1. Mario Rey B. Guieb
55-K Ledesma Street, Ozamiz City /
259-E Galvez Bldg, Libertad, Pasay City
Metro Manila, Philippines
Mobile No. Saudi Arabia : +966596913506
Mobile No. Philippines : +639198041385 (Roaming)
Email : rguieb_68@yahoo.com/marioreyguieb@yahoo.com
OBJECTIVES : To effectively and economically manage construction projects through
inspection, monitoring and direct supervision.
CAREER SUMMARY :
With 15 years experienced in abroad in construction of plant and building in inspection/testing and supervising the
electrical, instrumentation and telecommunication installation such as power system, lighting system, fire alarm
system, lan system (voice and data), building automation management system, intercom system, camera system,
access control system, public address system, cathodic protection system and tank leak detection system.Have a
knowledged in designing and calculation of power/lighting load schedule, estimate bill of quantities of materials
and material take-off based on approved design drawing.
ACADEMIC QUALIFICATION :
• Bachelor of Science in Electrical Engineering (1985-1990)
Misamis University, Ozamiz City, Philippines.
• Board of Electrical Engineer Examination Licensure – Examination no. 41374, Philippine Regulation
Commission ( October 22 & 23, 1990 ), Manila, Philippines.
TECHNICAL/TRAINING QUALIFICATIONS :
• Certificate in Mv/Hv Cable Splicing Development Program (2 weeks seminar / trainee) Yanbu, KSA.
• Certificate in Plant Electrical Engineering Trainee (4 months actual trainee-installation /operation) Philippine
SAUDI ARAMCO QUALIFICATIONS :
• Saudi Aramco Protocol no. 70019431(SAP #)
• Saudi Aramco Badge no. 7526934-1
COMPUTER LITERATE :
• Microsoft excel, Microsoft word & Microsoft outlook
WORK EXPERIENCE :
Gulf Mas Engineering & Contracting Co.
Post Box No. 1000 Ras Tanura 31941, Saudi Arabia (February 26, 2013 to Present)
Supplied to:
SK Engineering and Construction (July 30, 2014 to March 31, 2015)
QC Telecommunication Inspector
Wasit Gas Plant Project-Package 4, NGL Fractionation Unit
Saudi Aramco Gas Plant, Khursaniyah Al Jubail, KSA
Client : Saudi Aramco
Duties and Responsibilities :
Page 1
2. • Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness
the installation of Paging system call station, beacon light and speakers for outdoor location both in hazardous
and non hazardous location.
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness
the installation of Paging system call station, beacon light and speakers for indoor location both in Substation
270, PIB-570, Emergency generator bldg 770, Operator shelter 333, MSB-469 and OME-369.
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness
the installation of voice and data outlet/box, conduiting, cabling and termination to telecommunication room
rack/lan panel for building Substation 270, PIB-570, Emergency generator bldg 770, Operator shelter 333,
MSB-469 and OME-369.
• Prepare and raise Non conformance report, Corrective action report, Preventive action report & Proactive
notification report to construction team.
• Responsible for discussing with the construction about the standard installation of paging system conduiting,
cable tray and cabling during actual preliminary inspection.
• Responsible for the submittal of red line drawings to SK engineering team and SK interface group during
internal inspection conducted.
• Confirm & witness the rectification of punchlist items in Log book entry(LBE) and Exception item list(EIL)
issued by Saudi Aramco Project Inspection Division prior for closed out.
Gulf Mas Engineering & Contracting Co.
Post Box No. 1000 Ras Tanura 31941, Saudi Arabia (February 26, 2013 to Present)
Supplied to:
Sumitomo Corporation (April 01, 2013 to April 30, 2014)
QC Electrical Inspector
Tanajib Communication Bldg/Nariyah Communication Bldg Expansion Project
Saudi Aramco Gas Plant, Tanajib, KSA
Client : Saudi Aramco
Duties and Responsibilities :
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness
the installation of Cable tray, Emt/Rgs conduit, Lighting system, Receptacle, Main
Distribution/Power/Lighting Panels, Enclosed Ckt breakers, 400Amp, 4W, 3Ø, 480/277 volts, 60hz
Automatic/Manual transfer switch, 300kva, 4W, 3Ø, 480/277 volts, 60hz Generator,12.5kva, 4W, 3Ø, 480v-
208/120v, 60hz Dry type transformer, 300kva, 13.8kv-480/277vac, 3Ø, 4W, 60hz Pad Mounted Transformer,
cable pulling/cable continuity/insulation resistance and termination of low voltage cable.
