SlideShare a Scribd company logo
1 of 7
GLAD ROBERT C. TORAL
NBK Building Flat5, Rasheed Bin Malik Street. Al
Mansoura Doha, Qatar
Tel. No. (00974)74490043
Cel. No. 0097474490043
e-mail: gladtoral@yahoo.com
PERSONAL INFORMATION
Age : 44
Date of Birth : November 10, 1970
Civil Status : Married
Nationality : Filipino
Religion : Catholic
EDUCATIONAL BACKGROUND
College-Vocational Bicol College of Arts and Trade Naga City
Diploma of Technology
Major in Electrical Technology (1988-1991)
WORK EXPERIENCE
SEPT.09,2014 UP TO THE PRESENT
ELSEWEDY CABLES WLL
P003 LUSAIL EXPRESSWAY PROJECT
THUMAMA SUPER TO WAKRA SUBSTATION PROJECT
ELECTRICAL SITE SUPERVISOR
1. Ensuring that the installations comply with the documents and that quality requirements and deadlines are
met.
2. Ensuring that installation procedures are followed.
3. Ensuring that my team is efficient.
4. Ensuring the safety rules are followed.
JAN.08,2013 – APR.08,2014
ALSTOM TRANSPORT SA, DUBAI
AL SUFOUH TRAM PROJECT
ELECTRICAL SITE SUPERVISOR
1. Ensuring that the installations comply with the documents and that quality requirements and
deadlines are met.
2. Managing general weekly and daily schedules.
2
3. Managing SST construction team and /or SST Subcontractor on site supervising works.
4. Ensuring that works meet the requirements of the construction documents.
5. Ensuring that installation procedures are followed.
6. Collecting, checking and signing of related SST installation quality records.
7. Collecting and signing all teams daily reports.
8. Organising the team under my authority.
9. Ensuring that my team is efficient.
10. Managing non-confomities relating to the activity.
11. Ensuring the safety rules are followed.
12. Collecting and signing daily reports relating to the activity and forwarding them to the Power
supply Construction Manager.
13. reporting to the power supply Construction Manager on the jobs with which is concerned.
NOV.20,2011 TO NOV.20,2012 SANKYU MANAR SAUDI ARABIA
ELECTRICAL SUPERVISOR
1. Coordinates with Sub-contractor ( Civil, Mechanical and Electrical) through daily activities,
Site Inspection for Actual Site Conditions and for Services drawings.
2. Supervise and Inspect the Installations / Erections of Sub Station equipment such as
Transformers, Switchgears, LV Distribution Boards, DC Panel and Main Motor Panel.
3. Supervise and Manage Power Distribution System / Communication System containment
installations, Cable Pulling and Terminations for the Incomer and Feeder Power.
4. Inspect quality and efficiency of works of sub-contractor to ensure proper compliance with
all approved drawings, technical requirements and safety guidelines.
5. Prepare and monitor construction schedules to achieve target completion date.
6. Assist in the preparation of as-built diagrams and revision of drawings.
7. Ensure safety in all aspect of work.
3
March 7,2008 to March 31, 2011 MITSUBISHI HEAVY INDUSTRIES
ELECTRICAL SITE SUPERVISOR
Duties and Responsibilities:
1. Coordinate with other contractors (Civil, Electrical and Mechanical) through
Daily/ Weekly Site Coordination, Site Inspection for Actual Site Conditions
and Clarifications for combined services drawings.
2. Supervise and inspect the installations/ erection of traction power substation
equipment such as transformers, rectifiers, positive & negative isolators, low
voltage main switch board, UPS and 33kv Gas Insulated switchgears’ (GIS)
for Metro Stations.
3. Supervise and manage Power Distribution System / Communication System
containment installations, cable pulling and terminations for the traction power
substations.
4. Supervise and inspects the installation of Auxiliary System such as CCTV,
Time Distribution System, Door Access / Intrusion Alarm System and Public
address system.
5. Inspect quality and efficiency of works of sub-contractors to ensure proper
compliance with all the approved drawings, technical requirements and safety
guidelines.
6. Prepare and monitor construction schedules to achieve target completion
date.
7. Assist in the preparation of as-built diagrams and revision of drawings to
Suit actual site conditions.
8. Handled several stations for Red line and Green line underground Stations.
9. Ensure safety in all aspect of work.
10. Trained as Sub-station Operator for the Dubai Metro.
February 14, 2006 to MERCURY ENGINEERING QATAR
February 13, 2007 * Electrician A
Duties and Responsibilities:
1. Reports to Electrical Supervisor;
2. Assists and performs the necessary tasks assigned by the electrical
supervisor;
3. Performs cable pulling, cable dressing and loop checking;
4. Cable gladding and termination.
