SlideShare a Scribd company logo
1 of 4
CVName :- NAGI .OTHMAN.ABDULSALEM.ABDALLA
Date of birth :- 03-Jan-1956.
Nationality :- Libyan.
Marital Status :- Married.
E-mail :- najiothman@yahoo.com.
nabdalla@noc.ly
Academy Degree:-
• Executive Certificate in Management and Leadership from
Massachusetts Institute of Technology Sloan School of Management
May 2014.
• M.SC in Electrical Engineering from University of Strathclyde Glasgow
Scotland U.K 1992.
• B.SC in Electrical Engineering University Of Portland Oregon USA
1981.
• Primary - high School TOBRUK Libya 1975.
Professional Profile Summary:-
• Holder of M.sc (1992) in Electrical Engineering from University of
Strathclyde Glasgow Scotland U.K and B.sc. (1981) in Electrical
Engineering from University of Portland Oregon USA. More than 30
years of multi experience & good relationship networking in Oil & Gas
industry.
• Worked as; Electrical engineer with (Arabian Gulf Oil Company Libya),
Project Engineer, construction coordinator of (AGOCO: x-BP of
Libya).Manager of Engineering and Construction Department AGOCO
Libya, until the end of August 2008.Consultant Engineer with National
Oil Corporation (NOC) from 2008 until now.
• Experience included: electrical, mechanical, civil, gas projects.
Engineering &Construction Management Department. (Completed &
evaluated numerous of projects for AGOCO Libyan Oil Fields Projects.).
• Chairman of Management Committee of Wintershall EPSA-4 Area 201-
Kufra.
• Participated in many Committees of Oil & Gas Libya.
• Attended many training programs in the control system and Contracts Projects
Management. For examples:- Programmable Controller with Square D Co,
SWINDON, Wilts UK 1982 and Roxby Training Center at Stockton- on-Tees
UK, Contracts Projects Management with Oxford training center London 2013,
SCADA with COMSIPEE INTERPRICE Paris France in1982,Project
Management with IFP Paris France and Managing Technical Professional MIT
Boston USA 2005/ 2013.
• Technical adviser from NOC of MELLITAH Oil & Gas B.V. and ENI Team
for BOURI Gas Utilization Assessment Study with Mustang Engineering
Limited in WOKING, Surrey. UK.
Employment: -2008- until now.
Consultant Engineering with National Oil Corporation Libya Maintenance &
projects Department review following up and approval the budget of the projects for
the Following Companies:-
 The ARABAIN Gulf Oil Company (AGOCO).
 SIRTI Oil & Gas Company.
 MABRUK Oil Operation (Total).
 MELLITAH Oil &Gas B.V. (Eni).
 AKAKUS Oil Operation (Repsol).
 Chairman of the Management Committee for winter shall EPSA-4 Area 201-
Kofra.
 Participated in Ministry of Oil& NOC Committees of Oil & Gas Libya :-
• Evaluation & recommendation for implementation of HETIBA Gas Field
development Project in SIRTI Oil & Gas Company.(Chairman)
• Investigation the cost increasing in price of oil & gas projects in Libya.
(Chairman).
• Chairman of D-Structure development basic evolution for Total Oil and Gas off-
shore.
• Member Committee issued by Ministry of Oil for upgrade Libyan Oil Law.
• Attending work shop for Al-Juerf Phase two Gas Utilization Project study for
Mabrouk Oil CO and TOTAL with Worley Parsons in ABU-DUABI.
• Technical Adviser from NOC with MELLITAH Oil &Gas B.V and ENI Team
for the study phase of BOURI Gas Utilization Project at Mustang Engineering
WOKING Surrey, U.K.
• Chairman of Committee issued by NOC Chairman for study the best choose to
used the 42 inch pipeline from A103 Zuitena Field to The Coast Gas Line .
1998-2008:-Manager of Engineering and Construction Department
Engineering and Construction Manager at The ARABAIN Gulf Oil Company The
Company produce more than 480 thousands barrel of oil each day and have more
than 6000 employee .During that time more than 200 projects was completed with
budget over 2 billion dollars the type of these projects were Mechanical
engineering, Electrical, civil, processor, Gas utilization projects, fire fighting
projects, production supporting projects and executed by different contracts from
different nationality. New oil storage tanks. Oil wells tie-in pipeline. Trunk Pipe
Lines and high voltage electrical over head 33kv and 11kv with their Substations,
oil fields airports run ways and Engineering design for surface facilities.
• The man power for ECD was over 180 engineers.
• Managing Engineering, Construction Coordinators and head sections of
civil, Mechanical, Processor, Fire and safety, electrical and drawing.
• Interview and hiring new Engineers for Engineering Department.
• Member of Production Increase Committee in the Company.
• Dealing with all new modification of surface facilities in all AGOCO Fields.
• Dealing with the modification projects of the two AGOCO refineries SARIR
and MESSLA of 30 and 20 thousands barrel of oil each day.
• Member of main AGOCO Tender Committee.
1993-1998:- Construction Coordinator.
Construction Coordinator AGOCO for more than five years to follow up and
responsible for all projects contracts which executed for MESSLA field –
NAFOORA –Hamada- Beda-TOBRUK terminal-Benghazi AGOCO head quarter)
Man power was more than 80 engineers including X-ray welding inspection
group .Chairman of Fire Investigation committee for Sarir Field Gas Plant accident
in1995.Member of Investigation committee for Nafoora Field water injection Tank
explosion.
1992 -1993 Project Engineer AGOCO.
Project Engineer for Oil Fields of The Arabian Gulf Oil Company (MESSLA-
SARIR -Hamada) also member of committee for hand over projects.
1989-1992 Post graduate study for M sc.
M.sc. Electrical Engineering from University of Strathclyde through AGOCO post
graduate training program.TheM.sc. Electrical Engineering Post graduate by
courses and the thesis was The Marginal Cost of Power generation.
1981- 1989 Project Engineer for SCADA.
Project Engineer for MESSLA field Control System and TOBRUK Terminal and
Commissioning Engineering to start MESSLA automation new oil field of 120
Thousands barrel of oil per day and automation of TOBRUK Oil Terminal. Training
new automation group to operated MESSLA field control room.
1977- 1981B.sc. in Electrical Engineering.
B. sc in Electrical Engineering from University of Portland Oregon USA
(Scholarship by AGOCO) Graduated in 1981.
1976 - 1977Study English Language at Saint. Louis University USA.
Study English as second language at St. Louis University, Saint. Louis. MO, USA
for one year. I accepted at University of Portland to study my B.sc in Electrical
Engineering in 1977.
1982-2013 Training.
Attended training programs:-
• UK - Control System and Contracts Projects Management.
• France - Project Management with IFP.
• USA - Managing Technical Professionals with MIT.
• Egypt - Contract Preparation.
• Iraq – Design and Use of Training Package Baghdad 1987.
• China- Member of NOC Committee to visit CNPC Sept 2002.
• Turkey - Project Management.
• Italy - Paper in Libya Oil &Gas (March) 2012.
• Emirate- Member of NOC Committee to Visit Abu-Dubai NPCC.

