GLAD ROBERT C. TORAL
NBK Building Flat5, Rasheed Bin Malik Street. Al
Mansoura Doha, Qatar
Tel. No. (00974)74490043
Cel. No. 0097474490043
e-mail: gladtoral@yahoo.com
PERSONAL INFORMATION
Age : 44
Date of Birth : November 10, 1970
Civil Status : Married
Nationality : Filipino
Religion : Catholic
EDUCATIONAL BACKGROUND
College-Vocational Bicol College of Arts and Trade Naga City
Diploma of Technology
Major in Electrical Technology (1988-1991)
WORK EXPERIENCE
SEPT.09,2014 UP TO THE PRESENT
ELSEWEDY CABLES WLL
P003 LUSAIL EXPRESSWAY PROJECT
THUMAMA SUPER TO WAKRA SUBSTATION PROJECT
ELECTRICAL SITE SUPERVISOR
1. Ensuring that the installations comply with the documents and that quality requirements and deadlines are
met.
2. Ensuring that installation procedures are followed.
3. Ensuring that my team is efficient.
4. Ensuring the safety rules are followed.
JAN.08,2013 – APR.08,2014
ALSTOM TRANSPORT SA, DUBAI
AL SUFOUH TRAM PROJECT
ELECTRICAL SITE SUPERVISOR
1. Ensuring that the installations comply with the documents and that quality requirements and
deadlines are met.
2. Managing general weekly and daily schedules.
2
3. Managing SST construction team and /or SST Subcontractor on site supervising works.
4. Ensuring that works meet the requirements of the construction documents.
5. Ensuring that installation procedures are followed.
6. Collecting, checking and signing of related SST installation quality records.
7. Collecting and signing all teams daily reports.
8. Organising the team under my authority.
9. Ensuring that my team is efficient.
10. Managing non-confomities relating to the activity.
11. Ensuring the safety rules are followed.
12. Collecting and signing daily reports relating to the activity and forwarding them to the Power
supply Construction Manager.
13. reporting to the power supply Construction Manager on the jobs with which is concerned.
NOV.20,2011 TO NOV.20,2012 SANKYU MANAR SAUDI ARABIA
ELECTRICAL SUPERVISOR
1. Coordinates with Sub-contractor ( Civil, Mechanical and Electrical) through daily activities,
Site Inspection for Actual Site Conditions and for Services drawings.
2. Supervise and Inspect the Installations / Erections of Sub Station equipment such as
Transformers, Switchgears, LV Distribution Boards, DC Panel and Main Motor Panel.
3. Supervise and Manage Power Distribution System / Communication System containment
installations, Cable Pulling and Terminations for the Incomer and Feeder Power.
4. Inspect quality and efficiency of works of sub-contractor to ensure proper compliance with
all approved drawings, technical requirements and safety guidelines.
5. Prepare and monitor construction schedules to achieve target completion date.
6. Assist in the preparation of as-built diagrams and revision of drawings.
7. Ensure safety in all aspect of work.
3
March 7,2008 to March 31, 2011 MITSUBISHI HEAVY INDUSTRIES
ELECTRICAL SITE SUPERVISOR
Duties and Responsibilities:
1. Coordinate with other contractors (Civil, Electrical and Mechanical) through
Daily/ Weekly Site Coordination, Site Inspection for Actual Site Conditions
and Clarifications for combined services drawings.
2. Supervise and inspect the installations/ erection of traction power substation
equipment such as transformers, rectifiers, positive & negative isolators, low
voltage main switch board, UPS and 33kv Gas Insulated switchgears’ (GIS)
for Metro Stations.
3. Supervise and manage Power Distribution System / Communication System
containment installations, cable pulling and terminations for the traction power
substations.
4. Supervise and inspects the installation of Auxiliary System such as CCTV,
Time Distribution System, Door Access / Intrusion Alarm System and Public
address system.