4
December 1, 2004 to Light Rail Transit Authority
February 10, 2006 Line 2 System (Government Service)
• Engineering Assistant A
Duties and Responsibilities:
1. Reports to the Electrical Foreman;
2. Assists and performs the necessary tasks assigned by the Electrical Foreman.
3. Performs preventive maintenance and maintenance of Overhead Catenaries’
System (OCS) and distribution network through daily inspection of the OCS at
the machine, connecting line and depot;
4. Regularly inspects and measures the contact wire and performs repair if
necessary
5. Performs hi-pot testing of OCS reinforcing cables;
6. Performs periodic inspection of section insulator;
7. Performs periodic inspection of lightning arrester
8. Performs grounding resistance test or lightning arrester;
9. Responds immediately to emergency and corrective repair works of the
system;
10Secures evidences and useful data in case there are incidents involving OCS
Failures
11. Assists in the preparation of maintenance reports;
12. Performs other related functions that maybe assigned from time to time.
June 2004 BETA ELECTRIC CORPORATION
to Sept. 2004 Grand Shang Tower, Makati City
● Jr. Electrician
Duties & Responsibilities:
1. Installer of all types of boxes.
2. Fabricates hub for stub out pvc
3. Installer of PVC for the designated units
4. Chipping & relocate boxes (if necessary)
5
September 5, 2003 BETA ELECTRIC CORPORATION
to April 2004 MRT Line 2, Package 4, Project Phase 2
● Leadman / Electrician (O.C.S.)
Duties & Responsibilities:
1. CAD Welder
2. Checked floodlights
3. Troubleshoot floodlights
4. Installed floodlights
5. Installed lighting arrester
6. Driving of ground rod & ground testing
7. Installed cantilevers
8. Clustering
9. String of messenger & contact wires
July 2002 to May 2003 Kettaneh Construction W.L.L.
RAS LAFFAN – Qatar Power Plant
Desalination Project
P.O. Box 22401, Doha, Qatar
● Electrician
Duties & Responsibilities:
1. CAD Welder
2. Cable Pulling
3. Installer of all types of boxes.
4. Fabricates hub for stub out pvc
5. Installer of PVC for the designated units
6. Chipping & relocate boxes (if necessary)
7. Installer of all types of lighting fixtures
8. Installer of all types of outlet/power outlet
9. Panel Board terminations
10. Troubleshooter of all types of electrical machines
11. MICC cable installer and troubleshooter
12Troubleshooting of electro mechanical faults like Press machines, Bending
machines, Magnetic Contractors, Welding machines and electric drills/power
tools
6
June 1995 to Nov. 2000 HONDA PHILIPPINES, INC.
Km. 17, South Superhighway
East Service Road, Parañaque City
● Maintenance Electrician-Manufacturing Plant
Duties & Responsibilities:
1. Assigned in the maintenance of all electrical works and communication
facilities
2. Preventive maintenance
3. Troubleshooting and repairs of spot welding machine and controls
4. Troubleshooting and repairs of conveyors and controls
5. Troubleshoot and repairs of telephone lines until T.T.C.
6. Troubleshoot and repairs of CNC machines
7. Troubleshoot and repairs of press machines
8. Troubleshoot and repairs of fire alarms/smoke detector/chronology equipment
November 1992 to AL-TEBYAN CO. LTD.
June 17, 1994 Al-Saiam Compound
P.O. Box 4922 Dammam 31412, K. S. A.
Duties & Responsibilities:
1. Preventive maintenance
2. Troubleshoot and repairs of panel board breakers
3. Troubleshoot and repairs of flood lights/spotlights
4. Troubleshoot and repairs of sludge motor and controls
5. Troubleshoot and repairs of bowling machine
7
Training Programs
Title Date of Attendance Conducted
Training of Personnel for Installation 09-05-03/03-31-04 Balfour Beatty Rail
and Rectification of Overhead Contact
System (OCS ) of MRT 2 Manila
16th
Voluntary Arbitration Advocacy Training11-16~19-’99 Department of Labor
and Employment
(DOLE)
Seminar on Managing Safety and Health 09-01-98 Honda Philippines,
Inc.
Seminar on Basic Office Procedures and 08-20-98 “
Work Ethics
5S Introduction and Action Planning 07-20~24-98 “
J. Course 04-20~26-98 “
Basic First Aid Training 03-31 to 04-28-98 “
Industrial Fire Brigade Training 03-24~30-98 “
Leading Small Group Seminar 03-13-97 “
Basic Shopfloor Seminar 12-01~09-97 “
Desirable Work Values 10-15-97 “
Basic Motorcycle Course 09-01~10-97 “
PABX Switchboard Operator 10-05~16-92 Radio Veritas Asia
Practical Training Buildings and Grounds 11-13-90/04-16-91 MERALCO
Division (OJT 3)
Trainee Technician OJT 2 04-17-90 to 05-31-90 Naga Telephone Co.
I hereby certify that the above information are true and correct to the best of my
knowledge and belief.
GLAD ROBERT C. TORAL
Applicant’s Signature