More Related Content

What's hot

MEC - COMPANY PROFILE
MEC - COMPANY PROFILEMEC - COMPANY PROFILE
MEC - COMPANY PROFILE
Carlos Camino
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
Ali Issa
 
Results of KGHM International in 2013
Results of KGHM International in 2013Results of KGHM International in 2013
Results of KGHM International in 2013
KGHM
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015
???? ?????
 
Resume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELResume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_EL
krishna kumar
 
50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECT50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECT
Tilal Ahmed
 
Halliburton Presentation Distribution Channels
Halliburton Presentation   Distribution ChannelsHalliburton Presentation   Distribution Channels
Halliburton Presentation Distribution Channels
ellis136
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015
David Karbach
 

What's hot (20)

CV Bernard Graves
CV Bernard GravesCV Bernard Graves
CV Bernard Graves
 
MEC - COMPANY PROFILE
MEC - COMPANY PROFILEMEC - COMPANY PROFILE
MEC - COMPANY PROFILE
 
Merrit CV
Merrit CVMerrit CV
Merrit CV
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
Results of KGHM International in 2013
Results of KGHM International in 2013Results of KGHM International in 2013
Results of KGHM International in 2013
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015
 
Bio-data -MSK
Bio-data -MSKBio-data -MSK
Bio-data -MSK
 
Resume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELResume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_EL
 
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.sEsia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
 
Esia of 220 k v ug transmission line from lalazar to mauripur g.s & 132 ...
Esia of 220 k v ug transmission line from lalazar to  mauripur g.s & 132 ...Esia of 220 k v ug transmission line from lalazar to  mauripur g.s & 132 ...
Esia of 220 k v ug transmission line from lalazar to mauripur g.s & 132 ...
 
Saleh_Abdulrahman_Cv
Saleh_Abdulrahman_CvSaleh_Abdulrahman_Cv
Saleh_Abdulrahman_Cv
 
ESIA 132kV Underground Single Circuit Transmission Line from Creek City Grid ...
ESIA 132kV Underground Single Circuit Transmission Line from Creek City Grid ...ESIA 132kV Underground Single Circuit Transmission Line from Creek City Grid ...
ESIA 132kV Underground Single Circuit Transmission Line from Creek City Grid ...
 
