Since last 13.7 years, I have been working electrical fields of industrial experience with GASCO UAE, Shell Pearl GTL Qatar. Aramco KSA, SEWA Sharjah, such 11KV to 400 KV substations, (GIS 33 KV to 220 KV) 5 KVA Upto120 MVA Transformer Erection installation, switch gears & Circuit breaker, as, LV, MV, HV, VCB, ACB, OCB, SF6, to 11 KV, 33 KV, 132 KV, 220 KV, installation Erection. Power & Control Cables termination, Grounding system, pre-commissioning & commissioning testing done other project
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
Electrical Engineer
1. Dhiraj Kumar Nishad, Sr. Electrical Engineer exp. 13.7
Passport No -----------S5754459
Date of Issue --------03/05/2018
Date of expiry------02/05/2028
Place of Issue ------Dubai
Place of birth-------Saran
Mobile # +919931883365 WhatsApp & imo
Mobile # +971582828413 WhatsApp & imo (UAE) Presently
Mobile # +919431630471 BSNL Home
Mobile # +919905010002 Airtel, Wife if urgent
Email: - dhirajee7@gmail.com Skype: - dhirajee7
Applied post for: - {Sr. Electrical Engineer}
OBJECTIVE
To strive, grow and achieve the best of my performance through hard work with an organization providing all
round growth and venture into new technologies and also seeking a challenging career in a progressive
organization offering to prove, utilize and enhance my skills.
AREAS OF EXPERTISE
Summary : -
Since last 13.7 years, I have been working electrical fields of industrial experience with GASCO UAE, Shell
Pearl GTL Qatar. Aramco KSA, SEWA Sharjah, such 11KV to 400 KV substations, (GIS 33 KV to 220 KV) 5
KVA Upto120 MVA Transformer Erection installation, switch gears & Circuit breaker, as, LV, MV, HV, VCB,
ACB, OCB, SF6, to 11 KV, 33 KV, 132 KV, 220 KV, installation Erection. Power & Control Cables termination,
Grounding system, pre-commissioning & commissioning testing done other project MEP & construction project,
high raise Residential buildings, Public Utility Buildings, VILLA, Malls, Hospitals, Schools, Showrooms, works,
MV, LV, breaker switch gear installation tested, Panels Erection testing, power distribution board installation,
breakers installation such MCB, ELCB, ACB, RCCB, MDB, SMDB, DB, test & erection installation done.
Education: - Electrical in an Engineering in B.E from New Delhi University India with EIMSR.
Experience & Skills
Project management & leadership, team work, effective communication and conflict resolution.
Implementation of industry best practices and systems processes and standards related to work.
LV, MV, HV, switchgear & circuit breaker, substation, generator, motors grounding systems.
Experience in construction oil & gas industry, power sector & operation maintenance.
Power sector, oil & gas, testing, erection & installation pre-commissioning.
Power & distribution transformer erection & Installation testing.
Design of 400/220/132 KV 1316 MW Power Generation.
Good written and verbal communication English skills.
2. Construction, High rise building scope 20 floors.
32mw one-unit 12x32 = 384 MW = 220 KV
Ability to Work under Pressure.
Time Management
Decision Making
Computer literate
Self-motivation.
Adaptability.
Power Transformer Erection installation & Testing
Testing and commissioning of RTCC panels, parallel operation and AVR relays
Erection of Power Transformer including oil filtration and BDV tests.
Testing and commissioning of Power & Auxiliary Transformers.
Transformer internal external functions test
CT, VT, Bucholz relay, MOV, WIT, Test.
50 MVA to 132 KV Step up transformer
96 MVA 132KV three phase power TR
Transformer on-load tap changers
Special test & routine test.
100 KVA to 200 MVA,
Switchgear Erection installation & Testing
Uni Gear ZS1,12-17.5 KV, ZS2 36 kV, 2500A, 31.5 kA SR 12/SRU12 ABB
Breaker timing, CB and Bus Bar Contact resistance measurement tests.
Erection & Testing of Gas Insulated switchgears (GIS) Switchgears.
Functional Check- interlocks, controls and indications.
Gas-Insulated Substations – GIS. ABB & Siemens
NXPLUS C, NX AIR, 8DA10, Siemens
Pilot cable stability and inter trip tests.
IR value & HV test of Switchgears.
Other project works erection & Testing installation
Preparation of submittal documents for Material approval and method statement for erection and testing.
Erection of Earth grid and lightning protection system & Earthing resistance measurements and grid tests
Preparation of enquiries and Purchase order for project materials and subcontract works
Battery charger commissioning and Batter charging & discharging capacity tests.
Differential and REF stability & sensitivity tests of 33 / 11 KV substations
Erection of Light fixtures, Cable trays, trucking and Cables
Testing of Current Transformers & Voltage Transformers
Final functional tests, Trip Test through Primary injection
32x12= 384 MW generator step up transformer 132 (kV)
Design for shop drawings and as built markup drawings.