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness
the Grounding and Bonding, Continuity/Resistance of earthing system.
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and Saudi
Aramco Pre-commissioning form and witness the illumination test of lighting pole fixture/building perimeter
fixture/indoor fixture and continuity resistance/polarity test of receptacle
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and Saudi
Aramco Pre-commissioning form and witness the testing of insulation resistance,contact resistance and
thermal trip unit setting/testing of molded circuit breaker in the Distribution/Power/Lighting Panel by the
Vendor(Wescosa).
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and Saudi
Aramco Pre-commissioning form and witness the Pre-energization functional testing of Automatic/Manual
transfer switch by the vendor(Wescosa).
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and Saudi
Aramco Pre-commissioning form and witness the Pre-energization testing and functional test with 700kw
resistive load bank for 4 hrs of the 300kva Diesel Generator by the Vendor(Saudi Diesel Equipment Co.).
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and Saudi
Aramco Pre-commissioning form and witness the Pre-energization testing of the Dry type/Pad mounted
transformer by the Vendor(Wescosa).
Page 2
3. • Responsible for the issuance of Non-conformance report, Corrective action report, Preventive action and
Proactive notification report to the subcontractor ACES Co.
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness
the conduiting, cable pulling, continuity of Addressable fire alarm and instrumentation facility alarm system.
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness
the installation of fire alarm control panel, sensitivity/multi criteria smoke detectors, heat detectors, fire alarm
horn/audible w/strobe light, facility alarm panel, fire alarm module relay panel, exhaust fan auto
changer/control panel, purge fan/exhaust fan/fire smoke motorized damper monitoring panel and oil/water
leak detector panel of fire alarm and instrumentation facility alarm system.
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and Saudi
Aramco Pre-commissioning form and witness the Pre-energization calibration, functional testing of fire alarm
control panel and associated instrumentation facility alarm system.
GS Engineering & Construction Corp. (Construction Div.)
Mussafah, United Arab Emirates (Sept. 27, 2011 to Nov. 04, 2012)
QA/QC Electrical/Instrument Inspector
Inter Refineries Pipelines Project ( IRP-II )
Tebodin Consulting Engineers ( Project Management Consultant )
Client : Takreer
Duties and Responsibilities :
• Prepare the Inspection Test Plan and Check list for the Instrumentation and Control System Works ( Rev.A-
F,0 ), Electrical Works ( Rev.A-F,0 ), Telecommunication - Public address & General Alarm ( Rev.A ),
Telephone & Local Network System ( Rev.A,0 ), CCTV System ( Rev.A,0 ), Access Control System
( Rev.A,0), Cathodic Protection System as per vendor installation & testing procedure ( Rev.A-B,0 ), Fiber
Optic Cable Installation & Testing along the Pipeline ( Rev.A-B,0 ) & Fire Alarm System ( Rev.A-0 ) prior
for review, comment & approval by the PMC ( Tebodin Consulting Engineers ).
• Conduct inspection for the continuity test of cathodic hook-up boss/ wire rope to reinforcement bar and rebar
to rebar in the foundation footing of Substation 1100 at Mussafa terminal and Substation 900 in Madinat
zayed terminal.
• Responsible for witnessing the installation of cathodic titanium anode (MMO Ti Ribbon Anode), Conductor
bar, Cu/Cu/SO4 reference electrode, power feeder cable, Anode lead cable, Er probe, isolator and monitoring
pipe in the tank bottom at mussafah and madinat zayed terminal.
• Responsible for the Inspection the installation of monitoring test box station, Cu/Cu/SO4 reference electrode
and Mp3 probe in the tank ring wall and Substation at Mussafah terminal and Madinat Zayed terminal.