More Related Content

What's hot (19)

CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.doc
 
- CV ADNAN
- CV ADNAN- CV ADNAN
- CV ADNAN
 
MY RESUME
MY RESUMEMY RESUME
MY RESUME
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
bernie final cv update
bernie final cv updatebernie final cv update
bernie final cv update
 
CV karim convert[1] (2)
CV karim convert[1] (2)CV karim convert[1] (2)
CV karim convert[1] (2)
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
 
Eng Samer Ali CV
Eng Samer Ali CVEng Samer Ali CV
Eng Samer Ali CV
 
Ir. Unggang CV latest
Ir. Unggang CV latestIr. Unggang CV latest
Ir. Unggang CV latest
 
CV - Karim Kamarudin - Oct 15
CV - Karim Kamarudin - Oct 15CV - Karim Kamarudin - Oct 15
CV - Karim Kamarudin - Oct 15
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and construction
 
CV_SIVAM OCT.doc 1
CV_SIVAM OCT.doc 1CV_SIVAM OCT.doc 1
CV_SIVAM OCT.doc 1
 
Nazar Abbas CV
Nazar Abbas CVNazar Abbas CV
Nazar Abbas CV
 
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copy
 
MEP engineer CV
MEP engineer CV MEP engineer CV
MEP engineer CV
 
Ravishankar-CV
Ravishankar-CVRavishankar-CV
Ravishankar-CV
 
9 years Exp Electrical engineer
9 years Exp Electrical engineer9 years Exp Electrical engineer
9 years Exp Electrical engineer
 

Viewers also liked

Особенности построения семантического ядра при работе с крупными сайтами
Особенности построения семантического ядра при работе с крупными сайтамиОсобенности построения семантического ядра при работе с крупными сайтами
Особенности построения семантического ядра при работе с крупными сайтамиIBSchool Интернет-Бизнес школа
 
Nisha D'souza Resume 2015
Nisha D'souza Resume 2015Nisha D'souza Resume 2015
Nisha D'souza Resume 2015Nisha D'souza
 