Erection & Testing of MCC, LVAC panels etc.
Testing of 33 and 11 kV Capacitor Banks
Lighting and power circuit wiring.
Testing of Cables
3. Safety profile:
Have organized HAZARD and in full team spirit. PTW Training competed & PTW coordinator
TBM or TBT, conducted rules, PPE, zero goal/Accident, Hazard minimize,
Take safe work report from site & investigation at site.
Handling permits systems more than decade.
H v x PP ’S
Responsibilities of Electrical Engineer: -
Responsible for implementations and monitoring of all electrical related works at site
Check PPE in accordance with site condition. Workers & labors management.
Daily Progress Report with daily manpower and productivity wise report
Site for inspection Ensures that work is carried out as per above project
Control the whole test record report Testing, making analysis reports
Notification to Electrical Manager the completion of the preparation
Coordinate all the site activities according to work schedule
Check that work is ready for inspection and prepares RFI.
Controlling of materials and workers staffs at site.
Work permit renewed & checked valid permit
Electrical standard & code as: - IEEE, NEC, ANSI, IEC, ISI, NETA, NFPA, NEMA,
Currently working overseas.
Post Held-------------Electrical Engineer
Period ---------------17 May 2017 till.
Company -----------Allen Electrical Services LLC joint venture SEWA
Project---------------Distribution 132, 33 KV to 11KV by 415V.
Client----------------Sharjah Electrical water Authority (Government)
Location-------------Sharjah Kharfkkhan
Work :- 132 /33 KV, 33/11 KV & 415V. Substation, Distribution such as erection, installation, pre
commission, & Commissioning testing, control panels & switch gear, power transformer step down bus bar &
panel attachment, AC/ DC, DB Panels erection, installation, lay outing, cable trench, cable pulling, control
cable & power cable testing, insulation resistance, termination, 33 KV & 11 KV beaker testing, VT, CT
neutral, TR & Switchgear protection systems, safely startup system.
Work Experience of details in overseas.
Post Held-------------Electrical Engineer
Period ---------------30 Jan 2016) to 17March 2017.
Year------------------1.2
Reason---------------contract end
Company -----------Beijing Emirates construction co
Project---------------Residential Building, MEP Project.
Client----------------Ministry of interior
Location-------------Madina (Jeddah) KSA
Work done: - MEP Project as lighting protection. Slab in roof PVC conducting, PVC Pipe installation, Cable
tray, cable pulling, cable termination, Cable testing, erection & installation control panels, LV MV switch
gear, MCB, ELCB, MCCB, MD, SMDB erection Panels breaker installation, one-way switch. Two-way
switch connection.
4. Post Held-----------Electrical Engineer
Period---------------20 Nov 2014) to 15 Dec 2016.
Year-----------------2.2
Reason--------------contract end
Company-----------Madina Group WLL Joint venture Shell Perl GTL
Project--------------Ras Laffan Perl GTL
Client---------------Shell Perl GTL
Location-----------Qatar (Al khor)
Work done: - 132 KV substation, turned around, Prepare of AA/AP / WTP & BRM cabin installation.
Communication & power cable, cable termination, cable pulling, cable tray, fire alarm, smoke detector, RMU
substation, and lighting
Post Held-----------Electrical Engineer
Period--------------31Jan 2013 to 01 Mar 2014
Year-----------------1.3
Reason--------------contract end
Company-----------Midong E&C with Samsung Engineering & construction co. ltd
Project--------------Aramco NGL. Power plant 230 KV, Saudi Arabia oil company
Client----------------Saudi Aramco
Location------------Shaybah Dammam, Saudi Arab
Work done: - 230 KV, NGL – power generation & transmission, cable tray layout, cable tray
installation, cable pulling, cable gladding & cable termination, earth & Grounding, Lightning Protection, step
up & step-down transformer installation, AC & DC switches installation, Cable testing, loop check cable
hiport, pre -commissioning & commissioning testing Hi pot testing etc. done.
Post Held-------------Electrical Engineer
Period-----------------24 July 2011) to 13 August 2012
Year-------------------1.5
Reason----------------contract end
Company-------------AL- Hasoun Sejong with Hyundai cons. Engr. Co. ltd)
Project----------------power Plant (GTG) 10x32MW= 320 MW
Client-----------------Abu Dhabi GASCO
Location-------------Abu Dhabi, IGD5, Habshan-5 Utilities & offsite.
Work done: - power Plant (GTG) 12x32MW, 384 totals 132 KV. earthing system, Grounding, cable tray
layout dressing & installation, cable pulling, cable testing, & cable termination, Lightning Protection, cathode
protection, security system, safety device installation, Fire & Gas, LV, MV, HV breakers & switchgear
erection installation, Step down Power transformer 50 MVA 132KVto 96 MVA, erection & installation, pre -
commissioning & commissioning testing Hi pot testing ETC done.