5. Inspect quality and efficiency of works of sub-contractors to ensure proper
compliance with all the approved drawings, technical requirements and safety
guidelines.
6. Prepare and monitor construction schedules to achieve target completion
date.
7. Assist in the preparation of as-built diagrams and revision of drawings to
Suit actual site conditions.
8. Handled several stations for Red line and Green line underground Stations.
9. Ensure safety in all aspect of work.
10. Trained as Sub-station Operator for the Dubai Metro.
February 14, 2006 to MERCURY ENGINEERING QATAR
February 13, 2007 * Electrician A
Duties and Responsibilities:
1. Reports to Electrical Supervisor;
2. Assists and performs the necessary tasks assigned by the electrical
supervisor;
3. Performs cable pulling, cable dressing and loop checking;
4. Cable gladding and termination.
4
December 1, 2004 to Light Rail Transit Authority
February 10, 2006 Line 2 System (Government Service)
• Engineering Assistant A
Duties and Responsibilities:
1. Reports to the Electrical Foreman;
2. Assists and performs the necessary tasks assigned by the Electrical Foreman.
3. Performs preventive maintenance and maintenance of Overhead Catenaries’
System (OCS) and distribution network through daily inspection of the OCS at
the machine, connecting line and depot;
4. Regularly inspects and measures the contact wire and performs repair if
necessary
5. Performs hi-pot testing of OCS reinforcing cables;
6. Performs periodic inspection of section insulator;
7. Performs periodic inspection of lightning arrester
8. Performs grounding resistance test or lightning arrester;
9. Responds immediately to emergency and corrective repair works of the
system;
10Secures evidences and useful data in case there are incidents involving OCS
Failures
11. Assists in the preparation of maintenance reports;
12. Performs other related functions that maybe assigned from time to time.
June 2004 BETA ELECTRIC CORPORATION
to Sept. 2004 Grand Shang Tower, Makati City
● Jr. Electrician
Duties & Responsibilities:
1. Installer of all types of boxes.
2. Fabricates hub for stub out pvc
3. Installer of PVC for the designated units
4. Chipping & relocate boxes (if necessary)
5
September 5, 2003 BETA ELECTRIC CORPORATION
to April 2004 MRT Line 2, Package 4, Project Phase 2
● Leadman / Electrician (O.C.S.)
Duties & Responsibilities:
1. CAD Welder
2. Checked floodlights
3. Troubleshoot floodlights
4. Installed floodlights
5. Installed lighting arrester
6. Driving of ground rod & ground testing
7. Installed cantilevers
8. Clustering
9. String of messenger & contact wires
July 2002 to May 2003 Kettaneh Construction W.L.L.
RAS LAFFAN – Qatar Power Plant
Desalination Project
P.O. Box 22401, Doha, Qatar
● Electrician
Duties & Responsibilities:
1. CAD Welder
2. Cable Pulling
3. Installer of all types of boxes.
4. Fabricates hub for stub out pvc
5. Installer of PVC for the designated units
6. Chipping & relocate boxes (if necessary)
7. Installer of all types of lighting fixtures
8. Installer of all types of outlet/power outlet
9. Panel Board terminations
10. Troubleshooter of all types of electrical machines
11. MICC cable installer and troubleshooter
12Troubleshooting of electro mechanical faults like Press machines, Bending
machines, Magnetic Contractors, Welding machines and electric drills/power
tools
6
June 1995 to Nov. 2000 HONDA PHILIPPINES, INC.
Km. 17, South Superhighway
East Service Road, Parañaque City
● Maintenance Electrician-Manufacturing Plant
Duties & Responsibilities:
1. Assigned in the maintenance of all electrical works and communication
facilities
2. Preventive maintenance
3. Troubleshooting and repairs of spot welding machine and controls
4. Troubleshooting and repairs of conveyors and controls
5. Troubleshoot and repairs of telephone lines until T.T.C.
6. Troubleshoot and repairs of CNC machines
7. Troubleshoot and repairs of press machines
8. Troubleshoot and repairs of fire alarms/smoke detector/chronology equipment
November 1992 to AL-TEBYAN CO. LTD.