• Responsible for the inspection of the installation of cathodic reference electrode ( Ag/AgCl ), MMO Titanium
Tubular Anode, Polarization coupon, Er probe, Test lead cable, Positive header cable, Bonding cable,
negative header cable, reference electrode lead cable, cable to pipe connection, test station, negative junction
box, bonding junction box, positive junction box and anode terminal box ( including supports & base
foundation ) & cathodic cable termination in the pipeline from Mussafa terminal to Al Ain terminal.
• Conduct inspection for the installation of pvc embedded conduit and square box of the telepnone & data,
lightings and small power in the Substation 1100 in mussafah terminal.
• Conduct visual inspection for the electrical/communication sleeves in the Substation 1100 at mussafah
terminal prior for closing the shuttering in the sidewall and concrete pouring.
• Witness the installation of tank leak detection pipes at the tank bottom in madinat zayed terminal and al
ruwais terminal.
• Conduct inspection for laying and testing of fiber optic cable for SDH & CCTV along the pipeline from
Mussafah to Al-Ain, Tarif to Madinat and Sheihat to Ruwais.
• Witness the calibration of transmitters, gas detectors, control valve and popping test of safety valve.
• Responsible for the over-all material inspection of electrical, instrument, cathodic protection,
telecommunication & fire alarm in mussafah main warehouse.
• Responsible for the witness inspection of all electrical works in the Substation, Lpg, Pumphouse and trench at
Adnoc Lpg bottling & storage plant-Mussafah Terminal.
• Responsible for instrument inspection of control valve, transmitters, gas detectors, junction boxes & trench in
the Adnoc Lpg bottling and storage plant-Mussafah Terminal.
Page 3
4. GS Engineering & Construction Corp. (Construction Div.)
Al Ruwais, United Arab Emirates (Oct. 13, 2010 to Aug. 27, 2011)
QA/QC Instrument/Electrical Inspector
Green Diesel Project ( Expansion )
Worley Parsons ( Project Management Consultant )
Client : Takreer
Duties and Responsibilities :
• Responsible for the Quality Inspection & Monitoring for all Instrumentation works to the designated area
( Unit 804, 805, 806 & 812 ).
• Responsible for checking/witnessing the subcontractor’s Inspection Test Request (ITR) prior for clients
inspection & approval.
• Responsible for witnessing the instruments pre-calibration (Simulation) of pressure transmitter, temperature
transmitter,flow transmitter, level transmitter, pressure indicator, transmitter indicator, flow indicator,
temperature element, control valve, solenoid valve, pressure relief valve & etc. by using hart communicator,
milli amps calibrator (0 – 24 vdc/4 – 20ma), instrument, bath calibrator, nitrogen & air compressor.
• Responsible for the issuance of the Non-Conformance Report & Site Observation Memo to the Subcontractor.
• Conduct inspection for the electrical lighting pole-cable/cable tray, electrical heater-cable tray, cable, ckt
breaker/contactor.
• Witness the solo run test of the Mv compressor motor and low voltage motor.
• Witness the illumination test of lightings in the process and perimeter area.
• Conduct inspection for the installation of fire alarm system-manual call point, horn, strobe light, smoke
detector, heat detector and linear heat detector wire.
• Conduct inspection for the installation of public address-speakers, telephone w/ acoustic booth, rotating lamp
and hooter.
• Witness the functional test of the public address system in the process area thru the main console in the new
control building.
• Witness the functional test of the fire alarm system ( mcp, beacon & horn ), linear heat detector wire and
deluge skid in the process area thru the main console in the new control bldg.
• Conduct inspection and testing for the cathodic protection for anode and electrode in unit 804, 805, 806 and
unit 812 thru the cathodic test station box and cathodic rectifier.
• Conduct inspection for the installation & termination of cathodic protection system of rectifier panel, anode
terminal box, test station box and bond junction box.
• Witness the functional test of the cctv camera in the control bldg, substations and process area thru the cctv
monitor in the control room.
