manager, Operation . 2002 – 2003 : PROJECT CONTROL ENGINEER / CONSULTANT MODEC International LLC (Thru Brunel (SEA) International Consultants) ESSO Chad Offshore Development Project 1) Conversion of MT Companion into FSO 2) Conversion of MT Sahara into FPSO Jurong Shipyard Pte Ltd, SINGAPORE • Responsible for preparing project estimates / budgets, assist preparation & issuance of various site instructions, estimating/quantity surveys, review/evaluate & agree and approve quoted proposals of the main Contractor, Jurong Shipyard Private Limited, as well as negotiating final price, issuance of Change Orders, various Cost Reports for the ESSO Offshore Conversion Project for the COMIT Chad Offshore Development Project. • Responsible for the preparation and control of CTRs based from estimated and actual man-hours. • Responsible for the preparation and implementation project schedules including controls, progress monitoring, management reporting and meetings with the Shipyard. • Report directly to the Contract / Admin Manager. August ’01 to Febryary 02 : PLANNING ENGINEER FOSTER WHEELER EASTERN PTE LTD (Thru Kingsforce Management Consultants) ExxonMobil Site Integration of Pipelines Project Jurong Island and Jurong, SINGAPORE • Responsible for the planning, scheduling, progress monitoring, material issuance / control and estimating including various co-ordination with Sub-contractors for the SIP project covering six sub- contract packages for ExxonMobil Plants and Refineries within the Jurong Island and Jurong mainland. • Responsible for the preparation and control of CTRs based from estimated and actual man-hours of Foster Wheeler employees and its sub-contractors. • Report directly to the Project Manager. September ’00 to August ‘01 : PROJECT CONTROL HEAD HIAP SENG ENGINEERING LIMITED SHELL SERAYA-2 PROJECT, SINGAPORE • Responsible for the planning, scheduling, monitoring and cost control including estimating and various coordination with the Project Management Team/Client for the Multi-mechanical Works and Equipment Dress-up contracts for the Shell Seraya-2 Project. • Report directly to the General Manager, Projects. June ’00 to September : PLANNING/ COST ENGINEER - COMMISSIONING SIME SEMBCORP ENGINEERING SDN BHD OFFSHORE OIL & GAS PROJECTS - MALAYSIA Currently assigned in the Planning & Proposals Department of the Company with homebase & fabrication yard located in Pasir Gudang, Johor, Malaysia. My responsibilities includes planning and preparation of schedules covering engineering, procurement, fabrication, hook-up & commissioning for the offshore oil & gas platforms using Artemis 7000, Primavera & Workpack/Jobcards (for offshore HUC
  • 7. CV_Alfred_Coning2014 7 OF 12 works) softwares. Also involves in the estimating, writing various method statements as well as commissioning execution plans for the proposed projects for bidding. • Responsible for the planning, scheduling and monitoring of PETRONAS/EPMI – Angsi-A Development Project (4 modules + bridge) which is currently being undertaken by the Company. My works includes preparation of job cards for the offshore hook-up & commissioning stage of the project. • Completed the bidding proposal of the Helang Central Processing Platform (Integrated Platform) for the NIPPON Exploration (Malaysia) Sdn Bhd. Sep ’99 to June ‘00 : PLANNING/SCHEDULING ENGINEER KELLOGG – CHIYODA CORPORATION J.V. SINGAPORE OLEFINS PROJECT The scope includes engineering, procurement and construction of the Singapore Olefins project covering utilities, cogeneration, gasification, offsites (tankage & jetty) and process packages. • Responsible for the planning, scheduling using P3 Ver. 3.0 and monitoring of OSBL – Utilities, Cogeneration and Gasification areas including preparation of various planning works & monitoring reports. Feb ’99 to Sep ‘99 : PLANNING/COST CONTROL ENGINEER SUMATEC CORPORATION SDN BHD MTBE – PROPANE DEHYDROGENATION PROJECT MECHANICAL & PIPING INSTALLATION, Malaysia The project covers fabrication and erection of 55,000 lm of piping with various sizes, installation of about 300 units of static & rotating equipment and vessels, pre-commissioning as well as assistance to commissioning and start-up of the plant. [One of the tallest vessel/column(106m) erected in this