Post Held----------------Electrical Engineer
Period--------------------20 May 2005 to 10 July 2009
Year-----------------------4.5
Reason--------------------project end
Company----------------Saudi Environmental Projects Company Ltd.
Project-------------------Ministry of water and Electricity Saudi Arab
Client--------------------Saud king Abdullah
5. Location----------------Jeddah Saudi Arab.
Work done: - 33/11 KVA step down, transformers erection installation, MV/LV Breaker/ switchgears
erection & installation, cable tray, cable pulling, cable termination, lighting, conduit in roof, lighting
fan box erection installation, eating grounding, Water treatment Plants Waste water treatment WTP
plant, SBR, MBR, MBBR, waste water treatment plant. Understanding of and ability to operate PLC/SCADA
process control systems. Deep well, raw tank, sand filter, filtration tank, cartage tank, reverses osmosis,
intermediate tank, store tank, Chemical.
Work Experience of previous details in India.
Post Held------------Electrical Engineer (MEP)
Period ---------------15 oct 2009 to 15 July 2011
Year------------------1.9
Reason---------------contract end went to UAE
Company------------Roto power co.& Tenon co. ltd
Project---------------Reliance fresh mall project.
Client----------------Reliance Industries co. Lt
Location------------New Delhi
Work done: - Cable tray installation, cable pulling, smoke detected, fire alarm, gas detected. Transformer
installation substation 132 KVA, UPS, Emergency Diesel Generator, System gen set, (DG) MCCB, MCC,
panel board, star delta motor connection & pump, O&M done. Control panel, LV, panel board, single
phase, three phases, substation, meager cable testing single phase, three motor & pump, star
delta & delta star connection, SCADA & DCM, PLC, etc.
Qualification or education details.
Technician qualifications & education details.
COURSE INSTITUTION BOARD/
UNIVERSITY
YEAR & DURING YEAR OF
PASSING
PERCENTAGE
OF MARKS
DIV
B.E in Elec.
Engineering
EIMSR Delhi Delhi University 2003 to 2007
= 4 yrs.
09 Oct
2007
60% 1 nd
Computer known.
I know as, software installation, Windows, XP, core2, vista, PC, laptop programming WWW side view, Internet
Explorer & formatting system, MS office word, excel, power point, Scada PLC Computer operator ting all of
thing, set up, photo shop, ms, office, excel, power point, internet browsing, down loads programs,
email, fax, cope. Type of speed 20 wpm.
Note: - Overseas 11.7 Years & Ind 2 Years total =13.7 YR
CLASS INSTITUTION BOARD/
UNIVERSITY
YEAR &
DURING
YEAR OF
PASSING
PERCENTAGE
OF MARKS
Div
SSC, Metric, 10th
Rana pratap high school
ram pur kala khairah
BSEB Patna 1994 to 1995
=1 yrs
15 June
1995
56.63% 2 nd
Enter mediate
10+2
PT J L N College
Marhowrah saran
BIE Patna 2001to 2003
=2 yrs
29 may
2003
57.5% 2 nd
6. Designing in Electrical: - Shop Drawing. Basic Auto cad. BOQ, Proto type file,
Quantification, shop drawing modification, basic knowledge, if required.
Personal Details: -
Date of expiry license-----------------26/02/2019
Nationality & Religion---------------------- Indian & Hindus Blood group: A+
Active Mobile Number: --------------------+971582828413, +971505629636 UAE
Sex & Marital Status ------------------------Male & Married
Date of Birth & age -------------------------16.01.1982 & 34years
Present Location: ----------------------------Sharjah (UAE)
Driving license------------------------NO 2217393707 KSA
Expected Salary: -----------------------------Negotiable
Present salary: -------------------------------8500 + accommodation
Notice Period: -------------------------------30 Days
My Name ------------------------------------Dhiraj Kumar Nishad
Skype id: ------------------------------------dhirajee7
W f ’ ----------------------------------------Indu Devi
F ’ ---------------------------------------Raj Kumar Prasad
M ’ -------------------------------------Sunder pati Devi
Height---------------------------------------168 5 7“
Languages known. English Arabic Hindi & Bhojpuri local.
Permanent Address. Dhiraj Kumar Nishad, PO & PS- Marhowra (Near hero agency, Main
District - Chapra (Saran) India, Pin 841418 MB +91-09931883365, now Sharjah UAE +971-
0582828413What’sApp & imo +91-09431630471 Direct
Present Address. Dhwal mahto Camp # 4 Nagloi 4 jawalpuri C52) Delhi 110041Ph
+918800414256, Dhwal mahto.
Hobbies: - Hard working, discus about our job, spare time Q&A our team related our Jobs.
strengths: - I am an honest self-motivated and hard-working person positive attitude towards my career and
my life.
Declaration: -
I hereby declare that the information furnished above is true to the best of my knowledge
and belief.
Applicant
(DHIRAJ KUMAR NISHAD)