Samsung Eng’g & Construction,Saudi Arabia Ltd
Saudi Arabia (Nov. 12, 2009 to May 10, 2010)
QC Electrical Inspector
Diesel Hydrotreator Plant Project ( Expansion )
Saudi Aramco Oil & Gas Refinery Plant Facilities, Ras Tanura, KSA
Client : Saudi Aramco
Duties and Responsibilities :
• Responsible for the Quality Inspection & Monitoring for conduiting, cable tray, cable pulling, installation of
electrical panels, automatic transfer switch ,transformer, switchgear and motor solo run test activities to the
designated area of responsibilities.
• Witness the illumination test of lighting system, trip unit testing/setting of molded circuit breaker, testing and
functional test of dry type/oil filled transformer, testing at no load run test of diesel generator and testing and
functional test of low voltage switchgear at substation.
• Witness the installation and hi-pot test of the medium voltage cable 15 kv from the existing oil filled
transformer to the low voltage switchgear at the substation.
• Responsible of the material inspection for the electrical, paging & intercom, cctv & door contact, telephone &
data and fire alarm system at samsung main warehouse.
Page 4
5. • Responsible for checking subcontractor’s Request for Inspection (RFI) prior for clients inspection & approval.
• Responsible for the issuance of the Non-Conformance Report to the Subcontractor.
Sendan Al-Emarat Contracting Est.
United Arab Emirates (March 16, 2009 to Aug 5, 2009)
Electrical Superintendent
Dubai Metro Project (Greenline Project-Phase II)
Client : Government of Dubai-Roads and Transport Authority
Main Contractor : Mitsubishi Heavy Industies, Ltd.
Duties and Responsibilities :
• Responsible for the preparation/submittal to Mitsubishi Heavy Industry (MHI) through to our subcontractor
(Concord) the monthly progress report, weekly work schedule plan, weekly progress report , construction
weekly report, daily activity report and the weekly minutes of meeting.
• Responsible for checking & reviewing our subcontractor (Concord) monthly progress report, weekly work
schedule plan, weekly progress report , construction weekly report and daily activity report.
• Monitor the subcontractor work progress for the 20 Stations/Substations and the 33kv cable installation in the
trackside of the Dubai Light Rail Transit based on the Master Schedule of Electrical Installation
Programme for Dubai LRT Green Line Project-Phase II.
• Direct instruction to the field supervisors regarding the target date for the completion of task based on the
work schedule and work progress development.
Tecnimont Icb Pvt Ltd (E & I Division)
Saudi Arabia (JUNE 29, 2008 to DEC 25, 2008)
QA/QC Electrical Inspector
Petrochemicals Project-High Density Polyethylene and Low Density Polyethylene Plant
Jubail, Saudi Arabia
Client : Tasnee
Project Management : Integrated Management Team(IMT)
Duties and Responsibilities :
• Responsible for the inspection and monitoring of all electrical Mv/Lv motors, lighting panels, switchgear, heat
tracing cables & electric heater of mechanical equipment in the Low Density Polyethylene (LDPE) Area.
• Assist and witness the solo run test for the Mv/Lv Motors in the Low Density
Polyethylene (LDPE) Area.
• Responsible for the preparation of attachment documents for construction rectication of final
checking/walkdown inspection of client’s punchlist item prior for acceptance.
• Responsible for the preparation of the punchlist items conducted by the Integrated Management Team prior
for construction rectification.
GS Engineering & Construction Corp. (Construction Div.)
Oman (April 11, 2007-April 10, 2008)
Field Electrical Supervisor/Electrical Inspector
Sohar Aromatics Project
Benzene and Paraxylene Plant
Sohar, Oman
Client : Aromatics Oman L.L.C.
Duties and Responsibilities :
• Over-all supervision for electrical/communication works ( lightings, receptacle, ac power, telephone, paging
and fire alarm system ) for all the bldgs in aromatics project ( four substations, four control rooms, waste
water treatment/dehydrator/mcc bldg, chemical/hazardous warehouse, gate house 1 & 2, demi & desal bldg,
laboratory and administration bldg).
Page 5
6. • Responsible for checking and confirming the installation of embedded pvc conduit, galvanized conduit and
cable tray prior for inspection by Gs Qa/Qc and client’s electrical engineer.