June 17, 1994 Al-Saiam Compound
P.O. Box 4922 Dammam 31412, K. S. A.
Duties & Responsibilities:
1. Preventive maintenance
2. Troubleshoot and repairs of panel board breakers
3. Troubleshoot and repairs of flood lights/spotlights
4. Troubleshoot and repairs of sludge motor and controls
5. Troubleshoot and repairs of bowling machine
7
Training Programs
Title Date of Attendance Conducted
Training of Personnel for Installation 09-05-03/03-31-04 Balfour Beatty Rail
and Rectification of Overhead Contact
System (OCS ) of MRT 2 Manila
16th
Voluntary Arbitration Advocacy Training11-16~19-’99 Department of Labor
and Employment
(DOLE)
Seminar on Managing Safety and Health 09-01-98 Honda Philippines,
Inc.
Seminar on Basic Office Procedures and 08-20-98 “
Work Ethics
5S Introduction and Action Planning 07-20~24-98 “
J. Course 04-20~26-98 “
Basic First Aid Training 03-31 to 04-28-98 “
Industrial Fire Brigade Training 03-24~30-98 “
Leading Small Group Seminar 03-13-97 “
Basic Shopfloor Seminar 12-01~09-97 “
Desirable Work Values 10-15-97 “
Basic Motorcycle Course 09-01~10-97 “
PABX Switchboard Operator 10-05~16-92 Radio Veritas Asia
Practical Training Buildings and Grounds 11-13-90/04-16-91 MERALCO
Division (OJT 3)
Trainee Technician OJT 2 04-17-90 to 05-31-90 Naga Telephone Co.
I hereby certify that the above information are true and correct to the best of my
knowledge and belief.
GLAD ROBERT C. TORAL
Applicant’s Signature

Glad CV

  • 1.
    GLAD ROBERT C.TORAL NBK Building Flat5, Rasheed Bin Malik Street. Al Mansoura Doha, Qatar Tel. No. (00974)74490043 Cel. No. 0097474490043 e-mail: gladtoral@yahoo.com PERSONAL INFORMATION Age : 44 Date of Birth : November 10, 1970 Civil Status : Married Nationality : Filipino Religion : Catholic EDUCATIONAL BACKGROUND College-Vocational Bicol College of Arts and Trade Naga City Diploma of Technology Major in Electrical Technology (1988-1991) WORK EXPERIENCE SEPT.09,2014 UP TO THE PRESENT ELSEWEDY CABLES WLL P003 LUSAIL EXPRESSWAY PROJECT THUMAMA SUPER TO WAKRA SUBSTATION PROJECT ELECTRICAL SITE SUPERVISOR 1. Ensuring that the installations comply with the documents and that quality requirements and deadlines are met. 2. Ensuring that installation procedures are followed. 3. Ensuring that my team is efficient. 4. Ensuring the safety rules are followed. JAN.08,2013 – APR.08,2014 ALSTOM TRANSPORT SA, DUBAI AL SUFOUH TRAM PROJECT ELECTRICAL SITE SUPERVISOR 1. Ensuring that the installations comply with the documents and that quality requirements and deadlines are met. 2. Managing general weekly and daily schedules.
  • 2.