project. • Responsible for the planning, scheduling using P3 and preparation of planning packages including various planning & progress monitoring procedures. • Prepares daily site reports and weekly progress evaluation, quantity take-off and monitoring of the project. Prepare the weekly and monthly reports. Emphasizes the importance of accurate field reporting to all site supervisors. • Prepares various correspondences & technical queries to Client with relevant to planning and contracts. • Attend meetings and various discussions including technical coordination. December ’97 to March ’99 : HUC PLANNING/COST ENGINEER (HU & Commissioning) SIME SEMBAWANG / ESSO PRODUCTION MALAYSIA (EPMI) LAWIT ‘A’ – OFFSHORE GAS COMPRESSION FACILITIES The project covers the engineering, procurement, construction, pre-commissioning, load-out/sea- fastening, offshore hook-up and commissioning including start-up assistance of two gas compression modules [about 1600MT each] for EPMI. • While onshore, responsible for the weekly and monthly progress reporting including attending progress meeting and planning coordination with EPMI. • While offshore, responsible for developing the Planning Packages for the Offshore Hook-up and Commissioning as well as preparation of detailed offshore shutdown schedules. • Responsible for the preparation of work packs/job cards which includes detailed works operation, man- hours, manpower, materials, equipment, consumables, etc. and implement the system during the offshore hook-up and commissioning phase in Lawit Offshore Gasfield. • Conducts the daily tracking of progress and follow-up of materials, equipment/tools and consumables including coordination with SSE Head office, EPMI personnel and Vendor’s Representatives. • Responsible for the preparation of comprehensive daily reports as well as weekly and monthly progress reports. • Administer various project variation notices and change orders including cost estimates and final pricing proposals. • Administer the commissioning and start-up assistance to EPMI including closing out of cost. • Participate in various meetings and discussions related to onshore pre-commissioning, offshore hook-up & commissioning (HUC), offshore plant shutdowns & tie-ins.
  • 8. CV_Alfred_Coning2014 8 OF 12 • Prepare and submit comprehensive Project Close-out Report of the project. December ’96 to December ‘97 : PLANNER / PROJECT CONTROL ENGINEER KUALA LUMPUR INTERNATIONAL AIRPORT - SEPANG MAS ENGINEERING SUPPORT FACILITIES • Responsible for planning and preparation of Works Programme using Primavera Project Planner software for the MAS Engineering Support Facilities Project located at Kuala Lumpur International Airport at Sepang, Malaysia. • Responsible for the site planning / scheduling as well as progress monitoring. • Responsible for the preparation of weekly and monthly progress reports for the client. • Assist in the preparation of cost forecasts and monthly financial reports. • Prepares internal weekly management report and submit to the Project Director. • Participate in the weekly progress meeting with the client. • Prepare various construction method statements and finally the Project Close-out Report. June ‘ 96 to November ’96 : PROJECT OPERATIONS HEAD FF CRUZ & COMPANY - Philippines ENGINEERING AND CONSTRUCTION DEPARTMENT • Responsible for the formulation, preparation and implementation of planning and scheduling, project monitoring & cost controls procedures. • Supervises and handles Cost Estimators, Quantity Surveyors and Planning Engineers for the Operations Department of the Company. • Logistical supports including deploying of adequate resources to various projects. • Handles preparation of bid proposals for both technical and commercial including various construction method statements. Oct ‘93 to May ‘96 : PLANNING ENGINEER I AIRPORT AUTHORITY – GOV’T OF HONG KONG THE NEW CHEK LAP KOK INTERNATIONAL AIRPORT • Part of the Team responsible for the initial planning including construction methodology and preparation of schedule using P3 for the following works for the New Hong Kong Airport at Chek Lap Kok; - Airfield Works including runways, taxiways, taxilanes, apron pavements, apron and runway lighting system, high mast lighting system, access roads and other