• Monitor and check subcontractor civil work status in site prior for subcontractor’s installation of electrical and
communication sleeves.
• Coordinate with architectural/civil group for bldg. concreting schedule for slab, beam, sidewall & blockworks
installation prior for electrical/communication cable tray opening & conduit sleeves.
• Prepare material quantity take-off for electrical/communication based on the latest approved drawings prior
for a comparison with subcontractors quantity material take-off.
• Responsible for conducting a meeting thrice a week with the subcontractor of the electrical and
communication regarding the field problems, material status and deliver, manpower and work progress.
• Electrical/Communication representative for a weekly meeting with GS architectural/civil group,
subcontractors architectural/civil, electrical/communi-
cation and hvac/plumbing group concerning with field problems which involve
Architectural/civil/hvac works & electrical/communication material approval.
Hyundai Heavy Industries Co., Ltd (Construction Div.)
Nigeria (Dec 17, 2005-Dec 1, 2006)
QA/QC Electrical/Instrument Inspector
Bonny Terminal Integrated Project-EPIC Contract
Onshore/Offshore Oil and Gas Plant
Bonny Island, Nigeria
Client : Shell Petroleum Development Corporation
Duties and Responsibilities :
• Responsible for the Quality Control inspection and monitoring of all electrical/instrument installation
including substation in accordance to Project Specifications, Standards and Codes of Practices in Nigeria w/c
covered Unit#11,A2/A5(Crude Dehydration & Stabilization Plant),Unit#12,B1/B3
(Emulsion Treatment), Unit#13,A4/A7 (Process Gas Handling),Unit#14,B2/B4 (Produced/Effluent Water
Treatment System), Unit#21, A3/A6 (Crude Export
System), Unit #25,E3(Fuel Gas Plant)/Unit #37,E2(Flare System) at Process Area.
• Responsible for checking and monitoring of all the storaged/preserved electrical equipments, materials and
instruments to assigned area.
• Responsible for the issuing of internal non-conformance report(NCR) & punchlist items to construction and
checking/monitoring electrical/instrument installation punchlist items to assigned area.
• Responsible for answering the non-conformance report (NCR) & corrective action report (CAR) from the
client (Shell petroleum development co.)
Samko International Co. W.L.L. (Electro Mechanical)
Qatar (Oct 29, 2004-Oct 29, 2005)
Site Electrical Engineer
Al-Saad Retail Complex Mall Project
Doha, Qatar
Consultant : GHD Management Engineering Environment
Contractor : Ramco Trading & Contracting (W.L.L.)
Duties and Responsibilities :
• Prepare the mechanical work plan in site based on the project planning schedule for the Electrical system and
Communication system.
• Supervised and monitor the work progress for the installation of embedded pvc/galvanized conduit & wirings
for the Mall base building lightings, power, fire alarm system, cctv, telephone, tv, & public address.
• Supervised and monitor the work progress for the installation of galvanized cable tray,cable pulling and
termination of Lv cables & Control cables in the Retail Complex Mall.
• Responsible for the layout of embedded pvc conduit for the Mall base building lightings, power, fire alarm
system, cctv, telephone, tv, and public address prior for the preparation of shop drawing.
Page 6
7. Al Hussam Technical Services L.L.C. (Electro Mechanical)
United Arab Emirates (Feb 10, 2003-Feb 29, 2004)
Site Electrical Engineer
Dubai Municipality Project, DS 148/1 Main Pumping Station “Q” Phase-1
Drainage Pumping Station DR-20
Consultant : Montgomery Watson Harza
Contractor : Wade Adams Contracting (L.L.C.)
Dubai Municipality Project, DS 148/1 Main Pumping Station “Q” Phase-2
Drainage Pumping Station DR-18 & DR-19
Consultant : Montgomery Watson Harza
Contractor : Al Naboodah Engineering Services
Duties and Responsibilities :
• Responsible for supervising the execution of works and termination of Lv/11Kv Mv cables for the motors,
penstock cable, street light, lightings, power, emergency light, heat/smoke detector, fire alarm & control
cables in the control panel for the drainage pumping station DR-20 of Dubai Municipality Projects.