    2 3. Managing SSTconstruction team and /or SST Subcontractor on site supervising works. 4. Ensuring that works meet the requirements of the construction documents. 5. Ensuring that installation procedures are followed. 6. Collecting, checking and signing of related SST installation quality records. 7. Collecting and signing all teams daily reports. 8. Organising the team under my authority. 9. Ensuring that my team is efficient. 10. Managing non-confomities relating to the activity. 11. Ensuring the safety rules are followed. 12. Collecting and signing daily reports relating to the activity and forwarding them to the Power supply Construction Manager. 13. reporting to the power supply Construction Manager on the jobs with which is concerned. NOV.20,2011 TO NOV.20,2012 SANKYU MANAR SAUDI ARABIA ELECTRICAL SUPERVISOR 1. Coordinates with Sub-contractor ( Civil, Mechanical and Electrical) through daily activities, Site Inspection for Actual Site Conditions and for Services drawings. 2. Supervise and Inspect the Installations / Erections of Sub Station equipment such as Transformers, Switchgears, LV Distribution Boards, DC Panel and Main Motor Panel. 3. Supervise and Manage Power Distribution System / Communication System containment installations, Cable Pulling and Terminations for the Incomer and Feeder Power. 4. Inspect quality and efficiency of works of sub-contractor to ensure proper compliance with all approved drawings, technical requirements and safety guidelines. 5. Prepare and monitor construction schedules to achieve target completion date. 6. Assist in the preparation of as-built diagrams and revision of drawings. 7. Ensure safety in all aspect of work.
  • 3.
    3 March 7,2008 toMarch 31, 2011 MITSUBISHI HEAVY INDUSTRIES ELECTRICAL SITE SUPERVISOR Duties and Responsibilities: 1. Coordinate with other contractors (Civil, Electrical and Mechanical) through Daily/ Weekly Site Coordination, Site Inspection for Actual Site Conditions and Clarifications for combined services drawings. 2. Supervise and inspect the installations/ erection of traction power substation equipment such as transformers, rectifiers, positive & negative isolators, low voltage main switch board, UPS and 33kv Gas Insulated switchgears’ (GIS) for Metro Stations. 3. Supervise and manage Power Distribution System / Communication System containment installations, cable pulling and terminations for the traction power substations. 4. Supervise and inspects the installation of Auxiliary System such as CCTV, Time Distribution System, Door Access / Intrusion Alarm System and Public address system. 5. Inspect quality and efficiency of works of sub-contractors to ensure proper compliance with all the approved drawings, technical requirements and safety guidelines. 6. Prepare and monitor construction schedules to achieve target completion date. 7. Assist in the preparation of as-built diagrams and revision of drawings to Suit actual site conditions. 8. Handled several stations for Red line and Green line underground Stations. 9. Ensure safety in all aspect of work. 10. Trained as Sub-station Operator for the Dubai Metro. February 14, 2006 to MERCURY ENGINEERING QATAR February 13, 2007 * Electrician A Duties and Responsibilities: 1. Reports to Electrical Supervisor; 2. Assists and performs the necessary tasks assigned by the electrical supervisor; 3. Performs cable pulling, cable dressing and loop checking; 4. Cable gladding and termination.
  • 4.
    4 December 1, 2004to Light Rail Transit Authority February 10, 2006 Line 2 System (Government Service) • Engineering Assistant A Duties and Responsibilities: 1. Reports to the Electrical Foreman; 2. Assists and performs the necessary tasks assigned by the Electrical Foreman. 3. Performs preventive maintenance and maintenance of Overhead Catenaries’ System (OCS) and distribution network through daily inspection of the OCS at the machine, connecting line and depot; 4. Regularly inspects and measures the contact wire and performs repair if necessary 5. Performs hi-pot testing of OCS reinforcing cables; 6. Performs periodic inspection of section insulator; 7. Performs periodic inspection of lightning arrester 8. Performs grounding resistance test or lightning arrester; 9. Responds immediately to emergency and corrective repair works of the system; 10Secures evidences and useful data in case there are incidents involving OCS Failures 11. Assists in the preparation of maintenance reports; 12. Performs other related functions that maybe assigned from time to time. June 2004 BETA ELECTRIC CORPORATION to Sept. 2004 Grand Shang Tower, Makati City ● Jr. Electrician Duties & Responsibilities: 1. Installer of all types of boxes. 2. Fabricates hub for stub out pvc 3. Installer of PVC for the designated units 4. Chipping & relocate boxes (if necessary)
  • 5.