Press 1 is Gone - Final
Press 1 is Gone - FinalPress 1 is Gone - Final
Press 1 is Gone - FinalAlex Noble
 
Ia perspective-on-supply-chain-risk
Ia perspective-on-supply-chain-riskIa perspective-on-supply-chain-risk
Ia perspective-on-supply-chain-riskM Zaki Rahmani
 
Content Recommendation with SharePoint Search
Content Recommendation with SharePoint SearchContent Recommendation with SharePoint Search
Content Recommendation with SharePoint SearchAndré Vala
 
Web advertising bureau_セミボラ報告会(東京)_20130730
Web advertising bureau_セミボラ報告会(東京)_20130730Web advertising bureau_セミボラ報告会(東京)_20130730
Web advertising bureau_セミボラ報告会(東京)_20130730Hiroshi Hayashi
 
Влияние эффективности платежного решения на продуктивность онлайн-бизнеса.
  Влияние эффективности платежного решения на продуктивность онлайн-бизнеса.  Влияние эффективности платежного решения на продуктивность онлайн-бизнеса.
Влияние эффективности платежного решения на продуктивность онлайн-бизнеса.IBSchool Интернет-Бизнес школа
 
Microsoft in 2016 Client briefing
Microsoft in 2016 Client briefingMicrosoft in 2016 Client briefing
Microsoft in 2016 Client briefingAdepteq
 
Building Solutions with Office Graph
Building Solutions with Office GraphBuilding Solutions with Office Graph
Building Solutions with Office GraphAndré Vala
 

Viewers also liked (13)

Особенности построения семантического ядра при работе с крупными сайтами
Особенности построения семантического ядра при работе с крупными сайтамиОсобенности построения семантического ядра при работе с крупными сайтами
Особенности построения семантического ядра при работе с крупными сайтами
 
My publication
My publicationMy publication
My publication
 
Nisha D'souza Resume 2015
Nisha D'souza Resume 2015Nisha D'souza Resume 2015
Nisha D'souza Resume 2015
 
Press 1 is Gone - Final
Press 1 is Gone - FinalPress 1 is Gone - Final
Press 1 is Gone - Final
 
Evaluation 6 f
Evaluation 6 fEvaluation 6 f
Evaluation 6 f
 
Ia perspective-on-supply-chain-risk
Ia perspective-on-supply-chain-riskIa perspective-on-supply-chain-risk
Ia perspective-on-supply-chain-risk
 
Soal ulangan sd
Soal ulangan sdSoal ulangan sd
Soal ulangan sd
 
Content Recommendation with SharePoint Search
Content Recommendation with SharePoint SearchContent Recommendation with SharePoint Search
Content Recommendation with SharePoint Search
 
Web advertising bureau_セミボラ報告会(東京)_20130730
Web advertising bureau_セミボラ報告会(東京)_20130730Web advertising bureau_セミボラ報告会(東京)_20130730
Web advertising bureau_セミボラ報告会(東京)_20130730
 
Влияние эффективности платежного решения на продуктивность онлайн-бизнеса.
  Влияние эффективности платежного решения на продуктивность онлайн-бизнеса.  Влияние эффективности платежного решения на продуктивность онлайн-бизнеса.
Влияние эффективности платежного решения на продуктивность онлайн-бизнеса.
 
Microsoft in 2016 Client briefing
Microsoft in 2016 Client briefingMicrosoft in 2016 Client briefing
Microsoft in 2016 Client briefing
 
Accessing our service
Accessing our serviceAccessing our service
Accessing our service
 
Building Solutions with Office Graph
Building Solutions with Office GraphBuilding Solutions with Office Graph
Building Solutions with Office Graph
 

Similar to Glad CV

ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy
 
consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11Ali Elamin
 
Richard Manalo-Electrical Engineer
Richard Manalo-Electrical EngineerRichard Manalo-Electrical Engineer
Richard Manalo-Electrical EngineerRichard Manalo
 