air side structures, - Aviation Fuel System including Jet A-1 Fuel Tank Farm and its related structures. - Offshore Aviation Fuel Receipt Facilities at Sha Chau Island. - Commercial Facilities such as Airport Hotel and Aircraft Base Maintenance, • Task Force member responsible for the assessment of pre-qualifications and tender documents submissions of various Designs and Works contract packages. • Conduct coordination meetings with various design consultants and review / comments to their submissions including tender drawings and bill of quantities. • Participate in various planning and coordination meetings with the Design Consultants and Works Contractors. • Responsible for the review, comments and approval of Works programme including various planning documents submitted by various Contractors. • Responsible for the review, comments and accept the design progress reports submitted by the Consultants for the various Design Contracts. • Site planning works including allocation of temporary roads, utilities, works areas for Contractors and various construction support facilities. • Responsible for the review, comments and accept the construction progress reports submitted by the Contractors for the various Works Contracts. • Prepare weekly and monthly management reports and submit to the Airport Authority’s Planning and Scheduling Divisional Manager. Jan ’93 to Oct ’93 : SENIOR PLANNING & PROGRAMMING ENGINEER KUMAGAI GUMI [HONG KONG] LIMITED HEAD OFFICE - TENDERING DEPARTMENT
  • 9. CV_Alfred_Coning2014 9 OF 12 • Responsible for the initial planning and programming, using P3, for tendered projects of various civil and electro-mechanical projects in Hong Kong and China. • Preparation of Works Programme and planning packages of the following awarded Contracts under the Hong Kong Highways Department; - West Kowloon Expressway and MTR Railway Station Project - North Lantau Expressway and MTR Railway Station & Tunnel Project - Ma Wan Bridge and Viaduct Project • Assist for the preparation of various construction methods. • Attend meeting with the Client’s Project Management Team. Jan ’92 to Dec ’92 : PLANNING/COST & COMMISSIONING ENGINEER MOBIL OIL [HONG KONG] LIMITED NEW TSING YI FUELS TERMINAL PROJECT Part of the Venture Team that composed the following groups; engineering, computer phase-in, turnover, start- up and operations. The TEAM was responsible for the commissioning and start-up of the New Terminal Facility that includes; fuels storage and handling system, lube blending and packaging facilities and plant utilities. Venture Team was also responsible for the demolition of the Old Fuel Terminal located in the same island. • Report directly to the Turnover Manager and functionally responsible for the planning and developing the VENTURE schedules using ‘Primavera Project Planner. • Initiate schedule meetings with the Venture Team managers. • Prepares detailed commissioning and start-up schedule for the HRWS, ATLR, FCS, Lube Blending Filling and Utilities System. • Responsible for the progress monitoring and evaluation of the project. • Task force member for the assessment and verification of project completion and readiness for the initial operation. • Site inspections and prepare final checklist required prior to commissioning and start-up. Submit the document to the Start-Up Manager for final rectification. • Participate in various meetings and discussions. 1989 to 1991 : OPERATIONS HEAD/SITE REPRESENTATIVE MARUBENI CORPORATION GREAT MAN-MADE RIVER PROJECT - LIBYA Sarir/Tazerbo, Libya, GSPAJ, North Africa The scope covers the installation and commissioning of 62 submersible wellpumps and motors with a depth from 150m to 400m below ground located at the Libyan Sahara desert for GMMR Libya. • Responsible for the logistical support of the project. • Responsible for planning and scheduling using P3, project monitoring & controls as well as basic engineering works. • Conducts planning sessions with project superintendents, field supervisors and sub-contractors. • Participate in meetings and discussions at staff level. • Administers all site sub-contractors. 