• Responsible for supervising the execution of works and termination of Mv/Lv cables for the submersible
pumps, penstock cable, fountain lightings, street light, lightings, power, outdoor socket outlet, emergency
light, heat/smoke detector, fire alarm & control cables in the control panel for the drainage pumping stations
DR-18 & DR-19 of Dubai Municipality Projects.
• Responsible for the calculation of load distribution schedule / details of connected load & single line diagram
for the sea water / sewage pumping station in Jebel Ali, Jumeira Island.
Shamael Al-Khaleej Est. (Mech’l/Elect’l/Civil Construction)
KSA (Oct 22, 2000-Dec 18, 2002)
Electrical Engineer
Ministry of Interior Project, New PCC Bldg. (Extension Phase-2)
Security Forces Hospital, Riyadh, KSA
Consultant : Ministry of Interior (Electrical Dept.)
Duties and Responsibilities :
• Supervised installation and termination of Lv cables & Control cables for the building automation and
management system (Bamms), computer and telephone integration system, close circuit television (cctv),
television (tv), intercom and public address and fire alarm system of the New Pcc Building Phase-2 at
Security Forces Hospital.
• Responsible for supervising the installation and termination of Lv cables for the transformer, Lv panel, db
panel, street pole, garden light & power / emergency power for the parking area of Security Forces Hospital.
• Responsible for supervising the execution of works and termination of Lv cables for the db panels, fire alarm
system, lightings, power / emergency power of medical gas plant, pump room and hospital perimeter fence of
the New Pcc Building Phase-2 at Security Forces Hospital.
• Design / estimate bill of materials for panels, lightings, power / emergency power of medical gas plant, pump
room and perimeter fence of the New Pcc Bdg Phase-2 at Security Forces Hospital.
• Design / estimate bill of materials for transformer, switchboard, panel, street pole, garden light and power /
emergency power for the parking area of Security Forces Hospital.
Mohammad Al-Mojil Group (Construction Division)
KSA (April 7, 1999-Mar 28, 2000)
Field Electrical/Instrument Engineer (Engineering Dept.)
Yanbu Petrochemical Polymers Project
Polyethylene & Polypropylene Plant
Yanbu, KSA
Main Contractor : Mitsubishi Heavy Industry (MHI)
Page 7
8. Duties and Responsibilities :
• Supervised installation and termination of Control cables, Lv cables & 33Kv Mv cables for the transformer,
motors, db panels & installation of cable tray, conduiting & grounding, cable at Yanbu Petrochemical Plant.
• Supervised installation, conduiting, wiring and termination for fire alarm system and communication system
in the process area at Yanbu Petrochemical Plant.
• Supervised installation of cable tray, conduiting & termination of cables for the instruments pressure
transmitter, analyzer, flow transmitter, level transmitter and loop check from instruments up to control room
at Yanbu Petrochemical Plant.
• Prepare/raise technical queries to client/contractor regarding field problems and drawing design discrepancy.
• Prepare request for approval of materials (Rfa) to the client/contractor.
Mohammad Al-Mojil Group (Construction Division)
KSA (Aug 5, 1998-April 6, 1999)
Field Electrical/Instrument Engineer (Engineering Dept.)
Qassim Expansion of Product Supply System
Gasoline & Kerosene Bulk Plant
Saudi Aramco Bulk Plant Facilities, Qassim KSA
Main Contractor: Snc Lavalin Int’l.
Duties and Responsibilities :
• Supervised the installation of cable tray,conduiting,cable pulling and termination of Wires, Lv cables &
34.5Kv Mv cables for the transformer/transformer busduct, Cathodic Protection, switchboard panel in the
substation and installation & termination of lighting panel, paging system, power / emergency power,
telephone and fire alarm system in satellite interface building at Saudi Aramco Bulk Plants Facilities,
Qassim.
• Supervised installation of instrument panels, cable tray, conducting, cable pulling and termination of cables
for the instruments pressure transmitter, flow transmitter, level transmitter, level switch (high and low), motor
operated valve and loop check from instruments up to control room at Saudi Aramco Plant Facilities, Qassim.