Resume sg jeffrey perea feb2017
Resume sg jeffrey perea feb2017Resume sg jeffrey perea feb2017
Resume sg jeffrey perea feb2017Jeffrey Perea
 
REVILLA RESUME_final recent dated sept 7,2013
REVILLA RESUME_final recent dated sept 7,2013REVILLA RESUME_final recent dated sept 7,2013
REVILLA RESUME_final recent dated sept 7,2013Reynaldo Revilla
 
Engr.SaherCV (1)
Engr.SaherCV (1)Engr.SaherCV (1)
Engr.SaherCV (1)Saher Jehad
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 

Similar to Glad CV (20)

RATHEESH - CV - 19-08-2015
RATHEESH  - CV - 19-08-2015RATHEESH  - CV - 19-08-2015
RATHEESH - CV - 19-08-2015
 
Haider Ali_CV
Haider Ali_CVHaider Ali_CV
Haider Ali_CV
 
Jun-Jun ( my resume )
Jun-Jun ( my resume )Jun-Jun ( my resume )
Jun-Jun ( my resume )
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
rachand
rachandrachand
rachand
 
nestor
nestornestor
nestor
 
Zackary Ajuoga CV-1
Zackary Ajuoga CV-1Zackary Ajuoga CV-1
Zackary Ajuoga CV-1
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
 
consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11
 
ameen cv new
ameen cv newameen cv new
ameen cv new
 
Richard Manalo-Electrical Engineer
Richard Manalo-Electrical EngineerRichard Manalo-Electrical Engineer
Richard Manalo-Electrical Engineer
 
Resume sg jeffrey perea feb2017
Resume sg jeffrey perea feb2017Resume sg jeffrey perea feb2017
Resume sg jeffrey perea feb2017
 
REVILLA RESUME_final recent dated sept 7,2013
REVILLA RESUME_final recent dated sept 7,2013REVILLA RESUME_final recent dated sept 7,2013
REVILLA RESUME_final recent dated sept 7,2013
 
Engr.SaherCV (1)
Engr.SaherCV (1)Engr.SaherCV (1)
Engr.SaherCV (1)
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 