1988 to 1989 : PLANNING & SCHEDULING SUPERVISOR THE RALPH M. PARSONS COMPANY, USA LEAD & ZINC MINING MODULES ASSEMBLY The scope covers fabrication/assembly, installation of equipment/vessels, testing & pre-commissioning and load- out/seafastening of 11 modules for the modular mining project in Alaska, USA. • Part of the Team that attended project clarification/kick-off at R. M. Parsons & Company, Pasadena, California U.S.A. Initiates planning and prepares schedules of fabrication, erection and assembly of modules using Primavera Project Planner. • Handles and supervises the planning and scheduling team responsible for the progress monitoring and schedule updating works during the fabrication stage in the Philippines. • Conducts site planning sessions with the project superintendents and field supervisors. • Participate in the Weekly Progress meeting. 1986 to 1988 : CIVIL SUPERVISOR / ESTIMATING ENGINEER III
  • 10. CV_Alfred_Coning2014 10 OF 12 ATLANTIC, GULF & PACIFIC CO. OF MANILA INC. [AG&P] AG&P Engineering Center Engineering and Estimating Department • Part of the Team of selected engineers who developed and modified the AG&P standard construction system for the computerization of estimating using IBM Based MC2, Interactive Cost Estimating System (ICES). • Use ICES in estimating various domestic and overseas projects. • Various engineering works including basic designs, preparation of structural steel shop drawings, etc. • Involve in the planning & engineering works for the fabrication / pre-commissioning of 120 men Living Quarters, Utility Deck & Baanpot Central processing platform for Union Oil of Thailand. • Involve in the planning & engineering works for the fabrication / pre-commissioning of BPD Offshore Complex – South Bassien, Phase 2 Topsides for Snamprogetti SPA, Italy. 1984 to 1986 : RESIDENT ENGINEER AGAP ARABIA LIMITED (AGAP) Arabian American Oil Company (ARAMCO) BERRI SPHEROIDING FACILITIES PROJECT The scope covers revamp and upgrading of the existing gas and oil site plant located in Abu Ali Island, Saudi Arabia. • Handles and supervises the Operation Center [OPCEN] including logistical supports for the project. • Review and comments to technical drawing & reports, works schedules, cost and material reports as well as weekly & monthly progress reports. • Recommend corrective action to the Project Manager where unfavorable trends and cost overruns were reported against the budget. • Responsible for the requisition of construction materials and equipment, consumable and conduct follow-up to the main Operations Center. • Coordinate with the Equipment Supervisor for adequate scheduling, maintenance and deployment of construction equipment. • Conduct site meetings with project superintendents and supervisors at site level. • Coordinate with ARAMCO regarding technical and contractual issues. • Participate in the Weekly and Monthly Progress meeting with the Client. 1983 to 1984 : PLANNING & SCHEDULING ENGINEER AGAP ARABIA LIMITED (AGAP) Arabian American Oil Company (ARAMCO) RAS TANURA REFINERY MODERNIZATION PROJECT Offplot and Related Onplot Facilities The scope covers the demolition and relocation of the existing asphalt plant, upgrading and modernization of piping, mechanical and instrumentation system including various tie-ins to additional refinery train. • Coordination with the Consultant’s Planner for the development of overall project schedule. • Prepare weekly and monthly manpower, equipment and quantity tracking reports. • Responsible in making recovery forecast schedule in cases of delays and recommend corrective analysis to improve the existing schedule. • Participate in the Weekly Coordination meeting with the customer. 1982 to 1983 : PLANNING / COST ENGINEER AGAP ARABIA LIMITED (AGAP) ABQAIQ G.O.S.P. 2 PLANT MODERNIZATION PROJECT • Prepare the overall project schedule with the assistance of ARAMCO/BROWN & ROOT Planner. • Prepare weekly schedules and conduct daily updating. • Establish cost coding system per work items and charging of field construction costs. • Prepare weekly and monthly cost reports. • Monitor actual cost and compare against budget. 1979 to 1982 : SENIOR FIELD ENGINEER / ESTIMATOR ATLANTIC, GULF & PACIFIC CO. OF MANILA INC. [AG&P]. AG&P Head Office-Construction Group • Engineering and estimating of various local and overseas tender projects. • Read and interpret plans, specifications and other tender documents.