GE Hitachi. Nuclear Innovation
GE Hitachi. Nuclear InnovationGE Hitachi. Nuclear Innovation
GE Hitachi. Nuclear Innovation
 
50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECT50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECT
 
RS Resume
RS ResumeRS Resume
RS Resume
 
Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation - BTC U...
Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation - BTC U...Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation - BTC U...
Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation - BTC U...
 
Korean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMRKorean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMR
 
Ashram Ramesar Cv
Ashram Ramesar CvAshram Ramesar Cv
Ashram Ramesar Cv
 
Halliburton Presentation Distribution Channels
Halliburton Presentation   Distribution ChannelsHalliburton Presentation   Distribution Channels
Halliburton Presentation Distribution Channels
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015
 

Similar to السير الذاتية-4

Similar to السير الذاتية-4 (20)

Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017
 
SABER CV
SABER CVSABER CV
SABER CV
 
jamespickering
jamespickeringjamespickering
jamespickering
 
DMacLellan2015
DMacLellan2015DMacLellan2015
DMacLellan2015
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
Zulfiqar - Cv
Zulfiqar - CvZulfiqar - Cv
Zulfiqar - Cv
 
RAJEEV-RESUME
RAJEEV-RESUMERAJEEV-RESUME
RAJEEV-RESUME
 
Konstantinos Valvis CV 17.08.2016
Konstantinos Valvis  CV 17.08.2016Konstantinos Valvis  CV 17.08.2016
Konstantinos Valvis CV 17.08.2016
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
Oct. -2015-CV
 
CV.PM
CV.PMCV.PM
CV.PM
 
Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016
 
CV2015
CV2015CV2015
CV2015
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 
SUKESH-CV 01.09.2016
SUKESH-CV 01.09.2016SUKESH-CV 01.09.2016
SUKESH-CV 01.09.2016
 
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Omar AlHajri CV
Omar AlHajri  CVOmar AlHajri  CV
Omar AlHajri CV
 
RCPRESUMEOCT2016
RCPRESUMEOCT2016RCPRESUMEOCT2016
RCPRESUMEOCT2016
 
Maher Taha- CV-Oct 2015
Maher Taha- CV-Oct 2015Maher Taha- CV-Oct 2015
Maher Taha- CV-Oct 2015
 