Glad CV

  • 1. GLAD ROBERT C. TORAL NBK Building Flat5, Rasheed Bin Malik Street. Al Mansoura Doha, Qatar Tel. No. (00974)74490043 Cel. No. 0097474490043 e-mail: gladtoral@yahoo.com PERSONAL INFORMATION Age : 44 Date of Birth : November 10, 1970 Civil Status : Married Nationality : Filipino Religion : Catholic EDUCATIONAL BACKGROUND College-Vocational Bicol College of Arts and Trade Naga City Diploma of Technology Major in Electrical Technology (1988-1991) WORK EXPERIENCE SEPT.09,2014 UP TO THE PRESENT ELSEWEDY CABLES WLL P003 LUSAIL EXPRESSWAY PROJECT THUMAMA SUPER TO WAKRA SUBSTATION PROJECT ELECTRICAL SITE SUPERVISOR 1. Ensuring that the installations comply with the documents and that quality requirements and deadlines are met. 2. Ensuring that installation procedures are followed. 3. Ensuring that my team is efficient. 4. Ensuring the safety rules are followed. JAN.08,2013 – APR.08,2014 ALSTOM TRANSPORT SA, DUBAI AL SUFOUH TRAM PROJECT ELECTRICAL SITE SUPERVISOR 1. Ensuring that the installations comply with the documents and that quality requirements and deadlines are met. 2. Managing general weekly and daily schedules.
  • 2. 2 3. Managing SST construction team and /or SST Subcontractor on site supervising works. 4. Ensuring that works meet the requirements of the construction documents. 5. Ensuring that installation procedures are followed. 6. Collecting, checking and signing of related SST installation quality records. 7. Collecting and signing all teams daily reports. 8. Organising the team under my authority. 9. Ensuring that my team is efficient. 10. Managing non-confomities relating to the activity. 11. Ensuring the safety rules are followed. 12. Collecting and signing daily reports relating to the activity and forwarding them to the Power supply Construction Manager. 13. reporting to the power supply Construction Manager on the jobs with which is concerned. NOV.20,2011 TO NOV.20,2012 SANKYU MANAR SAUDI ARABIA ELECTRICAL SUPERVISOR 1. Coordinates with Sub-contractor ( Civil, Mechanical and Electrical) through daily activities, Site Inspection for Actual Site Conditions and for Services drawings. 2. Supervise and Inspect the Installations / Erections of Sub Station equipment such as Transformers, Switchgears, LV Distribution Boards, DC Panel and Main Motor Panel. 3. Supervise and Manage Power Distribution System / Communication System containment installations, Cable Pulling and Terminations for the Incomer and Feeder Power. 4. Inspect quality and efficiency of works of sub-contractor to ensure proper compliance with all approved drawings, technical requirements and safety guidelines. 5. Prepare and monitor construction schedules to achieve target completion date. 6. Assist in the preparation of as-built diagrams and revision of drawings. 7. Ensure safety in all aspect of work.
  • 3. 3 March 7,2008 to March 31, 2011 MITSUBISHI HEAVY INDUSTRIES ELECTRICAL SITE SUPERVISOR Duties and Responsibilities: 1. Coordinate with other contractors (Civil, Electrical and Mechanical) through Daily/ Weekly Site Coordination, Site Inspection for Actual Site Conditions and Clarifications for combined services drawings. 2. Supervise and inspect the installations/ erection of traction power substation equipment such as transformers, rectifiers, positive & negative isolators, low voltage main switch board, UPS and 33kv Gas Insulated switchgears’ (GIS) for Metro Stations. 3. Supervise and manage Power Distribution System / Communication System containment installations, cable pulling and terminations for the traction power substations. 4. Supervise and inspects the installation of Auxiliary System such as CCTV, Time Distribution System, Door Access / Intrusion Alarm System and Public address system. 5. Inspect quality and efficiency of works of sub-contractors to ensure proper compliance with all the approved drawings, technical requirements and safety guidelines. 6. Prepare and monitor construction schedules to achieve target completion date. 7. Assist in the preparation of as-built diagrams and revision of drawings to Suit actual site conditions. 8. Handled several stations for Red line and Green line underground Stations. 9. Ensure safety in all aspect of work. 10. Trained as Sub-station Operator for the Dubai Metro. February 14, 2006 to MERCURY ENGINEERING QATAR February 13, 2007 * Electrician A Duties and Responsibilities: 1. Reports to Electrical Supervisor; 2. Assists and performs the necessary tasks assigned by the electrical supervisor; 3. Performs cable pulling, cable dressing and loop checking; 4. Cable gladding and termination.