    5 September 5, 2003BETA ELECTRIC CORPORATION to April 2004 MRT Line 2, Package 4, Project Phase 2 ● Leadman / Electrician (O.C.S.) Duties & Responsibilities: 1. CAD Welder 2. Checked floodlights 3. Troubleshoot floodlights 4. Installed floodlights 5. Installed lighting arrester 6. Driving of ground rod & ground testing 7. Installed cantilevers 8. Clustering 9. String of messenger & contact wires July 2002 to May 2003 Kettaneh Construction W.L.L. RAS LAFFAN – Qatar Power Plant Desalination Project P.O. Box 22401, Doha, Qatar ● Electrician Duties & Responsibilities: 1. CAD Welder 2. Cable Pulling 3. Installer of all types of boxes. 4. Fabricates hub for stub out pvc 5. Installer of PVC for the designated units 6. Chipping & relocate boxes (if necessary) 7. Installer of all types of lighting fixtures 8. Installer of all types of outlet/power outlet 9. Panel Board terminations 10. Troubleshooter of all types of electrical machines 11. MICC cable installer and troubleshooter 12Troubleshooting of electro mechanical faults like Press machines, Bending machines, Magnetic Contractors, Welding machines and electric drills/power tools
  • 6.
    6 June 1995 toNov. 2000 HONDA PHILIPPINES, INC. Km. 17, South Superhighway East Service Road, Parañaque City ● Maintenance Electrician-Manufacturing Plant Duties & Responsibilities: 1. Assigned in the maintenance of all electrical works and communication facilities 2. Preventive maintenance 3. Troubleshooting and repairs of spot welding machine and controls 4. Troubleshooting and repairs of conveyors and controls 5. Troubleshoot and repairs of telephone lines until T.T.C. 6. Troubleshoot and repairs of CNC machines 7. Troubleshoot and repairs of press machines 8. Troubleshoot and repairs of fire alarms/smoke detector/chronology equipment November 1992 to AL-TEBYAN CO. LTD. June 17, 1994 Al-Saiam Compound P.O. Box 4922 Dammam 31412, K. S. A. Duties & Responsibilities: 1. Preventive maintenance 2. Troubleshoot and repairs of panel board breakers 3. Troubleshoot and repairs of flood lights/spotlights 4. Troubleshoot and repairs of sludge motor and controls 5. Troubleshoot and repairs of bowling machine
  • 7.
    7 Training Programs Title Dateof Attendance Conducted Training of Personnel for Installation 09-05-03/03-31-04 Balfour Beatty Rail and Rectification of Overhead Contact System (OCS ) of MRT 2 Manila 16th Voluntary Arbitration Advocacy Training11-16~19-’99 Department of Labor and Employment (DOLE) Seminar on Managing Safety and Health 09-01-98 Honda Philippines, Inc. Seminar on Basic Office Procedures and 08-20-98 “ Work Ethics 5S Introduction and Action Planning 07-20~24-98 “ J. Course 04-20~26-98 “ Basic First Aid Training 03-31 to 04-28-98 “ Industrial Fire Brigade Training 03-24~30-98 “ Leading Small Group Seminar 03-13-97 “ Basic Shopfloor Seminar 12-01~09-97 “ Desirable Work Values 10-15-97 “ Basic Motorcycle Course 09-01~10-97 “ PABX Switchboard Operator 10-05~16-92 Radio Veritas Asia Practical Training Buildings and Grounds 11-13-90/04-16-91 MERALCO Division (OJT 3) Trainee Technician OJT 2 04-17-90 to 05-31-90 Naga Telephone Co. I hereby certify that the above information are true and correct to the best of my knowledge and belief. GLAD ROBERT C. TORAL Applicant’s Signature