• Prepare quantity material take-off based on the latest approved plan drawing prior for purchasing and
installation.
• Design / estimate bill of materials for panels, lightings, power and emergency power in satellite interface
building at Saudi Aramco Bulk Plants Facilities, Qassim.
Mohammad Al-Mojil Group (Construction Division)
KSA (July 11, 1996-July 3, 1998)
Field Electrical/Instrument Engineer (Engineering Dept.)
Abqaiq Modernization of Distribution Control System
Oil & Gas Refinery Plant
Saudi Aramco, Abqaiq, KSA
Main Contractor: Parsons Int’l
Duties and Responsibilities :
• Supervised the installation of cable tray, conduiting, cable pulling and termination and wires, Lv cables & Mv
cables for the transformer, mcc panel, switchgear panel in the substation / control rooms and installation &
termination of lighting panel, power and emergency power at the Saudi Aramco Plants Facilities, Abqaiq.
• Supervised installation of cable tray, conduiting, wiring & termination for fire alarm system and paging
system in the process area, control room & substations at Saudi Aramco Plant Facilities, Abqaiq.
• Supervised installation of marshalling panel, cable tray, conduiting, cable pulling, termination of cables and
hook-up installation of tubing for the instruments pressure transmitter, flow transmitter, level transmitter,
analyzer, level switch (high and low),solenoid valve and loop check from instruments up to control room at
Saudi Aramco Plant Facilities, Abqaiq.
• Prepare bulk of quantities of materials based on the projects contract prior for estimation/comparison against
the material quantity take-off of the latest issued approved design plan drawings.
Page 8
9. Philippine Compak Boards
Philippines (Feb 20, 1995-Dec 30, 1995)
Control Room Operator
National Power Corporation
Philippines (June 1, 1993-Mar 31, 1994)
Plant Equipment Operator Power Plant Barge-106
Gyro Steel Sales & Services
Philippines (Oct 16, 1990-Nov 15, 1991)
Mechanical Engineering Services
Apprenticeship Trainee
Personal Details:
Name : Mario Rey B. Guieb
Age : 46 y/o
Date of Birth : June 22, 1968
Civil Status : Single
Religion : Roman Catholic
Address : 55-k Ledesma Street, Ozamiz City
Philippine Telephone : (+63) 2-5566212 / (+63) 2-5509051 / (+63) 88-5645217
Contact number : +639393787502
Profession : Philippine Registered Electrical Engineer ( License No. REE 22629 )
Regular Member : Institute of Integrated Electrical Engineers of the Philippines ( IIEE )
Membership No. 32982
Email address : rguieb_68@yahoo.com / marioreyguieb@yahoo.com
I hereby certify that all stated information are true and correct to the best of my knowledge and ability.
Sincerely,
Mario Rey Guieb
Applicant
Page 9
10. Philippine Compak Boards
Philippines (Feb 20, 1995-Dec 30, 1995)
Control Room Operator
National Power Corporation
Philippines (June 1, 1993-Mar 31, 1994)
Plant Equipment Operator Power Plant Barge-106
Gyro Steel Sales & Services
Philippines (Oct 16, 1990-Nov 15, 1991)
Mechanical Engineering Services
Apprenticeship Trainee
Personal Details:
Name : Mario Rey B. Guieb
Age : 46 y/o
Date of Birth : June 22, 1968
Civil Status : Single
Religion : Roman Catholic
Address : 55-k Ledesma Street, Ozamiz City
Philippine Telephone : (+63) 2-5566212 / (+63) 2-5509051 / (+63) 88-5645217
Contact number : +639393787502
Profession : Philippine Registered Electrical Engineer ( License No. REE 22629 )
Regular Member : Institute of Integrated Electrical Engineers of the Philippines ( IIEE )
Membership No. 32982
Email address : rguieb_68@yahoo.com / marioreyguieb@yahoo.com
I hereby certify that all stated information are true and correct to the best of my knowledge and ability.
Sincerely,
Mario Rey Guieb
Applicant
Page 9