  • 4. 4 December 1, 2004 to Light Rail Transit Authority February 10, 2006 Line 2 System (Government Service) • Engineering Assistant A Duties and Responsibilities: 1. Reports to the Electrical Foreman; 2. Assists and performs the necessary tasks assigned by the Electrical Foreman. 3. Performs preventive maintenance and maintenance of Overhead Catenaries’ System (OCS) and distribution network through daily inspection of the OCS at the machine, connecting line and depot; 4. Regularly inspects and measures the contact wire and performs repair if necessary 5. Performs hi-pot testing of OCS reinforcing cables; 6. Performs periodic inspection of section insulator; 7. Performs periodic inspection of lightning arrester 8. Performs grounding resistance test or lightning arrester; 9. Responds immediately to emergency and corrective repair works of the system; 10Secures evidences and useful data in case there are incidents involving OCS Failures 11. Assists in the preparation of maintenance reports; 12. Performs other related functions that maybe assigned from time to time. June 2004 BETA ELECTRIC CORPORATION to Sept. 2004 Grand Shang Tower, Makati City ● Jr. Electrician Duties & Responsibilities: 1. Installer of all types of boxes. 2. Fabricates hub for stub out pvc 3. Installer of PVC for the designated units 4. Chipping & relocate boxes (if necessary)
  • 5. 5 September 5, 2003 BETA ELECTRIC CORPORATION to April 2004 MRT Line 2, Package 4, Project Phase 2 ● Leadman / Electrician (O.C.S.) Duties & Responsibilities: 1. CAD Welder 2. Checked floodlights 3. Troubleshoot floodlights 4. Installed floodlights 5. Installed lighting arrester 6. Driving of ground rod & ground testing 7. Installed cantilevers 8. Clustering 9. String of messenger & contact wires July 2002 to May 2003 Kettaneh Construction W.L.L. RAS LAFFAN – Qatar Power Plant Desalination Project P.O. Box 22401, Doha, Qatar ● Electrician Duties & Responsibilities: 1. CAD Welder 2. Cable Pulling 3. Installer of all types of boxes. 4. Fabricates hub for stub out pvc 5. Installer of PVC for the designated units 6. Chipping & relocate boxes (if necessary) 7. Installer of all types of lighting fixtures 8. Installer of all types of outlet/power outlet 9. Panel Board terminations 10. Troubleshooter of all types of electrical machines 11. MICC cable installer and troubleshooter 12Troubleshooting of electro mechanical faults like Press machines, Bending machines, Magnetic Contractors, Welding machines and electric drills/power tools
  • 6. 6 June 1995 to Nov. 2000 HONDA PHILIPPINES, INC. Km. 17, South Superhighway East Service Road, Parañaque City ● Maintenance Electrician-Manufacturing Plant Duties & Responsibilities: 1. Assigned in the maintenance of all electrical works and communication facilities 2. Preventive maintenance 3. Troubleshooting and repairs of spot welding machine and controls 4. Troubleshooting and repairs of conveyors and controls 5. Troubleshoot and repairs of telephone lines until T.T.C. 6. Troubleshoot and repairs of CNC machines 7. Troubleshoot and repairs of press machines 8. Troubleshoot and repairs of fire alarms/smoke detector/chronology equipment November 1992 to AL-TEBYAN CO. LTD. June 17, 1994 Al-Saiam Compound P.O. Box 4922 Dammam 31412, K. S. A. Duties & Responsibilities: 1. Preventive maintenance 2. Troubleshoot and repairs of panel board breakers 3. Troubleshoot and repairs of flood lights/spotlights 4. Troubleshoot and repairs of sludge motor and controls 5. Troubleshoot and repairs of bowling machine
  • 7. 7 Training Programs Title Date of Attendance Conducted Training of Personnel for Installation 09-05-03/03-31-04 Balfour Beatty Rail and Rectification of Overhead Contact System (OCS ) of MRT 2 Manila 16th Voluntary Arbitration Advocacy Training11-16~19-’99 Department of Labor and Employment (DOLE) Seminar on Managing Safety and Health 09-01-98 Honda Philippines, Inc. Seminar on Basic Office Procedures and 08-20-98 “ Work Ethics 5S Introduction and Action Planning 07-20~24-98 “ J. Course 04-20~26-98 “ Basic First Aid Training 03-31 to 04-28-98 “ Industrial Fire Brigade Training 03-24~30-98 “ Leading Small Group Seminar 03-13-97 “ Basic Shopfloor Seminar 12-01~09-97 “ Desirable Work Values 10-15-97 “ Basic Motorcycle Course 09-01~10-97 “ PABX Switchboard Operator 10-05~16-92 Radio Veritas Asia Practical Training Buildings and Grounds 11-13-90/04-16-91 MERALCO Division (OJT 3) Trainee Technician OJT 2 04-17-90 to 05-31-90 Naga Telephone Co. I hereby certify that the above information are true and correct to the best of my knowledge and belief. GLAD ROBERT C. TORAL Applicant’s Signature