السير الذاتية-4

  • 1. CVName :- NAGI .OTHMAN.ABDULSALEM.ABDALLA Date of birth :- 03-Jan-1956. Nationality :- Libyan. Marital Status :- Married. E-mail :- najiothman@yahoo.com. nabdalla@noc.ly Academy Degree:- • Executive Certificate in Management and Leadership from Massachusetts Institute of Technology Sloan School of Management May 2014. • M.SC in Electrical Engineering from University of Strathclyde Glasgow Scotland U.K 1992. • B.SC in Electrical Engineering University Of Portland Oregon USA 1981. • Primary - high School TOBRUK Libya 1975. Professional Profile Summary:- • Holder of M.sc (1992) in Electrical Engineering from University of Strathclyde Glasgow Scotland U.K and B.sc. (1981) in Electrical Engineering from University of Portland Oregon USA. More than 30 years of multi experience & good relationship networking in Oil & Gas industry. • Worked as; Electrical engineer with (Arabian Gulf Oil Company Libya), Project Engineer, construction coordinator of (AGOCO: x-BP of Libya).Manager of Engineering and Construction Department AGOCO Libya, until the end of August 2008.Consultant Engineer with National Oil Corporation (NOC) from 2008 until now. • Experience included: electrical, mechanical, civil, gas projects. Engineering &Construction Management Department. (Completed & evaluated numerous of projects for AGOCO Libyan Oil Fields Projects.). • Chairman of Management Committee of Wintershall EPSA-4 Area 201- Kufra. • Participated in many Committees of Oil & Gas Libya. • Attended many training programs in the control system and Contracts Projects Management. For examples:- Programmable Controller with Square D Co, SWINDON, Wilts UK 1982 and Roxby Training Center at Stockton- on-Tees UK, Contracts Projects Management with Oxford training center London 2013,
  • 2. SCADA with COMSIPEE INTERPRICE Paris France in1982,Project Management with IFP Paris France and Managing Technical Professional MIT Boston USA 2005/ 2013. • Technical adviser from NOC of MELLITAH Oil & Gas B.V. and ENI Team for BOURI Gas Utilization Assessment Study with Mustang Engineering Limited in WOKING, Surrey. UK. Employment: -2008- until now. Consultant Engineering with National Oil Corporation Libya Maintenance & projects Department review following up and approval the budget of the projects for the Following Companies:-  The ARABAIN Gulf Oil Company (AGOCO).  SIRTI Oil & Gas Company.  MABRUK Oil Operation (Total).  MELLITAH Oil &Gas B.V. (Eni).  AKAKUS Oil Operation (Repsol).  Chairman of the Management Committee for winter shall EPSA-4 Area 201- Kofra.  Participated in Ministry of Oil& NOC Committees of Oil & Gas Libya :- • Evaluation & recommendation for implementation of HETIBA Gas Field development Project in SIRTI Oil & Gas Company.(Chairman) • Investigation the cost increasing in price of oil & gas projects in Libya. (Chairman). • Chairman of D-Structure development basic evolution for Total Oil and Gas off- shore. • Member Committee issued by Ministry of Oil for upgrade Libyan Oil Law. • Attending work shop for Al-Juerf Phase two Gas Utilization Project study for Mabrouk Oil CO and TOTAL with Worley Parsons in ABU-DUABI. • Technical Adviser from NOC with MELLITAH Oil &Gas B.V and ENI Team for the study phase of BOURI Gas Utilization Project at Mustang Engineering WOKING Surrey, U.K. • Chairman of Committee issued by NOC Chairman for study the best choose to used the 42 inch pipeline from A103 Zuitena Field to The Coast Gas Line . 1998-2008:-Manager of Engineering and Construction Department Engineering and Construction Manager at The ARABAIN Gulf Oil Company The Company produce more than 480 thousands barrel of oil each day and have more than 6000 employee .During that time more than 200 projects was completed with budget over 2 billion dollars the type of these projects were Mechanical engineering, Electrical, civil, processor, Gas utilization projects, fire fighting projects, production supporting projects and executed by different contracts from different nationality. New oil storage tanks. Oil wells tie-in pipeline. Trunk Pipe Lines and high voltage electrical over head 33kv and 11kv with their Substations, oil fields airports run ways and Engineering design for surface facilities.
  • 3. • The man power for ECD was over 180 engineers. • Managing Engineering, Construction Coordinators and head sections of civil, Mechanical, Processor, Fire and safety, electrical and drawing. • Interview and hiring new Engineers for Engineering Department. • Member of Production Increase Committee in the Company. • Dealing with all new modification of surface facilities in all AGOCO Fields. • Dealing with the modification projects of the two AGOCO refineries SARIR and MESSLA of 30 and 20 thousands barrel of oil each day. • Member of main AGOCO Tender Committee. 1993-1998:- Construction Coordinator. Construction Coordinator AGOCO for more than five years to follow up and responsible for all projects contracts which executed for MESSLA field – NAFOORA –Hamada- Beda-TOBRUK terminal-Benghazi AGOCO head quarter) Man power was more than 80 engineers including X-ray welding inspection group .Chairman of Fire Investigation committee for Sarir Field Gas Plant accident in1995.Member of Investigation committee for Nafoora Field water injection Tank explosion. 1992 -1993 Project Engineer AGOCO. Project Engineer for Oil Fields of The Arabian Gulf Oil Company (MESSLA- SARIR -Hamada) also member of committee for hand over projects. 1989-1992 Post graduate study for M sc. M.sc. Electrical Engineering from University of Strathclyde through AGOCO post graduate training program.TheM.sc. Electrical Engineering Post graduate by courses and the thesis was The Marginal Cost of Power generation. 1981- 1989 Project Engineer for SCADA. Project Engineer for MESSLA field Control System and TOBRUK Terminal and Commissioning Engineering to start MESSLA automation new oil field of 120 Thousands barrel of oil per day and automation of TOBRUK Oil Terminal. Training new automation group to operated MESSLA field control room. 1977- 1981B.sc. in Electrical Engineering. B. sc in Electrical Engineering from University of Portland Oregon USA (Scholarship by AGOCO) Graduated in 1981. 1976 - 1977Study English Language at Saint. Louis University USA.
  • 4. Study English as second language at St. Louis University, Saint. Louis. MO, USA for one year. I accepted at University of Portland to study my B.sc in Electrical Engineering in 1977. 1982-2013 Training. Attended training programs:- • UK - Control System and Contracts Projects Management. • France - Project Management with IFP. • USA - Managing Technical Professionals with MIT. • Egypt - Contract Preparation. • Iraq – Design and Use of Training Package Baghdad 1987. • China- Member of NOC Committee to visit CNPC Sept 2002. • Turkey - Project Management. • Italy - Paper in Libya Oil &Gas (March) 2012. • Emirate- Member of NOC Committee to Visit Abu-Dubai NPCC.