  • 11. CV_Alfred_Coning2014 11 OF 12 • Prepare quantity take-off and establish total man-hours per work items. • Develop the overall project schedule. • Prepare manpower and equipment schedules. • Prepare material, labor, equipment, consumable and overhead costs. • Prepare the pricing summary and cash-flow analysis. • Assist in the preparation of technical and commercial proposal. • Assigned to various awarded projects of the Company as Senior Field Engineer. 1978 to 1979 : JR CIVIL FIELD ENGINEER MINISTRY OF PUBLIC WORKS Flood Control and Drainage Division • Plan and design temporary facilities and initiate revisions to engineering drawings. • Conduct survey works and dimensional controls in accordance with the drawing. • Assist the Supervisor in the daily work planning and scheduling. • Supervise and check the works if conforms to drawings and specifications of the project. • Prepare trouble reports for any engineering problems that affect the schedule and costs. • Responsible for the inspections of all works falling within the flood control and drainage category. • Prepare reports to FCDD Chief regarding work deficiencies found. • Prepare and submit the daily field operations report (FOR). 1977 to 1978 : ENGINEERING AIDE/ DRAFTSMAN ATLANTIC, GULF & PACIFIC CO. OF MANILA INC. [AG&P] Construction Group As working student prior to graduation: • Assist site planning of works, determine manpower and equipment requirements and material requisitions for the high-rise Hotel Project. • Assist the engineer on the RC works of the project and see to it that it conforms to the construction drawings and specifications. • Prepare miscellaneous drafting works. CONTINUING EDUCATION, SEMINARS AND TRAINING: 1) Pneumatic Instrumentation Course, AG&P - 1981 2) Supervisory Training Seminar, AG&P - 1984 3) IBM Job Analysis System Training, JAS/34, AG&P - 1986 4) Interactive Costs Estimating System Training [ICES], AG&P - 1986/87 5) Put It In writing Seminar, AG&P - 1987 6) Primavera Project Planner (P3) Training Course, AG&P - 1988 7) Introduction to Airport Operations, Airport Authority Hong Kong - Oct. ’95 8) Core Supervisory Training Programme, Airport Authority Hong Kong - Nov. ‘95 9) Offshore Safety Orientation & Sea Survival Course By OTS, Pasir Gudang, Malaysia – March 1998 10) Offshore Job Safety Analysis Course By ESSO Production (Malaysia) Inc. – April 1998 11) AMS Real Time Projects & Jobcards System Training Course – SSE, Malaysia – May 1998 12) Open Plan Professional Training Course – Seraya Shell Singapore – October 2000. 13) Offshore Safety & Sea Survival Training conducted by CONSIST- September 2005 14) Helicopter Underwater Escape Training conducted by CONSIST – September 2005 15) 2009 Leadership in Safety Workshop, MPN – NJVDP – November 2009 16) Mockingbird Online Seminar, EMDC – December 2009 17) Water Survival & Swing Rope Training incl. HUET – M&O Blisston – January 2010 PROFESSIONAL & PERSONAL REFERENCES: Mr. Steven Day, Construction Manager Exxon Mobil Development Company E-mail: steven.m.day@exxonmobil .com Tel. No. (+62) 8111 337 542 Mr. Terence Dowd, Planning Manager Bechtel International (HK) Limited E-mail: terence.dowd@bechtelinternational .com Tel. No. (852) 2829 6725 (Hong Kong) Mr. Leon Pace, Project Manager Exxon Mobil Development Company
  • 12. CV_Alfred_Coning2014 12 OF 12 E-mail: león.w.pace@exxonmobil .com Tel 1-832- 867 6098 (USA) Mr. Steve Hindmarsh, Construction Lead Exxon Mobil Development Company E-mail: steve.e.hindmarsh@exxonmobil .com Tel +234 805 551 3788 (Nigeria) Mrs. Edna Encarnacion, General Manager Azdaman Sdn Berhad Consultants E-mail: azdaman@global .com Tel No. +60122680918 (Malaysia) ACKNOWLEDGEMENT: I hereby certify that the foregoing information are true and correct to the best of my knowledge. _________________________________ Alfredo B. Coning Senior Planning/Project Control Engineer